CN206595658U - A kind of cable testing bridge being easily installed - Google Patents

A kind of cable testing bridge being easily installed Download PDF

Info

Publication number
CN206595658U
CN206595658U CN201720154673.1U CN201720154673U CN206595658U CN 206595658 U CN206595658 U CN 206595658U CN 201720154673 U CN201720154673 U CN 201720154673U CN 206595658 U CN206595658 U CN 206595658U
Authority
CN
China
Prior art keywords
casing
testing bridge
cable testing
pole
kelly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720154673.1U
Other languages
Chinese (zh)
Inventor
樊哲云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINJIANG UYGUR [UIGHUR] AUTONOMOUS REGION POWER TRANSMISSION AND TRANSFORMATION Co Ltd
Original Assignee
XINJIANG UYGUR [UIGHUR] AUTONOMOUS REGION POWER TRANSMISSION AND TRANSFORMATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINJIANG UYGUR [UIGHUR] AUTONOMOUS REGION POWER TRANSMISSION AND TRANSFORMATION Co Ltd filed Critical XINJIANG UYGUR [UIGHUR] AUTONOMOUS REGION POWER TRANSMISSION AND TRANSFORMATION Co Ltd
Priority to CN201720154673.1U priority Critical patent/CN206595658U/en
Application granted granted Critical
Publication of CN206595658U publication Critical patent/CN206595658U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of cable testing bridge being easily installed, and is related to cable testing bridge field.The cable testing bridge being easily installed, including plate body, the both sides at the top of the plate body are installed with suspension ring, the bottom of the plate body is installed with pole, the bottom of the pole is interspersed to be provided with casing, the pole, which runs through the top of casing close to one end of casing and extends to be installed with the left of housing, the cabinets cavity on the right side of the inside of casing, the cabinets cavity, is installed with neck.The cable testing bridge being easily installed, pass through the improvement to casing and housing, in the presence of pole, neck, kelly, elastic rod, cross bar, roller, slide rail, slide plate, back-moving spring, body and ball, the effect that convenience is installed to cable testing bridge is reached, so as to facilitate the use of user, therefore the service efficiency of cable testing bridge is also improved, while also improving the operating efficiency of cable testing bridge.

