CN206615931U - The hanging apparatus and melting furnace system of melting furnace bell - Google Patents
The hanging apparatus and melting furnace system of melting furnace bell Download PDFInfo
- Publication number
- CN206615931U CN206615931U CN201621370087.2U CN201621370087U CN206615931U CN 206615931 U CN206615931 U CN 206615931U CN 201621370087 U CN201621370087 U CN 201621370087U CN 206615931 U CN206615931 U CN 206615931U
- Authority
- CN
- China
- Prior art keywords
- bell
- melting furnace
- hanging apparatus
- suspension bracket
- suspension rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Vertical, Hearth, Or Arc Furnaces (AREA)
Abstract
The utility model is related to a kind of hanging apparatus and melting furnace system of melting furnace bell, the hanging apparatus of the melting furnace bell, including:Moveable suspension bracket;Hoisting mechanism, the hoisting mechanism is arranged on the suspension bracket, and the hoisting mechanism includes the suspension rod that can be stretched up and down, and the suspension rod can be moved with the suspension bracket, and the free end of the suspension rod is provided with the connector with the dismantled and assembled connection of bell;And for judging whether the connector reaches the locating and detecting device of the first predeterminated position, institute's locating and detecting device is fixedly arranged on the second predeterminated position.The hanging apparatus and melting furnace system of melting furnace bell can quickly, precisely, stably carry bell, reduce production safety hidden danger.
Description
Technical field
The utility model is related to aluminium production technical field, the hanging apparatus of more particularly to a kind of melting furnace bell and fusing
Furnace system.
Background technology
The lifting of current melting furnace bell carries out bell frequently with traditional straddle truck structure type and is turned on and off, in equipment
It can be interfered during operation with the ground installation (such as going out aluminium chute) of top charging melting furnace and bell can not be realized and transported after opening
Go to bell deposit position.In order to complete the unlatching and displacement of bell, it usually needs lift bell using the driving in factory building
The suspension centre at top is realized, but this mode has following shortcoming:
1st, using traveling crane shove charge lid it is difficult to ensure that registration, bell often occurs and collide with, be easily damaged bell and stove
Body, so as to increase production and maintenance cost;
2nd, using traveling crane shove charge lid operationally, easily swing, have very for the personnel in lifting region and equipment
Big potential safety hazard;
3rd, using traveling crane shove charge lid, it is necessary to which someone assists to complete the connection and dismounting between travelling crane hook and bell suspension centre
Work, degree of danger is higher, and loses time;
4th, bell is made of refractory brick and castable mode mostly, and tonnage is very big (for example:85 tons of melting furnace bell weight
About 90 tons), therefore driving in factory building need to meet the Lifting Capacity of this weight, thus cause factory building and driving investment significantly
Degree increase.
The content of the invention
Based on this, it is necessary to provide a kind of hanging apparatus and melting furnace system of melting furnace bell, can quickly, precisely,
Bell is stably carried, production safety hidden danger is reduced.
Its technical scheme is as follows:
A kind of hanging apparatus of melting furnace bell, including:Moveable suspension bracket;Hoisting mechanism, the hoisting mechanism is set
In on the suspension bracket, the hoisting mechanism includes the suspension rod that can be stretched up and down, and the suspension rod can be moved with the suspension bracket, described to hang
The free end of bar is provided with the connector with the dismantled and assembled connection of bell;And for judging whether the connector reaches the first default position
The locating and detecting device put, institute's locating and detecting device is fixedly arranged on the second predeterminated position.
The hanging apparatus of above-mentioned melting furnace bell is in use, travelling bridge, when locating and detecting device detects the company of suspension rod
When fitting reaches the first predeterminated position, suspension rod action, make suspension centre (or bell other default fixations at the top of connector and bell
Position) it is connected, suspension rod shrinks and then liftable bell, bell is separated with fusing furnace body, suspension rod is being driven by suspension bracket
It is moved to above bell storage platform, bell is stably placed at bell storage platform, completes corresponding process by suspension rod stretching
Afterwards, then travelling bridge, make connector and bell be connected (also judged herein using another locating and detecting device, with
Ensure that the suspension centre at the top of connector and bell fixes reliable), suspension rod shrinks, bell is left bell storage platform, travelling bridge,
When the connector that locating and detecting device detects suspension rod reaches the first predeterminated position, now suspension rod acts, makes bell and fusing
Furnace body, which coordinates, to be fixed, and then suspension bracket is continued to move to, and resets suspension rod.The hanging apparatus of the melting furnace bell can quickly, essence
It is accurate, bell is stably moved to bell storage platform, and can quickly, precisely, stably realize that bell and melting furnace are positioned and match somebody with somebody
Close and fix, reduce people's labor intensity, reduce production safety hidden danger.
Technical scheme is illustrated further below:
In one of the embodiments, the hanging apparatus of the melting furnace bell also includes the drive for driving the suspension bracket movement
Motivation structure, the drive mechanism includes rotatable first road wheel and rotatable second road wheel, first road wheel
Install in one end of the suspension bracket, second road wheel is installed in the other end of the lifting.
In one of the embodiments, the hanging apparatus of the melting furnace bell also includes and the described first walking slipping
Coordinate the first guide rail and the second guide rail being slidably matched with second road wheel, first guide rail is fixedly arranged on factory building column
On, second guide rail is fixedly arranged on facility floor;The drive mechanism also includes support frame, and one end of support frame as described above is installed on
Second end of second road wheel, the other end and the suspension bracket is fixed, and makes the suspension bracket parallel with facility floor or approximate flat
OK.
In one of the embodiments, first guide rail is provided with the first outwardly ligand, first walking
Wheel is provided with the first mating groove set to the concave;Second guide rail is provided with the second outwardly ligand, second walking
Wheel is provided with the second mating groove set to the concave.
In one of the embodiments, the hoisting mechanism also includes driving the actuating unit stretched above and below the suspension rod,
The fixing end of the telescopic end of the actuating unit and the suspension rod is fixed.
In one of the embodiments, the hanging apparatus of the melting furnace bell also includes being used to judge the bell with melting
Change furnace body whether the position detecting switch of accurate positioning.
In one of the embodiments, the hanging apparatus of the melting furnace bell also includes being used to control the suspension bracket to move
And controller flexible up and down and the brake for fixing first road wheel or/and second road wheel of the suspension rod
Device, the controller and the brake gear, the position detecting switch, the drive mechanism, the actuating unit and institute
State locating and detecting device communication connection.
In one of the embodiments, the suspension rod at least two, and be arranged at intervals along the length direction of the suspension bracket.
In one of the embodiments, the connector includes the first coupler body and is oppositely arranged to be formed with first coupler body
Second coupler body of hook and slot, the fixing end of first coupler body and the fixing end of second coupler body are fixed, first coupler body
Free end and the free end of second coupler body are arranged at intervals to form breach, and the breach is communicated with the hook and slot.
In one of the embodiments, first coupler body is provided with outwardly first spacing preiection, and described first is spacing
It is raised to be set towards the hook and slot;Second coupler body is provided with outwardly second spacing preiection, the second spacing preiection court
Set to the hook and slot.
The technical program additionally provides a kind of melting furnace system, includes the hanging apparatus of above-mentioned melting furnace bell, in addition to
Melting furnace and bell storage platform, the melting furnace and the bell storage platform are arranged at intervals at below the suspension bracket, described
The top of bell storage platform is provided with thermal insulation layer.
In above-mentioned melting furnace system, melting furnace is arranged at intervals with bell storage platform, and the row that bell is carried is reduced as far as possible
Car distance, effectively shortens lifting and run time;Simultaneously when bell is placed on storage platform, bell (piece number 2) and thermal insulation layer
It is closed, effectively reduce scattering and disappearing for bell refractory lining heat.
Brief description of the drawings
Fig. 1 is the structural representation of the hanging apparatus of melting furnace bell described in the utility model;
The partial enlarged drawing that Fig. 2 is A in Fig. 1;
The partial enlarged drawing that Fig. 3 is B in Fig. 1;
Fig. 4 is the structural representation of connector described in the utility model;
Fig. 5 is the structural representation of melting furnace system described in the utility model;
Fig. 6 is the structural representation of bell storage platform described in the utility model.
