CN206582519U - Cryogenic Dewar bottle is prized - Google Patents

Cryogenic Dewar bottle is prized Download PDF

Info

Publication number
CN206582519U
CN206582519U CN201720179426.7U CN201720179426U CN206582519U CN 206582519 U CN206582519 U CN 206582519U CN 201720179426 U CN201720179426 U CN 201720179426U CN 206582519 U CN206582519 U CN 206582519U
Authority
CN
China
Prior art keywords
dewar bottle
pipeline
gas phase
phase pipeline
cryogenic dewar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720179426.7U
Other languages
Chinese (zh)
Inventor
孟树森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangjiagang Epps Energy Equipment Co Ltd
Original Assignee
Zhangjiagang Epps Energy Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangjiagang Epps Energy Equipment Co Ltd filed Critical Zhangjiagang Epps Energy Equipment Co Ltd
Priority to CN201720179426.7U priority Critical patent/CN206582519U/en
Application granted granted Critical
Publication of CN206582519U publication Critical patent/CN206582519U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This application discloses a kind of cryogenic Dewar bottle sled.The cryogenic Dewar bottle is prized, including control device, one feeder, at least one fills pipeline and some flexible pipes, the control device includes control cabinet, first gas phase pipeline, first liquid pipe and electronic-weighing claim, the first gas phase pipeline and the first liquid pipe pass through control cabinet, the pipeline that fills includes the second gas phase pipeline and second liquid phase pipeline, the second gas phase pipeline is sequentially connected the first gas phase pipeline by flexible pipe, the gas phase mouth of first stop valve and cryogenic Dewar bottle, the second liquid phase pipeline is sequentially connected the first liquid pipe by flexible pipe, second stop valve, pneumatic operated valve, pressure transmits the liquid phase mouthful of table and cryogenic Dewar bottle, the cryogenic Dewar bottle is deserved to be called located at electronic-weighing, the feeder is connected to the pneumatic operated valve.This new type low temperature Dewar bottle sled it is settable it is multiple fill pipeline, drastically increase and fill efficiency, use electronic-weighing instead and claim to replace conventional flow meters, more accurately measure filling weight.

Description

Cryogenic Dewar bottle is prized
Technical field
The application is related to LNG fields, more particularly to a kind of cryogenic Dewar bottle sled.
Background technology
At present, all it is single joint for filling for Dewar bottle in LNG loading technique, every time can only be independent one The LNG of Dewar bottle is filled, and efficiency is extremely low, and the vacuum line in filling equipment is fixedly connected with liquid feeding flexible pipe, it has not been convenient to fill, Tear open, use flowmeter the measure of existing filling weight more in addition, due to many reasons such as pressure, easily cause measurement error compared with Greatly.So needing to propose to improve.
Utility model content
The purpose of this utility model is to provide a kind of cryogenic Dewar bottle sled, to overcome deficiency of the prior art.
To achieve the above object, the utility model provides following technical scheme:
The embodiment of the present application discloses a kind of cryogenic Dewar bottle sled, including control device, a feeder, at least one fills Pipeline and some flexible pipes, the control device claim including control cabinet, the first gas phase pipeline, the first liquid pipe and electronic-weighing, The first gas phase pipeline and the first liquid pipe pass through control cabinet, and the pipeline that fills includes the second gas phase pipeline and the second liquid Phase pipeline, the second gas phase pipeline is sequentially connected the first gas phase pipeline, the first stop valve and cryogenic Dewar bottle by flexible pipe Gas phase mouth, the second liquid phase pipeline is sequentially connected the first liquid pipe, the second stop valve, pneumatic operated valve, pressure by flexible pipe and passed The liquid phase mouthful of table and cryogenic Dewar bottle is sent, the cryogenic Dewar bottle is deserved to be called located at electronic-weighing, and the feeder is connected to institute State pneumatic operated valve.
It is preferred that, in above-mentioned cryogenic Dewar bottle sled, the first gas phase pipeline and the first liquid pipe are in connection the First pressure table and second pressure table are respectively equipped with pipeline before two gas phase pipelines and second liquid phase pipeline.
It is preferred that, in above-mentioned cryogenic Dewar bottle sled, it is provided between the first gas phase pipeline and second liquid phase pipeline Reflux line, the reflux line end is connected between first pressure table sum the second gas phase pipeline, and the return line is first End is connected between the pressure transmitter and cryogenic Dewar bottle liquid phase mouthful.
It is preferred that, in above-mentioned cryogenic Dewar bottle sled, the 3rd stop valve is provided with the return line.
It is preferred that, in above-mentioned cryogenic Dewar bottle sled, the control cabinet includes casing, emergency stop switch, gas leakage report Alert detector, pressure warning unit and touch-screen, the emergency stop switch, gas leakage alarm detector, pressure warning unit and Touch-screen is fixed on the casing.
It is preferred that, in above-mentioned cryogenic Dewar bottle sled, the pressure warning unit can set alarm pressure scope.
It is preferred that, in above-mentioned cryogenic Dewar bottle sled, the touch-screen includes automatic mode and manual mode, it is described from Dynamic model formula shows the filling weight of each cryogenic Dewar bottle, and the manual mode single can be filled manually.
Compared with prior art, the utility model has the advantage of:This new type low temperature Dewar bottle sled multiple can be applied in combination, Drastically increase and fill efficiency, use electronic-weighing instead and claim to replace conventional flow meters, more accurately measure filling weight, increase simultaneously Return line, can utilize the liquids recovery remained in pipeline, additionally by the optimization to process system, for filling During the bog of generation may be recovered utilization.
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments described in application, for those of ordinary skill in the art, on the premise of not paying creative work, Other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 show the structural representation that cryogenic Dewar bottle is prized in the utility model specific embodiment.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Detailed description, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole implementation Example.Based on the embodiment in the utility model, those of ordinary skill in the art institute on the premise of creative work is not made The every other embodiment obtained, belongs to the scope of the utility model protection.
Join shown in Fig. 1, the cryogenic Dewar bottle sled in the present embodiment, including control device 10, a feeder 20, at least one Pipeline 30 and some flexible pipes 40 are filled, control device 10 includes control cabinet 11, the first gas phase pipeline 12, the and of the first liquid pipe 13 Electronic-weighing claims 14, and the first gas phase pipeline 12 and the first liquid pipe 13 pass through control cabinet 11, and filling pipeline 30 includes the second gas Phase pipeline 31 and second liquid phase pipeline 32, the second gas phase pipeline 31 are sequentially connected the first gas phase pipeline 12, first by flexible pipe 40 The gas phase mouth of stop valve 33 and cryogenic Dewar bottle 50, second liquid phase pipeline 32 is sequentially connected the first liquid pipe by flexible pipe 40 13rd, the liquid phase mouthful of the second stop valve 34, pneumatic operated valve 35, pressure transmission table 36 and cryogenic Dewar bottle 50, cryogenic Dewar bottle 50 is located at Electronic-weighing claims on 14, and feeder 20 is connected to pneumatic operated valve 35.
In the technical scheme, this new type low temperature Dewar bottle sled it is settable it is multiple fill pipeline 30, while being shut out to multiple low temperature Watt bottle is filled, and drastically increase cryogenic Dewar bottle fills efficiency;14 are claimed to replace conventional flow in addition, using electronic-weighing instead Gauge, more accurately measures filling weight, the first gas phase pipeline 12 and the second gas phase pipeline 31 is added, in filling process The bog of generation may be recovered utilization.
Further, the first gas phase pipeline 12 and the first liquid pipe 13 are connecting the second gas phase pipeline 31 and second liquid phase First pressure table 15 and second pressure table 16 are respectively equipped with pipeline before pipeline 32.
In the technical scheme, the first gas phase pipeline 12 and the first liquid pipe 13 are connecting the second gas phase pipeline 31 and second First pressure table 15 and second pressure table 16 are respectively equipped with pipeline before liquid pipe 32, passes through first pressure table 15 and Two pressure gauges 16 can observe the pressure change in filling process constantly, to adjust charge pressure in time.
Further, reflux line 60, reflux line 60 are provided between the first gas phase pipeline 12 and second liquid phase pipeline 32 End is connected between the gas phase pipeline 31 of first pressure table 15 and second, and the head end of return line 60 is connected to the He of pressure transmitter 36 Between the liquid phase mouthful of cryogenic Dewar bottle 50.
Further, the 3rd stop valve 61 is provided with reflux line 60.
In above-mentioned two technical scheme, reflux line 60 is provided between the first gas phase pipeline 12 and second liquid phase pipeline 32, is returned The 3rd stop valve 61 is provided with flow tube road 60, in filling process, the 3rd stop valve 61 is closed, and reflux line 60 is not Work, and after end is filled, the liquid for opening residual in the 3rd stop valve 61, second liquid phase pipeline 32 just can be by returning Flow tube road 60 flows back to tank car or liquid feeding is in-car, it is to avoid waste, and saves the energy.
Further, control cabinet 11 includes casing 111, emergency stop switch 112, gas leakage alarm detector 113, pressure report Alarm device 114 and touch-screen 115, emergency stop switch 112, gas leakage alarm detector 113, pressure warning unit 114 and touch Screen 115 is fixed on casing 111.
In the technical scheme, emergency stop switch 112 can close the utility model cryogenic Dewar bottle and prize all pneumatic operated valves 35, in hair During raw emergency, filling process can be cut off, gas leakage alarm detector 113 can be by control when occurring gas leakage Device 10 cuts off filling process, and pressure warning unit 114 can be cut when charge pressure exceeds setting range by control device 10 Disconnected filling process, touch-screen 115 can realize the operating function such as manual.
Further, pressure warning unit 114 can set alarm pressure scope.
In the technical scheme, pressure warning unit 114 can set alarm pressure scope, for the cooled cryostat of different size Bottle 50, charge pressure is also different, adjusts the alarm pressure scope of pressure warning unit 114, expands the utility model cooled cryostat The application of bottle sled.
Further, touch-screen 115 includes automatic mode and manual mode, and automatic mode shows filling for each cryogenic Dewar bottle Loading amount, manual mode single can be filled manually.
In the technical scheme, during automatic mode, touch-screen 115 shows the numbering of each cryogenic Dewar bottle 50 and filled accordingly Loading amount, is easy to observation, and manual mode can realize that quantitative and quota is filled to single cryogenic Dewar bottle, while filling When loading amount is not enough, it is possible to use manual mode is supplemented.
In summary, the utility model cryogenic Dewar bottle sled multiple can be applied in combination, and drastically increases and fills efficiency, changes Claimed to replace conventional flow meters with electronic-weighing, more accurately measure filling weight, while adding return line, will can remained in Liquids recovery in pipeline is utilized, and additionally by the optimization to process system, can be carried out for the bog of the generation in filling process Recycle.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or deposited between operating In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability is included, so that process, method, article or equipment including a series of key elements not only will including those Element, but also other key elements including being not expressly set out, or also include being this process, method, article or equipment Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Also there is other identical element in process, method, article or equipment including the key element.
Described above is only the embodiment of the application, it is noted that for the ordinary skill people of the art For member, on the premise of the application principle is not departed from, some improvements and modifications can also be made, these improvements and modifications also should It is considered as the protection domain of the application.

Claims (7)

1. a kind of cryogenic Dewar bottle sled, it is characterised in that if including control device, a feeder, at least one fill pipeline and Dry flexible pipe, the control device claims including control cabinet, the first gas phase pipeline, the first liquid pipe and electronic-weighing, and described first Gas phase pipeline and the first liquid pipe pass through control cabinet, and the pipeline that fills includes the second gas phase pipeline and second liquid phase pipeline, The second gas phase pipeline is sequentially connected the gas phase mouth of the first gas phase pipeline, the first stop valve and cryogenic Dewar bottle by flexible pipe, The second liquid phase pipeline is sequentially connected the first liquid pipe, the second stop valve, pneumatic operated valve, pressure transmission table and low by flexible pipe The liquid phase mouthful of warm Dewar bottle, the cryogenic Dewar bottle is deserved to be called located at electronic-weighing, and the feeder is connected to the pneumatic operated valve.
2. cryogenic Dewar bottle sled according to claim 1, it is characterised in that:The first gas phase pipeline and the first liquid-phase tube Road is respectively equipped with first pressure table and second pressure table in the pipeline before connecting the second gas phase pipeline and second liquid phase pipeline.
3. cryogenic Dewar bottle sled according to claim 2, it is characterised in that:The first gas phase pipeline and second liquid phase pipe Reflux line is provided between road, the reflux line end is connected between first pressure table sum the second gas phase pipeline, described Return line head end is connected between the pressure transmitter and cryogenic Dewar bottle liquid phase mouthful.
4. cryogenic Dewar bottle sled according to claim 3, it is characterised in that:Provided with the 3rd cut-off in the return line Valve.
5. cryogenic Dewar bottle sled according to claim 1, it is characterised in that:The control cabinet include casing, emergency stop switch, Gas leakage alarm detector, pressure warning unit and touch-screen, the emergency stop switch, gas leakage alarm detector, pressure Warning device and touch-screen are fixed on the casing.
6. cryogenic Dewar bottle sled according to claim 5, it is characterised in that:The pressure warning unit can set alarm pressure Power scope.
7. cryogenic Dewar bottle sled according to claim 5, it is characterised in that:The touch-screen includes automatic mode and manual Pattern, the automatic mode shows the filling weight of each cryogenic Dewar bottle, and the manual mode single can be filled manually.
CN201720179426.7U 2017-02-27 2017-02-27 Cryogenic Dewar bottle is prized Expired - Fee Related CN206582519U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720179426.7U CN206582519U (en) 2017-02-27 2017-02-27 Cryogenic Dewar bottle is prized

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720179426.7U CN206582519U (en) 2017-02-27 2017-02-27 Cryogenic Dewar bottle is prized

Publications (1)

Publication Number Publication Date
CN206582519U true CN206582519U (en) 2017-10-24

Family

ID=60091012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720179426.7U Expired - Fee Related CN206582519U (en) 2017-02-27 2017-02-27 Cryogenic Dewar bottle is prized

Country Status (1)

Country Link
CN (1) CN206582519U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113464836A (en) * 2021-07-07 2021-10-01 广州市粤佳气体有限公司 Full-automatic supply process for low-temperature liquid gas dewar tank

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113464836A (en) * 2021-07-07 2021-10-01 广州市粤佳气体有限公司 Full-automatic supply process for low-temperature liquid gas dewar tank

Similar Documents

Publication Publication Date Title
CN101418908B (en) Air entraining system for high-pressure hydrogenation stations
CN101957294B (en) Saving type valve low temperature test system
WO2015101134A1 (en) Drug dosing device and method for dosage metering and control
CN202938010U (en) Automatic filling system
CN206582519U (en) Cryogenic Dewar bottle is prized
CN204512945U (en) A kind of LNG vaporizing station
CN202442107U (en) Independent liquefied natural gas supply device
CN104075780A (en) Connection method for verification and calibration of flow instruments
CN206973262U (en) A kind of LNG cold pump sump gas extraction system
CN112903068A (en) Non-constant-current low-temperature static mass method calibrating device and method thereof
CN204829260U (en) LNG that can accurately measure adds mechanism of qi
CN104865043B (en) A kind of LNG cold flow characteristics experimental provision
CN204359610U (en) A kind of full-automatic gas cylinder internal test method water test unit
CN203348913U (en) Liquid ammonia loading and unloading system
CN207814922U (en) A kind of carbon dioxide charging device
CN206247018U (en) LNG gasification air supply system
CN201837564U (en) Calibration device for low-temperature gas bottle safety valve
CN205480201U (en) Liquefied natural gas double - circuit precise measurement system
CN206723838U (en) A kind of LNG tank BOG recovery systems
CN204404623U (en) Hybrid refrigeration cryogen matching device
CN208222070U (en) LNG pressure liquid level emasuring device
CN208951669U (en) A kind of double metering dispensers based on single current gauge
CN203052196U (en) Recovery device for residual liquid in filing pipeline of cryogenic liquid tank lorry
CN205352688U (en) Low temperature valve capability test device based on computer data gathers
CN207215237U (en) Differential pressure type level gauge liquid phase device improved structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171024

CF01 Termination of patent right due to non-payment of annual fee