Description

A kind of cable testing bridge being easily installed
Technical field
The utility model is related to cable testing bridge technical field, specially a kind of cable testing bridge being easily installed.
Background technology
Cable testing bridge is divided into the structures such as slot type, pellet type and ladder-type, grid type, by support, trailing arm and installation annex etc. Crane span structure can independently be set up in composition, building, can also be attached on various buildings or structures and piping lane support, should be embodied knot Structure is simple, handsome in appearance, the features such as configure flexible and easy to maintenance, and whole parts are both needed to carry out zinc-plated processing, installed in building The outdoor crane span structure of beyond the region of objective existence, it is (arm-type by the straightway of slot type, pellet type or ladder-type, curved logical, threeway, four-way component and trailing arm Support), suspension bracket etc. constitute the full name (hereinafter referred to as crane span structure) of the rigid structure system with contiguity support cable, ladder-type cable Crane span structure CQ1-T type step type cable bridge frames are Curve guide impeller according to domestic and international relevant information, and it has lightweight, cost Low, moulding do not have, easy for installation, radiating, it is ventilative good the advantages of, he is applied to typically be relatively large in diameter laying for cable, is suitable for High and low pressure power cable is laid, tray type cable bridge, and tray type cable bridge is the side such as oil, chemical industry, light industry, telecommunication The most widely used one kind in face, it has the advantages that lightweight, load is big, handsome in appearance, simple in construction, easy for installation, and it is Suitable for the installation of power cable, it is also suitable for controlling laying for cable, channel-type cable bridge, channel-type cable bridge is a kind of complete Enclosed type cable testing bridge, it is best suited for laying computer cable, communication cable, thermocouple cable and other Highly Sensitive Systems Cable etc. is controlled, it has preferable effect, step to the protection for shielding environmental cable in interference and heavy corrosion for controlling cable The respective advantage and disadvantage of formula, pellet type, channel-type cable bridge, ladder-type bus bar installation casing has a good performance of ventilating, not dust-proof, do not prevent Interference, slot type, pellet type bus bar installation casing have dust-proof, anti-tampering performance.
But cable testing bridge in the market, during use, it is not easy to that cable testing bridge is installed, so that The use for the person of being not convenient to use, therefore the service efficiency of cable testing bridge is also reduced, while also reducing the work of cable testing bridge Efficiency.
Utility model content
(1) technical problem solved
In view of the shortcomings of the prior art, the utility model provides a kind of cable testing bridge being easily installed, and solves cable The problem of crane span structure is not easy to install.
(2) technical scheme
To realize object above, the utility model is achieved by the following technical programs:A kind of cable being easily installed Crane span structure, including plate body, the both sides at the top of the plate body are installed with suspension ring, and the bottom of the plate body is installed with branch Bar, the bottom of the pole is interspersed to be provided with casing, and the pole is close to one end of casing is through the top of casing and extends to It is installed with the right side of the inside of casing, the cabinets cavity on the left of housing, the cabinets cavity and is installed with neck, The inside of the neck is connected with the kelly being adapted with neck, and the one end of the kelly away from neck sequentially passes through pole, shell The right side of body and casing and the outside for extending to casing.
The both sides of the bottom of the housing cavity are installed with elastic rod, and the top of two elastic rods passes through cross bar It is fixedly connected, the top of the cross bar is connected with roller by rotating shaft, and the roller is contacted with the bottom of kelly, the shell The both sides of intracoelomic cavity and slide rail is installed with above the kelly, and the chute of two slide rails is connected by slide plate slides, Three back-moving springs are installed with the top of the slide plate, the top of the back-moving spring and the top of cabinets cavity, which are fixed, to be connected Connect, the both sides of the slide plate bottom are installed with body, and the bottom of the body is inlaid with ball, the ball and kelly Top contact.
It is preferred that, the top of the suspension ring is interspersed to be provided with the bolt being adapted with suspension ring.
It is preferred that, rubber block is installed with the top of the suspension ring, the surface of the rubber block offers anti-slip veins, institute The top for stating bolt runs through rubber block and extends to the top of rubber block.
It is preferred that, the quantity of the pole is three, and three poles are uniformly distributed in the bottom of plate body.
It is preferred that, offer on the pole and positioned at the inside of casing the groove for being available for kelly to move.
It is preferred that, the front surface of the casing is connected with chamber door by hinge, and the front surface of the chamber door fixes peace Equipped with handle.
(3) beneficial effect
The utility model provides a kind of cable testing bridge being easily installed.Possesses following beneficial effect:
1st, cable testing bridge being easily installed, by the improvement to casing and housing, in pole, neck, kelly, elasticity In the presence of bar, cross bar, roller, slide rail, slide plate, back-moving spring, body and ball, reach that convenience is pacified to cable testing bridge The effect of dress, so as to facilitate the use of user, therefore also improves the service efficiency of cable testing bridge, while also improving electricity The operating efficiency of cable crane span structure.
2nd, the cable testing bridge being easily installed, by the setting to plate body, suspension ring, bolt and rubber block, has reached convenience The effect that cable testing bridge is fixed, so as to facilitate the use of user, therefore also improves the use effect of cable testing bridge Rate, while also improving the service efficiency of cable testing bridge.
Brief description of the drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the structural representation of the utility model casing;
Fig. 3 is the structural representation of the utility model housing.
In figure:1 plate body, 2 suspension ring, 3 poles, 4 casings, 5 housings, 6 necks, 7 kellies, 8 elastic rods, 9 cross bars, 10 rollers, 11 slide rails, 12 slide plates, 13 back-moving springs, 14 bodys, 15 balls, 16 bolts, 17 rubber blocks, 18 grooves, 19 chamber doors, 20 handles.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
The utility model embodiment provides a kind of cable testing bridge being easily installed, as Figure 1-3, including plate body 1, plate body The both sides at 1 top are installed with suspension ring 2, and the top of suspension ring 2 is interspersed to be provided with the bolt 16 being adapted with suspension ring 2, hangs The top of ring 2 is installed with rubber block 17, and the surface of rubber block 17 offers anti-slip veins, and rubber block is run through at the top of bolt 16 17 and the top of rubber block 17 is extended to, the bottom of plate body 1 is installed with pole 3, and the quantity of pole 3 is three, and three Pole 3 is uniformly distributed on the bottom of plate body 1, pole 3 and the groove for being available for kelly 7 to move is offered positioned at the inside of casing 4 18, the bottom of pole 3 is interspersed to be provided with casing 4, and the front surface of casing 4 is connected with chamber door 19 by hinge, chamber door 19 Front surface is installed with handle 20, and pole 3 is close to one end of casing 4 is through the top of casing 4 and extends in casing 4 It is installed with the right side of portion, the inner chamber of casing 4 on the left of housing 5, the inner chamber of casing 4 and is installed with neck 6, the inside of neck 6 The kelly 7 being adapted with neck 6 is connected with, the one end of kelly 7 away from neck 6 sequentially passes through the right side of pole 3, housing 5 and casing 4 Side and the outside for extending to casing 4.
The both sides of the bottom of the inner chamber of housing 5 are installed with elastic rod 8, and the top of two elastic rods 8 passes through cross bar 9 It is fixedly connected, the top of cross bar 9 is connected with roller 10 by rotating shaft, and roller 10 is contacted with the bottom of kelly 7, in housing 5 The both sides of chamber and it is installed with slide rail 11 positioned at the top of kelly 7, and the chute of two slide rails 11 passes through slide plate 12 and slided and connects Connect, the top of slide plate 12 is installed with three back-moving springs 13, and the top at the top and the inner chamber of casing 4 of back-moving spring 13 is fixed Connection, the both sides of the bottom of slide plate 12 are installed with body 14, and the bottom of body 14 is inlaid with ball 15, ball 15 and kelly 7 top contact.
In summary, the cable testing bridge being easily installed, by the improvement to casing 4 and housing 5, pole 3, neck 6, In the presence of kelly 7, elastic rod 8, cross bar 9, roller 10, slide rail 11, slide plate 12, back-moving spring 13, body 14 and ball 15, reach The effect that convenience is installed to cable testing bridge has been arrived, so as to facilitate the use of user, therefore cable testing bridge has been also improved Service efficiency, while also improving the operating efficiency of cable testing bridge.
Also, by the setting to plate body 1, suspension ring 2, bolt 16 and rubber block 17, reach that convenience is entered to cable testing bridge The fixed effect of row, so as to facilitate the use of user, therefore also improves the service efficiency of cable testing bridge, while also improving The service efficiency of cable testing bridge.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or deposited between operating In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability is included, so that process, method, article or equipment including a series of key elements not only will including those Element, but also other key elements including being not expressly set out, or also include being this process, method, article or equipment Intrinsic key element.In the absence of more restrictions, by sentence " including one ... the key element limited, it is not excluded that Also there is other identical element in process, method, article or equipment including the key element.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of cable testing bridge being easily installed, including plate body (1), it is characterised in that:The both sides at the top of the plate body (1) are equal Suspension ring (2) are installed with, the bottom of the plate body (1) is installed with pole (3), and the bottom of the pole (3) is interspersed to be set Casing (4) is equipped with, the pole (3) is close to one end of casing (4) is through the top of casing (4) and extends to the interior of casing (4) It is installed with the right side of portion, casing (4) inner chamber on the left of housing (5), casing (4) inner chamber and is installed with neck (6), the inside of the neck (6) is connected with the kelly (7) being adapted with neck (6), the remote neck (6) of the kelly (7) One end sequentially passes through pole (3), the right side of housing (5) and casing (4) and the outside for extending to casing (4);
The both sides of the bottom of housing (5) inner chamber are installed with elastic rod (8), and the top of two elastic rods (8) leads to Cross cross bar (9) to be fixedly connected, the top of the cross bar (9) is connected with roller (10) by rotating shaft, the roller (10) with The bottom contact of kelly (7), the both sides of housing (5) inner chamber and is installed with slide rail (11) above the kelly (7), And the chute of two slide rails (11) is slidably connected by slide plate (12), three resets are installed with the top of the slide plate (12) Spring (13), the top of the back-moving spring (13) with being fixedly connected at the top of casing (4) inner chamber, slide plate (12) bottom Both sides are installed with body (14), and the bottom of the body (14) is inlaid with ball (15), the ball (15) and kelly (7) top contact.
2. a kind of cable testing bridge being easily installed according to claim 1, it is characterised in that:The top of the suspension ring (2) It is interspersed to be provided with the bolt (16) being adapted with suspension ring (2).
3. a kind of cable testing bridge being easily installed according to claim 2, it is characterised in that:The top of the suspension ring (2) Rubber block (17) is installed with, the surface of the rubber block (17) offers anti-slip veins, and the top of the bolt (16) is run through Rubber block (17) and the top for extending to rubber block (17).
4. a kind of cable testing bridge being easily installed according to claim 1, it is characterised in that:The quantity of the pole (3) For three, and three poles (3) are uniformly distributed in the bottom of plate body (1).
5. a kind of cable testing bridge being easily installed according to claim 1, it is characterised in that:On the pole (3) and position The groove (18) for being available for kelly (7) mobile is offered in the inside of casing (4).
6. a kind of cable testing bridge being easily installed according to claim 1, it is characterised in that:The positive table of the casing (4) Face is connected with chamber door (19) by hinge, and the front surface of the chamber door (19) is installed with handle (20).
CN201720154673.1U 2017-02-21 2017-02-21 A kind of cable testing bridge being easily installed Withdrawn - After Issue CN206595658U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720154673.1U CN206595658U (en) 2017-02-21 2017-02-21 A kind of cable testing bridge being easily installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720154673.1U CN206595658U (en) 2017-02-21 2017-02-21 A kind of cable testing bridge being easily installed

Publications (1)

Publication Number Publication Date
CN206595658U true CN206595658U (en) 2017-10-27

Family

ID=60125277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720154673.1U Withdrawn - After Issue CN206595658U (en) 2017-02-21 2017-02-21 A kind of cable testing bridge being easily installed

Country Status (1)

Country Link
CN (1) CN206595658U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108471096A (en) * 2018-06-13 2018-08-31 广东电网有限责任公司 It is a kind of to be easily installed the crane span structure used
CN108767770A (en) * 2018-08-15 2018-11-06 江苏金利电气有限公司 A kind of Novel cable bridge
CN109560518A (en) * 2019-01-02 2019-04-02 安徽坤和电气有限公司 One kind can extend cable testing bridge
CN109728550A (en) * 2019-01-02 2019-05-07 安徽坤和电气有限公司 A kind of cellular-type cable testing bridge
CN109802339A (en) * 2019-01-02 2019-05-24 安徽坤和电气有限公司 A kind of bilayer cable testing bridge

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108471096A (en) * 2018-06-13 2018-08-31 广东电网有限责任公司 It is a kind of to be easily installed the crane span structure used
CN108471096B (en) * 2018-06-13 2023-05-26 广东电网有限责任公司 Bridge convenient to install and use
CN108767770A (en) * 2018-08-15 2018-11-06 江苏金利电气有限公司 A kind of Novel cable bridge
CN109560518A (en) * 2019-01-02 2019-04-02 安徽坤和电气有限公司 One kind can extend cable testing bridge
CN109728550A (en) * 2019-01-02 2019-05-07 安徽坤和电气有限公司 A kind of cellular-type cable testing bridge
CN109802339A (en) * 2019-01-02 2019-05-24 安徽坤和电气有限公司 A kind of bilayer cable testing bridge
CN109728550B (en) * 2019-01-02 2021-07-13 安徽天彩电缆集团有限公司 Separated cable bridge
CN109802339B (en) * 2019-01-02 2021-08-06 安徽天彩电缆集团有限公司 Double-layer cable bridge

Similar Documents

Publication Publication Date Title
CN206595658U (en) A kind of cable testing bridge being easily installed
CN208401445U (en) Multifunctional cable bridge is used in a kind of erection of electric power
CN206018910U (en) Indoor ventilation apparatus
CN207079794U (en) A kind of pass-through type smallpox Multifunctional keel
CN205791060U (en) Novel single rod suspension type capital construction case
CN202544632U (en) Glass-detachable window frame structure
CN203131369U (en) Intelligent building indoor unit with freely-adjusted visual angle
CN204696489U (en) A kind of outdoor distributing box
CN209217629U (en) A kind of waterproof cable bridge frame
CN208908330U (en) A kind of adjustable Novel cable bridge
CN208257315U (en) A kind of removable grafting gantry
CN202384681U (en) Outdoor prefabricated substation with ventilation structure
CN208654715U (en) A kind of industrial personal computer internal circuit board fixing structure
CN209658761U (en) A kind of combined type slip device with self-locking function
CN207514538U (en) A kind of security device installation mounting bracket
CN207530475U (en) A kind of automatic telescopic cable testing bridge supporting rack
CN206000345U (en) A kind of section bar resistance to compression supporting construction
CN202810505U (en) Retractile door
CN205024831U (en) H shaped steel structure
CN203603312U (en) Integrated house wall
CN209514465U (en) A kind of multi-action computer pedestal
CN203560590U (en) Horizontal cross for pallet type bridge rack
CN206639123U (en) A kind of fixing rack of computer
CN206364459U (en) A kind of combination bore cable testing bridge being easily installed
CN201778543U (en) Door handle of freezer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20171027

Effective date of abandoning: 20221128

AV01 Patent right actively abandoned

Granted publication date: 20171027

Effective date of abandoning: 20221128

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned