CN206610021U - A kind of geographical teaching solar eclipse phenomenon demonstrator - Google Patents
A kind of geographical teaching solar eclipse phenomenon demonstrator Download PDFInfo
- Publication number
- CN206610021U CN206610021U CN201720111647.0U CN201720111647U CN206610021U CN 206610021 U CN206610021 U CN 206610021U CN 201720111647 U CN201720111647 U CN 201720111647U CN 206610021 U CN206610021 U CN 206610021U
- Authority
- CN
- China
- Prior art keywords
- mounting rod
- installing frame
- screw mandrel
- nut
- bull stick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Toys (AREA)
Abstract
The utility model is related to teaching field, more particularly to a kind of geographical teaching solar eclipse phenomenon demonstrator.The technical problems to be solved in the utility model is to provide a kind of geographical teaching that can demonstrate solar eclipse phenomenon solar eclipse phenomenon demonstrator.In order to solve the above-mentioned technical problem, the utility model provides such a geographical teaching solar eclipse phenomenon demonstrator, includes installation case, the first mounting rod, the first installing frame, first bearing seat, tellurion, the first bull stick, second bearing seat, slide rail, sliding block, first nut etc.;Installation case or so two walls, which are symmetrically connected with second bearing seat, second bearing seat, is respectively connected with the second bull stick, and installation case inner bottom part center is connected with slidingtype on slide rail, slide rail and is connected with sliding block, and sliding block coordinates with slide rail.The utility model is in presentation process, by rotating clockwise the second bull stick, allows the first inserted link to fix the first mounting rod and the 3rd mounting rod to realize, the second inserted link is by the securing purpose of the second mounting rod.
Description
Technical field
The utility model is related to teaching field, more particularly to a kind of geographical teaching solar eclipse phenomenon demonstrator.
Background technology
Geography is various natural phenomenas and humane phenomenon in the geographical environment for study earth surface, and between them mutually
The subject of relation.A geographical word sees China earliest《The book of Changes》.The geography in ancient times is mainly explored to be had on the figure of the earth, size
The measuring method of pass, or known area and country are described.Geography is each in the geographical environment for study earth surface
Kind of natural phenomena and humane phenomenon, and between them correlation subject.
We can touch solar eclipse in geography learning, although the principle of solar eclipse is readily appreciated that, but is the absence of on solar eclipse
Demonstrating appliance.
Therefore need that a kind of demonstrating effect of research and development is directly perceived, the geographical teaching of convenient disassembly solar eclipse phenomenon demonstrator badly, come
Overcome in the prior art the shortcoming that demonstrating effect is not directly perceived, dismounting is inconvenient.
Utility model content
(1)The technical problem to be solved
The utility model lacks the shortcoming of the demonstrating appliance on solar eclipse in order to overcome in the prior art, and the utility model will
The technical problem of solution is to provide a kind of geographical teaching that can demonstrate solar eclipse phenomenon solar eclipse phenomenon demonstrator.
(2)Technical scheme
In order to solve the above-mentioned technical problem, the utility model provides such a geographical teaching and demonstrates dress with solar eclipse phenomenon
Put, include installation case, the first mounting rod, the first installing frame, first bearing seat, tellurion, the first bull stick, second bearing seat,
Slide rail, sliding block, the first nut, the second nut, the first inserted link, the second inserted link, the first screw mandrel, the second screw mandrel, the second bull stick, second
Installing frame, the second mounting rod, illuminating lamp, the 3rd installing frame, the 3rd mounting rod and bead, install case or so two walls and are symmetrically connected with
The second bull stick is respectively connected with second bearing seat, second bearing seat, case inner bottom part center is installed and is connected with slip on slide rail, slide rail
Formula is connected with sliding block, and sliding block coordinates with slide rail, and the right-hand member of second bull stick in left side is connected with the first screw mandrel, second bull stick on right side
Left end be connected with the second screw mandrel, the second screw mandrel is connected with the first screw mandrel, the hand of spiral of the second screw mandrel and the first screw mandrel on the contrary,
Slidingtype is connected with the first nut on first screw mandrel, and the first nut and the first screw mandrel coordinate, and the first nut top is connected with first
Slidingtype is connected with the second nut, the second nut on the slider top connection in inserted link, the first nut bottom and left side, the second screw mandrel
Coordinate with the second screw mandrel, the second nut top is connected with the second inserted link, the slider top connection on the second nut bottom and right side, peace
Vanning roof left part, which is provided with the first installing frame, the first installing frame, is connected with the first mounting rod, and the first mounting rod top is connected with
It is connected with first bearing seat, first bearing seat in the middle part of the first bull stick, the first bull stick and is connected with tellurion, the first installing frame or so
It is provided with two walls and the first mounting rod on first through hole, and the first installing frame or so two walls and the first mounting rod and is provided with first
Through hole is in same horizontal line, is installed case roof left part and is provided with the 3rd installing frame, it is right that the 3rd installing frame is located at the first installing frame
Be connected with the 3rd mounting rod in side, the 3rd installing frame, the 3rd mounting rod top is connected with bead, two walls of the 3rd mounting rod or so and
It is provided with third through-hole on 3rd mounting rod, the third through-hole being provided with two walls of the 3rd mounting rod or so and the 3rd mounting rod is in
In same horizontal line, and third through-hole is in same horizontal line with first through hole, is installed case roof right part and is provided with the second peace
Frame up, be connected with the second mounting rod in the second installing frame, the second mounting rod left upper portion is connected with illuminating lamp, the second mounting rod with
The wall of second installing frame or so two is provided with the second through hole, the second through hole that the wall of the second mounting rod and the second installing frame or so two is provided with
In same horizontal line.
Preferably, steel wire rope, guide rail, guide pin bushing, spring, first connecting rod, block rubber, second connecting rod and fixation are also included
Bar, installs case left upper portion and is connected with second connecting rod, second connecting rod antetheca top is connected with fix bar, second connecting rod right upper portion
It is connected with slidingtype on guide rail, guide rail and is connected with guide pin bushing, guide pin bushing coordinates with guide rail, and guide pin bushing left side central portion is connected with steel wire rope, steel
Cord is wrapped in fix bar, on the right side of guide pin bushing and is connected with guide rail between right side on the right side of spring, guide pin bushing and is symmetrically connected with first
Connecting rod, first connecting rod right-hand member is connected with block rubber, and block rubber is contacted with tellurion.
Preferably, it is light material to install box material.
Preferably, the material of tellurion is plastics.
Preferably, the material of bead is plastics.
Preferably, the material of the second bull stick is stainless steel.
Operation principle:In presentation process, by rotating clockwise the second bull stick, the second bull stick drives the first screw mandrel and second
Screw mandrel is rotated clockwise, and the first screw mandrel drives the first nut to left movement, and the first nut drives the first inserted link to left movement, simultaneously
Sliding block on the left of the drive of first nut is to left movement on slide rail, and the second screw mandrel drives the second nut to move right, the second nut
Drive the second inserted link to move right, at the same the first nut drive on the right side of sliding block moved right on slide rail, when the first inserted link to
Left movement extremely fixes the first mounting rod and the 3rd mounting rod, and the second inserted link is moved right to by the second mounting rod and fixed
After firmly, stop operating the second bull stick, and then by rotating the first bull stick, the first bull stick drives tellurion to rotate, to demonstrate solar eclipse
Phenomenon.
Because also including steel wire rope, guide rail, guide pin bushing, spring, first connecting rod, block rubber, second connecting rod and fix bar, peace
Vanning left upper portion is connected with second connecting rod, and second connecting rod antetheca top is connected with fix bar, the connection of second connecting rod right upper portion
There is slidingtype on guide rail, guide rail to be connected with guide pin bushing, guide pin bushing coordinates with guide rail, and guide pin bushing left side central portion is connected with steel wire rope, steel wire rope
It is fixed in fix bar, on the right side of guide pin bushing and is connected with guide rail between right side on the right side of spring, guide pin bushing and is symmetrically connected with first connecting rod,
First connecting rod right-hand member is connected with block rubber, and block rubber is contacted with tellurion, when the first bull stick drives tellurion to turn in solar eclipse
During phenomenon, steel wire rope is untied from fix bar, pulls steel wire rope to move downward, steel wire rope pulls guide pin bushing and connecting rod on guide rail
To left movement, and then connecting rod drives block rubber to left movement, after block rubber, which leaves, to be contacted with tellurion, rotate the globe to
During in solar eclipse phenomenon, steel wire rope is unclamped, guide pin bushing and connecting rod are moved right in the presence of spring force, and then connecting rod drives
Block rubber is moved right, when block rubber is moved right to when being contacted with tellurion, then steel wire rope is fixed on into fix bar, this
Sample, block rubber just can play fixation to tellurion.
Because installation box material is light material, weight can be reduced, facilitates taking for teacher.
Because the material of tellurion is plastics, when to be rotated the globe, more fast.
Because the material of bead be plastics, can alleviator weight.
Because the material of the second bull stick is stainless steel, stainless steel corrosion resistance and acid resistance are strong, make the service life of device
It is longer.
(3)Beneficial effect
The utility model is in presentation process, by rotating clockwise the second bull stick, and the first inserted link is allowed by first to realize
Mounting rod and the 3rd mounting rod are fixed, and the securing purpose of the second mounting rod is fixed the first mounting rod, by the second inserted link
After three mounting rods and the second mounting rod, by rotating the first bull stick, drive tellurion to rotate to realize, demonstrate the mesh of solar eclipse phenomenon
, and it is provided with the cause of steel wire rope, guide rail, guide pin bushing, spring, first connecting rod, block rubber, second connecting rod and fix bar, energy
It is enough that fixation is played to tellurion, and then the stability of device can be improved.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present utility model.
Fig. 2 is second of main structure diagram of the present utility model.
Mark in accompanying drawing for:1- installs case, 2- steel wire ropes, 3- guide rails, 4- guide pin bushings, 5- springs, 6- first connecting rods, 7- rubbers
Blob of viscose, the mounting rods of 8- first, the installing frames of 9- first, 10- second connecting rods, 11- fix bars, 12- first bearing seats, 13- tellurions,
The bull sticks of 14- first, 15- first through hole, 16- second bearing seats, 17- slide rails, 18- sliding blocks, the nuts of 19- first, the spiral shells of 20- second
Mother, the inserted links of 21- first, the inserted links of 22- second, the screw mandrels of 23- first, the screw mandrels of 24- second, the bull sticks of 25- second, the installing frames of 26- second,
The through holes of 27- second, the mounting rods of 28- second, 29- illuminating lamps, the installing frames of 30- the 3rd, 31- third through-holes, the mounting rods of 32- the 3rd,
33- beads.
Embodiment
The utility model is further described with reference to the accompanying drawings and examples.
Embodiment 1
A kind of geographical teaching solar eclipse phenomenon demonstrator, as shown in Figure 1-2, include installation case 1, the first mounting rod 8,
First installing frame 9, first bearing seat 12, tellurion 13, the first bull stick 14, second bearing seat 16, slide rail 17, sliding block 18, first
Nut 19, the second nut 20, the first inserted link 21, the second inserted link 22, the first screw mandrel 23, the second screw mandrel 24, the second bull stick 25, second
Installing frame 26, the second mounting rod 28, illuminating lamp 29, the 3rd installing frame 30, the 3rd mounting rod 32 and bead 33, install case 1 or so
Two walls, which are symmetrically connected with second bearing seat 16, second bearing seat 16, is respectively connected with the second bull stick 25, installs the inner bottom part center of case 1
It is connected with slidingtype on slide rail 17, slide rail 17 and is connected with sliding block 18, sliding block 18 coordinates with slide rail 17, second bull stick 25 in left side
Right-hand member is connected with the first screw mandrel 23, and the left end of second bull stick 25 on right side is connected with the second screw mandrel 24, the second screw mandrel 24 and first
Screw mandrel 23 is connected, and the hand of spiral of the second screw mandrel 24 and the first screw mandrel 23 is on the contrary, slidingtype is connected with first on the first screw mandrel 23
Nut 19, the first nut 19 coordinates with the first screw mandrel 23, and the top of the first nut 19 is connected with the first inserted link 21, the bottom of the first nut 19
The top of sliding block 18 in portion and left side is connected, and slidingtype is connected with the second nut 20, the second nut 20 and second on the second screw mandrel 24
Screw mandrel 24 coordinates, and the top of the second nut 20 is connected with the second inserted link 22, and the top of sliding block 18 on the bottom of the second nut 20 and right side connects
Connect, the installation roof left part of case 1, which is provided with the first installing frame 9, the first installing frame 9, is connected with the first mounting rod 8, the first mounting rod 8
Top, which is connected with first bearing seat 12, first bearing seat 12, is connected with the first bull stick 14, and the middle part of the first bull stick 14 is connected with ground
First through hole 15, and the first installing frame 9 or so are provided with globe 13, the wall of the first installing frame 9 or so two and the first mounting rod 8
First through hole 15 is provided with two walls and the first mounting rod 8 to be in same horizontal line, and the roof left part of case 1 is installed and is provided with the 3rd installation
Frame 30, the 3rd installing frame 30, which is located in the right side of the first installing frame 9, the 3rd installing frame 30, is connected with the 3rd mounting rod 32, the 3rd peace
Dress bar 32 top, which is connected with bead 33, the wall of the 3rd mounting rod 32 or so two and the 3rd mounting rod 32, is provided with third through-hole 31,
The third through-hole 31 being provided with the wall of 3rd mounting rod 32 or so two and the 3rd mounting rod 32 is in same horizontal line, and the 3rd
Through hole 31 is in same horizontal line with first through hole 15, is installed the roof right part of case 1 and is provided with the second installing frame 26, the second installing frame
The second mounting rod 28 is connected with 26, the left upper portion of the second mounting rod 28 is connected with illuminating lamp 29, the second mounting rod 28 and second
The wall of installing frame 26 or so two is provided with the second through hole 27, the second mounting rod 28 and the wall of the second installing frame 26 or so two be provided with second
Through hole 27 is in same horizontal line.
Embodiment 2
A kind of geographical teaching solar eclipse phenomenon demonstrator, as shown in Figure 1-2, include installation case 1, the first mounting rod 8,
First installing frame 9, first bearing seat 12, tellurion 13, the first bull stick 14, second bearing seat 16, slide rail 17, sliding block 18, first
Nut 19, the second nut 20, the first inserted link 21, the second inserted link 22, the first screw mandrel 23, the second screw mandrel 24, the second bull stick 25, second
Installing frame 26, the second mounting rod 28, illuminating lamp 29, the 3rd installing frame 30, the 3rd mounting rod 32 and bead 33, install case 1 or so
Two walls, which are symmetrically connected with second bearing seat 16, second bearing seat 16, is respectively connected with the second bull stick 25, installs the inner bottom part center of case 1
It is connected with slidingtype on slide rail 17, slide rail 17 and is connected with sliding block 18, sliding block 18 coordinates with slide rail 17, second bull stick 25 in left side
Right-hand member is connected with the first screw mandrel 23, and the left end of second bull stick 25 on right side is connected with the second screw mandrel 24, the second screw mandrel 24 and first
Screw mandrel 23 is connected, and the hand of spiral of the second screw mandrel 24 and the first screw mandrel 23 is on the contrary, slidingtype is connected with first on the first screw mandrel 23
Nut 19, the first nut 19 coordinates with the first screw mandrel 23, and the top of the first nut 19 is connected with the first inserted link 21, the bottom of the first nut 19
The top of sliding block 18 in portion and left side is connected, and slidingtype is connected with the second nut 20, the second nut 20 and second on the second screw mandrel 24
Screw mandrel 24 coordinates, and the top of the second nut 20 is connected with the second inserted link 22, and the top of sliding block 18 on the bottom of the second nut 20 and right side connects
Connect, the installation roof left part of case 1, which is provided with the first installing frame 9, the first installing frame 9, is connected with the first mounting rod 8, the first mounting rod 8
Top, which is connected with first bearing seat 12, first bearing seat 12, is connected with the first bull stick 14, and the middle part of the first bull stick 14 is connected with ground
First through hole 15, and the first installing frame 9 or so are provided with globe 13, the wall of the first installing frame 9 or so two and the first mounting rod 8
First through hole 15 is provided with two walls and the first mounting rod 8 to be in same horizontal line, and the roof left part of case 1 is installed and is provided with the 3rd installation
Frame 30, the 3rd installing frame 30, which is located in the right side of the first installing frame 9, the 3rd installing frame 30, is connected with the 3rd mounting rod 32, the 3rd peace
Dress bar 32 top, which is connected with bead 33, the wall of the 3rd mounting rod 32 or so two and the 3rd mounting rod 32, is provided with third through-hole 31,
The third through-hole 31 being provided with the wall of 3rd mounting rod 32 or so two and the 3rd mounting rod 32 is in same horizontal line, and the 3rd
Through hole 31 is in same horizontal line with first through hole 15, is installed the roof right part of case 1 and is provided with the second installing frame 26, the second installing frame
The second mounting rod 28 is connected with 26, the left upper portion of the second mounting rod 28 is connected with illuminating lamp 29, the second mounting rod 28 and second
The wall of installing frame 26 or so two is provided with the second through hole 27, the second mounting rod 28 and the wall of the second installing frame 26 or so two be provided with second
Through hole 27 is in same horizontal line.
Also include steel wire rope 2, guide rail 3, guide pin bushing 4, spring 5, first connecting rod 6, block rubber 7, second connecting rod 10 and fix
Bar 11, installs the left upper portion of case 1 and is connected with second connecting rod 10, the antetheca top of second connecting rod 10 is connected with fix bar 11, and second connects
The right upper portion of bar 10 is connected with slidingtype on guide rail 3, guide rail 3 and is connected with guide pin bushing 4, and guide pin bushing 4 coordinates with guide rail 3, in the left side of guide pin bushing 4
Portion is connected with steel wire rope 2, and steel wire rope 2 is wrapped in fix bar 11, and spring is connected between right side in the right side of guide pin bushing 4 and guide rail 3
5, the right side of guide pin bushing 4 is symmetrically connected with first connecting rod 6, and the right-hand member of first connecting rod 6 is connected with block rubber 7, and block rubber 7 connects with tellurion 13
Touch.
Embodiment 3
A kind of geographical teaching solar eclipse phenomenon demonstrator, as shown in Figure 1-2, include installation case 1, the first mounting rod 8,
First installing frame 9, first bearing seat 12, tellurion 13, the first bull stick 14, second bearing seat 16, slide rail 17, sliding block 18, first
Nut 19, the second nut 20, the first inserted link 21, the second inserted link 22, the first screw mandrel 23, the second screw mandrel 24, the second bull stick 25, second
Installing frame 26, the second mounting rod 28, illuminating lamp 29, the 3rd installing frame 30, the 3rd mounting rod 32 and bead 33, install case 1 or so
Two walls, which are symmetrically connected with second bearing seat 16, second bearing seat 16, is respectively connected with the second bull stick 25, installs the inner bottom part center of case 1
It is connected with slidingtype on slide rail 17, slide rail 17 and is connected with sliding block 18, sliding block 18 coordinates with slide rail 17, second bull stick 25 in left side
Right-hand member is connected with the first screw mandrel 23, and the left end of second bull stick 25 on right side is connected with the second screw mandrel 24, the second screw mandrel 24 and first
Screw mandrel 23 is connected, and the hand of spiral of the second screw mandrel 24 and the first screw mandrel 23 is on the contrary, slidingtype is connected with first on the first screw mandrel 23
Nut 19, the first nut 19 coordinates with the first screw mandrel 23, and the top of the first nut 19 is connected with the first inserted link 21, the bottom of the first nut 19
The top of sliding block 18 in portion and left side is connected, and slidingtype is connected with the second nut 20, the second nut 20 and second on the second screw mandrel 24
Screw mandrel 24 coordinates, and the top of the second nut 20 is connected with the second inserted link 22, and the top of sliding block 18 on the bottom of the second nut 20 and right side connects
Connect, the installation roof left part of case 1, which is provided with the first installing frame 9, the first installing frame 9, is connected with the first mounting rod 8, the first mounting rod 8
Top, which is connected with first bearing seat 12, first bearing seat 12, is connected with the first bull stick 14, and the middle part of the first bull stick 14 is connected with ground
First through hole 15, and the first installing frame 9 or so are provided with globe 13, the wall of the first installing frame 9 or so two and the first mounting rod 8
First through hole 15 is provided with two walls and the first mounting rod 8 to be in same horizontal line, and the roof left part of case 1 is installed and is provided with the 3rd installation
Frame 30, the 3rd installing frame 30, which is located in the right side of the first installing frame 9, the 3rd installing frame 30, is connected with the 3rd mounting rod 32, the 3rd peace
Dress bar 32 top, which is connected with bead 33, the wall of the 3rd mounting rod 32 or so two and the 3rd mounting rod 32, is provided with third through-hole 31,
The third through-hole 31 being provided with the wall of 3rd mounting rod 32 or so two and the 3rd mounting rod 32 is in same horizontal line, and the 3rd
Through hole 31 is in same horizontal line with first through hole 15, is installed the roof right part of case 1 and is provided with the second installing frame 26, the second installing frame
The second mounting rod 28 is connected with 26, the left upper portion of the second mounting rod 28 is connected with illuminating lamp 29, the second mounting rod 28 and second
The wall of installing frame 26 or so two is provided with the second through hole 27, the second mounting rod 28 and the wall of the second installing frame 26 or so two be provided with second
Through hole 27 is in same horizontal line.
Also include steel wire rope 2, guide rail 3, guide pin bushing 4, spring 5, first connecting rod 6, block rubber 7, second connecting rod 10 and fix
Bar 11, installs the left upper portion of case 1 and is connected with second connecting rod 10, the antetheca top of second connecting rod 10 is connected with fix bar 11, and second connects
The right upper portion of bar 10 is connected with slidingtype on guide rail 3, guide rail 3 and is connected with guide pin bushing 4, and guide pin bushing 4 coordinates with guide rail 3, in the left side of guide pin bushing 4
Portion is connected with steel wire rope 2, and steel wire rope 2 is wrapped in fix bar 11, and spring is connected between right side in the right side of guide pin bushing 4 and guide rail 3
5, the right side of guide pin bushing 4 is symmetrically connected with first connecting rod 6, and the right-hand member of first connecting rod 6 is connected with block rubber 7, and block rubber 7 connects with tellurion 13
Touch.
It is light material to install the material of case 1.
Embodiment 4
A kind of geographical teaching solar eclipse phenomenon demonstrator, as shown in Figure 1-2, include installation case 1, the first mounting rod 8,
First installing frame 9, first bearing seat 12, tellurion 13, the first bull stick 14, second bearing seat 16, slide rail 17, sliding block 18, first
Nut 19, the second nut 20, the first inserted link 21, the second inserted link 22, the first screw mandrel 23, the second screw mandrel 24, the second bull stick 25, second
Installing frame 26, the second mounting rod 28, illuminating lamp 29, the 3rd installing frame 30, the 3rd mounting rod 32 and bead 33, install case 1 or so
Two walls, which are symmetrically connected with second bearing seat 16, second bearing seat 16, is respectively connected with the second bull stick 25, installs the inner bottom part center of case 1
It is connected with slidingtype on slide rail 17, slide rail 17 and is connected with sliding block 18, sliding block 18 coordinates with slide rail 17, second bull stick 25 in left side
Right-hand member is connected with the first screw mandrel 23, and the left end of second bull stick 25 on right side is connected with the second screw mandrel 24, the second screw mandrel 24 and first
Screw mandrel 23 is connected, and the hand of spiral of the second screw mandrel 24 and the first screw mandrel 23 is on the contrary, slidingtype is connected with first on the first screw mandrel 23
Nut 19, the first nut 19 coordinates with the first screw mandrel 23, and the top of the first nut 19 is connected with the first inserted link 21, the bottom of the first nut 19
The top of sliding block 18 in portion and left side is connected, and slidingtype is connected with the second nut 20, the second nut 20 and second on the second screw mandrel 24
Screw mandrel 24 coordinates, and the top of the second nut 20 is connected with the second inserted link 22, and the top of sliding block 18 on the bottom of the second nut 20 and right side connects
Connect, the installation roof left part of case 1, which is provided with the first installing frame 9, the first installing frame 9, is connected with the first mounting rod 8, the first mounting rod 8
Top, which is connected with first bearing seat 12, first bearing seat 12, is connected with the first bull stick 14, and the middle part of the first bull stick 14 is connected with ground
First through hole 15, and the first installing frame 9 or so are provided with globe 13, the wall of the first installing frame 9 or so two and the first mounting rod 8
First through hole 15 is provided with two walls and the first mounting rod 8 to be in same horizontal line, and the roof left part of case 1 is installed and is provided with the 3rd installation
Frame 30, the 3rd installing frame 30, which is located in the right side of the first installing frame 9, the 3rd installing frame 30, is connected with the 3rd mounting rod 32, the 3rd peace
Dress bar 32 top, which is connected with bead 33, the wall of the 3rd mounting rod 32 or so two and the 3rd mounting rod 32, is provided with third through-hole 31,
The third through-hole 31 being provided with the wall of 3rd mounting rod 32 or so two and the 3rd mounting rod 32 is in same horizontal line, and the 3rd
Through hole 31 is in same horizontal line with first through hole 15, is installed the roof right part of case 1 and is provided with the second installing frame 26, the second installing frame
The second mounting rod 28 is connected with 26, the left upper portion of the second mounting rod 28 is connected with illuminating lamp 29, the second mounting rod 28 and second
The wall of installing frame 26 or so two is provided with the second through hole 27, the second mounting rod 28 and the wall of the second installing frame 26 or so two be provided with second
Through hole 27 is in same horizontal line.
Also include steel wire rope 2, guide rail 3, guide pin bushing 4, spring 5, first connecting rod 6, block rubber 7, second connecting rod 10 and fix
Bar 11, installs the left upper portion of case 1 and is connected with second connecting rod 10, the antetheca top of second connecting rod 10 is connected with fix bar 11, and second connects
The right upper portion of bar 10 is connected with slidingtype on guide rail 3, guide rail 3 and is connected with guide pin bushing 4, and guide pin bushing 4 coordinates with guide rail 3, in the left side of guide pin bushing 4
Portion is connected with steel wire rope 2, and steel wire rope 2 is wrapped in fix bar 11, and spring is connected between right side in the right side of guide pin bushing 4 and guide rail 3
5, the right side of guide pin bushing 4 is symmetrically connected with first connecting rod 6, and the right-hand member of first connecting rod 6 is connected with block rubber 7, and block rubber 7 connects with tellurion 13
Touch.
It is light material to install the material of case 1.
The material of tellurion 13 is plastics.
The material of bead 33 is plastics.
The material of second bull stick 25 is stainless steel.
Operation principle:In presentation process, by rotating clockwise the second bull stick 25, the second bull stick 25 drives the first screw mandrel 23
Rotated clockwise with the second screw mandrel 24, the first screw mandrel 23 drives the first nut 19 to left movement, and the first nut 19 drives first to insert
Bar 21 to left movement, while the first nut 19 drive on the left of sliding block 18 on slide rail 17 to left movement, the second screw mandrel 24 drives
Second nut 20 is moved right, and the second nut 20 drives the second inserted link 22 to move right, while on the right side of the drive of the first nut 19
Sliding block 18 is moved right on slide rail 17, consolidates the first mounting rod 8 and the 3rd mounting rod 32 when the first inserted link 21 is moved to the left
Live calmly, and the second inserted link 22 is moved right to after being fixed the second mounting rod 28, stop operating the second bull stick 25, then leads to
The first bull stick 14 of rotation is crossed, the first bull stick 14 drives tellurion 13 to rotate, to demonstrate solar eclipse phenomenon.
Because also including steel wire rope 2, guide rail 3, guide pin bushing 4, spring 5, first connecting rod 6, block rubber 7, the and of second connecting rod 10
Fix bar 11, installs the left upper portion of case 1 and is connected with second connecting rod 10, the antetheca top of second connecting rod 10 is connected with fix bar 11, the
The right upper portion of two connecting rod 10 is connected with slidingtype on guide rail 3, guide rail 3 and is connected with guide pin bushing 4, and guide pin bushing 4 coordinates with guide rail 3, and guide pin bushing 4 is left
Middle side part is connected with steel wire rope 2, and steel wire rope 2 is fixed in fix bar 11, is connected with the right side of guide pin bushing 4 and guide rail 3 between right side
Spring 5, the right side of guide pin bushing 4 is symmetrically connected with first connecting rod 6, and the right-hand member of first connecting rod 6 is connected with block rubber 7, block rubber 7 and tellurion
13 contacts, when the first bull stick 14 drive tellurion 13 to turn in solar eclipse phenomenon, steel wire rope 2 are untied from fix bar 11, is drawn
Dynamic steel wire rope 2 is moved downward, and steel wire rope 2 pulls guide pin bushing 4 and connecting rod on guides 3 to left movement, and then connecting rod drives rubber
Blob of viscose 7 is to left movement, after block rubber 7, which leaves, to be contacted with tellurion 13, when rotating the globe 13 in solar eclipse phenomenon, unclamps steel
Cord 2, guide pin bushing 4 and connecting rod are moved right in the presence of the elastic force of spring 5, and then connecting rod drives block rubber 7 to move right,
When block rubber 7 is moved right to when being contacted with tellurion 13, then steel wire rope 2 is fixed on fix bar 11, so, block rubber
7 just can play fixation to tellurion 13.
Because it is light material to install the material of case 1, weight can be reduced, facilitates taking for teacher.
Because the material of tellurion 13 be plastics, when to rotate the globe 13 when, more fast.
Because the material of bead 33 be plastics, can alleviator weight.
Because the material of the second bull stick 25 is stainless steel, stainless steel corrosion resistance and acid resistance are strong, make the use longevity of device
Life is longer.
Embodiment described above only expresses preferred embodiment of the present utility model, and it describes more specific and detailed,
But therefore it can not be interpreted as the limitation to the utility model the scope of the claims.It should be pointed out that for the common of this area
For technical staff, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these are all
Belong to protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (6)
1. a kind of geographical teaching solar eclipse phenomenon demonstrator, it is characterised in that include installation case(1), the first mounting rod
(8), the first installing frame(9), first bearing seat(12), tellurion(13), the first bull stick(14), second bearing seat(16), slide rail
(17), sliding block(18), the first nut(19), the second nut(20), the first inserted link(21), the second inserted link(22), the first screw mandrel
(23), the second screw mandrel(24), the second bull stick(25), the second installing frame(26), the second mounting rod(28), illuminating lamp(29), the 3rd
Installing frame(30), the 3rd mounting rod(32)And bead(33), case is installed(1)The wall of left and right two is symmetrically connected with second bearing seat
(16), second bearing seat(16)On be respectively connected with the second bull stick(25), case is installed(1)Inner bottom part center is connected with slide rail(17),
Slide rail(17)Upper slidingtype is connected with sliding block(18), sliding block(18)With slide rail(17)Coordinate, second bull stick in left side(25)The right side
End is connected with the first screw mandrel(23), second bull stick on right side(25)Left end be connected with the second screw mandrel(24), the second screw mandrel(24)
With the first screw mandrel(23)Connection, the second screw mandrel(24)With the first screw mandrel(23)Hand of spiral on the contrary, the first screw mandrel(23)Upper cunning
Dynamic formula is connected with the first nut(19), the first nut(19)With the first screw mandrel(23)Coordinate, the first nut(19)Top is connected with
First inserted link(21), the first nut(19)Bottom and the sliding block in left side(18)Top is connected, the second screw mandrel(24)Upper slidingtype connects
It is connected to the second nut(20), the second nut(20)With the second screw mandrel(24)Coordinate, the second nut(20)Top is connected with second and inserted
Bar(22), the second nut(20)Bottom and the sliding block on right side(18)Top is connected, and installs case(1)Roof left part is provided with the first installation
Frame(9), the first installing frame(9)Inside it is connected with the first mounting rod(8), the first mounting rod(8)Top is connected with first bearing seat
(12), first bearing seat(12)On be connected with the first bull stick(14), the first bull stick(14)Middle part is connected with tellurion(13), first
Installing frame(9)The wall of left and right two and the first mounting rod(8)On be provided with first through hole(15), and the first installing frame(9)Left and right two
Wall and the first mounting rod(8)On be provided with first through hole(15)In same horizontal line, case is installed(1)Roof left part is provided with the 3rd
Installing frame(30), the 3rd installing frame(30)Positioned at the first installing frame(9)Right side, the 3rd installing frame(30)Inside it is connected with the 3rd installation
Bar(32), the 3rd mounting rod(32)Top is connected with bead(33), the 3rd mounting rod(32)The wall of left and right two and the 3rd mounting rod
(32)On be provided with third through-hole(31), the 3rd mounting rod(32)The wall of left and right two and the 3rd mounting rod(32)On the threeway that is provided with
Hole(31)In same horizontal line, and third through-hole(31)With first through hole(15)In same horizontal line, case is installed
(1)Roof right part is provided with the second installing frame(26), the second installing frame(26)Inside it is connected with the second mounting rod(28), the second mounting rod
(28)Left upper portion is connected with illuminating lamp(29), the second mounting rod(28)With the second installing frame(26)The wall of left and right two is provided with second
Through hole(27), the second mounting rod(28)With the second installing frame(26)The second through hole that the wall of left and right two is provided with(27)In same level
On line.
2. a kind of geographical teaching solar eclipse phenomenon demonstrator according to claim 1, it is characterised in that also include steel
Cord(2), guide rail(3), guide pin bushing(4), spring(5), first connecting rod(6), block rubber(7), second connecting rod(10)And fix bar
(11), case is installed(1)Left upper portion is connected with second connecting rod(10), second connecting rod(10)Antetheca top is connected with fix bar
(11), second connecting rod(10)Right upper portion is connected with guide rail(3), guide rail(3)Upper slidingtype is connected with guide pin bushing(4), guide pin bushing(4)With
Guide rail(3)Coordinate, guide pin bushing(4)Left side central portion is connected with steel wire rope(2), steel wire rope(2)It is wrapped in fix bar(11)On, guide pin bushing
(4)Right side and guide rail(3)Spring is connected between interior right side(5), guide pin bushing(4)Right side is symmetrically connected with first connecting rod(6), first
Connecting rod(6)Right-hand member is connected with block rubber(7), block rubber(7)With tellurion(13)Contact.
3. a kind of geographical teaching solar eclipse phenomenon demonstrator according to claim 2, it is characterised in that install case(1)
Material is light material.
4. a kind of geographical teaching solar eclipse phenomenon demonstrator according to claim 3, it is characterised in that tellurion(13)
Material be plastics.
5. a kind of geographical teaching solar eclipse phenomenon demonstrator according to claim 4, it is characterised in that bead(33)'s
Material is plastics.
6. a kind of geographical teaching solar eclipse phenomenon demonstrator according to claim 5, it is characterised in that the second bull stick
(25)Material be stainless steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720111647.0U CN206610021U (en) | 2017-02-07 | 2017-02-07 | A kind of geographical teaching solar eclipse phenomenon demonstrator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720111647.0U CN206610021U (en) | 2017-02-07 | 2017-02-07 | A kind of geographical teaching solar eclipse phenomenon demonstrator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206610021U true CN206610021U (en) | 2017-11-03 |
Family
ID=60167902
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720111647.0U Expired - Fee Related CN206610021U (en) | 2017-02-07 | 2017-02-07 | A kind of geographical teaching solar eclipse phenomenon demonstrator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206610021U (en) |
-
2017
- 2017-02-07 CN CN201720111647.0U patent/CN206610021U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205384789U (en) | Teaching aid is used in english teaching | |
CN201886690U (en) | Hinged four-bar linkage type demonstration device | |
CN206610021U (en) | A kind of geographical teaching solar eclipse phenomenon demonstrator | |
CN205238941U (en) | Compatible english teaching board of english -Chinese intertranslation | |
CN107642055B (en) | A kind of municipal administration road maintenance warning sign board | |
CN206601866U (en) | A kind of physics teaching buoyancy size ocular demonstration device | |
CN213211436U (en) | A physics course teaching aid for demonstrating law of conservation of momentum | |
CN201349779Y (en) | Whiteboard shelf structure | |
CN210777382U (en) | English classroom synchronous translation exercise device | |
CN108332010A (en) | A kind of display apparatus supporting structure | |
CN209103667U (en) | A kind of easy-to-dismount apparatus for demonstrating of primary school teaching | |
CN206601865U (en) | A kind of physics teaching liquid pressure ocular demonstration device | |
CN208225305U (en) | A kind of big screen display device of education | |
CN206946784U (en) | A kind of physics teaching apparatus for demonstrating | |
CN206058669U (en) | One kind freely lands motion test device of motion | |
CN203351069U (en) | Writing brush calligraphy copy practice device | |
CN204541323U (en) | English teaching reader arranging apparatus | |
CN206726584U (en) | A kind of different drops and gravitional force apparatus for demonstrating under quality | |
CN215679743U (en) | Presentation device is used in coal mine safety teaching | |
CN108922432A (en) | A kind of Chinese literature displaying device | |
CN220713408U (en) | Teaching aid | |
CN216534528U (en) | Exhibition device is hung in chinese teaching convenient to use | |
CN203931272U (en) | A kind of physics teaching lever principle apparatus for demonstrating | |
CN203721088U (en) | High school mathematics teaching tool for demonstrating elliptical orbit | |
CN202983125U (en) | Auxiliary volleyball spiking teaching device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171103 Termination date: 20180207 |