CN206581213U - A kind of breastwork forward position formwork support arrangement device - Google Patents
A kind of breastwork forward position formwork support arrangement device Download PDFInfo
- Publication number
- CN206581213U CN206581213U CN201720051586.3U CN201720051586U CN206581213U CN 206581213 U CN206581213 U CN 206581213U CN 201720051586 U CN201720051586 U CN 201720051586U CN 206581213 U CN206581213 U CN 206581213U
- Authority
- CN
- China
- Prior art keywords
- breastwork
- forward position
- stretcher
- connector
- leading screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model is a kind of breastwork forward position formwork support arrangement device, including pull bar, stretcher, connector and spud pile, described pull bar one end is hinged with breastwork forward position die head, the other end is fixedly connected with stretcher, the stretcher other end is fixedly connected with connector, the connector is articulated with spud pile, the spud pile, which is fixed at, to be grouted at the top of stone walling, the stretcher includes the sleeve leading screw opposite with two thread rotary orientations, sleeve two ends are respectively equipped with the tapped blind hole coordinated with leading screw, two leading screws are screwed in the tapped blind hole at sleeve two ends respectively, one leading screw is fixedly connected with pull bar, another leading screw is fixedly connected with connector;The utility model reduces working procedure, avoid damage of the conventional bonding technique to breastwork forward position template, the service life of breastwork forward position template is extended, reinforcement material, electric welding mechanical work and labour's input cost is saved, the simplification of technological process also reduces construction safety risk indirectly.
Description
Technical field
The utility model is related to gravity type quay breastwork formwork construction technology field, more particularly to a kind of breastwork forward position template
The vertical device of branch.
Background technology
The Zhi Li and Demolition Construction of gravity type quay cast-in-situ creast wall template are always emphasis and difficult point in construction, are particularly
The Zhi Li of forward position template and the key point for removing even more construction, are used always in conventional breastwork forward position formwork support arrangement construction
Channel-section steel reinforcement process is welded, butt welding mouth is cut again during dismounting, and work progress is wasted time and energy, the later stage, by calculating, changes and added
Gu the position of channel-section steel is in grouting on stone walling, certain material and cost of labor are saved, but the Zhi Li of breastwork forward position template
Fail to abrogate all the time with the welding procedure of dismounting, cause the service life of template to be limited, reinforcement material wastes serious and construction
The problems such as potential safety hazard is larger fails effectively to be solved always.
The content of the invention
The utility model aims to solve the problem that the deficiencies in the prior art, and provides a kind of breastwork forward position formwork support arrangement device.
The utility model to achieve the above object, using following technical scheme:A kind of breastwork forward position formwork support arrangement device, bag
Pull bar, stretcher, connector and spud pile are included, described pull bar one end is hinged with breastwork forward position die head, the other end and tensioning
Device is fixedly connected, and the stretcher other end is fixedly connected with connector, and the connector is articulated with spud pile, the fixation
Stake, which is fixed at, to be grouted at the top of stone walling, and the stretcher includes the sleeve leading screw opposite with two thread rotary orientations, sleeve two
End is respectively equipped with the tapped blind hole coordinated with leading screw, and two leading screws are screwed in the tapped blind hole at sleeve two ends respectively, a leading screw
It is fixedly connected with pull bar, another leading screw is fixedly connected with connector.
The spud pile is to be embedded in the channel-section steel at the top of stone masonry wall in advance.
The pull bar is coating steel pipe.
The beneficial effects of the utility model are:The utility model is that holding out against or pine for stretcher can be achieved by turnbarrel
Relax, held out against come branch vertical breastwork forward position template, when removing breastwork forward position template, stretcher need to only be relaxed, afterwards by stretcher
Pull bar is dismantled, working procedure is reduced, improves efficiency of construction, whole work progress is simple to operate, safe and reliable, it is to avoid is passed
Damage of the welding procedure of uniting to breastwork forward position template, extends the service life of breastwork forward position template, saves reinforcement material, electricity
Mechanical work and labour's input cost are welded, the simplification of technological process also reduces construction safety risk indirectly.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
In figure:1- breastworks forward position template;2- pull bars;3- stretchers;4- sleeves;5- leading screws;6- connectors;7- spud piles;
8- grouts stone walling;
It is described in detail referring to the drawings below with reference to embodiment of the present utility model.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples:
As shown in figure 1, a kind of breastwork forward position formwork support arrangement device, including pull bar 2, stretcher 3, connector 6 and spud pile
7, described one end of pull bar 2 is hinged with the top of breastwork forward position template 1, and the other end is fixedly connected with stretcher 3, and the stretcher 3 is another
One end is fixedly connected with connector 6, and the connector 6 is articulated with spud pile 7, and the spud pile 7, which is fixed at, grouts stone walling 8
Top, the stretcher 3 includes a sleeve 4 leading screw 5 opposite with two thread rotary orientations, and the two ends of sleeve 4 are respectively equipped with and silk
The tapped blind hole that thick stick 5 coordinates, two leading screws 5 are screwed in the tapped blind hole at the two ends of sleeve 4 respectively, and a leading screw 5 is fixed with pull bar 2
Connection, another leading screw 5 is fixedly connected with connector 6.
The spud pile 7 is the channel-section steel for being embedded in the top of stone masonry wall 8 in advance.
The pull bar 2 is coating steel pipe.
The utility model is exemplarily described above in conjunction with accompanying drawing, it is clear that the utility model implement not by
The limitation of aforesaid way, if the various improvement that method design of the present utility model and technical scheme are carried out are employed, or without
Improvement directly applies to other occasions, within protection domain of the present utility model.
Claims (3)
1. a kind of breastwork forward position formwork support arrangement device, it is characterised in that including pull bar (2), stretcher (3), connector (6) and solid
Determine stake (7), described pull bar (2) one end at the top of breastwork forward position template (1) with being hinged, and the other end is fixedly connected with stretcher (3), institute
State stretcher (3) other end to be fixedly connected with connector (6), the connector (6) is articulated with spud pile (7), the fixation
Stake (7), which is fixed at, to be grouted at the top of stone walling (8), and the stretcher (3) includes a sleeve (4) and two thread rotary orientations conversely
Leading screw (5), sleeve (4) two ends are respectively equipped with the tapped blind hole coordinated with leading screw (5), and two leading screws (5) screw in sleeve (4) respectively
In the tapped blind hole at two ends, a leading screw (5) is fixedly connected with pull bar (2), another leading screw (5) and the fixed company of connector (6)
Connect.
2. breastwork forward position formwork support arrangement device according to claim 1, it is characterised in that the spud pile (7) is pre-buried
In grouting the channel-section steel at the top of stone walling (8).
3. breastwork forward position formwork support arrangement device according to claim 1, it is characterised in that the pull bar (2) is galvanized steel
Pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720051586.3U CN206581213U (en) | 2017-01-17 | 2017-01-17 | A kind of breastwork forward position formwork support arrangement device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720051586.3U CN206581213U (en) | 2017-01-17 | 2017-01-17 | A kind of breastwork forward position formwork support arrangement device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206581213U true CN206581213U (en) | 2017-10-24 |
Family
ID=60109805
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720051586.3U Active CN206581213U (en) | 2017-01-17 | 2017-01-17 | A kind of breastwork forward position formwork support arrangement device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206581213U (en) |
-
2017
- 2017-01-17 CN CN201720051586.3U patent/CN206581213U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201025038Y (en) | Adjustable pre-stress steel arch frame | |
CN205935621U (en) | Simple and easy outer scaffold frame and shear force wall connecting device | |
CN203961238U (en) | Bolt anchor slab adjustable tool formula builder's jack | |
CN203514763U (en) | Putlog-hole-free plug-in type outer frame L-shape steel wall connecting piece structure | |
CN103556820A (en) | Suspension mold for enlarging and reinforcing concrete beam and construction method of suspension mold | |
CN204531185U (en) | A kind of adjustable reinforcing bar straight thread connector | |
CN206581213U (en) | A kind of breastwork forward position formwork support arrangement device | |
CN212224604U (en) | Wall connecting assembly for connecting outer wall scaffold and wall structure | |
CN105332376A (en) | Hydraulic manipulator pile-pulling clamping device and pile pulling machine | |
CN205348724U (en) | Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting | |
CN203907010U (en) | Flexible connection device for pipe jacking construction in soft soil layer | |
CN202483157U (en) | Tool type anchoring part for overhanging scaffold | |
CN211341679U (en) | Cantilever scaffold puts up wall bolt pre-buried device | |
CN207453121U (en) | A kind of hydraulic structure flow-passing surface pre-embedded anchoring bolts | |
CN203846496U (en) | Self-lock device for pulling timber piles | |
CN205976565U (en) | PVC pipe root protective sheath | |
CN203531350U (en) | U-shaped pull ring for steel beam fixing of cantilever outer frame | |
CN202039862U (en) | Concrete curved surface shaping template | |
CN201627203U (en) | Revolvable ground anchor device for single-side support form | |
CN220301341U (en) | Concrete dam upset template anchor | |
CN204343649U (en) | A kind of tool-type wire rope draw ring | |
CN204252541U (en) | The tapered screw rod of single side formwork can be realized | |
CN204456449U (en) | A kind of simple and easy callable pre-buried wall-connecting piece | |
CN212742552U (en) | Foundation pit transverse supporting mechanism and foundation pit supporting device | |
CN108842770A (en) | A kind of convenient hydraulic excavator piling equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |