CN206578289U CN201720253533.XU CN201720253533U CN206578289U CN 206578289 U CN206578289 U CN 206578289U CN 201720253533 U CN201720253533 U CN 201720253533U CN 206578289 U CN206578289 U CN 206578289U
Authority
CN
China
Prior art keywords
containment wall
layer
brick
ladle
involucrum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720253533.XU
Other languages
Chinese (zh)
Inventor
陈希来
刘光平
程文雍
方斌祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zili High Temperature Technology Co ltd
Original Assignee
Zhejiang Zili High Temperature Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zili High Temperature Technology Co Ltd filed Critical Zhejiang Zili High Temperature Technology Co Ltd
Priority to CN201720253533.XU priority Critical patent/CN206578289U/en
Application granted granted Critical
Publication of CN206578289U publication Critical patent/CN206578289U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of containment wall work improved ladle of Rotating fields, belongs to refractory equipment technical field.Ladle includes involucrum, containment wall permanent layer and containment wall working lining, containment wall permanent layer is located on the inside of involucrum, containment wall working lining includes containment wall brick layer, separation layer and the cast bed of material, containment wall brick layer is built by laying bricks or stones on the inside of containment wall permanent layer, separation layer is strippingly attached on containment wall brick layer medial surface, and the cast bed of material is cast on the inside of separation layer.It is improved by the structure to containment wall working lining, is not only convenient for the progress of scarfing cinder peeling process, and can avoid that containment wall permanent layer is caused in scarfing cinder peeling process to damage, improves the service life of ladle.

Description

A kind of containment wall work improved ladle of Rotating fields
Technical field
The utility model is related to refractory equipment field, specifically, is related to a kind of containment wall work improved ladle of Rotating fields.
Background technology
Publication No. is discloses a kind of ladle in CN102211180A patent document, as shown in its accompanying drawing 1, including involucrum 111st, located at the inner side of involucrum 111 heat-insulation layer 103, the containment wall permanent layer 102 located at the inner side of heat-insulation layer 103 and it is cast in containment wall forever The cast bed of material 104 of the long inner side of layer 102.The containment wall working lining that the bed of material 104 constitutes the ladle is poured into a mould, it in use can be because The reasons such as slag erosion are thinning and occur wearing bag, and molten steel is damaged through the Bao Konghui that wears on pouring layer to containment wall permanent layer, The service life of whole ladle is set to shorten, to prevent the cast bed of material from occurring wearing bag, usual way has:(1) the old cast bed of material is removed On slag and it is old cast the bed of material outside pour into a mould new layer, its work difficulty is than larger;(2) the old cast bed of material is peeled off, and again Containment wall working lining is poured into a mould, according to artificial scarfing cinder peeling, then compares and takes time and effort, according to bale breaker scarfing cinder peeling, then easily Containment wall permanent layer is caused to damage.
The content of the invention
The purpose of this utility model is to provide a kind of ladle, is improved by the Rotating fields that work its containment wall, with just While scarfing cinder peeling, it is to avoid containment wall permanent layer is caused to damage, the service life of ladle is improved.
To achieve these goals, the utility model, which provides the improved ladle of containment wall work Rotating fields, includes involucrum, containment wall Permanent layer and containment wall working lining, containment wall permanent layer are located on the inside of involucrum, and containment wall working lining includes containment wall brick layer, separation layer and cast The bed of material, containment wall brick layer is built by laying bricks or stones on the inside of containment wall permanent layer, and separation layer is strippingly attached on containment wall brick layer medial surface, castable Layer is cast on the inside of separation layer.
The existing individual layer cast bed of material is substituted by using the containment wall brick layer arranged from the outside to the core, separation layer and the cast bed of material to make , can be in scarfing cinder peeling process, by contact position between separation layer and brick layer, in order to by separation layer and cast for containment wall working lining The bed of material is stripped down from containment wall brick layer together, and due to that can avoid causing damage to containment wall permanent layer provided with brick masonry layer; In addition, by setting brick masonry layer, separation layer and the cast bed of material, molten steel destruction can be avoided to provide multilayer protection for permanent layer, carried The service life of high ladle.
Specific scheme is that separation layer thickness is 1 millimeter to 5 millimeters.
Another specific scheme is that separation layer is the smearing that the corundum chamotte being applied on containment wall brick layer medial surface is consolidated into The bed of material.Work progress is simple.
It is preferred that scheme be along point to involucrum central shaft direction, containment wall brick layer be the brick building structure of updip formula.Down In scarfing cinder peeling process, separation layer applies adhesive force to containment wall brick layer has the component for pointing to involucrum direction, can be prevented effectively from by Containment wall brick is detached from brick building structure to come off, and further improves the service life of ladle.
Preferred scheme is in tilted layout upward for bricklaying surface on containment wall brick in containment wall brick layer, i.e., pushed up from starting brick to bag The upper bricklaying surface of brick is to be in tilted layout upward.
Scheme further preferably is that the top rade of bricklaying surface on containment wall brick is equal.
The utility model containment wall work improved ladle of Rotating fields, is not only convenient for the progress of scarfing cinder peeling process, it is to avoid right Permanent layer causes damage, and can improve the service life of ladle to prevent molten steel destroys permanent layer from providing multilayer protection.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model embodiment 1;
Fig. 2 is A partial enlarged drawings in Fig. 1;
Fig. 3 is the structural representation of the utility model embodiment 2.
Wherein, 1, involucrum, 2, containment wall permanent layer, 3, containment wall working lining, 31, the cast bed of material, 311, upper bricklaying surface, 32, apply Skinning loam layer, 33, containment wall brick layer, 4, bag top casting material feeding layer.
Embodiment
With reference to embodiments and its accompanying drawing is further described to the utility model.
Embodiment 1
Referring to Fig. 1 and Fig. 2, ladle has involucrum 1, the containment wall permanent layer 2 positioned at the inner side of involucrum 1 and positioned at containment wall permanent layer The containment wall working lining 3 of 2 inner sides, containment wall working lining 3 has containment wall brick layer 33, separation layer 32 and the cast bed of material 31.
Containment wall brick layer 33 is in the brick building structure of the inner side of containment wall permanent layer 2, containment wall brick by the containment wall such as magnesia carbon brick brick masonry Upper bricklaying surface and lower bricklaying surface be to arrange in the horizontal direction, i.e., containment wall brick layer 33 be the brick building structure of horizontal;Separation layer The 32 smearing bed of material to be consolidated into by the corundum chamotte being applied on the medial surface of containment wall brick layer 33, i.e. separation layer 32 is strippingly attached On the medial surface of containment wall brick layer 33;The cast bed of material 31 is the castable being made up of the refractory material for being cast in the inner side of separation layer 22 Layer.
Bag top casting material feeding layer 4 is by being cast in the inner side of involucrum 1 and pouring above containment wall permanent layer 2 and containment wall working lining 3 Material feeding is made.
When carrying out scarfing cinder peeling to containment wall working lining 3, by contact position between separation layer 32 and containment wall brick layer 33, using tearing open Chartered plane peels off separation layer 32 together with the cast bed of material 31, effectively prevents the infringement to containment wall permanent layer 2.
Embodiment 2
As the explanation to the present embodiment 2, the difference only pair with above-described embodiment 1 is illustrated below.
The brick building structure of updip formula is built up using the containment wall as shown in Figure 3 above that bricklaying surface 331 is in tilted layout upward is brick, To substitute the brick building structure of horizontal as shown in Figure 2 in above-described embodiment 1, the containment wall brick layer 33 of the present embodiment, i.e. edge are used as The direction of the central shaft of involucrum 1 is pointed to, containment wall brick layer 33 is the brick building structure of updip formula.
When carrying out scarfing cinder peeling with the cast bed of material 31 to separation layer 32, can effectively it prevent containment wall brick from brick masonry Extract out and come off in structure.
In the present embodiment, the upper bricklaying surface of starting brick to bag dome brick is to be in tilted layout upward in containment wall brick layer 32, and Top rade is equal;In addition, the upper bricklaying surface of bag dome brick can also be set as horizontal direction arrangement, it is easy to pour bag top casting material feeding layer Note.
This example is only to illustrate technical concepts and features of the present utility model, and its object is to allow person skilled in the art Scholar can understand content of the present utility model and implement according to this, and protection domain of the present utility model can not be limited with this.All The equivalent change or modification made according to the utility model Spirit Essence, should all cover within protection domain of the present utility model.

Claims (6)

  1. The improved ladle of Rotating fields 1. a kind of containment wall works, including involucrum, containment wall permanent layer and containment wall working lining, the containment wall is forever Long layer is located on the inside of the involucrum;
    It is characterized in that:
    The containment wall working lining includes building containment wall brick layer on the inside of the containment wall permanent layer by laying bricks or stones, is strippingly attached to the bag Separation layer and the cast bed of material that is cast on the inside of the separation layer on nogging layer medial surface.
  2. 2. ladle according to claim 1, it is characterised in that:
    The thickness of the separation layer is 1 millimeter to 5 millimeters.
  3. 3. ladle according to claim 1, it is characterised in that:
    The separation layer is the smearing bed of material that the corundum chamotte being applied on the containment wall brick layer medial surface is consolidated into.
  4. 4. the ladle according to any one of claims 1 to 3 claim, it is characterised in that:
    Along the direction for pointing to the involucrum central shaft, the containment wall brick layer is the brick building structure of updip formula.
  5. 5. ladle according to claim 4, it is characterised in that:
    The upper bricklaying surface of containment wall brick is in tilted layout upward in the containment wall brick layer.
  6. 6. ladle according to claim 5, it is characterised in that:
    The top rade of the upper bricklaying surface of the containment wall brick is equal.
CN201720253533.XU 2017-03-15 2017-03-15 A kind of containment wall work improved ladle of Rotating fields Expired - Fee Related CN206578289U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720253533.XU CN206578289U (en) 2017-03-15 2017-03-15 A kind of containment wall work improved ladle of Rotating fields

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720253533.XU CN206578289U (en) 2017-03-15 2017-03-15 A kind of containment wall work improved ladle of Rotating fields

Publications (1)

Publication Number Publication Date
CN206578289U true CN206578289U (en) 2017-10-24

Family

ID=60113499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720253533.XU Expired - Fee Related CN206578289U (en) 2017-03-15 2017-03-15 A kind of containment wall work improved ladle of Rotating fields

Country Status (1)

Country Link
CN (1) CN206578289U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113333727A (en) * 2021-07-02 2021-09-03 王磊 Improved structure's package wall brick masonry structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113333727A (en) * 2021-07-02 2021-09-03 王磊 Improved structure's package wall brick masonry structure
CN113333727B (en) * 2021-07-02 2023-06-09 王磊 Structure-improved wall-covered brick masonry structure

Similar Documents

Publication Publication Date Title
CN106083110B (en) High strength steel ladle-lining castable
CN108971470A (en) A kind of new-type ladle and its building method
CN206677166U (en) A kind of improved cast ladle of structure
CN206578289U (en) A kind of containment wall work improved ladle of Rotating fields
CN103302280B (en) A kind of building method of steel ladle bottom for ultra-low carbon steel
CN100389911C (en) Casing patch method for ladle brickwork neck bush
CN104972103B (en) Combined type permanent ladle layer pour mass
CN204220980U (en) A kind of trouble free service layer ladle liner
CN206425545U (en) A kind of ladle wall working lining
CN203917892U (en) Long-life tundish
CN203917884U (en) A kind of continuous casting tundish
CN205888058U (en) Compound masonry construction of steel ladle lining
CN104972104B (en) A kind of liner in dundish manufacture method and combinations thereof mode
CN209272454U (en) A kind of new-type ladle
CN205183761U (en) Ladle package end pouring structure
CN208917231U (en) A kind of blast furnace goes out residual iron device
CN210151148U (en) Converter mouth structure
CN214684247U (en) Steel ladle
CN104707956A (en) Beam blank continuous casting tundish turbulence controller and installation method thereof
CN203944831U (en) Novel anti-leakage ladle lining
CN207944116U (en) A kind of clinker mold
CN105033235A (en) Smelting steel ladle
CN104399959A (en) Masonry construction capable of increasing service cycle of bottom of steel ladle
CN206550342U (en) A kind of brick building structure of improved containment wall of structure
CN205289726U (en) Permanent layer pouring body of improved generation combined type ladle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 312300 Zhejiang city of Shaoxing province Hangzhou Bay Juxian two East District of Shangyu economic and Technological Development Zone two Road No. 9

Patentee after: Zhejiang Zili High Temperature Technology Co.,Ltd.

Address before: 312300 Zhejiang city of Shaoxing province Hangzhou Bay Juxian two East District of Shangyu economic and Technological Development Zone two Road No. 9

Patentee before: ZHEJIANG ZILI HIGH TEMPERATURE TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171024