CN206581213U - A kind of breastwork forward position formwork support arrangement device - Google Patents

A kind of breastwork forward position formwork support arrangement device Download PDF

Info

Publication number
CN206581213U
CN206581213U CN201720051586.3U CN201720051586U CN206581213U CN 206581213 U CN206581213 U CN 206581213U CN 201720051586 U CN201720051586 U CN 201720051586U CN 206581213 U CN206581213 U CN 206581213U
Authority
CN
China
Prior art keywords
breastwork
forward position
stretcher
connector
leading screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720051586.3U
Other languages
Chinese (zh)
Inventor
高平原
孔令臣
刘旭东
王帅
刘浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN201720051586.3U priority Critical patent/CN206581213U/en
Application granted granted Critical
Publication of CN206581213U publication Critical patent/CN206581213U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model is a kind of breastwork forward position formwork support arrangement device, including pull bar, stretcher, connector and spud pile, described pull bar one end is hinged with breastwork forward position die head, the other end is fixedly connected with stretcher, the stretcher other end is fixedly connected with connector, the connector is articulated with spud pile, the spud pile, which is fixed at, to be grouted at the top of stone walling, the stretcher includes the sleeve leading screw opposite with two thread rotary orientations, sleeve two ends are respectively equipped with the tapped blind hole coordinated with leading screw, two leading screws are screwed in the tapped blind hole at sleeve two ends respectively, one leading screw is fixedly connected with pull bar, another leading screw is fixedly connected with connector;The utility model reduces working procedure, avoid damage of the conventional bonding technique to breastwork forward position template, the service life of breastwork forward position template is extended, reinforcement material, electric welding mechanical work and labour's input cost is saved, the simplification of technological process also reduces construction safety risk indirectly.

Description

A kind of breastwork forward position formwork support arrangement device
Technical field
The utility model is related to gravity type quay breastwork formwork construction technology field, more particularly to a kind of breastwork forward position template The vertical device of branch.
Background technology
The Zhi Li and Demolition Construction of gravity type quay cast-in-situ creast wall template are always emphasis and difficult point in construction, are particularly The Zhi Li of forward position template and the key point for removing even more construction, are used always in conventional breastwork forward position formwork support arrangement construction Channel-section steel reinforcement process is welded, butt welding mouth is cut again during dismounting, and work progress is wasted time and energy, the later stage, by calculating, changes and added Gu the position of channel-section steel is in grouting on stone walling, certain material and cost of labor are saved, but the Zhi Li of breastwork forward position template Fail to abrogate all the time with the welding procedure of dismounting, cause the service life of template to be limited, reinforcement material wastes serious and construction The problems such as potential safety hazard is larger fails effectively to be solved always.
The content of the invention
The utility model aims to solve the problem that the deficiencies in the prior art, and provides a kind of breastwork forward position formwork support arrangement device.
The utility model to achieve the above object, using following technical scheme:A kind of breastwork forward position formwork support arrangement device, bag Pull bar, stretcher, connector and spud pile are included, described pull bar one end is hinged with breastwork forward position die head, the other end and tensioning Device is fixedly connected, and the stretcher other end is fixedly connected with connector, and the connector is articulated with spud pile, the fixation Stake, which is fixed at, to be grouted at the top of stone walling, and the stretcher includes the sleeve leading screw opposite with two thread rotary orientations, sleeve two End is respectively equipped with the tapped blind hole coordinated with leading screw, and two leading screws are screwed in the tapped blind hole at sleeve two ends respectively, a leading screw It is fixedly connected with pull bar, another leading screw is fixedly connected with connector.
The spud pile is to be embedded in the channel-section steel at the top of stone masonry wall in advance.
The pull bar is coating steel pipe.
The beneficial effects of the utility model are:The utility model is that holding out against or pine for stretcher can be achieved by turnbarrel Relax, held out against come branch vertical breastwork forward position template, when removing breastwork forward position template, stretcher need to only be relaxed, afterwards by stretcher Pull bar is dismantled, working procedure is reduced, improves efficiency of construction, whole work progress is simple to operate, safe and reliable, it is to avoid is passed Damage of the welding procedure of uniting to breastwork forward position template, extends the service life of breastwork forward position template, saves reinforcement material, electricity Mechanical work and labour's input cost are welded, the simplification of technological process also reduces construction safety risk indirectly.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
In figure:1- breastworks forward position template;2- pull bars;3- stretchers;4- sleeves;5- leading screws;6- connectors;7- spud piles; 8- grouts stone walling;
It is described in detail referring to the drawings below with reference to embodiment of the present utility model.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples:
As shown in figure 1, a kind of breastwork forward position formwork support arrangement device, including pull bar 2, stretcher 3, connector 6 and spud pile 7, described one end of pull bar 2 is hinged with the top of breastwork forward position template 1, and the other end is fixedly connected with stretcher 3, and the stretcher 3 is another One end is fixedly connected with connector 6, and the connector 6 is articulated with spud pile 7, and the spud pile 7, which is fixed at, grouts stone walling 8 Top, the stretcher 3 includes a sleeve 4 leading screw 5 opposite with two thread rotary orientations, and the two ends of sleeve 4 are respectively equipped with and silk The tapped blind hole that thick stick 5 coordinates, two leading screws 5 are screwed in the tapped blind hole at the two ends of sleeve 4 respectively, and a leading screw 5 is fixed with pull bar 2 Connection, another leading screw 5 is fixedly connected with connector 6.
The spud pile 7 is the channel-section steel for being embedded in the top of stone masonry wall 8 in advance.
The pull bar 2 is coating steel pipe.
The utility model is exemplarily described above in conjunction with accompanying drawing, it is clear that the utility model implement not by The limitation of aforesaid way, if the various improvement that method design of the present utility model and technical scheme are carried out are employed, or without Improvement directly applies to other occasions, within protection domain of the present utility model.

Claims (3)

1. a kind of breastwork forward position formwork support arrangement device, it is characterised in that including pull bar (2), stretcher (3), connector (6) and solid Determine stake (7), described pull bar (2) one end at the top of breastwork forward position template (1) with being hinged, and the other end is fixedly connected with stretcher (3), institute State stretcher (3) other end to be fixedly connected with connector (6), the connector (6) is articulated with spud pile (7), the fixation Stake (7), which is fixed at, to be grouted at the top of stone walling (8), and the stretcher (3) includes a sleeve (4) and two thread rotary orientations conversely Leading screw (5), sleeve (4) two ends are respectively equipped with the tapped blind hole coordinated with leading screw (5), and two leading screws (5) screw in sleeve (4) respectively In the tapped blind hole at two ends, a leading screw (5) is fixedly connected with pull bar (2), another leading screw (5) and the fixed company of connector (6) Connect.
2. breastwork forward position formwork support arrangement device according to claim 1, it is characterised in that the spud pile (7) is pre-buried In grouting the channel-section steel at the top of stone walling (8).
3. breastwork forward position formwork support arrangement device according to claim 1, it is characterised in that the pull bar (2) is galvanized steel Pipe.
CN201720051586.3U 2017-01-17 2017-01-17 A kind of breastwork forward position formwork support arrangement device Active CN206581213U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720051586.3U CN206581213U (en) 2017-01-17 2017-01-17 A kind of breastwork forward position formwork support arrangement device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720051586.3U CN206581213U (en) 2017-01-17 2017-01-17 A kind of breastwork forward position formwork support arrangement device

Publications (1)

Publication Number Publication Date
CN206581213U true CN206581213U (en) 2017-10-24

Family

ID=60109805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720051586.3U Active CN206581213U (en) 2017-01-17 2017-01-17 A kind of breastwork forward position formwork support arrangement device

Country Status (1)

Country Link
CN (1) CN206581213U (en)

Similar Documents

Publication Publication Date Title
CN201025038Y (en) Adjustable pre-stress steel arch frame
CN205935621U (en) Simple and easy outer scaffold frame and shear force wall connecting device
CN203961238U (en) Bolt anchor slab adjustable tool formula builder's jack
CN203514763U (en) Putlog-hole-free plug-in type outer frame L-shape steel wall connecting piece structure
CN103556820A (en) Suspension mold for enlarging and reinforcing concrete beam and construction method of suspension mold
CN204531185U (en) A kind of adjustable reinforcing bar straight thread connector
CN206581213U (en) A kind of breastwork forward position formwork support arrangement device
CN212224604U (en) Wall connecting assembly for connecting outer wall scaffold and wall structure
CN105332376A (en) Hydraulic manipulator pile-pulling clamping device and pile pulling machine
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN203907010U (en) Flexible connection device for pipe jacking construction in soft soil layer
CN202483157U (en) Tool type anchoring part for overhanging scaffold
CN211341679U (en) Cantilever scaffold puts up wall bolt pre-buried device
CN207453121U (en) A kind of hydraulic structure flow-passing surface pre-embedded anchoring bolts
CN203846496U (en) Self-lock device for pulling timber piles
CN205976565U (en) PVC pipe root protective sheath
CN203531350U (en) U-shaped pull ring for steel beam fixing of cantilever outer frame
CN202039862U (en) Concrete curved surface shaping template
CN201627203U (en) Revolvable ground anchor device for single-side support form
CN220301341U (en) Concrete dam upset template anchor
CN204343649U (en) A kind of tool-type wire rope draw ring
CN204252541U (en) The tapered screw rod of single side formwork can be realized
CN204456449U (en) A kind of simple and easy callable pre-buried wall-connecting piece
CN212742552U (en) Foundation pit transverse supporting mechanism and foundation pit supporting device
CN108842770A (en) A kind of convenient hydraulic excavator piling equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant