CN206599708U - A kind of platform for preventing car jump between high road bed and bridge is carried on the back - Google Patents

A kind of platform for preventing car jump between high road bed and bridge is carried on the back Download PDF

Info

Publication number
CN206599708U
CN206599708U CN201720193677.0U CN201720193677U CN206599708U CN 206599708 U CN206599708 U CN 206599708U CN 201720193677 U CN201720193677 U CN 201720193677U CN 206599708 U CN206599708 U CN 206599708U
Authority
CN
China
Prior art keywords
inner support
steelframe
bridge
short
long
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720193677.0U
Other languages
Chinese (zh)
Inventor
王玉钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720193677.0U priority Critical patent/CN206599708U/en
Application granted granted Critical
Publication of CN206599708U publication Critical patent/CN206599708U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

Carried on the back the utility model discloses a kind of platform for preventing car jump between high road bed and bridge, the bridge connected including roadbed table top and roadbed table top side, the bottom of the roadbed table top is provided with fill stratum, the fill stratum includes the lap slab of bridge overlapped with side bridge at top, the broken stone pile being symmetrically pressed into inner chamber, the short steelframe of inner support and the long steelframe of inner support of lap slab of bridge bottom connection, the limestone filler filled between the short steelframe of inner support and the long steelframe of inner support and lap slab of bridge, the green stone slag filler filled between the short steelframe of inner support and the long steelframe of inner support and broken stone pile, the secondary crushed rock filler filled between the long steelframe of inner support and permeable bottom plate.The utility model is by setting the short steelframe of broken stone pile, inner support, the long steelframe of inner support, permeable bottom plate, secondary crushed rock filler, green stone slag filler, limestone filler and lap slab of bridge, entirety is used in conjunction with each other, and has reached the advantage of prevention high filling subgrade sedimentation from many aspects.

Description

A kind of platform for preventing car jump between high road bed and bridge is carried on the back
Technical field
The utility model is related to abutment roadbed technical field, specially a kind of platform of prevention car jump between high road bed and bridge The back of the body.
Background technology
So-called bumping at bridge-head is due to highway end of the bridge and expansion joint(Bridge approach)The relative settlement at place or expansion joint destruction And make road surface longitudinal slope occur step cause vehicle by when produce jump phenomenon.
Platform carries on the back this section of roadbed while linking main body roadbed, while connect with culvert abutment abutment body, due to road roller pressing less than, Plus the soil body connect with concrete side produce gap, easily infiltration.And because being connected with concreting body phase, I Know, the soil body has the characteristic of its natural subsidence, and concreting body is not settled typically, so this section of roadbed is easier to out Show failure by shear and produce bumping at bridge-head.Therefore this section of roadbed is also high compared with the requirement of main body roadbed, and compactness must reach 96%, The gravel soil or sandy soil of filler good water permeability.
At present, the precautionary measures of not very good bumping at bridge-head, bumping at bridge-head is multiple, and the reason for it causes problem is a variety of It is various.
Utility model content
The purpose of this utility model is that providing a kind of platform for preventing car jump between high road bed and bridge carries on the back, and possesses from many aspects Prevent the advantage of high filling subgrade sedimentation, solve due to causing the varied high filling subgrade of reason to settle asking for bad prevention Topic.
To achieve the above object, the utility model provides following technical scheme:One kind prevention car jump between high road bed and bridge The platform back of the body, including the bridge that roadbed table top and roadbed table top side connect, the bottom of the roadbed table top is provided with fill stratum, institute State the lap slab of bridge that with side bridge overlaps of the fill stratum including top, the broken stone pile being symmetrically pressed into inner chamber, lap slab of bridge The stone filled between the short steelframe of inner support and the long steelframe of inner support, the short steelframe of inner support and the long steelframe of inner support and lap slab of bridge of bottom connection The green stone slag filler filled between the short steelframe of grey hardcore, inner support and the long steelframe of inner support and broken stone pile, the long steelframe of inner support and permeable The secondary crushed rock filler filled between bottom plate.
It is preferred that, the entirety that the short steelframe of the lap slab of bridge, inner support, the long steelframe of inner support, broken stone pile and permeable bottom plate are constituted Lateral section is rectangle, and whole interior is divided into five triangles by the short steelframe of inner support and the long steelframe of inner support.
It is preferred that, the surface of the permeable bottom plate is provided with leaking hole.
It is preferred that, remaining of the inner chamber of the fill stratum is banketed as original soil layer soil.
Compared with prior art, the beneficial effects of the utility model are as follows:
1st, the utility model is by setting the short steelframe of broken stone pile, inner support, the long steelframe of inner support, permeable bottom plate, secondary rubble to fill out In material, green stone slag filler, limestone filler and lap slab of bridge, the combination by broken stone pile, the short steelframe of inner support and the long steelframe of inner support, It ensure that whole fill stratum will not produce deformation, even if global shape is in infall process, also ensure the consistent of shape, simultaneously Also overall anti-pressure ability is improved, mitigates the settlement action for being pressurized and bringing, by distinguishing the secondary crushed rock filler set, green stone Slag filler, limestone filler and lap slab of bridge(Lap slab of bridge, for the measure for preventing the sedimentation of bridge end coupling part and taking, It can be rotated with the sedimentation banketed, vehicle can play cushioning effect when travelling, sedimentation of being banketed even if the platform back of the body is also unlikely to production Life is uneven), the settlement action that infiltration is brought can be mitigated, and lime stone is used, lime stone is produced expansion by water, by bridge Beam attachment strap jack-up, also mitigates the effect of natural subsidence, is integrally used in conjunction with each other, and has reached prevention high fill road from many aspects The advantage of base sedimentation.
Brief description of the drawings
Fig. 1 is the utility model structural representation.
In figure:1 roadbed table top, 2 fill stratums, 3 broken stone piles, the short steelframe of 4 inner supports, the long steelframe of 5 inner supports, 6 permeable bottom plates, 7 two Secondary crushed rock filler, 8 green stone slag fillers, 9 limestone fillers, 10 lap slab of bridge, 11 bridges.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Referring to Fig. 1, a kind of platform for preventing car jump between high road bed and bridge is carried on the back, including roadbed table top 1 and roadbed table top 1 one The bridge 11 that side connects, the bottom of roadbed table top 1 is provided with fill stratum 2, and fill stratum 2 includes being taken with side bridge 11 for top Broken stone pile 3, the short steelframe 4 of inner support of the bottom of lap slab of bridge 10 connection and the inner support being symmetrically pressed into the lap slab of bridge 10 that connects, inner chamber Limestone filler 9, the short steelframe 4 of inner support filled between the short steelframe 4 of long steelframe 5, inner support and the long steelframe 5 of inner support and lap slab of bridge 10 Filled between green stone slag filler 8, the long steelframe 5 of inner support and the permeable bottom plate 6 filled between the long steelframe of inner support 5 and broken stone pile 3 Secondary crushed rock filler 7.
The utility model is by setting the short steelframe 4 of broken stone pile 3, inner support, the long steelframe 5 of inner support, permeable bottom plate 6, secondary rubble Filler 7, green stone slag filler 8, limestone filler 9 and lap slab of bridge 10, pass through broken stone pile 3, the short steelframe 4 of inner support and the long steelframe of inner support In 5 combination, it ensure that whole fill stratum 2 will not produce deformation, even if global shape is in infall process, also ensure shape It is consistent, while also improve overall anti-pressure ability, mitigate the settlement action for being pressurized and bringing, pass through and distinguish set secondary broken Hardcore 7, green stone slag filler 8, limestone filler 9 and lap slab of bridge 10(Lap slab of bridge 10, for preventing bridge end coupling part The measure for settling and taking, can be rotated with the sedimentation banketed, and vehicle can play cushioning effect when travelling, even if the platform back of the body is filled out It is uneven that soil sedimentation is also unlikely to generation), the settlement action that infiltration is brought can be mitigated, and use lime stone, lime stone Expansion is produced by water, by the jack-up of lap slab of bridge 10, the effect of natural subsidence is also mitigated, is integrally used in conjunction with each other, reach The advantage that prevention high filling subgrade is settled from many aspects.
The overall lateral section that the short steelframe 4 of lap slab of bridge 10, inner support, the long steelframe 5 of inner support, broken stone pile 3 and permeable bottom plate 6 are constituted For rectangle, and whole interior is divided into five triangles by the short steelframe 4 of inner support and the long steelframe 5 of inner support, triangular structure frame, more It is stable.
The surface of permeable bottom plate 6 is provided with leaking hole, facilitates the infiltration of aqueous, it is to avoid ponding.
Remaining of the inner chamber of fill stratum 2 banket for original soil layer soil, facilitate the combination between soil layer.
In summary:The platform back of the body of the prevention car jump between high road bed and bridge, passes through broken stone pile 3, the short steelframe 4 of inner support, inner support Long steelframe 5, permeable bottom plate 6, secondary crushed rock filler 7, green stone slag filler 8, limestone filler 9 and lap slab of bridge 10, solve by In causing the problem of varied high filling subgrade of reason settles bad prevention.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of platform for preventing car jump between high road bed and bridge is carried on the back, including roadbed table top(1)With roadbed table top(1)What side connected Bridge(11), it is characterised in that:The roadbed table top(1)Bottom be provided with fill stratum(2), the fill stratum(2)Including top Portion with side bridge(11)The lap slab of bridge of overlap joint(10), the broken stone pile that is symmetrically pressed into inner chamber(3), lap slab of bridge(10) The short steelframe of inner support of bottom connection(4)With the long steelframe of inner support(5), the short steelframe of inner support(4)With the long steelframe of inner support(5)And lap slab of bridge (10)Between the limestone filler filled(9), the short steelframe of inner support(4)With the long steelframe of inner support(5)And broken stone pile(3)Between fill Green stone slag filler(8), the long steelframe of inner support(5)With permeable bottom plate(6)Between the secondary crushed rock filler filled(7).
2. a kind of platform for preventing car jump between high road bed and bridge according to claim 1 is carried on the back, it is characterised in that:The bridge Attachment strap(10), the short steelframe of inner support(4), the long steelframe of inner support(5), broken stone pile(3)With permeable bottom plate(6)The overall lateral section of composition is Rectangle, and whole interior is by the short steelframe of inner support(4)With the long steelframe of inner support(5)It is divided into five triangles.
3. a kind of platform for preventing car jump between high road bed and bridge according to claim 1 is carried on the back, it is characterised in that:It is described permeable Bottom plate(6)Surface be provided with leaking hole.
4. a kind of platform for preventing car jump between high road bed and bridge according to claim 1 is carried on the back, it is characterised in that:It is described to banket Layer(2)Inner chamber remaining banket for original soil layer soil.
CN201720193677.0U 2017-03-02 2017-03-02 A kind of platform for preventing car jump between high road bed and bridge is carried on the back Expired - Fee Related CN206599708U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720193677.0U CN206599708U (en) 2017-03-02 2017-03-02 A kind of platform for preventing car jump between high road bed and bridge is carried on the back

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720193677.0U CN206599708U (en) 2017-03-02 2017-03-02 A kind of platform for preventing car jump between high road bed and bridge is carried on the back

Publications (1)

Publication Number Publication Date
CN206599708U true CN206599708U (en) 2017-10-31

Family

ID=60146456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720193677.0U Expired - Fee Related CN206599708U (en) 2017-03-02 2017-03-02 A kind of platform for preventing car jump between high road bed and bridge is carried on the back

Country Status (1)

Country Link
CN (1) CN206599708U (en)

Similar Documents

Publication Publication Date Title
CN203174453U (en) Light-mass embankment structure for managing bump at bridge head
CN103276639B (en) Roadbed structure for deep soft soil region
CN209178724U (en) A kind of expansive soil foundation Ballast track high-speed railway embankment ruggedized construction
CN108797249A (en) The construction method of soft soil roadbed high roadbed steep slope road section Foam lightweight soil
CN204849508U (en) Roadbed structure of soft soil foundation highway road bridge changeover portion
CN103821060A (en) Construction method of conventional expressway soft foundation treating technology
CN103046446A (en) Highway reconstruction and extension project joint portion treatment structure
CN107587420B (en) A kind of abutment approach pavement structure and its construction method
CN104746399A (en) Construction method for preventing vehicle bump at bridge head
CN208844378U (en) A kind of novel mixed Irish bridge structure
CN108360369A (en) The road and bridge end of the bridge engaging portion structure of pre- anti-jump vehicle phenomenon
CN203960701U (en) The relative settlement coordination structure of soft soil roadbed the old and new's subgrade and pavement joining place
CN206599708U (en) A kind of platform for preventing car jump between high road bed and bridge is carried on the back
CN208039220U (en) A kind of old roadbed develops the base formation of stake reinforcing in column hammer
CN110438855B (en) Construction method for backfilling underneath-crossing railway bridge and culvert road bed
CN216663671U (en) Highway road surface pavement structure
CN207452609U (en) A kind of hassock layer Foam lightweight soil road structure in deep soft foundation section
CN206784081U (en) A kind of salinized soil high-speed railway subgrade new structure
CN105113350A (en) Pier abutment roadbed structure and construction method
CN214737081U (en) Firm town road soft or hard is plugged into and is prevented novel structure that subsides
CN210797245U (en) Structure is backfilled to bridgehead abutment back of body
CN111677006A (en) Structure and method for preventing and controlling differential settlement of roadbed at edge of linear underground structure
CN201027297Y (en) Transition strapping plate for bridge
CN216712710U (en) Combined filling roadbed bridge abutment structure and bridge comprising same
CN211199940U (en) Prevent reinforced earth retaining wall roadbed structure of bridgehead car skip

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171031

Termination date: 20180302

CF01 Termination of patent right due to non-payment of annual fee