Description of reference numerals:
100th, suspension bracket, 200, hoisting mechanism, 210, suspension rod, 220, connector, the 221, first coupler body, the 222, second coupler body,
223rd, hook and slot, 224, breach, the 225, first spacing preiection, the 226, second spacing preiection, 230, actuating unit, 300, detection and localization
Device, the 310, second predeterminated position, the 410, first road wheel, the 412, first mating groove, the 420, second road wheel, 422, second matches somebody with somebody
Close groove, 430, support frame, the 440, first guide rail, the 442, first ligand, the 450, second guide rail, the 452, second ligand, 500,
Factory building column, 600, facility floor, 700, fusing furnace body, 800, bell storage platform, 810, thermal insulation layer, 10, bell.
Embodiment
It is below in conjunction with accompanying drawing and specifically real for the purpose of this utility model, technical scheme and advantage is more clearly understood
Mode is applied, the utility model is described in further detail.It should be appreciated that embodiment described herein
Only to explain the utility model, protection domain of the present utility model is not limited.
It should be noted that when element is referred to as " being arranged at " or " install in " " being fixedly arranged on " another element, it can be with
Directly on another element or there can also be an element placed in the middle.When an element is considered as " connection " another yuan
Part, it can be directly to another element or may be simultaneously present centering elements.Term as used herein is " vertical
", " level ", "left", "right" and similar statement for illustrative purposes only, it is unique embodiment party to be not offered as
Formula.
Unless otherwise defined, all of technologies and scientific terms used here by the article is with belonging to technical field of the invention
The implication that technical staff is generally understood that is identical.Term used in the description of the invention herein is intended merely to description tool
The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term as used herein " and/or " including one or more
The arbitrary and all combination of related Listed Items.
" first " described in the utility model, " second " do not represent specific quantity and order, are only used for title
Distinguish.
As shown in figure 1, a kind of hanging apparatus of melting furnace bell described in the utility model, including:Moveable suspension bracket
100;Hoisting mechanism 200, hoisting mechanism 200 is arranged on suspension bracket 100, and hoisting mechanism 200 includes the suspension rod that can be stretched up and down
210, suspension rod 210 can be moved with suspension bracket 100, and the free end of suspension rod 210 is provided with the connector 220 with the dismantled and assembled connection of bell;And
For judging whether connector 220 reaches the locating and detecting device 300 of the first predeterminated position, institute's locating and detecting device 300 is fixed
In the second predeterminated position 310.
As shown in Fig. 1, Fig. 5 and Fig. 6, the hanging apparatus of above-mentioned melting furnace bell is in use, travelling bridge 100, works as positioning
When the connector 220 that detection means 300 detects suspension rod 210 reaches the first predeterminated position, suspension rod 210 acts, makes connector 220
It is connected with the suspension centre (or bell other default fixed bits) at the top of bell, suspension rod 210 shrinks and then liftable bell, makes
Bell is separated with fusing furnace body 700, is being driven suspension rod 210 to be moved to the top of bell storage platform 800 by suspension bracket 100, is being hung
Bar 210 is stretched, and bell is stably placed at into bell storage platform 800, is completed after corresponding process, then travelling bridge 100, makes company
Fitting 220 is connected with bell (also to be judged, to ensure connector 220 using another locating and detecting device 300 herein
Fix reliable with the suspension centre at the top of bell), suspension rod 210 shrinks, bell is left bell storage platform 800, travelling bridge 100,
When locating and detecting device 300 detect suspension rod 210 connector 220 reach the first predeterminated position when, now suspension rod 210 act,
Make bell with fusing furnace body 700 coordinate to fix, then suspension bracket 100 is continued to move to, and resets suspension rod 210.The melting furnace bell
Hanging apparatus quickly, precisely, stably by bell can be moved to bell storage platform 800, and can quickly, it is accurate, stably
Ground realizes that bell is fixed with melting furnace location fit, reduces people's labor intensity, reduces production safety hidden danger.
As shown in Figure 1, Figure 2 and Figure 3, in the present embodiment, the hanging apparatus of melting furnace bell also includes driving suspension bracket 100
Mobile drive mechanism (not shown), drive mechanism includes rotatable first road wheel 410 and rotatable second walking
Wheel 420, the first road wheel 410 is installed in one end of suspension bracket 100, and the second road wheel 420 installs the other end in lifting;It is thus real
The movement of the rolling friction of suspension bracket 100 is showed, has run more steady.Further, the hanging apparatus of melting furnace bell also includes
It is slidably matched the first guide rail and the second guide rail for being slidably matched with the second road wheel 420 with the first road wheel 410, the first guide rail is consolidated
On factory building column 500, the second guide rail is fixedly arranged on facility floor 600;Drive mechanism also includes support frame 430, support frame 430
One end be installed on the second end of the second road wheel 420, the other end and suspension bracket 100 and fix, make suspension bracket 100 and facility floor 600
Parallel or less parallel.Thus foring makes suspension bracket 100 be moved in semi-gantry structure, utilizes facility floor 600 and factory building
Column 500 is respectively subjected to the gravity of suspension bracket 100, the equipment being fixedly arranged on suspension bracket 100 and bell, makes the structure of suspension bracket 100 reliable, together
When the problem of interfere with ground installation when solving operation.Bell opens the span of equipment (suspension bracket 100 and its drive mechanism) only
It is covering melting furnace part, effectively reduces relative to driving span, and the weight of the half undertaken by ground rail, so
The bell but investment for lifting same load can be saved a lot, therefore be especially suitable for the lifting of large-tonnage top charging melting furnace bell.
It is preferred that, the first guide rail 440 is provided with the first outwardly ligand 442, and the first road wheel 410 is provided with the set to the concave
One mating groove 412;Second guide rail 450 is provided with the second outwardly ligand 452, and the second road wheel 420 is provided with and set to the concave
The second mating groove 422;The first road wheel 410 or the second road wheel 420 can be avoided to derail, make the movement of suspension bracket more steady
Safety.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 5 and Fig. 6, further, hoisting mechanism 200 also includes driving suspension rod about 210
Flexible actuating unit 230, the fixing end of the telescopic end and suspension rod 210 of actuating unit 230 is fixed;It is thus achieved that suspension rod 210
It is steady flexible, reduce the potential safety hazard in the swing of hoisting process, reduction lifting region;The actuating unit 230 can be hydraulic pressure
Pump, pulsometer or other equipment with flexible power.Further, the hanging apparatus of melting furnace bell also includes being used to judge
Bell with fusing furnace body 700 whether the position detecting switch (not shown) of accurate positioning, to confirm that bell has been reached really
Predeterminated position point, can fix reliably with fusing furnace body 700, be played " dual fail-safe " while being engaged with locating and detecting device 300
Effect.Further, the hanging apparatus of melting furnace bell also includes being used to control suspension bracket 100 to move and suspension rod 210
The controller (not shown) stretched down and the brake gear for fixing the first road wheel 410 or/and the second road wheel 420
(not shown), controller and brake gear, position detecting switch, drive mechanism, actuating unit 230 and locating and detecting device
300 communication connections;Thus the movement of suspension bracket 100 is realized automatically by controller, while coordinating having stretched up and down for suspension rod 210
Into the carrying back and forth of bell, the labor intensity of people is reduced;Specifically, controller presses pre- by driving mechanisms control suspension bracket 100
If track movement, while the brake gear can stop the suspension bracket 100 in time, make its movement locus accurate;When detection and localization dress
When putting the first predeterminated position of arrival of connectors 220 that 300 detect suspension rod 210, controller passes through actuating unit 230 and drives suspension rod
210 actions, detect suspension centre (or bell other default fixed bits) at the top of connector 220 and bell even when position detecting switch
Fixation is connect, suspension rod 210 shrinks and then liftable bell, bell is separated with fusing furnace body 700, driven by suspension bracket 100
Suspension rod 210 is moved to the top of bell storage platform 800, and suspension rod 210 is stretched, and bell is stably placed at into bell storage platform
800, complete after corresponding process, then travelling bridge 100, connector 220 is connected with bell (herein also using another fixed
Level detecting apparatus 300 is judged, to ensure that connector 220 and the suspension centre at the top of bell fix reliable, and utilizes another location
Detection switch carries out location point detection);Controller controls suspension rod 210 to shrink, bell is left bell by actuating unit 230
Storage platform 800, then drive suspension bracket 100 to move by drive mechanism, when locating and detecting device 300 detects the company of suspension rod 210
When fitting 220 reaches the first predeterminated position, now the suspension rod 210 of controller through hole actuating unit 230 acts, makes bell and melting furnace
Body 700 coordinates fixed (being judged again by position detecting switch), and then suspension bracket 100 is continued to move to, and makes suspension rod 210
Reset, it is further quick, bell precisely, is stably moved to bell storage platform 800, and can quickly, precisely, stably in fact
Existing bell is fixed with melting furnace location fit, realizes the automatic transporting of bell.
As shown in Figures 1 and 2, in the present embodiment, suspension rod 210 at least two, and along the length direction of suspension bracket 100
It is arranged at intervals.Thus make the carrying of bell more steady reliable.Connector 220 include the first coupler body 221 and with the first coupler body 221
The second coupler body 222 to form hook and slot 223 is oppositely arranged, the fixing end of the first coupler body 221 and the fixing end of the second coupler body 222 are consolidated
Fixed, the free end of the first coupler body 221 and the free end of the second coupler body 222 are arranged at intervals to form breach 224, breach 224 and hook and slot
223 communicate;Thus the suspension centre of bell may pass through hook and slot 223 and breach 224 and coordinate with the first coupler body 221 and the second coupler body 222, when
When suspension rod 210 shrinks, the suspension centre is close to fix with the first coupler body 221 and the second coupler body 222 in the gravity of bell.Further,
First coupler body 221 is provided with outwardly first spacing preiection 225, and the first spacing preiection 225 is set towards hook and slot 223;Second hook
Body 222 is provided with outwardly second spacing preiection 226, and the second spacing preiection 226 is set towards hook and slot 223;Thus work as suspension rod
During 210 contraction, the suspension centre is with the first coupler body 221 and the second coupler body 222 while the gravity of bell is close to fix, and first is spacing
Spacing hole of the spacing preiection 226 of projection 225 and second respectively with suspension centre coordinates, and makes the carrying of bell more safe and reliable.
The locating and detecting device 300 is photoelectric detection switch, displacement detection switch, pressure detection switch, machine vision inspection
The positional information detection devices such as device are surveyed, concrete mode can be achieved by the prior art, will not be repeated here.The controller,
Drive mechanism, actuating unit 230, the concrete mode of brake gear and position detecting switch can also be achieved by the prior art,
It will not be repeated here.It is preferred that, drive device is driven using variable-frequency motor, passes through the laser near bell stop position
Position indicator (locating and detecting device 300 be preferably laser orientation instru-ment), can accurately control stop position, it is ensured that bell it is vertical
Lifting, positional precision≤± 5mm, so as to ensure that bell is accurately positioned with body of heater, it is to avoid the generation for phenomenon of colliding with, are protected
Equipment;Actuating unit 230 is preferably hydraulic lifting system simultaneously, can ensure that furnace cover lifting speed is steady, and raising distance
Very little (about 150mm), effectively reduces the lifting time, while the safety to equipment has reliable guarantee.Because bell is opened
Open being accurately positioned for equipment so that the connector 220 of the suspension rod 210 of hydraulic lifting system can be with the suspension centre at the top of bell certainly
Dynamic connection, it is not necessary to which personnel's auxiliary is completed, and is reduced the labor intensity and danger of personnel, is efficiently reduced the lifting time;This
The lifting Lift-on/Lift-off System of the hanging apparatus of the melting furnace bell of utility model is rigid structure, efficiently avoid bell in lifting
During swing, it is ensured that the security of lifting.The melting furnace is preferably aluminium melting furnace.
As shown in Fig. 1, Fig. 5 and Fig. 6, the utility model also provides a kind of melting furnace system, including above-mentioned melting furnace bell
Hanging apparatus, in addition to melting furnace and bell storage platform 800, melting furnace and bell storage platform 800 are arranged at intervals at and hung
The lower section of frame 100, the top of bell storage platform 800 is provided with thermal insulation layer 810.
As shown in Figures 1 to 6, in above-mentioned melting furnace system, melting furnace is arranged at intervals with bell storage platform 800, to the greatest extent may be used
The running distance of bell carrying can be reduced, effectively shortens lifting and run time;Simultaneously when bell is placed on storage platform, stove
Lid (piece number 2) is closed with thermal insulation layer, effectively reduces scattering and disappearing for bell refractory lining heat.The top of bell storage platform 800
Thermal insulation layer can with piecemeal dismounting, it is necessary to when can locally dismount thermal insulation layer, beneficial to observation bell refractory lining scaling loss situation, it is determined that
Whether repairing is needed.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses several embodiments of the present utility model, and it describes more specific and detailed,
But therefore it can not be interpreted as the limitation to utility model patent scope.It should be pointed out that for the common skill of this area
For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to
Protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (10)
1. a kind of hanging apparatus of melting furnace bell, it is characterised in that including:
Moveable suspension bracket;
Hoisting mechanism, the hoisting mechanism is arranged on the suspension bracket, and the hoisting mechanism includes the suspension rod that can be stretched up and down, institute
Stating suspension rod can move with the suspension bracket, and the free end of the suspension rod is provided with the connector with the dismantled and assembled connection of bell;And
For judging whether the connector reaches the locating and detecting device of the first predeterminated position, institute's locating and detecting device is fixedly arranged on
Second predeterminated position.
2. the hanging apparatus of melting furnace bell according to claim 1, it is characterised in that also including driving the suspension bracket to move
Dynamic drive mechanism, the drive mechanism includes rotatable first road wheel and rotatable second road wheel, described first
Road wheel is installed in one end of the suspension bracket, and second road wheel is installed in the other end of the lifting.
3. the hanging apparatus of melting furnace bell according to claim 2, it is characterised in that also including being walked with described first
Slipping coordinates the first guide rail and the second guide rail being slidably matched with second road wheel, and first guide rail is fixedly arranged on factory building
On column, second guide rail is fixedly arranged on facility floor;The drive mechanism also includes support frame, and one end of support frame as described above is pacified
The second end provided with second road wheel, the other end and the suspension bracket is fixed, and makes the suspension bracket parallel or near with facility floor
Like parallel.
4. the hanging apparatus of melting furnace bell according to claim 2, it is characterised in that the hoisting mechanism also includes driving
The actuating unit stretched above and below the suspension rod is moved, the fixing end of the telescopic end of the actuating unit and the suspension rod is fixed.
5. the hanging apparatus of melting furnace bell according to claim 4, it is characterised in that also including for judging the stove
Lid with fusing furnace body whether the position detecting switch of accurate positioning.
6. the hanging apparatus of melting furnace bell according to claim 5, it is characterised in that also including for controlling described hang
Frame move and the suspension rod controller flexible up and down and for fixing first road wheel or/and second road wheel
Brake gear, the controller and the brake gear, the position detecting switch, the drive mechanism, the engine
Structure and locating and detecting device communication connection.
7. the hanging apparatus of melting furnace bell according to claim 1, it is characterised in that the suspension rod at least two,
And be arranged at intervals along the length direction of the suspension bracket.
8. the hanging apparatus of the melting furnace bell according to any one of claim 1 to 7, it is characterised in that the connector
Be oppositely arranged including the first coupler body and with first coupler body the second coupler body to form hook and slot, the fixing end of first coupler body with
The fixing end of second coupler body is fixed, and the free end of first coupler body and the free end of second coupler body are arranged at intervals shape
Into breach, the breach is communicated with the hook and slot.
9. the hanging apparatus of melting furnace bell according to claim 8, it is characterised in that first coupler body is provided with outside
The first spacing preiection is protruded, first spacing preiection is set towards the hook and slot;Second coupler body is provided with outwardly the
Two spacing preiections, second spacing preiection is set towards the hook and slot.
10. a kind of melting furnace system, it is characterised in that the lifting dress including any one of claim 1 to the 9 melting furnace bell
Put, in addition to melting furnace and bell storage platform, the melting furnace and the bell storage platform are arranged at intervals at the suspension bracket
Lower section, the top of the bell storage platform is provided with thermal insulation layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621370087.2U CN206615931U (en) | 2016-12-13 | 2016-12-13 | The hanging apparatus and melting furnace system of melting furnace bell |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621370087.2U CN206615931U (en) | 2016-12-13 | 2016-12-13 | The hanging apparatus and melting furnace system of melting furnace bell |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206615931U true CN206615931U (en) | 2017-11-07 |
Family
ID=60229453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621370087.2U Active CN206615931U (en) | 2016-12-13 | 2016-12-13 | The hanging apparatus and melting furnace system of melting furnace bell |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206615931U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109266869A (en) * | 2018-10-28 | 2019-01-25 | 中国十九冶集团有限公司南京分公司 | A kind of bell upside-down mounting and bell mounting process |
CN109573807A (en) * | 2018-12-06 | 2019-04-05 | 中国船舶重工集团公司第七〇九研究所 | The pressure vessel of ocean nuclear power platform reloads with top cover suspender and its hanging method |
-
2016
- 2016-12-13 CN CN201621370087.2U patent/CN206615931U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109266869A (en) * | 2018-10-28 | 2019-01-25 | 中国十九冶集团有限公司南京分公司 | A kind of bell upside-down mounting and bell mounting process |
CN109266869B (en) * | 2018-10-28 | 2021-01-05 | 中国十九冶集团有限公司南京分公司 | Furnace cover upside-down mounting and furnace cover mounting process |
CN109573807A (en) * | 2018-12-06 | 2019-04-05 | 中国船舶重工集团公司第七〇九研究所 | The pressure vessel of ocean nuclear power platform reloads with top cover suspender and its hanging method |
CN109573807B (en) * | 2018-12-06 | 2020-05-05 | 中国船舶重工集团公司第七一九研究所 | Top cover lifting appliance for pressure vessel reloading of ocean nuclear power platform and lifting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205501818U (en) | Steel truss arch bridge maintenance car | |
CN102747841B (en) | Curtain wall assembly, turnover and hoisting equipment and construction method thereof | |
CN103726421B (en) | Height and span adjustable track paver for metro construction | |
CN206615931U (en) | The hanging apparatus and melting furnace system of melting furnace bell | |
CN205348733U (en) | Furred ceiling operation platform | |
US9732570B2 (en) | Apparatus for tripping oil pipe and system for automatic well workover | |
CN203877761U (en) | Factory crane with automatic positioning device | |
CN107234233A (en) | Molten iron ground automation induction system | |
CN103821084B (en) | Operational method at the bottom of implement at the bottom of beam and beam | |
JP2011116281A (en) | Installation method and carrying device for platform door device | |
CN203684019U (en) | Height and span adjustable track laying machine for subway construction | |
JP2011236650A (en) | Load lifting/lowering equipment | |
CN106120664B (en) | Ship lift tail-bay main gate construction method | |
CN113090291A (en) | Shield subway tunnel segment repair and reinforcement complete equipment | |
JP5318335B2 (en) | Construction method of the structure above the railway | |
CN201177983Y (en) | Conveying and storing apparatus for radioactive or dangerous articles | |
CN214836436U (en) | Shield subway tunnel segment repair and reinforcement complete equipment | |
CN102295935A (en) | Rapid replacing method for coke grid of coke barrier vehicle of large-scale coke furnace | |
CN205369033U (en) | Gallows formula bridge tool car | |
JP4187445B2 (en) | crane | |
CN105253793B (en) | Construction method for traction transporting and hoisting of zinc pot in zinc plating workshop | |
CN104694678B (en) | A kind of telescopic row's Steam Dust method and apparatus for hot application field | |
CN205638500U (en) | Large -scale steel shotcrete of variant formula installation movable trolley | |
KR100530351B1 (en) | Telescopical Trolley Car for Inspection | |
CN202611706U (en) | Shaft deslagging platform device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |