- CN206607303U CN206607303U CN201720192895.2U CN201720192895U CN206607303U CN 206607303 U CN206607303 U CN 206607303U CN 201720192895 U CN201720192895 U CN 201720192895U CN 206607303 U CN206607303 U CN 206607303U
- Authority
- CN
- China
- Prior art keywords
- block
- pole
- slide rail
- ventilation duct
- pulley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model is related to a kind of galvanizing rig, more particularly to uniform galvanizing rig is used in a kind of processing of ventilation duct.The technical problems to be solved in the utility model is to provide a kind of ventilation duct processing and uses uniform galvanizing rig.In order to solve the above-mentioned technical problem, the utility model provides the processing of such a ventilation duct and uses uniform galvanizing rig, includes base, galvanizing bath, the first pole, upright slide rail, fixed inserted link, draw ring, rocking handle, drawstring, guide pin bushing, first pulley, second pulley, first sliding block etc.;It is provided with the top of base on the left of galvanizing bath, the top of base and is provided with the first pole, the first fixed block is connected with the first pole, the crown center of the first fixed block is provided with neck, and the first pole is located at the left side of galvanizing bath.The utility model has reached uniform zinc-plated effect, and the utility model is simple to operate, and zinc-plated effect is good, and overall structure is simple, it is easy to safeguard, device reliability is high, and low manufacture cost, replicability is strong.
Description
Technical field
Uniform galvanizing rig is used the present invention relates to a kind of galvanizing rig, more particularly to a kind of processing of ventilation duct.
Background technology
Ventilation duct is the hollow tubing for being used to divulge information, mostly circular or square.Ventilation duct make with install sheet material used,
Section bar and other major item materials, should meet the regulation of design and the national current standard of Related product, and using inspection of dispatching from the factory
Verification of conformity is tested, should be carried out an acceptance inspection during materials arrival by the existing relevant standard of country.
It is zinc-plated to refer to plate one layer of zinc to play the table of attractive in appearance, antirust etc. on the surface of metal, alloy or other materials
Face treatment technology.Zinc is soluble in acid, can also be dissolved in alkali, therefore it is called amphoteric metal.Zinc hardly occurs in dry air
Change.In malaria, zinc surface can generate the basic zinc carbonate film of densification.The passivated processing of zinc coating, dyeing are applied
Cover after shield photo etching, its protective and dicoration can be significantly improved.
Existing galvanizing rig haves the shortcomings that zinc-plated uneven, therefore needs a kind of zinc-plated uniform ventilation duct of research and development badly and adds
The uniform galvanizing rig of work.
The content of the invention
(1) technical problem to be solved
The present invention is in order to overcome the zinc-plated uneven shortcoming of existing galvanizing rig, and the technical problem to be solved in the present invention is
A kind of ventilation duct processing is provided and uses uniform galvanizing rig.
(2) technical scheme
In order to solve the above-mentioned technical problem, uniform galvanizing rig is used the invention provides the processing of such a ventilation duct, wrapped
Base, galvanizing bath, the first pole, upright slide rail, fixed inserted link, draw ring, rocking handle, drawstring, guide pin bushing, first pulley, second are included
Pulley, the first sliding block, bearing block, the first fixed plate, fixture block, the first fixed block, rotating shaft, spring, fastening block, the second fixed plate and
It is rotated with the top of set, base and is provided with galvanizing bath, is provided with the first pole, the first pole and is connected with the left of the top of base
First fixed block, the crown center of the first fixed block is provided with neck, and the first pole is located at the left side of galvanizing bath, the top of base
Left end is provided with upright slide rail, and upright slide rail is located at slidingtype on the left side of the first pole, upright slide rail and is connected with the first sliding block,
The top of upright slide rail is provided with first pulley and second pulley, and first pulley is located at the left side of second pulley, the first sliding block top
Portion is connected with drawstring, and drawstring bypasses first pulley and second pulley, and the left wall top of upright slide rail is connected with guide pin bushing, and drawstring is passed through
Guide pin bushing, the left end of drawstring is connected with draw ring, and the left lower of upright slide rail is connected with fixed inserted link, and the right side of the first sliding block is set
Have and fixture block is provided with the middle of bearing block, the bottom of bearing block, fixture block is located at the surface of neck, fixture block is corresponding with neck, axle
Rotating shaft is installed, rotating shaft, which is located in the front side of upright slide rail, drawstring and the first sliding block, rotating shaft, is provided with the first fixation in bearing
Plate, the first fixed plate is located at the right side of bearing block, and the left end of rotating shaft, which is connected with rocking handle, rotating shaft, is connected with spring, and spring is located at
The right side of first fixed plate, the end of spring is connected with fastening block, and the mode that the right-hand member of rotating shaft is connected through a screw thread is connected with rotation
Gu set, is rotated with set periphery and is provided with the second fixed plate.
Preferably, also include the second fixed block, cutting, the second sliding block, endless glide, the second pole, iron block, magnet,
Guide rail and guide block, the right-hand member of base are provided with guide rail, and the left end of guide rail is connected with galvanizing bath, and the top right side slidingtype of guide rail connects
Guide block is connected to, the left upper portion of guide block is connected with iron block, and the lower right-hand side of galvanizing bath sets magnet, and magnet is located at a positive left side for iron block
Side, magnet is corresponding with iron block, is provided with the top of guide block at the top of the second pole, the second pole and is connected with endless glide, ring
Shape slide rail slidingtype is connected with the second sliding block, and the left side upper end of the second sliding block is provided with cutting, and the top right side for being rotated with set is set
Have and be provided with jack in the middle part of the second fixed block, the second fixed block.
Preferably, in addition to rubber sleeve, rubber sleeve is covered on rocking handle, the medial surface of rubber sleeve and the outer surface of rocking handle are tight
Contiguity is touched, and the material of rubber sleeve is butadiene-styrene rubber.
Preferably, groove is provided with the first fixed plate, the cross sectional shape of groove is ellipse, and the number of groove is 5.
Operation principle:When needing to carry out zinc-plated processing to ventilation duct, staff pours into right amount into galvanizing bath first
Zinc liquid, then staff pressing fastening block compression spring, staff's grip pass through rotating shaft, make fastening block tight with ventilation duct
Contiguity is touched, and the right-hand member of ventilation duct abuts the first fixed plate, and staff's turn clockwise is rotated with set, blocks the second fixed plate logical
Airduct.Staff pulls open draw ring, slowly loosens drawstring so that sliding block is moved downward on upright slide rail, and slide block movement drives
Rotating shaft and ventilation duct are moved downwardly together, and when fixture block is caught in neck, the bottom of ventilation duct is contacted with galvanizing flux.Staff stops
Only loosen drawstring, staff persistently shakes rocking handle clockwise, drives rotating shaft to rotate clockwise, and then drive ventilation duct zinc-plated
Rotated in liquid, so that ventilation duct completes zinc-plated work in galvanizing bath, after the completion of galvanizer work, staff stops shaking
Shake handle, staff slowly pulls draw ring still further below, draw ring is recovered fixed inserted link, ventilation duct is separated with galvanizing flux, work
Make personnel's turn counterclockwise and be rotated with set, last staff removes ventilation duct.When needing to carry out zinc-plated to other ventilation ducts
Wait, repeat top-operation.
Because also including the second fixed block, cutting, the second sliding block, endless glide, the second pole, iron block, magnet, guide rail
And guide block, the right-hand member of base is provided with guide rail, and the left end of guide rail is connected with galvanizing bath, and the top right side slidingtype of guide rail is connected with
There is guide block, the left upper portion of guide block is connected with iron block, and the lower right-hand side of galvanizing bath sets magnet, and magnet is located at a positive left side for iron block
Side, magnet is corresponding with iron block, is provided with the top of guide block at the top of the second pole, the second pole and is connected with endless glide, ring
Shape slide rail slidingtype is connected with the second sliding block, and the left side upper end of the second sliding block is provided with cutting, and the top right side for being rotated with set is set
Have and be provided with jack in the middle part of the second fixed block, the second fixed block, so when the bottom of ventilation duct is contacted with galvanizing flux, work
Make personnel and promote guide block to the left, and then drive the second pole and endless glide to be moved to the left together, when magnet holds iron block, insert
Bar inserts jack.During zinc-plated, axis of rotation drives the second sliding block is equidirectional in endless glide to rotate, so that
Whole galvanizing rig rotates more steady.After the completion of galvanizer work, staff promotes to the right guide block, makes iron block and magnet
Separation, cutting is separated with jack.
Because also including covering rubber sleeve on rubber sleeve, rocking handle, the medial surface of rubber sleeve and the outer surface of rocking handle are close
Contact, the material of rubber sleeve is butadiene-styrene rubber, so when staff shakes rocking handle, staff is cased with by shaking
The rocking handle of rubber sleeve, can easily shake rocking handle, increase comfort, indefatigability.
Because being provided with groove in the first fixed plate, the cross sectional shape of groove is ellipse, and the number of groove is 5, so
The weight of the first fixed plate can be mitigated so that staff is more laborsaving when shaking rocking handle.
(3) beneficial effect
Invention achieves uniform zinc-plated effect, the present invention is simple to operate, and zinc-plated effect is good, and overall structure is simple, easily
In maintenance, device reliability is high, and low manufacture cost, replicability is strong.
Brief description of the drawings
Fig. 1 is main structure diagram of the invention.
Fig. 2 is part main structure diagram of the invention.
Fig. 3 is the main structure diagram of rocking handle of the present invention.
Fig. 4 is the main structure diagram of the first fixed plate of the invention.
Mark in accompanying drawing for:1- bases, 2- galvanizing baths, the poles of 3- first, 4- upright slide rails, 5- fixes inserted link, and 6- is drawn
Ring, 7- rocking handles, 8- drawstrings, 9- guide pin bushings, 10- first pulleys, 11- second pulleys, the sliding blocks of 12- first, 13- bearing blocks, 14- first
Fixed plate, 15- fixture blocks, 16- necks, the fixed blocks of 17- first, 18- rotating shafts, 19- springs, 20- fastening blocks, the fixed plates of 21- second,
22- is rotated with set, the fixed blocks of 23- second, 24- jacks, 25- cuttings, the sliding blocks of 26- second, 27- endless glides, the poles of 28- second,
29- iron blocks, 30- magnet, 31- guide rails, 32- guide blocks, 33- rubber sleeves, 34- grooves.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
Uniform galvanizing rig is used in a kind of ventilation duct processing, as Figure 1-4, includes base 1, galvanizing bath 2, the first pole
3rd, upright slide rail 4, fixed inserted link 5, draw ring 6, rocking handle 7, drawstring 8, guide pin bushing 9, first pulley 10, second pulley 11, the first sliding block
12nd, bearing block 13, the first fixed plate 14, fixture block 15, the first fixed block 17, rotating shaft 18, spring 19, fastening block 20, second are fixed
Plate 21 and set 22 is rotated with, the top of base 1, which is provided with the left of galvanizing bath 2, the top of base 1, is provided with the first pole 3, first
The first fixed block 17 is connected with pole 3, the crown center of the first fixed block 17 is provided with neck 16, and the first pole 3 is located at zinc-plated
The left side of groove 2, the left end at the top of base 1 is provided with upright slide rail 4, and upright slide rail 4 is located at the left side of the first pole 3, vertically
Slidingtype is connected with the first sliding block 12 on slide rail 4, and the top of upright slide rail 4 is provided with first pulley 10 and second pulley 11, the
One pulley 10 is located at the left side of second pulley 11, and the top of the first sliding block 12 is connected with drawstring 8, and drawstring 8 bypasses the He of first pulley 10
Second pulley 11, the left wall top of upright slide rail 4 is connected with guide pin bushing 9, and drawstring 8 passes through guide pin bushing 9, and the left end of drawstring 8 is connected with drawing
Ring 6, the left lower of upright slide rail 4 is connected with fixed inserted link 5, and the right side of the first sliding block 12 is provided with bearing block 13, bearing block
Fixture block 15 is provided with the middle of 13 bottom, fixture block 15 is located at the surface of neck 16, and fixture block 15 is corresponding with neck 16, bearing block
Rotating shaft 18 is installed, rotating shaft 18, which is located in upright slide rail 4, the front side of the sliding block 12 of drawstring 8 and first, rotating shaft 18, is provided with the on 13
One fixed plate 14, the first fixed plate 14 is located at the right side of bearing block 13, and the left end of rotating shaft 18, which is connected with rocking handle 7, rotating shaft 18, to be connected
Spring 19 is connected to, spring 19 is located at the right side of the first fixed plate 14, and the end of spring 19 is connected with fastening block 20, the right side of rotating shaft 18
Hold the mode being connected through a screw thread to be connected with and be rotated with set 22, be rotated with 22 peripheries of set and be provided with the second fixed plate 21.
Also include the second fixed block 23, cutting 25, the second sliding block 26, endless glide 27, the second pole 28, iron block 29,
Magnet 30, guide rail 31 and guide block 32, the right-hand member of base 1 are provided with guide rail 31, and the left end of guide rail 31 is connected with galvanizing bath 2, guide rail
31 top right side slidingtype is connected with guide block 32, and the left upper portion of guide block 32 is connected with iron block 29, the lower right-hand side of galvanizing bath 2
Magnet 30 is set, and magnet 30 is located at the directly to the left of iron block 29, and magnet 30 is corresponding with iron block 29, the top of guide block 32 is provided with the
Two poles 28, the top of the second pole 28 is connected with endless glide 27, and the slidingtype of endless glide 27 is connected with the second sliding block 26, the
The left side upper end of two sliding blocks 26 is provided with cutting 25, and the top right side for being rotated with set 22 is provided with the second fixed block 23, and second fixes
The middle part of block 23 is provided with jack 24.
Also include covering rubber sleeve 33, the medial surface of rubber sleeve 33 and the outer surface of rocking handle 7 on rubber sleeve 33, rocking handle 7
It is in close contact, the material of rubber sleeve 33 is butadiene-styrene rubber.
Groove 34 is provided with first fixed plate 14, the cross sectional shape of groove 34 is ellipse, and the number of groove 34 is 5.
Operation principle:When needing to carry out zinc-plated processing to ventilation duct, staff pours into right amount into galvanizing bath 2 first
Zinc liquid, then staff pressing the compression spring 19 of fastening block 20, staff's grip pass through rotating shaft 18, make fastening block 20 with
Ventilation duct is in close contact, and the right-hand member of ventilation duct abuts the first fixed plate 14, and staff's turn clockwise is rotated with set 22, makes second
Fixed plate 21 blocks ventilation duct.Staff pulls open draw ring 6, slowly loosens drawstring 8 so that sliding block is downward on upright slide rail 4
Motion, slide block movement drives rotating shaft 18 and ventilation duct to move downwardly together, when fixture block 15 is caught in neck 16, the bottom of ventilation duct
Contacted with galvanizing flux.Staff stops loosening drawstring 8, and staff persistently shakes rocking handle 7 clockwise, drives the up time of rotating shaft 18
Pin is rotated, and then drives ventilation duct to be rotated in galvanizing flux, so that ventilation duct completes zinc-plated work in galvanizing bath 2, when
After the completion of galvanizer is made, staff stops shaking rocking handle 7, and staff slowly pulls draw ring 6, draw ring 6 is recovered still further below
Fixed inserted link 5, makes ventilation duct be separated with galvanizing flux, turn that staff is counterclockwise is rotated with set 22, last staff removes logical
Airduct.When needing to carry out zinc-plated to other ventilation ducts, top-operation is repeated.
Because also including the second fixed block 23, cutting 25, the second sliding block 26, endless glide 27, the second pole 28, iron block
29th, magnet 30, guide rail 31 and guide block 32, the right-hand member of base 1 are provided with guide rail 31, and the left end of guide rail 31 is connected with galvanizing bath 2, led
The top right side slidingtype of rail 31 is connected with guide block 32, and the left upper portion of guide block 32 is connected with iron block 29, the right side of galvanizing bath 2
Lower section sets magnet 30, and magnet 30 is located at the directly to the left of iron block 29, and magnet 30 is corresponding with iron block 29, and the top of guide block 32 is set
There is the second pole 28, the top of the second pole 28 is connected with endless glide 27, and the slidingtype of endless glide 27 is connected with the second sliding block
26, the left side upper end of the second sliding block 26 is provided with cutting 25, and the top right side for being rotated with set 22 is provided with the second fixed block 23, second
The middle part of fixed block 23 is provided with jack 24, so when the bottom of ventilation duct is contacted with galvanizing flux, staff pushes away to the left
Dynamic guide block 32, and then drive the second pole 28 and endless glide 27 to be moved to the left together, when magnet 30 holds iron block 29, cutting
25 insertion jacks 24.During zinc-plated, rotating shaft 18, which is rotated, drives the second sliding block 26 is equidirectional in endless glide 27 to rotate,
So so that whole galvanizing rig rotates more steady.After the completion of galvanizer work, staff promotes to the right guide block 32, makes
Iron block 29 and magnet 30 are separated, and cutting 25 is separated with jack 24.
Because also including rubber sleeve 33, rubber sleeve 33 is covered on rocking handle 7, the medial surface of rubber sleeve 33 is outer with rocking handle 7
Intimate surface contact, the material of rubber sleeve 33 is butadiene-styrene rubber, so when staff shakes rocking handle 7, staff
By shaking the rocking handle 7 of set rubber sleeve 33, rocking handle 7 can be easily shaken, increases comfort, indefatigability.
Because being provided with groove 34 in the first fixed plate 14, the cross sectional shape of groove 34 is ellipse, and the number of groove 34 is 5
It is individual, so the weight of the first fixed plate 14 can be mitigated so that staff is more laborsaving when shaking rocking handle 7.
Embodiment described above only expresses the preferred embodiment of the present invention, and it describes more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (4)
1. uniform galvanizing rig is used in a kind of processing of ventilation duct, it is characterised in that include base (1), galvanizing bath (2), first
Bar (3), upright slide rail (4), fixed inserted link (5), draw ring (6), rocking handle (7), drawstring (8), guide pin bushing (9), first pulley (10), the
Two pulleys (11), the first sliding block (12), bearing block (13), the first fixed plate (14), fixture block (15), the first fixed block (17), turn
Axle (18), spring (19), fastening block (20), the second fixed plate (21) and set (22) is rotated with, is provided with the top of base (1) zinc-plated
It is provided with the left of groove (2), the top of base (1) on the first pole (3), the first pole (3) and is connected with the first fixed block (17),
The crown center of first fixed block (17) is provided with neck (16), and the first pole (3) is located at the left side of galvanizing bath (2), base (1)
The left end at top is provided with upright slide rail (4), and upright slide rail (4) is located at sliding on the left side of the first pole (3), upright slide rail (4)
Dynamic formula is connected with the first sliding block (12), and the top of upright slide rail (4) is provided with first pulley (10) and second pulley (11), first
Pulley (10), which is located at the top of the left side of second pulley (11), the first sliding block (12), is connected with drawstring (8), and drawstring (8) bypasses first
Pulley (10) and second pulley (11), the left wall top of upright slide rail (4) are connected with guide pin bushing (9), and drawstring (8) passes through guide pin bushing (9),
The left end of drawstring (8) is connected with draw ring (6), and the left lower of upright slide rail (4) is connected with fixed inserted link (5), the first sliding block
(12) it is provided with the right side of in the middle of bearing block (13), the bottom of bearing block (13) and is provided with fixture block (15), fixture block (15) is located at card
The surface of groove (16), fixture block (15) is corresponding with neck (16), and rotating shaft (18), rotating shaft (18) position are provided with bearing block (13)
In being provided with the first fixed plate (14), first on the front side of upright slide rail (4), drawstring (8) and the first sliding block (12), rotating shaft (18)
Fixed plate (14) is located at the right side of bearing block (13), and the left end of rotating shaft (18) is connected with rocking handle (7), and rotating shaft is connected with bullet on (18)
Spring (19), spring (19) is located at the right side of the first fixed plate (14), and the end of spring (19) is connected with fastening block (20), rotating shaft
(18) mode that right-hand member is connected through a screw thread, which is connected with, is rotated with set (22), is rotated with set (22) periphery and is provided with the second fixed plate
(21)。
2. uniform galvanizing rig is used in a kind of ventilation duct processing according to claim 1, it is characterised in that also include second
Fixed block (23), cutting (25), the second sliding block (26), endless glide (27), the second pole (28), iron block (29), magnet (30),
Guide rail (31) and guide block (32), the right-hand member of base (1) are provided with guide rail (31), and the left end of guide rail (31) is connected with galvanizing bath (2),
The top right side slidingtype of guide rail (31) is connected with guide block (32), and the left upper portion of guide block (32) is connected with iron block (29), zinc-plated
The lower right-hand side of groove (2) sets magnet (30), and magnet (30) is located at the directly to the left of iron block (29), magnet (30) and iron block (29) phase
It is provided with the top of correspondence, guide block (32) at the top of the second pole (28), the second pole (28) and is connected with endless glide (27), ring
Shape slide rail (27) slidingtype is connected with the second sliding block (26), and the left side upper end of the second sliding block (26) is provided with cutting (25), is rotated with
The top right side of set (22), which is provided with the middle part of the second fixed block (23), the second fixed block (23), is provided with jack (24).
3. uniform galvanizing rig is used in a kind of ventilation duct processing according to claim 2, it is characterised in that also include rubber
Cover (33), set rubber sleeve (33) on rocking handle (7), the medial surface of rubber sleeve (33) is in close contact with the outer surface of rocking handle (7), rubber
The material of gum cover (33) is butadiene-styrene rubber.
4. uniform galvanizing rig is used in a kind of ventilation duct processing according to claim 3, it is characterised in that the first fixed plate
(14) groove (34) is provided with, the cross sectional shape of groove (34) is ellipse, and the number of groove (34) is 5.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720192895.2U CN206607303U (en) | 2017-03-01 | 2017-03-01 | Uniform galvanizing rig is used in a kind of ventilation duct processing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720192895.2U CN206607303U (en) | 2017-03-01 | 2017-03-01 | Uniform galvanizing rig is used in a kind of ventilation duct processing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206607303U true CN206607303U (en) | 2017-11-03 |
Family
ID=60168383
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720192895.2U Expired - Fee Related CN206607303U (en) | 2017-03-01 | 2017-03-01 | Uniform galvanizing rig is used in a kind of ventilation duct processing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206607303U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106676446A (en) * | 2017-03-01 | 2017-05-17 | 湖州东方皮革有限公司 | Uniform galvanizing device for processing of vent duct |
CN110629147A (en) * | 2019-11-04 | 2019-12-31 | 郑文豪 | Hot-dip galvanizing treatment process for galvanized steel pipe |
-
2017
- 2017-03-01 CN CN201720192895.2U patent/CN206607303U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106676446A (en) * | 2017-03-01 | 2017-05-17 | 湖州东方皮革有限公司 | Uniform galvanizing device for processing of vent duct |
CN110629147A (en) * | 2019-11-04 | 2019-12-31 | 郑文豪 | Hot-dip galvanizing treatment process for galvanized steel pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206607303U (en) | Uniform galvanizing rig is used in a kind of ventilation duct processing | |
CN202762026U (en) | Table tennis basic skill shaping device | |
CN209696244U (en) | A kind of table tennis training teaching ball serving device convenient for adjusting service direction | |
CN205683502U (en) | A kind of efficient exercising apparatus of physical culture arm | |
CN106391549A (en) | Rotary fast cleaning device of Chinese herbal medicine | |
CN206772659U (en) | Sample processing apparatus | |
CN106676446A (en) | Uniform galvanizing device for processing of vent duct | |
CN109464793A (en) | A kind of random teeing apparatus of table tennis | |
CN208265195U (en) | A kind of automatic clothes hanging device | |
CN205586498U (en) | Three -dimensional detection type basketball stands of teaching dedicated | |
CN205692469U (en) | A kind of packaged type power sign board | |
CN205406078U (en) | Automatic register for easy reference ware that turns over of piano convenient to teaching | |
CN106925179A (en) | A kind of prepared Chinese ink makes and uses raw material mixing apparatus | |
CN206745950U (en) | Go out day present device and its percussive goes out gift mechanism | |
CN205908116U (en) | Foot -operated door handle | |
CN205287484U (en) | Badminton training handle | |
CN106956535A (en) | A kind of manufacturing writing brush nib stalk straightening equipment | |
CN207221279U (en) | A kind of mahjong machine dials board component | |
CN208582909U (en) | A kind of physical training device that physical education uses | |
CN206932120U (en) | Vertical machine pulls out line machine | |
CN206228871U (en) | A kind of body-building apparatus of tensile force of belt rope and rotating disk | |
CN108994858A (en) | A kind of toy for children robot | |
CN213643055U (en) | Football training frame for sports education | |
CN206921459U (en) | A kind of guitar dust-proof dust-removing frame | |
CN210748172U (en) | Wall map device for ideological and political education |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |