CN206582451U - Turn on joint - Google Patents

Turn on joint Download PDF

Info

Publication number
CN206582451U
CN206582451U CN201720184220.3U CN201720184220U CN206582451U CN 206582451 U CN206582451 U CN 206582451U CN 201720184220 U CN201720184220 U CN 201720184220U CN 206582451 U CN206582451 U CN 206582451U
Authority
CN
China
Prior art keywords
mobile jib
sleeve pipe
described sleeve
face
back segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720184220.3U
Other languages
Chinese (zh)
Inventor
刘国仟
李光显
吴壬华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Shinry Technologies Co Ltd
Original Assignee
Shenzhen Shinry Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Shinry Technologies Co Ltd filed Critical Shenzhen Shinry Technologies Co Ltd
Priority to CN201720184220.3U priority Critical patent/CN206582451U/en
Application granted granted Critical
Publication of CN206582451U publication Critical patent/CN206582451U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

One kind conducting joint, including mobile jib, sealing ring, sleeve pipe, mobile jib push-and-pull component.The mobile jib includes front end face, side between rear end face and the connection front end face and the rear end face, the mobile jib is provided with casting die close to one end of the front end face, described sleeve pipe is sheathed on the mobile jib periphery, the sealing ring is sheathed on the mobile jib periphery and positioned between the casting die and described sleeve pipe, the mobile jib push-and-pull component is connected to the mobile jib close to described rear end face one end, the mobile jib push-and-pull component is used to drive the mobile jib to move relative to described sleeve pipe, to cause the casting die to be moved towards described sleeve pipe and compress the sealing ring, so that the sealing ring radial dimension increase.The mobile jib is provided with hollow passageway, for connecting the detection tracheae and detected passage.The application can fast and effeciently turn on detected passage and detection tracheae, easy to operate, efficiency high without using instrument.

Description

Turn on joint
Technical field
The utility model is related to mechanical structure field, and in particular to one kind conducting joint.
Background technology
In the procedure for producing of the Electronic Assemblies product provided with water-cooling channel, in order to ensure the sealing of water-cooling channel, need Pressurized seal detection is carried out to water-cooling channel, the detection process needs to install the water nozzle and pressurized seal of water-cooling channel The conducting joint that detection tracheae is quickly connected.
In the prior art, generally detection tracheae is directly set on the water nozzle of water-cooling channel, then with the annular of screw-threaded coupling Retaining ring tracheae and water nozzle joint portion outer locking, with reach detection tracheae and water-cooling channel water nozzle between air pressure conducting, The function of transferring high voltage gas.However, this method needs to be installed annular retaining ring with screwdriver and is locked at tracheae and water nozzle Joint portion.It can be seen that, the method for being turned on the air pressure between tracheae and water nozzle using prior art needs the cooperation of extraneous instrument, It is careless slightly and troublesome poeration, activity duration are long, easily injure body;In addition, the ring for moving back loose screw thread in off working state Shape retaining ring simply falls out tracheae, finds time-consuming during next clamping.
Therefore, a kind of fast and convenient conducting joint of installation process how is designed, water nozzle and the detection of water-cooling channel is realized Air pressure conducting between tracheae, solves the extraneous instrument of installation conducting joint dependence, troublesome poeration, activity duration in the prior art long The problem of, it is the direction of industry research.
Utility model content
The purpose of this utility model is to provide a kind of conducting joint, realizes between the water nozzle of water-cooling channel and detection tracheae Air pressure is turned on, and solves to install the problem of conducting joint relies on extraneous instrument, troublesome poeration, long activity duration in the prior art.
In order to solve problem present in background technology, joint is turned on this application provides one kind, for connecting detection gas Pipe and detected passage, including mobile jib, sealing ring, sleeve pipe, mobile jib push-and-pull component;
The mobile jib includes the side between front end face, rear end face and the connection front end face and the rear end face, described Mobile jib is provided with casting die close to one end of the front end face, and the mobile jib is provided with hollow passageway, and the hollow passageway includes being conducted The first conducting orifice and the second conducting orifice, first conducting orifice be used for communicated with the detected passage, it is described second conducting Mouth is used to connect the detection tracheae;
Described sleeve pipe is sheathed on the mobile jib periphery, and described sleeve pipe includes positioning end face, and the positioning end face is used for and institute State detected passage to be fixedly connected, to fix the position of described sleeve pipe;
The sealing ring is sheathed on the mobile jib, and positioned between the casting die and described sleeve pipe;
The mobile jib push-and-pull component is connected to the mobile jib close to described rear end face one end, and the mobile jib push-and-pull component is used for The mobile jib is driven to be moved relative to described sleeve pipe, to cause the casting die to be moved towards described sleeve pipe and compress the sealing ring, So that the sealing ring radial dimension increases and is in close contact to form sealing structure with the sense channel, first conducting orifice Between the front end face and the sealing ring, second conducting orifice is located between sleeve pipe and the rear end face.
Wherein, the mobile jib includes mobile jib leading portion, and the end face of the mobile jib leading portion is the front end face, and the casting die is spiral shell Mother, is bolted on the mobile jib leading portion, and the sealing ring is sheathed on the mobile jib leading portion periphery, by adjusting the casting die in institute The position of mobile jib leading portion is stated, to adjust the increased size of sealing ring radial dimension.
Wherein, the mobile jib also includes mobile jib back segment, and the mobile jib back segment and the mobile jib leading portion are coaxially connected, the master Bar back segment is formed by the enlarged outside diameter of the mobile jib leading portion, and the end face away from the mobile jib leading portion is institute on the mobile jib back segment Rear end face is stated, described sleeve pipe includes connected sleeve pipe leading portion and sleeve pipe back segment, and described sleeve pipe back segment is by described sleeve pipe leading portion External diameter and internal diameter, which expand, to be formed, and described sleeve pipe leading portion is adjacent to the sealing ring and is sheathed on the mobile jib leading portion periphery, the set Pipe back segment is sheathed on the mobile jib back segment periphery, and the positioning end face is the company between described sleeve pipe leading portion and described sleeve pipe back segment Junction, the internal diameter of described sleeve pipe leading portion is less than the external diameter of the mobile jib back segment, to limit the mobile jib back segment towards described sleeve pipe The direction motion of leading portion.
Wherein, sleeve pipe also includes casing joints, and described sleeve pipe connector is sheathed on the mobile jib back segment periphery and fixed In described sleeve pipe back segment, the other end is articulated with the mobile jib push-and-pull component.
Wherein, the mobile jib push-and-pull component is held and a pair of handles, the pair of swivel bearing and institute including a pair of rotary shafts State the opposite sides that a pair of handles are respectively arranged at the mobile jib back segment;The swivel bearing two ends respectively with described sleeve pipe, institute State handle to be hinged, the handle two ends are hinged with the swivel bearing, the mobile jib back segment respectively.
Wherein, a pair of first positioning holes are additionally provided with described sleeve pipe connector;The pair of swivel bearing is close to the set One end of pipe connections is provided with the second positioning hole, and second positioning hole passes through hinge with first positioning hole;
Wherein, the pair of handle includes installation portion and Handheld Division, and the handgrip part is in the installation portion away from described The side of mobile jib, described Handheld Division one end is connected with the installation portion close to one end of the swivel bearing;The pair of rotation The one end of bearing away from described sleeve pipe connector is additionally provided with the first rotating hole, and the installation portion is close to one end of the swivel bearing Provided with the second rotating hole, first rotating hole passes through hinge with second rotating hole.
Wherein, the one end of the installation portion away from the swivel bearing is provided with the first advance and retreat hole, the mobile jib back segment side Upper that the second advance and retreat hole is provided with the rear end face, the first advance and retreat hole passes through hinge with the second advance and retreat hole.
Wherein, the mobile jib push-and-pull component also include limiting section, the limiting section two ends respectively with the pair of rotary shaft Hold connected, the limiting section is located between the pair of swivel bearing and the pair of handle, to hinder the pair of handle court Moved to the pair of swivel bearing.
The pair of handle is rotated in a clockwise direction centered on second rotating hole, second rotating hole is driven The rotate counterclockwise centered on second positioning hole, pulls the first advance and retreat hole to be moved away from described sleeve pipe, so as to drive described Mobile jib back segment is moved away from described sleeve pipe, to drive the casting die to be moved towards described sleeve pipe, extrudes the sealing ring, described one To rotatable handle to when abutting the locating part, the conducting joint reaches self-locking state;Centered on second rotating hole The pair of handle of counterclockwise rotates, second rotating hole is turned clockwise centered on second positioning hole, is pushed away Dynamic first advance and retreat hole is moved towards described sleeve pipe, so that promote the mobile jib back segment to be moved towards described sleeve pipe, it is described to drive Casting die is moved away from described sleeve pipe, discharges the sealing ring, when the mobile jib back segment is abutted to described sleeve pipe leading portion, the conducting Joint reaches released state.
The embodiment of the present application provides a kind of conducting joint, by setting hollow passageway in conducting joint, realize by Conducting between sense channel and detection tracheae;By rotating handle, casting die crush seal circle is driven, sealing ring is produced shape Become, passage be detected so as to quickly and easily block, it is ensured that good sealing property between conducting joint and detected passage, Air flow direction hollow passageway is guided simultaneously.The application is avoided using annular retaining ring and instrument, can fast and effeciently be turned on tested Survey passage and detection tracheae, easy to operate, efficiency high.
Brief description of the drawings
In order to illustrate more clearly of the technical scheme of the utility model embodiment, it will use below required in embodiment Accompanying drawing be briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present utility model, right For those of ordinary skill in the art, on the premise of not paying creative work, it can also be obtained according to these accompanying drawings His accompanying drawing.
Fig. 1 is the conducting joint configuration schematic diagram of the embodiment of the present application;
Fig. 2 is the conducting joint released state overall structure diagram of the embodiment of the present application;
Fig. 3-1 is the mobile jib structural representation of the conducting joint of the embodiment of the present application;
Fig. 3-2 is the mobile jib cross section structure schematic diagram of the conducting joint of the embodiment of the present application;
Fig. 4-1 is the sleeve structure schematic diagram of the conducting joint of the embodiment of the present application;
Fig. 4-2 is the casing profile structural representation of the conducting joint of the embodiment of the present application;
Fig. 5 is the conducting joint released state lower rhabd and casing profile structural representation of the embodiment of the present application;
Fig. 6 is the conducting joint released state lower seal and detected channel design schematic diagram of the embodiment of the present application;
Fig. 7 is the conducting joint released state lower rhabd push-and-pull modular construction schematic diagram of the embodiment of the present application;
Fig. 8 is the conducting joint self-locking state lower rhabd push-and-pull modular construction schematic diagram of the embodiment of the present application;
Fig. 9 is the conducting joint self-locking state structural representation of the embodiment of the present application;
Figure 10 is the conducting joint self-locking state lower rhabd and casing profile structural representation of the embodiment of the present application;
Figure 11 is the conducting joint self-locking state lower seal of the embodiment of the present application and detected channel cross-section structural representation Figure.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme to the utility model embodiment is carried out clearly Chu, it is fully described by.
Described in this application front end, rear end, left side, right side are illustrated by taking the direction of arrow in accompanying drawing 1 as an example, The direction indicated by arrow in accompanying drawing 1 is front end, and direction indicated by arrow is reversed rear end, using arrow direction as just To left-hand side direction is left side, and right-hand side direction is right side, is axial direction along the central axis direction of mobile jib, in mobile jib The direction of heart axle is radially.
Fig. 1 and Fig. 2 are referred to, joint is turned on this application provides one kind, for connecting detection tracheae and detected passage. The conducting joint includes casting die 1, sealing ring 2, mobile jib 3, sleeve pipe 4 and mobile jib push-and-pull component 5.The mobile jib 3 includes front end face 301st, the side 303 between rear end face 302 and the connection front end face 301 and the rear end face 302.
The mobile jib 3 is provided with casting die 1 close to one end of the front end face 301.In the present embodiment, the casting die 1 is Solid construction, the casting die 1 is fixedly connected on the mobile jib 3.When turning on joint in self-locking state, the casting die 1 and institute State sealing ring 2 closely coupled, or even under the squeezing action of casting die 1, casting die 1 described in the portion envelops of sealing ring 2 so that described It is seamless between casting die 1 and the sealing ring 2.Under the squeezing action of casting die 1, the sealing ring 2 is filled in the mobile jib 3 and institute State the gap between detected passage so that the tightly sealed detected passage of conducting joint, carry out air pressure inspection During survey, the problem of gas is leaked is not resulted in.
Fig. 3-1 and Fig. 3-2 are referred to, the mobile jib 3 is provided with hollow passageway 31, and the hollow passageway 31 includes what is be conducted First conducting orifice 311 and the second conducting orifice 312, first conducting orifice 311 are used to communicate with the detected passage, and described the Two conducting orifices 312 are used to connect the detection tracheae.First conducting orifice 311 is located at the front end face 301 and the sealing Between circle 2, second conducting orifice 312 is located between sleeve pipe 4 and the rear end face 302.Specifically, first conducting orifice 311 can be located at the mobile jib side 303 on front end face 301 or between front end face 301 and sealing ring 2 (not including sealing ring) On.Second conducting orifice 312 can be located at the mobile jib side 303 between sleeve pipe 4 (including sleeve pipe) and the rear end face 302 On, it can also be located on the rear end face 302.
Fig. 1 and Fig. 2 are referred to, described sleeve pipe 4 is sheathed on the periphery of mobile jib 3.In the present embodiment, described sleeve pipe 4 It is slidably connected with the mobile jib 3.
Fig. 4-1 and Fig. 4-2 are referred to, described sleeve pipe 4 includes positioning end face 411, and the positioning end face 411 is located at the set Pipe 4 is fixedly connected, to fix described sleeve pipe 4 close to one end of the sealing ring 2 for the end face with the detected passage Position.Specifically, will it is described positioning end face 411 before partial insertion described in be detected passage in, will the casting die 1, The sealing ring 2, part mobile jib 3 and part tubular 4 insert the detected passage, and the positioning end face 411 is fixed on described It is detected the end face of passage.
Fig. 1 and Fig. 2 are referred to, the sealing ring 2 is sheathed on the mobile jib 3, and positioned at the casting die 1 and described sleeve pipe 4 Between.In the present embodiment, the sealing ring 2 is fixedly connected on the mobile jib 3.The sealing ring 2 can be O-ring, or Person's others shape.
Fig. 1 and Fig. 2 are referred to, the mobile jib push-and-pull component 5 is connected to the mobile jib 3 close to described one end of rear end face 302, The mobile jib push-and-pull component 5 is used to drive the mobile jib 3 to move relative to described sleeve pipe 4, to cause the casting die 1 towards the set Pipe 4 moves and compresses the sealing ring 2 so that the radial dimension of sealing ring 2 increases and is in close contact with the sense channel Form sealing structure.The mobile jib push-and-pull component 5 can be elastic push-and-pull component or screens stretching assembly or eccentric wheel etc..
The embodiment of the present application provides a kind of conducting joint, by setting hollow passageway in conducting joint, realize by Conducting between sense channel and detection tracheae;By operating the mobile jib push-and-pull component, crush seal circle makes it produce shape Become, passage is detected so as to quickly block, it is ensured that good sealing property between conducting joint and detected passage, draw simultaneously Flow guide flows to hollow passageway.The application is avoided using annular retaining ring and instrument, can fast and effeciently turn on detected passage With detection tracheae, easy to operate, efficiency high.
In a kind of embodiment, referring to Fig. 1, the mobile jib 3 includes mobile jib leading portion 32, the end face of the mobile jib leading portion 32 For the front end face 301.The casting die 1 is nut, is bolted on the mobile jib leading portion 32, and the sealing ring 2 is sheathed on described The periphery of mobile jib leading portion 32 and the neighbouring casting die 1, by adjusting the casting die 1 in the position of the mobile jib leading portion 32, can be adjusted The distance that the whole sealing ring 2 is extruded, so that the increased size of the radial dimension of sealing ring 2 is adjusted, to adjust conducting joint pair In the detected sealed tightness of passage, while can also increase the passage bore model that conducting joint is applied to be detected passage Enclose.
In a kind of embodiment, referring to Fig. 1, the casting die also includes packing ring 11, packing ring 11 is located at casting die 1 and sealing ring Between 2, to increase the sealing between casting die 1 and sealing ring 2.
Fig. 3-1 is referred to, the mobile jib 3 also includes mobile jib back segment 33, the mobile jib back segment 33 and the mobile jib leading portion 32 Coaxially connected, the mobile jib back segment 33 is formed by the enlarged outside diameter of the mobile jib leading portion 32, remote on the mobile jib back segment 33 The end face of the mobile jib leading portion 32 is the rear end face 302.
In a kind of embodiment, referring to Fig. 1, in hollow passageway preparation process, because mobile jib is thinner, long mobile jib Structure may cause to hinder to processing hollow passageway, or even mobile jib can be caused to be broken.Therefore for the ease of processing, the mobile jib Back segment 33 can be divided into two parts:First mobile jib back segment 331 and the second mobile jib back segment 332.The first mobile jib back segment 331 Rear end is provided with screw-rod structure, the front end of the second mobile jib back segment 332 be provided with the screw-rod structure match it is screwed Hollow passageway, the first mobile jib back segment 331 and the second mobile jib back segment 332 can be spirally connected into mobile jib back segment 33, that is, be easy to processing, and really Protect the fastness of mobile jib.
In a kind of embodiment, Fig. 3-2 are referred to, first conducting orifice 311 originates in the mobile jib front end face 301, Axially through the mobile jib leading portion 32 and extend, terminate at the mobile jib back segment 33.Second conducting orifice 312 originates in institute The side 303 of mobile jib back segment 33 is stated, the mobile jib back segment 33 is extended radially through and extends, terminate at first conducting orifice 311 Termination, second conducting orifice 312 is connected with first conducting orifice 311, forms the hollow passageway 31 of L-shaped.It is described First conducting orifice 311 can be connected with the detected passage.Referring to Fig. 2, the connection of the second conducting orifice 312 one is transferred Joint 6, is connected by adapter coupling 6 with the detection tracheae.
In a kind of embodiment, Fig. 4-1, Fig. 4-2, Fig. 5 are referred to, described sleeve pipe 4 includes the connected He of sleeve pipe leading portion 41 Sleeve pipe back segment 42, described sleeve pipe back segment 42 is to be expanded to form by the external diameter and internal diameter of described sleeve pipe leading portion 41, described sleeve pipe leading portion 41 adjacent to the sealing ring 2 and are sheathed on the periphery of the mobile jib leading portion 32, and described sleeve pipe back segment 42 is sheathed on the mobile jib back segment 33 peripheries.The positioning end face 411 is the joint face between described sleeve pipe leading portion 41 and described sleeve pipe back segment 42.Before described sleeve pipe The internal diameter of section 41 is less than the external diameter of the mobile jib back segment 33, to limit the mobile jib back segment 33 towards the side of described sleeve pipe leading portion 41 To motion.Specifically, mobile jib back segment 33 includes including the first bearing surface on a positive stop lug boss 334, the positive stop lug boss 334 335, sleeve pipe leading portion 41 includes the second bearing surface 412.When conducting joint is changed into released state from self-locking state, the mobile jib push-and-pull Component 5 promotes the mobile jib 3 to be moved towards the direction of the sealing ring 2, when the first bearing surface 335 of the positive stop lug boss 334 Abutted against with the second bearing surface 412, mobile jib back segment 33 is no longer moved relative to sleeve pipe to sealing ring, now casting die 1 discharges completely Sealing ring 2, conducting joint reaches released state.
Described sleeve pipe back segment 42 also includes housing opening 421, and the opening 421 that houses is located at described sleeve pipe 4 and described the The corresponding position of two via holes 312, in order to which the detection tracheae houses be open 421 and the mobile jib back segment 33 by described Second conducting orifice 312 be connected.
Fig. 1 and Fig. 2 are referred to, sleeve pipe 4 also includes casing joints 43, and described sleeve pipe connector 43 is sheathed on the mobile jib Back segment 33 is peripheral and is fixed on described sleeve pipe back segment 42, and the other end is articulated with the mobile jib push-and-pull component 5.Specifically, it is described The front end of casing joints 43 is provided with hollow screw structure, and the inner radius of described sleeve pipe back segment 42 is provided with matched screw thread, To realize that described sleeve pipe connector 43 is spirally connected with described sleeve pipe back segment 42.Described sleeve pipe connector 43 can be slided relative to mobile jib 3 It is dynamic.In a kind of embodiment, described sleeve pipe connector 43 can be square, and the square casing joints 43 are articulated with the master Bar push-and-pull component 5, can fix described sleeve pipe 4, in case described sleeve pipe is rotated in the course of the work, so as to hinder conducting joint Normal work.
In a kind of embodiment, the mobile jib push-and-pull component 5 holds 51 and a pair of handles 52, described one including a pair of rotary shafts The opposite sides of the mobile jib back segment 33 is respectively arranged to swivel bearing 51 and the pair of handle 52.The swivel bearing 51 Two ends are hinged with described sleeve pipe 4, the handle 52 respectively, the two ends of handle 5 respectively with the swivel bearing 51, the mobile jib Back segment 33 is hinged.The pair of swivel bearing 51 and the pair of handle 52 can be symmetrically distributed in the second mobile jib back segment 332 left and right sides.
In a kind of embodiment, a pair of first positioning holes 431 are additionally provided with described sleeve pipe connector 43.The pair of rotation Bearing 51 is provided with the second positioning hole 511, second positioning hole 511 and described first close to one end of described sleeve pipe connector 43 Positioning hole 431 passes through hinge.In installation process, second positioning hole 511 is stacked on first positioning hole 431, Bearing pin is inserted in the second positioning hole 511 so that the pair of swivel bearing 51 is rotated with described sleeve pipe connector 43 and is connected.
In a kind of embodiment, the pair of handle 52 includes installation portion 521 and Handheld Division 522, the Handheld Division 522 In side of the installation portion 521 away from the mobile jib 3, described one end of Handheld Division 522 is with the installation portion 521 close to the rotation 51 one end connection is held in rotating shaft.The Handheld Division 522 can be with the installation portion 521 vertical connection, formed L-shaped handle, should Connected mode can be formed in one.In other embodiments, the pair of handle 52 can also be other shapes.Described one The first rotating hole 512 is additionally provided with to the one end of swivel bearing 51 away from described sleeve pipe connector 43, the installation portion 521 is close to institute The one end for stating swivel bearing 51 is provided with the second rotating hole 523, and first rotating hole 512 passes through with second rotating hole 523 Hinge.Specifically, in installation process, first rotating hole 512 is stacked on second rotating hole 523, by pin Axle is inserted in the first rotating hole 512 so that the pair of swivel bearing 51 is rotated with the installation portion 521 and is connected.
In a kind of embodiment, the one end of the installation portion 521 away from the swivel bearing 51 is provided with the first advance and retreat hole 524, the mobile jib back segment 33 is upper sideways to be provided with the second advance and retreat hole 333, the first advance and retreat hole at the rear end face 302 524 pass through hinge with the second advance and retreat hole 333.In installation process, the first advance and retreat hole 524 is stacked in described second On advance and retreat hole 333, bearing pin is inserted in the first advance and retreat hole 524 so that the installation portion 521 is rotated with the mobile jib back segment 33 to be connected Connect.
Anti-skidding adhesive tape can be wound on the Handheld Division 522 of the pair of handle 52, on the one hand, be easy to while rotation one To handle 52;On the other hand, in order to avoid hand directly contacts Handheld Division 522, hand protecting function is played.
In a kind of embodiment, Fig. 1 and Fig. 2 are referred to, conducting joint also includes limiting section 513,513 liang of the limiting section End be connected respectively with the pair of swivel bearing 51, the limiting section 513 be located at the pair of swivel bearing 51 with it is the pair of Between handle 522, to hinder the pair of handle 522 to be moved towards the pair of swivel bearing 51.Specifically, handle is rotated 52, mobile jib 3 can be driven to be moved away from sleeve pipe 4, so as to drive the crush seal circle 2 of casting die 1, limiting section 513 can limit handle 52 The maximum angle of rotation, so as to limit the crush seal circle 2 of casting die 1 at utmost, now turns on joint and reaches self-locking state.
Referring to Fig. 6, holding Handheld Division 522, the casting die 1, sealing ring 2, the sleeve pipe leading portion 41 that turn on joint are inserted tested Survey in passage 01, the positioning end face 411 is fixedly connected with the end face of the detected passage 01.It is understood that described The internal diameter of casting die 1, sealing ring 2, the external diameter of sleeve pipe leading portion 41 and detected passage 01 matches.The casting die 1 and sleeve pipe leading portion 41 external diameter can be less than or equal to the internal diameter of the detected passage 01, and the external diameter of the sealing ring 2 can be slightly less than Or equal to the internal diameter of the detected passage 01.The external diameter of described sleeve pipe back segment 42 is more than the interior of the detected passage 01 Footpath, in order to which the positioning end face 411 is fixedly connected with the end face of the detected passage 01.Now, described in 1 pair of the casting die Sealing ring 2 is without extruding force.
Also referring to Fig. 5 and Fig. 7, because the internal diameter of described sleeve pipe leading portion 41 is less than the external diameter of the mobile jib back segment 33, Described sleeve pipe leading portion 41 limits the mobile jib back segment 33 and moved towards sleeve pipe leading portion 41.The mobile jib rear end face 302 with it is described The distance between casing joints 43 are less than the length that the swivel bearing 51 is connected with the straight line of installation portion 52 so that described Swivel bearing 51 and the installation portion 52 can only broken line be connected.So the first rotating hole 512, first positioning hole 431 and institute State the first advance and retreat hole 524 mobile jib 3, installation portion 521, swivel bearing 51, casing joints 43 link together, form triangle Structure.Second positioning hole 511 is one in front and one in back distributed on the axis of mobile jib 3 respectively with the first advance and retreat hole 524, and the first rotation Turn hole 512 is located between first positioning hole 431 and the first advance and retreat hole 524, and below the axis of mobile jib 3.Wherein Mobile jib 3 is longest edge, and installation portion 521 and swivel bearing 51 are two short sides.Under this state, the Handheld Division 522 and the master It is at an acute angle between bar 3.
Also referring to Fig. 6 and Fig. 7, in use, the positioning end face 411 abuts the detected passway so that institute State the position of sleeve pipe 4 to fix, the pair of handle 52 is rotated in a clockwise direction centered on first rotating hole 512, drive First rotating hole 512 rotate counterclockwise centered on second positioning hole 511, pulls the first advance and retreat hole 524 to carry on the back Moved from described sleeve pipe 4, so as to drive the mobile jib back segment 33 to be moved away from described sleeve pipe 4, to drive the casting die 1 towards institute State sleeve pipe 4 to move, extrude the sealing ring 2, the pair of handle 52 is rotated to when abutting the locating part 513, now described The radial dimension of sealing ring 2 is maximum, and the conducting joint reaches self-locking state, to block detected passage.
Also referring to Fig. 7 to Fig. 9, in the present embodiment, joint will be turned on and be installed on the logical of the detected passage Behind road junction, and detection tracheae is connected to conducting joint.Hold Handheld Division, it is ensured that the positioning end face of conducting joint, which is abutted, to be detected The channel end surface and position of sleeve pipe 4 is motionless, Handheld Division is turned clockwise according to a directions shown in Fig. 7.Due to the second positioning hole 511 is fixed, and the first advance and retreat hole 524 can only move along a straight line vertically, then the revolving force drive the first rotating hole 512 along B is moved in direction upwards, so as to promote the first advance and retreat hole 524 to be moved backward relative to sleeve pipe 4 along c directions.Due to described spacing The inhibition in portion 513, when first rotating hole 512 rises to and second positioning hole 511, the first advance and retreat hole 524 point-blank when, reach conducting joint self-locking state.First rotating hole described in during the self-locking state of conducting joint 512nd, second positioning hole 511, the position relationship of the first advance and retreat hole 524 are as shown in Figure 8.Conducting joint during self-locking state Overall structure diagram is as shown in Figure 9.
Fig. 8 to Figure 11 is referred to, after self-locking state is reached, the first advance and retreat hole 524 is connected to the second mobile jib back segment 332 rear end, the motion backward in the first advance and retreat hole 524 drives the mobile jib 3 to move backward, the motion band backward of the mobile jib 3 The casting die 1 is moved to move backward relative to sleeve pipe 4.Now, the positive stop lug boss 335 of the mobile jib back segment 33 no longer with described sleeve pipe Second bearing surface 412 of leading portion 41 is abutted against, but produces certain gap with described sleeve pipe leading portion 41, its effect such as Figure 10 institutes Show.
Fig. 8 to Figure 11 is referred to, referring to figure(to write out, be also above) after self-locking state is reached, casting die 1 is along axle Moved to sleeve pipe 4, and described sleeve pipe 4 is fixed, so as to cause to be folded in close between the casting die 1 and described sleeve pipe 4 Seal 2 is extruded and produces deformation, causes the radial diameter of sealing ring 2 to increase, so as to seal and conduct joint and detected passage Between gap, it is ensured that conducting joint and detected passage sealing it is good.Sealing ring 2 produces deformation sealing and is detected passage effect Fruit is as shown in figure 11.When being passed through gas in detection tracheae, the hollow passageway of the gas from conducting joint, which is flowed into, is detected passage In, because conducting joint is good with detected passage sealing, detection tracheae can be achieved and is turned on the air pressure in detected passage, Complete the sealing propertytest process of detected passage.
Fig. 6 to Fig. 9 is referred to, ibidWhen turning on joint unblock, along counterclockwise centered on first rotating hole 512 Direction moves the pair of handle 52, drives the dextrorotation centered on second positioning hole 511 of the first rotating hole 512 Turn, promote the first advance and retreat hole 524 to be moved towards described sleeve pipe 4, so as to drive the mobile jib back segment 33 towards described sleeve pipe 4 Motion, to drive the casting die 1 to be moved away from described sleeve pipe 4, discharges the sealing ring 2, the mobile jib back segment 33 be moved to and When described sleeve pipe leading portion 41 is abutted against, the radial diameter of the sealing ring 2 is recovered, and the conducting joint reaches released state, no Conducting joint can be extracted in the detected passage and be detected passage by tight seal again.
In summary, although the utility model is disclosed above with preferred embodiment, but the preferred embodiment and it is not used to The utility model is limited, one of ordinary skill in the field is not being departed from spirit and scope of the present utility model, can make each Plant and change with retouching, therefore protection domain of the present utility model is defined by the scope that claim is defined.
Described above is preferred embodiment of the present utility model, it is noted that for the ordinary skill of the art For personnel, on the premise of the utility model principle is not departed from, some improvements and modifications can also be made, these improve and moistened Decorations are also considered as protection domain of the present utility model.

Claims (10)

1. one kind conducting joint, for connecting detection tracheae and detected passage, it is characterised in that including mobile jib, sealing ring, set Pipe, mobile jib push-and-pull component;
The mobile jib includes the side between front end face, rear end face and the connection front end face and the rear end face, the mobile jib Casting die is provided with close to one end of the front end face, the mobile jib is provided with hollow passageway, and the hollow passageway includes the be conducted One conducting orifice and the second conducting orifice, first conducting orifice are used to communicate with the detected passage, and second conducting orifice is used In the connection detection tracheae;
Described sleeve pipe is sheathed on the mobile jib periphery, and described sleeve pipe includes positioning end face, and the positioning end face is used for and the quilt Sense channel is fixedly connected, to fix the position of described sleeve pipe;
The sealing ring is sheathed on the mobile jib, and positioned between the casting die and described sleeve pipe;
The mobile jib push-and-pull component is connected to the mobile jib close to described rear end face one end, and the mobile jib push-and-pull component is used to drive The mobile jib is moved relative to described sleeve pipe, to cause the casting die to be moved towards described sleeve pipe and compress the sealing ring so that The sealing ring radial dimension increases and is in close contact to form sealing structure with the sense channel, and first conducting orifice is located at Between the front end face and the sealing ring, second conducting orifice is located between sleeve pipe and the rear end face.
2. conducting joint according to claim 1, it is characterised in that the mobile jib is included before mobile jib leading portion, the mobile jib The end face of section is the front end face, and the casting die is nut, is bolted on the mobile jib leading portion, and the sealing ring is sheathed on described Mobile jib leading portion periphery, by adjusting the casting die in the position of the mobile jib leading portion, is increased with adjusting the sealing ring radial dimension Plus size.
3. conducting joint according to claim 2, it is characterised in that the mobile jib also includes mobile jib back segment, the mobile jib Back segment and the mobile jib leading portion are coaxially connected, and the mobile jib back segment is formed by the enlarged outside diameter of the mobile jib leading portion, the master The end face away from the mobile jib leading portion is the rear end face on bar back segment, after described sleeve pipe is including connected sleeve pipe leading portion and sleeve pipe Section, described sleeve pipe back segment is to be expanded to form by the external diameter and internal diameter of described sleeve pipe leading portion, and described sleeve pipe leading portion is adjacent to the sealing Enclose and be sheathed on the mobile jib leading portion periphery, described sleeve pipe back segment is sheathed on the mobile jib back segment periphery, the positioning end face is Joint face between described sleeve pipe leading portion and described sleeve pipe back segment, the internal diameter of described sleeve pipe leading portion is less than the outer of the mobile jib back segment Footpath, is moved with limiting the mobile jib back segment towards the direction of described sleeve pipe leading portion.
4. conducting joint according to claim 3, it is characterised in that sleeve pipe also includes casing joints, described sleeve pipe connects Fitting is sheathed on the mobile jib back segment periphery and is fixed on described sleeve pipe back segment, and the other end is articulated with the mobile jib push-and-pull component.
5. conducting joint according to claim 4, it is characterised in that the mobile jib push-and-pull component is held including a pair of rotary shafts With a pair of handles, the pair of swivel bearing and the pair of handle are respectively arranged at the opposite sides of the mobile jib back segment;Institute Swivel bearing two ends are stated to be hinged with described sleeve pipe, the handle respectively, the handle two ends respectively with the swivel bearing, described Mobile jib back segment is hinged.
6. conducting joint according to claim 5, it is characterised in that a pair first are additionally provided with described sleeve pipe connector and is determined Position hole;The pair of swivel bearing close to one end of described sleeve pipe connector be provided with the second positioning hole, second positioning hole with First positioning hole passes through hinge.
7. conducting joint according to claim 6, it is characterised in that the pair of handle includes installation portion and Handheld Division, The handgrip part is in side of the installation portion away from the mobile jib, and described Handheld Division one end is with the installation portion close to described One end connection of swivel bearing;The one end of the pair of swivel bearing away from described sleeve pipe connector is additionally provided with the first rotating hole, The installation portion is provided with the second rotating hole, first rotating hole and second rotating hole close to one end of the swivel bearing Pass through hinge.
8. conducting joint according to claim 7, it is characterised in that the one end of the installation portion away from the swivel bearing Provided with the first advance and retreat hole, the mobile jib back segment side is upper to be provided with the second advance and retreat hole at the rear end face, and described first retreats Hole passes through hinge with the second advance and retreat hole.
9. conducting joint according to claim 8, it is characterised in that the mobile jib push-and-pull component also includes limiting section, institute State limiting section two ends respectively with the pair of swivel bearing to be connected, the limiting section is located at the pair of swivel bearing and described one To between handle, to hinder the pair of handle to be moved towards the pair of swivel bearing.
10. conducting joint according to claim 9, it is characterised in that along clockwise centered on second rotating hole Direction rotates the pair of handle, drives the second rotating hole rotate counterclockwise centered on second positioning hole, pulls First advance and retreat hole is moved away from described sleeve pipe, so as to drive the mobile jib back segment to be moved away from described sleeve pipe, to drive the pressure Part is moved towards described sleeve pipe, extrudes the sealing ring, and the pair of rotatable handle is to when abutting the locating part, the conducting Joint reaches self-locking state;The pair of handle of counterclockwise rotates centered on second rotating hole, second rotation Turn hole is turned clockwise centered on second positioning hole, promotes the first advance and retreat hole to be moved towards described sleeve pipe, so as to promote The mobile jib back segment is moved towards described sleeve pipe, to drive the casting die to be moved away from described sleeve pipe, discharges the sealing ring, institute When stating mobile jib back segment and abutting to described sleeve pipe leading portion, the conducting joint reaches released state.
CN201720184220.3U 2017-02-28 2017-02-28 Turn on joint Active CN206582451U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720184220.3U CN206582451U (en) 2017-02-28 2017-02-28 Turn on joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720184220.3U CN206582451U (en) 2017-02-28 2017-02-28 Turn on joint

Publications (1)

Publication Number Publication Date
CN206582451U true CN206582451U (en) 2017-10-24

Family

ID=60091947

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720184220.3U Active CN206582451U (en) 2017-02-28 2017-02-28 Turn on joint

Country Status (1)

Country Link
CN (1) CN206582451U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108235718A (en) * 2017-02-28 2018-06-29 深圳欣锐科技股份有限公司 Connector is connected
CN116404596A (en) * 2023-05-30 2023-07-07 国网江苏省电力有限公司泰州供电分公司 Cable conduit plug sealing element

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108235718A (en) * 2017-02-28 2018-06-29 深圳欣锐科技股份有限公司 Connector is connected
CN116404596A (en) * 2023-05-30 2023-07-07 国网江苏省电力有限公司泰州供电分公司 Cable conduit plug sealing element

Similar Documents

Publication Publication Date Title
CN206582451U (en) Turn on joint
CN106840580A (en) A kind of diaphragm positioning clamping device
CN108235718A (en) Connector is connected
CN210123054U (en) Movable connecting device used between hose and steel pipe
CN107893887A (en) A kind of expansion type joint of flexible pipe
CN207961629U (en) Y types pair go out valve
CN209524183U (en) A kind of joint sealing device that direct-burried is effective
CN217304535U (en) Pipeline under pressure gas sampling detection device
CN206513995U (en) Plug
CN208074365U (en) One kind can locking rotatable safety quick joint
CN209839421U (en) Pneumatic connector for preventing tail pipe from winding
CN110439465B (en) Axial oblique spraying, sucking and discharging assisting mechanism of sand discharging pipe of drilling well
CN206338497U (en) A kind of eccentric reducer
CN207213427U (en) A kind of adjustable type super-pressure adapter
CN213809398U (en) Fluid rotary direction-changing self-sealing pipe male joint
CN207245656U (en) A kind of high frequency hydroscillator
CN206572086U (en) A kind of outer silk swivel joint
CN206235480U (en) The attachment structure of lighter hydrocarbons liquefied gas safely and fast sampler
CN216813247U (en) Joint for pipeline connection
CN219692555U (en) Pipeline sealing flange type pipe fitting
CN210802507U (en) Online blockage removing tool
CN216344538U (en) High-pressure large-flow hinged joint
CN219552874U (en) Sealing water alarm device is with adjusting structure
CN109990148B (en) Pipe orifice sealing device of catalytic muffler
CN114738569B (en) Self-adaptive connecting device for multi-diameter tubular members

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant