CN206588715U - A kind of steel elbow retaining wall on slope equipment - Google Patents

A kind of steel elbow retaining wall on slope equipment Download PDF

Info

Publication number
CN206588715U
CN206588715U CN201720223873.8U CN201720223873U CN206588715U CN 206588715 U CN206588715 U CN 206588715U CN 201720223873 U CN201720223873 U CN 201720223873U CN 206588715 U CN206588715 U CN 206588715U
Authority
CN
China
Prior art keywords
frame
hydraulic means
retaining wall
steel elbow
pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720223873.8U
Other languages
Chinese (zh)
Inventor
沈晨光
沈燕丰
沈坚
陆雁锋
杨松松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangyin East Shun Steel Structure Co Ltd
Original Assignee
Jiangyin East Shun Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangyin East Shun Steel Structure Co Ltd filed Critical Jiangyin East Shun Steel Structure Co Ltd
Priority to CN201720223873.8U priority Critical patent/CN206588715U/en
Application granted granted Critical
Publication of CN206588715U publication Critical patent/CN206588715U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a kind of steel elbow retaining wall on slope equipment, including pedestal, the pedestal top left side installs organic frame, motor is installed on the left of the frame, the output end of the motor is connected with bearing, one end of the bearing is connected with rotating shaft, the end of the rotating shaft is connected with branch sleeve, the end of the branch sleeve is connected with emery wheel body, cone tank is offered on the emery wheel body, the first hydraulic means is also equipped with the frame, the end of the support is fixedly connected with clamping device body, the clamping device body includes crossbeam, the left and right ends of the crossbeam bottom are respectively equipped with the first installing plate and the second installing plate, the second hydraulic means and the 3rd hydraulic means are installed with respectively on first installing plate and the second installing plate, a kind of steel elbow retaining wall on slope equipment of the utility model, structure is novel, it is easy to operate, operating efficiency is high, machining accuracy is high, one-shot forming, avoid secondary operation.

Description

A kind of steel elbow retaining wall on slope equipment
Technical field
The utility model is related to steel pipe technical field, specially a kind of steel elbow retaining wall on slope equipment.
Background technology
The welding of metal, has melting welding, pressure welding and soldering three major types by the characteristics of its technical process points, and welding is a kind of to add The mode jointing metal or the manufacturing process and technology of other thermoplastics such as plastics of heat, high temperature or high pressure, the energy of welding There are many kinds, including gas flame, electric arc, laser, electron beam, friction and ultrasonic wave etc. in amount source.In addition to using in the factory, Welding can also be carried out in a variety of contexts, such as field, under water and space.No matter wherein, welding all may to operator with Come dangerous, so appropriate safeguard procedures must be taken when being welded.Welding the injury being likely to result in human body includes burning Wound, electric shock, inpairment of vision, suction toxic gas, ultraviolet overexposure etc..The shape of cross section of banjo fixing butt jointing weld seam, is determined In the groove type for being soldered body thickness before welding and two edge fits.During the thicker steel plate of welding, in order to penetrate and in edge fit Place outputs variously-shaped groove, relatively easily to send into welding rod or welding wire.Groove type has the groove and two of one side welding The groove of face welding.When selecting groove type, it is also contemplated that welding is convenient in addition to through welding is ensured, filling amount of metal is few, and welding becomes Shape is small and the low factor of retaining wall on slope expense.For the processing of steel elbow groove, groove is uneven during artificial bevel, also needs Grinding process, wastes time and energy, and machine tool, which can only be realized, carries out bevel to sheet material, and expensive, inefficiency.
Utility model content
The purpose of this utility model is to provide a kind of steel elbow retaining wall on slope equipment, to solve in above-mentioned background technology The problem of proposition.
To achieve the above object, the utility model provides following technical scheme:A kind of steel elbow retaining wall on slope equipment, bag Pedestal is included, the pedestal top left side is installed and motor is provided with the left of organic frame, the frame, and the output end of the motor connects Bearing is connected to, one end of the bearing is connected with rotating shaft, and the end of the rotating shaft is connected with branch sleeve, the branch sleeve End is connected with to offer on emery wheel body, the emery wheel body is also equipped with the first hydraulic means in cone tank, the frame, The output end of first hydraulic means is connected with piston rod, and the end of the piston rod is fixedly connected with support, the support End be fixedly connected with clamping device body, the clamping device body includes crossbeam, the left and right ends of the crossbeam bottom It is respectively equipped with the first installing plate and the second installing plate, first installing plate and the second installing plate and is installed with second respectively Hydraulic means and the 3rd hydraulic means, the output end of second hydraulic means and the 3rd hydraulic means are connected to the first folder V-type locating slot, and V-type locating slot and emery wheel body are offered in plate and second clamping plate, the first clamping plate and second clamping plate On cone tank in same level height, docking groove is offered in the first clamping plate, the width of the docking groove is more than second The width of clamping plate.
It is preferred that, the annexation between the frame and pedestal is welding, orthogonal between the frame and pedestal.
It is preferred that, hog frame is additionally provided between the frame and pedestal, the hog frame, frame and pedestal form stable Triangle.
It is preferred that, the motor and the first hydraulic means are mounted by means of bolts in frame.
It is preferred that, second hydraulic means and the 3rd hydraulic means are symmetrical set.
It is preferred that, collecting tank is additionally provided with the pedestal, the collecting tank is located at the underface of emery wheel body.
Compared with prior art, the beneficial effects of the utility model are:A kind of steel elbow retaining wall on slope of the utility model Equipment, structure is novel, easy to operate, and operating efficiency is high, and machining accuracy is high, one-shot forming, it is to avoid secondary operation, with very high Practicality, greatly improve a kind of use feature of steel elbow retaining wall on slope equipment, it is ensured that its using effect and make With benefit, it is adapted to be widely popularized.
Brief description of the drawings
Fig. 1 is a kind of structural representation of steel elbow retaining wall on slope equipment of the utility model;
Fig. 2 is a kind of clamping device body construction schematic diagram of steel elbow retaining wall on slope equipment of the utility model;
Fig. 3 shows for the first clamping plate and second clamping plate docking structure of a kind of steel elbow retaining wall on slope equipment of the utility model It is intended to.
In figure:1 pedestal, 2 frames, 3 hog frames, 4 motors, 5 bearings, 6 rotating shafts, 7 branch sleeves, 8 emery wheel bodies, 9 first Hydraulic means, 10 piston rods, 11 supports, 12 clamping device bodies, 13 crossbeams, 14 first installing plates, 15 second installing plates, 16 Two hydraulic means, 17 the 3rd hydraulic means, 18 first clamping plates, 19 second clamping plates, 20 docking grooves, 21 collecting tanks.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:A kind of steel elbow retaining wall on slope equipment, including Pedestal 1, the top left side of pedestal 1 installs organic frame 2, and the left side of the frame 2 is provided with motor 4, the output of the motor 4 End is connected with bearing 5, and one end of the bearing 5 is connected with rotating shaft 6, and the end of the rotating shaft 6 is connected with branch sleeve 7, described The end of branch sleeve 7, which is connected with emery wheel body 8, the emery wheel body 8, offers cone tank, is also installed in the frame 2 There is the first hydraulic means 9, the output end of first hydraulic means 9 is connected with piston rod 10, and the end of the piston rod 10 is consolidated Surely support 11 is connected with, the end of the support 11 is fixedly connected with clamping device body 12, and the clamping device body 12 is wrapped Crossbeam 13 is included, the left and right ends of the bottom of crossbeam 13 are respectively equipped with the first installing plate 14 and the second installing plate 15, described first The second hydraulic means 16 and the 3rd hydraulic means 17, described second are installed with respectively on the installing plate 15 of installing plate 14 and second The output end of the hydraulic means 17 of hydraulic means 16 and the 3rd is connected to first clamping plate 18 and second clamping plate 19, first folder The cone tank on V-type locating slot, and V-type locating slot and emery wheel body 8 is offered on plate 18 and second clamping plate 19 in same water Docking groove 20 is offered in flat height, the first clamping plate 18, the width of the docking groove 20 is more than the width of second clamping plate 19, Annexation between the frame 2 and pedestal 1 is welding, orthogonal between the frame 2 and pedestal 1, the He of frame 2 It is additionally provided with hog frame 3 between pedestal 1, the hog frame 3, frame 2 and the stable triangle of the formation of pedestal 1, the motor 4 and the One hydraulic means 9 is mounted by means of bolts in frame 2, the hydraulic means 17 or so of the second hydraulic means 16 and the 3rd It is symmetrical arranged, collecting tank 21 is additionally provided with the pedestal 1, the collecting tank 21 is located at the underface of emery wheel body 8.
Operation principle:A kind of steel elbow retaining wall on slope equipment of the utility model, in use, selection is closed as needed first Suitable emery wheel body 8, makes the cone tank on emery wheel body 8 meet groove requirement, and one end of steel pipe to be processed is placed on into the first folder Between plate 18 and second clamping plate 19, first clamping plate 18 and second is promoted to press from both sides by the second hydraulic means 16 and the 3rd hydraulic means 17 Plate 19 is drawn close mutually, is finally firmly fixed steel pipe to be processed, and the cone tank on steel pipe to be processed and emery wheel body 8 is existed Same level height, now starts motor 4, drives emery wheel body 8 to rotate at a high speed, and controls the promotion of the first hydraulic means 9 to clamp Device body 12 is close to emery wheel body 8, and the end and emery wheel body 8 for making steel pipe to be processed are contacted, and realizes the end to processing steel pipe The processing of portion's groove, after machining, is resetted, steel pipe is taken out, and the waste material of generation falls to be collected in collecting tank 21.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of steel elbow retaining wall on slope equipment, including pedestal(1), it is characterised in that:The pedestal(1)Top left side is installed Organic frame(2), the frame(2)Left side motor is installed(4), the motor(4)Output end be connected with bearing(5), institute State bearing(5)One end be connected with rotating shaft(6), the rotating shaft(6)End be connected with branch sleeve(7), the branch sleeve (7)End be connected with emery wheel body(8), the emery wheel body(8)On offer cone tank, the frame(2)On also install There is the first hydraulic means(9), first hydraulic means(9)Output end be connected with piston rod(10), the piston rod(10) End be fixedly connected with support(11), the support(11)End be fixedly connected with clamping device body(12), the folder Tight device body(12)Including crossbeam(13), the crossbeam(13)The left and right ends of bottom are respectively equipped with the first installing plate(14)With Second installing plate(15), first installing plate(14)With the second installing plate(15)It is upper to be installed with the second hydraulic means respectively (16)With the 3rd hydraulic means(17), second hydraulic means(16)With the 3rd hydraulic means(17)Output end connect respectively There is first clamping plate(18)And second clamping plate(19), the first clamping plate(18)And second clamping plate(19)On offer V-type positioning Groove, and V-type locating slot and emery wheel body(8)On cone tank same level height, the first clamping plate(18)On offer Docking groove(20), the docking groove(20)Width be more than second clamping plate(19)Width.
2. a kind of steel elbow retaining wall on slope equipment according to claim 1, it is characterised in that:The frame(2)And base Seat(1)Between annexation for welding, the frame(2)And pedestal(1)Between it is orthogonal.
3. a kind of steel elbow retaining wall on slope equipment according to claim 1, it is characterised in that:The frame(2)And base Seat(1)Between be additionally provided with hog frame(3), the hog frame(3), frame(2)And pedestal(1)Form stable triangle.
4. a kind of steel elbow retaining wall on slope equipment according to claim 1, it is characterised in that:The motor(4)With One hydraulic means(9)It is mounted by means of bolts on frame(2)On.
5. a kind of steel elbow retaining wall on slope equipment according to claim 1, it is characterised in that:Second hydraulic means (16)With the 3rd hydraulic means(17)It is symmetrical set.
6. a kind of steel elbow retaining wall on slope equipment according to claim 1, it is characterised in that:The pedestal(1)It is upper to go back Provided with collecting tank(21), the collecting tank(21)Positioned at emery wheel body(8)Underface.
CN201720223873.8U 2017-03-09 2017-03-09 A kind of steel elbow retaining wall on slope equipment Expired - Fee Related CN206588715U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720223873.8U CN206588715U (en) 2017-03-09 2017-03-09 A kind of steel elbow retaining wall on slope equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720223873.8U CN206588715U (en) 2017-03-09 2017-03-09 A kind of steel elbow retaining wall on slope equipment

Publications (1)

Publication Number Publication Date
CN206588715U true CN206588715U (en) 2017-10-27

Family

ID=60126029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720223873.8U Expired - Fee Related CN206588715U (en) 2017-03-09 2017-03-09 A kind of steel elbow retaining wall on slope equipment

Country Status (1)

Country Link
CN (1) CN206588715U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110900346A (en) * 2019-12-12 2020-03-24 郑喜凤 Multi-functional steel pipe grinding device for building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110900346A (en) * 2019-12-12 2020-03-24 郑喜凤 Multi-functional steel pipe grinding device for building
CN110900346B (en) * 2019-12-12 2021-06-01 江苏恒健建设集团有限公司 Multi-functional steel pipe grinding device for building

Similar Documents

Publication Publication Date Title
CN206305931U (en) A kind of small-sized efficient sander of composite steel tube
CN210499010U (en) Positioner of welding
CN206588715U (en) A kind of steel elbow retaining wall on slope equipment
CN206869393U (en) A kind of square tube positioning fixture
CN205765373U (en) A kind of tilting steel-pipe welding cut processing unit (plant)
CN207205642U (en) A kind of multi-functional Anti-dislocation steel-pipe welding equipment
CN102528370B (en) Pipe welding clamp
CN107627167A (en) A kind of pipeline end face high-efficient treatment device for building
CN208528391U (en) A kind of clamping tooling for the welding of shield girff
CN206632497U (en) A kind of vertical circumferential weld automatic TIG welding machine
CN210789691U (en) Cutting device for sheet metal process
CN212420294U (en) Pipeline erection welding steel frame for building construction
CN215588103U (en) Fixed submerged arc welding machine for building construction
CN214236695U (en) High-frequency heating device for compressor shell circular arc welding
CN210548985U (en) Feeding mechanism for laser cutting machine
CN212217538U (en) Vertical bearing bush welding platform
CN218366581U (en) Welding seam machine for processing steel-plastic composite barrel
CN105081659A (en) Roller type welding positioner
CN207942125U (en) A kind of deadlock anti-deformation arc welding fixture
CN211570715U (en) Longitudinal submerged arc welded pipe induction heating device
CN206779687U (en) valve automatic welding device
CN210498960U (en) Automatic welding is support frame for device with adjustable high stability
CN215902992U (en) Box splicing device for producing letter and newspaper boxes
CN220407748U (en) Clamp for welding metal tube
CN214921216U (en) Material high-frequency heating module of welding machine for pressure gauge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171027

Termination date: 20190309

CF01 Termination of patent right due to non-payment of annual fee