CN206581461U - A kind of building curtain wall - Google Patents
A kind of building curtain wall Download PDFInfo
- Publication number
- CN206581461U CN206581461U CN201720282058.9U CN201720282058U CN206581461U CN 206581461 U CN206581461 U CN 206581461U CN 201720282058 U CN201720282058 U CN 201720282058U CN 206581461 U CN206581461 U CN 206581461U
- Authority
- CN
- China
- Prior art keywords
- steel pole
- standing groove
- panel
- horizontal steel
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model discloses a kind of building curtain wall, including the built-in fitting inside wall and wall, the built-in fitting is fixedly connected by bolt with the stacker of built-in fitting side, one end of the stacker is fixedly connected by Fixed latches with vertical steel pole, the both sides of the vertical steel pole offer the first mounting groove, first mounting groove is internally provided with horizontal steel pole, and the inside on horizontal the steel pole top and bottom offers the first standing groove and the second standing groove.The utility model is by setting top and the standing groove of bottom first and the second standing groove of cross bar steel pole, and first standing groove and the second standing groove be interspersed, swivelling chute, rotating shaft, torsion spring and the restriction plate of horizontal steel pole both sides, it is used in conjunction with each other, the installation for facilitating first panel and second panel is reached, the fixed component quantity that first panel and second panel are installed and used is reduced, so as to reduce workload and the working time of staff, and the advantage of construction cost is reduced.
Description
Technical field
The utility model is related to technical field of building construction, specially a kind of building curtain wall.
Background technology
Building curtain wall is the exterior wall pad of building not load-bearing, generally by panel(Glass, metallic plate, slabstone, ceramic wafer
Deng)Supporting structure below(Aluminium cross beam and upright post, steel construction, Glass Rib etc.)Composition.
The panel installation operation of building curtain wall at this stage is comparatively laborious, more using part, not only increases work people
The workload of member and working time, and construction cost is added, because gap is smaller between panel and fixed component, and then right
When gap is sealed, work difficulty is larger and sealing effectiveness can be reduced.
Utility model content
The purpose of this utility model is to provide a kind of building curtain wall, possesses and facilitate panel to be installed, reduce panel
The usage amount of fixed component, so as to reduce workload and the working time of staff, and reduces construction cost, meanwhile,
It is convenient that gap is sealed, reduce work difficulty and ensure that the advantage of sealing effectiveness, solve building curtain at this stage
The panel installation operation of wall is comparatively laborious, more using part, not only increases workload and the working time of staff, and
Construction cost is added, because gap is smaller between panel and fixed component, and then when being sealed to gap, work difficulty
The problem of larger and sealing effectiveness can be reduced.
To achieve the above object, the utility model provides following technical scheme:A kind of building curtain wall, including wall and wall
Internal built-in fitting, the built-in fitting is fixedly connected by bolt with the stacker of built-in fitting side, and one end of the stacker leads to
Cross Fixed latches to be fixedly connected with vertical steel pole, the both sides of the vertical steel pole offer the first mounting groove, first installation
Groove is internally provided with horizontal steel pole, and the inside on horizontal the steel pole top and bottom offers the first standing groove and second and put
Groove is put, first standing groove is internally provided with first panel, the second standing groove is internally provided with second panel, the transverse direction
The middle part of steel pole both sides offers swivelling chute, and the swivelling chute is internally provided with restriction plate, the inside of the restriction plate
Through hole is offered, the inwall of the through hole is connected by torsion spring with rotating shaft, rotating shaft two ends are fixedly connected with horizontal steel pole, the transverse direction
Sealing block is provided with the outside of steel pole, the two ends of the sealing block are provided with projection, and projection is connected with vertical steel pole, the sealing
Top and bottom on the inside of block offer the second mounting groove, and the inside of second mounting groove is fixedly installed connecting pole, connection
One end of post is fixedly installed sucker, and the sucker is connected with first panel.
It is preferred that, the size of the horizontal steel pole is adapted with the size of the first mounting groove, horizontal steel pole and stacker
Junction offers mutually suitable fixing groove, and the first standing groove and the second standing groove of horizontal steel pole top and bottom are relative and wrong
Position is set up, and the size of first standing groove and the second standing groove is adapted.
It is preferred that, the bottom of the first panel is connected with the first standing groove of horizontal steel pole, and the top of first panel
It is connected with the second standing groove of horizontal steel pole, the bottom of second panel is connected with the second standing groove of horizontal steel pole, and the second face
Plate is connected with the first standing groove of horizontal steel pole, and the size of first panel is adapted with the size of second panel, first panel
Size is adapted with the size of the first standing groove and the second standing groove.
It is preferred that, the swivelling chute is located between the first standing groove and the second standing groove, and size and the limitation of swivelling chute
The size of plate one end is adapted, and the restriction plate is L-shaped, and the other end of restriction plate is connected with the first standing groove.
It is preferred that, the sealing block offers the groove being adapted with the junction of horizontal steel pole, the vertical steel pole with it is close
The junction of envelope block two ends projection offers the neck being adapted.
Compared with prior art, the beneficial effects of the utility model are as follows:
The utility model is by setting top and the standing groove of bottom first and the second standing groove of cross bar steel pole, and first puts
Put groove and the second standing groove is interspersed, swivelling chute, rotating shaft, torsion spring and the restriction plate of horizontal steel pole both sides, mutual cooperation make
With having reached the installation for facilitating first panel and second panel, reduced the fixation that first panel and second panel are installed and used
Number of components, so as to reduce workload and the working time of staff, and reduces the advantage of construction cost, by setting
The projection at sealing block two ends, projection is adapted with the first mounting groove on vertical steel pole, the second mounting groove of sealing block bottom, company
Post and sucker are connect, sucker is connected with first panel absorption, is used in conjunction with each other, has reached that convenience is sealed to gap, and drop
Low work difficulty and sealing effectiveness is ensure that, simultaneously, additionally it is possible to play the advantage of limitation restriction plate.
Brief description of the drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is structure enlarged diagram at the utility model Fig. 1 A;
Fig. 3 is that the utility model first installs slot structure schematic diagram.
In figure:1 wall, 2 built-in fittings, 3 bolts, 4 stackers, 5 Fixed latches, 6 vertical steel poles, 7 first mounting grooves, 8 horizontal strokes
To steel pole, 9 first standing grooves, 10 second standing grooves, 11 first panels, 12 second panels, 13 swivelling chutes, 14 rotating shafts, 15 torsion springs,
16 restriction plates, 17 sealing blocks, 18 projections, 19 necks, 20 second mounting grooves, 21 connecting poles, 22 suckers, 23 fixing grooves.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belongs to the scope of the utility model protection.
The built-in fitting 2 inside Fig. 1-3, a kind of building curtain wall, including wall 1 and wall 1 is referred to, built-in fitting 2 passes through spiral shell
Bolt 3 is fixedly connected with the stacker 4 of the side of built-in fitting 2, and one end of the stacker 4 is fixed by Fixed latches 5 with vertical steel pole 6
Connection, the both sides of vertical steel pole 6 offer the first mounting groove 7, and first mounting groove 7 is internally provided with horizontal steel pole 8, horizontal
The first standing groove 9 and the second standing groove 10 are offered to the inside of the top of steel pole 8 and bottom, the size of horizontal steel pole 8 and the
The size of one mounting groove 7 is adapted, and the junction of horizontal steel pole 8 and stacker 4 offers mutually suitable fixing groove 23, and horizontal steel
The first standing groove 9 and the second standing groove 10 of the top of bar 8 and bottom are relatively and dislocation is set up, and first standing groove 9 and second is put
The size for putting groove 10 is adapted, and first standing groove 9 is internally provided with first panel 11, and the inside of the second standing groove 10 sets
There is second panel 12, the bottom of first panel 11 is connected with the first standing groove 9 of horizontal steel pole 8, and the top of first panel 11
It is connected with the second standing groove 10 of horizontal steel pole 8, the bottom of second panel 12 is connected with the second standing groove 10 of horizontal steel pole 8,
And second panel 12 is connected with the first standing groove 9 of horizontal steel pole 8, the size of first panel 11 and the size phase of second panel 12
Adaptation, the size of first panel 11 is adapted with the size of the first standing groove 9 and the second standing groove 10, the horizontal both sides of steel pole 8
Middle part offer swivelling chute 13, the swivelling chute 13 is internally provided with restriction plate 16, and swivelling chute 13 is located at first and places
Between the standing groove 10 of groove 9 and second, and the size of swivelling chute 13 is adapted with the size of the one end of restriction plate 16, the restriction plate
16 be L-shaped, and the other end of restriction plate 16 is connected with the first standing groove 9, and the inside of restriction plate 16 offers through hole, and this leads to
The inwall in hole is connected by torsion spring 15 with rotating shaft 14, and the two ends of rotating shaft 14 are fixedly connected with horizontal steel pole 8, the outside of horizontal steel pole 8
Sealing block 17 is provided with, the two ends of the sealing block 17 are provided with projection 18, and projection 18 is connected with vertical steel pole 6, sealing block 17
The groove being adapted is offered with the junction of horizontal steel pole 8, the junction of the vertical steel pole 6 and the two ends projection 18 of sealing block 17
The neck 19 being adapted is offered, the top and bottom of the inner side of sealing block 17 offer the second mounting groove 20, second installation
The inside of groove 20 is fixedly installed connecting pole 21, and one end of connecting pole 21 is fixedly installed sucker 22, the face of sucker 22 and first
Plate 11 is connected, by setting top and bottom the first standing groove 9 and the second standing groove 10 of cross bar steel pole 8, and the first standing groove 9
It is interspersed with the second standing groove 10, swivelling chute 13, rotating shaft 14, torsion spring 15 and the restriction plate 16 of the horizontal both sides of steel pole 8, mutually
Use cooperatively, reached the installation for facilitating first panel 11 and second panel 12, reduce first panel 11 and second panel 12
The fixed component quantity installed and used, so as to reduce workload and the working time of staff, and reduces construction cost
Advantage, by setting the projection 18 at the two ends of sealing block 17, projection 18 is adapted with the first mounting groove 7 on vertical steel pole 6, close
The second mounting groove 20, connecting pole 21 and the sucker 22 of the bottom of block 17 are sealed, sucker 22 is connected with the absorption of first panel 11, cooperated
Use, reached that convenience is sealed to gap, and reduce work difficulty and ensure that sealing effectiveness, simultaneously, additionally it is possible to rise
To the advantage of limitation restriction plate 16.
In use, vertical steel pole 6 and stacker 4 are fixed into installation, and then horizontal steel pole 8 is inserted into the first mounting groove
In 7, and then second panel 12 is inserted in second standing groove 10 on the horizontal top of steel pole 8, the limitation of the horizontal inner side of steel plate 8 of rotation
Second panel 12 is simultaneously positioned in the first standing groove 9 of the bottom of horizontal steel pole 8 by plate 16, and first panel 11 is inserted into transverse direction
In second standing groove 10 of the bottom of steel pole 8, first panel 11 is simultaneously positioned over horizontal stroke by the restriction plate 16 in the horizontal outside of steel pole 8 of rotation
Into first standing groove 9 on the top of steel pole 8, then sealing block 17 is installed on to the outside of horizontal steel pole 8, while sucker 22 and first
Panel 11 carries out absorption connection, and projection 18 is caught in the neck 19 in vertical steel pole 6.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies
Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of building curtain wall, including wall(1)And wall(1)Internal built-in fitting(2), it is characterised in that:The built-in fitting
(2)Pass through bolt(3)With built-in fitting(2)The stacker of side(4)It is fixedly connected, the stacker(4)One end pass through fixed insert
Pin(5)With vertical steel pole(6)It is fixedly connected, the vertical steel pole(6)Both sides offer the first mounting groove(7), this first
Mounting groove(7)Be internally provided with horizontal steel pole(8), the horizontal steel pole(8)The inside of top and bottom offers first
Standing groove(9)With the second standing groove(10), first standing groove(9)Be internally provided with first panel(11), the second standing groove
(10)Be internally provided with second panel(12), the horizontal steel pole(8)The middle part of both sides offers swivelling chute(13), the rotation
Turn trough(13)Be internally provided with restriction plate(16), the restriction plate(16)Inside offer through hole, the through hole it is interior
Wall passes through torsion spring(15)With rotating shaft(14)Connection, rotating shaft(14)Two ends and horizontal steel pole(8)It is fixedly connected, the horizontal steel pole
(8)Outside be provided with sealing block(17), the sealing block(17)Two ends be provided with projection(18), projection(18)With vertical steel
Bar(6)Connection, the sealing block(17)The top and bottom of inner side offer the second mounting groove(20), second mounting groove
(20)Inside be fixedly installed connecting pole(21), connecting pole(21)One end be fixedly installed sucker(22), the sucker(22)
With first panel(11)Connection.
2. a kind of building curtain wall according to claim 1, it is characterised in that:The horizontal steel pole(8)Size and first
Mounting groove(7)Size be adapted, horizontal steel pole(8)With stacker(4)Junction offer mutually suitable fixing groove(23), and
Horizontal steel pole(8)Top and the first standing groove of bottom(9)With the second standing groove(10)Relative and dislocation is set up, first placement
Groove(9)With the second standing groove(10)Size be adapted.
3. a kind of building curtain wall according to claim 1 or 2, it is characterised in that:The first panel(11)Bottom with
Horizontal steel pole(8)The first standing groove(9)Connection, and first panel(11)Top and horizontal steel pole(8)The second standing groove
(10)Connection, second panel(12)Bottom and horizontal steel pole(8)The second standing groove(10)Connection, and second panel(12)With
Horizontal steel pole(8)The first standing groove(9)Connection, first panel(11)Size and second panel(12)Size be adapted,
First panel(11)Size and the first standing groove(9)With the second standing groove(10)Size be adapted.
4. a kind of building curtain wall according to claim 1, it is characterised in that:The swivelling chute(13)Positioned at the first standing groove
(9)With the second standing groove(10)Between, and swivelling chute(13)Size and restriction plate(16)The size of one end is adapted, the limit
Making sheet block(16)For L-shaped, and restriction plate(16)The other end and the first standing groove(9)Connection.
5. a kind of building curtain wall according to claim 1, it is characterised in that:The sealing block(17)With horizontal steel pole(8)
Junction offer the groove being adapted, the vertical steel pole(6)With sealing block(17)Two ends projection(18)Junction open up
There is the neck being adapted(19).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720282058.9U CN206581461U (en) | 2017-03-22 | 2017-03-22 | A kind of building curtain wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720282058.9U CN206581461U (en) | 2017-03-22 | 2017-03-22 | A kind of building curtain wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206581461U true CN206581461U (en) | 2017-10-24 |
Family
ID=60114764
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720282058.9U Expired - Fee Related CN206581461U (en) | 2017-03-22 | 2017-03-22 | A kind of building curtain wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206581461U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108222331A (en) * | 2017-12-19 | 2018-06-29 | 山西云度知识产权服务有限公司 | A kind of assembled architecture curtain wall closing-in structure |
CN108915141A (en) * | 2018-07-03 | 2018-11-30 | 芜湖海平环保科技有限公司 | A kind of dismountable building decoration curtain wall |
-
2017
- 2017-03-22 CN CN201720282058.9U patent/CN206581461U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108222331A (en) * | 2017-12-19 | 2018-06-29 | 山西云度知识产权服务有限公司 | A kind of assembled architecture curtain wall closing-in structure |
CN108915141A (en) * | 2018-07-03 | 2018-11-30 | 芜湖海平环保科技有限公司 | A kind of dismountable building decoration curtain wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207553393U (en) | Frame curtain wall multi-angle corner structure | |
CN206581461U (en) | A kind of building curtain wall | |
CN208986874U (en) | A kind of novel roofing aluminium alloy post | |
CN201812843U (en) | Framework installing machine | |
CN205637545U (en) | But height -adjusting's scaffold puts up strutting arrangement | |
CN208456087U (en) | A kind of construction of lift well operating platform | |
CN204059595U (en) | Detachable building | |
CN202560079U (en) | Instrumentalizing work site gate | |
CN204476150U (en) | A kind of have the exterior door of vertically blocking function | |
CN206077294U (en) | A kind of triangle roof photovoltaic panel installing support | |
CN207048150U (en) | A kind of building curtain wall combined type mounting seat | |
CN207381021U (en) | A kind of magnet-type LED display unit framework | |
CN209571986U (en) | A kind of polycrystalline silicon solar panel facilitating abutting joint | |
CN207700471U (en) | A kind of connection structure of glass and metal plate curtain wall | |
CN202970259U (en) | Improved sash frame body | |
CN207069977U (en) | A kind of solar panel fixed mount easy to use | |
CN205475886U (en) | Connection structure of curved surface curtain | |
CN208293857U (en) | A kind of keel connecting structure of curtain wall | |
CN208777709U (en) | A kind of building assembly Corner clamp | |
CN208457513U (en) | The split type Second bearing wall hanging rack component of photovoltaic DC-to-AC converter | |
CN206775435U (en) | A kind of photovoltaic bracket triangle joint device | |
CN207213322U (en) | A kind of valve support being easily installed | |
CN206299294U (en) | A kind of new folding door | |
CN205864356U (en) | A kind of photovoltaic component frame | |
CN108418514A (en) | A kind of solar panel pedestal being easily installed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171024 Termination date: 20180322 |