CN206578100U - Washing steel pipes device - Google Patents

Washing steel pipes device Download PDF

Info

Publication number
CN206578100U
CN206578100U CN201720133245.0U CN201720133245U CN206578100U CN 206578100 U CN206578100 U CN 206578100U CN 201720133245 U CN201720133245 U CN 201720133245U CN 206578100 U CN206578100 U CN 206578100U
Authority
CN
China
Prior art keywords
main body
plate
upper chamber
threaded rod
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720133245.0U
Other languages
Chinese (zh)
Inventor
肖永强
吕莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Yingtong Pipeline Co Ltd
Original Assignee
Hebei Yingtong Pipeline Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Yingtong Pipeline Co Ltd filed Critical Hebei Yingtong Pipeline Co Ltd
Priority to CN201720133245.0U priority Critical patent/CN206578100U/en
Application granted granted Critical
Publication of CN206578100U publication Critical patent/CN206578100U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model is related to the technical field of pipe production line servicing unit, more particularly to a kind of washing steel pipes device, and it can carry out internal observation, and raising uses reliability;And steel pipe can preferably be placed, improve cleaning performance;Including mounting table, main body and water tank, main body and water tank are installed on mounting table, main body is internally provided with working chamber, and dividing plate is horizontally arranged with working chamber, working chamber is divided on upper chamber and lower chambers, dividing plate and is provided with multiple through holes, is provided with main body wall and picks and places mouth, and be provided with picking and placeing mouthful on gear door, oral siphon and outlet pipe and be provided with water pump;It is provided with the side wall of main body at peep hole, peep hole and is provided with baffle plate;Upper junction plate, upper screwed pipe, upper threaded rod, train wheel bridge, lower connecting plate, lower screwed pipe, lower threaded rod and lower plate are provided with upper chamber, steel pipe is installed between train wheel bridge and lower plate.

Description

Washing steel pipes device
Technical field
The utility model is related to the technical field of pipe production line servicing unit, more particularly to a kind of washing steel pipes dress Put.
Background technology
It is well known that washing steel pipes device is the final tache in the production line of steel pipe, the steel pipe after production is carried out clear The servicing unit washed, and washing steel pipes device is divided into the steel pipe of different tube diameters and length is cleaned, the utility model is main Cleaned, be widely used in correlative technology field for small shape steel tube;Existing washing steel pipes device includes putting Platform, main body and water tank are put, main body and water tank are installed on mounting table, main body is internally provided with working chamber, and in working chamber Dividing plate is inside horizontally arranged with, working chamber is divided on upper chamber and lower chambers, dividing plate and is provided with multiple through holes, is set in main body wall Be equipped with and pick and place mouth, and gear door is provided with picking and placeing mouthful, pick and place mouth and communicated with upper chamber, the input of water tank by outlet pipe with The lower chambers connection of main body, the output end of water tank is communicated by oral siphon with the upper chamber of main body, and shower nozzle is provided with upper chamber, And shower nozzle, which is located on the output end of oral siphon, oral siphon and outlet pipe, is provided with water pump;This washing steel pipes device is used When open gear door, steel pipe is placed in upper chamber, by water pump control oral siphon from shower nozzle spray water steel pipe is cleaned, Water after cleaning enters bottom chamber by through hole, is introduced the water into water tank recycled by oral siphon afterwards;It is this Found in washing steel pipes device use, chamber interior can not be observed thereon, so as to cause it poor using reliability;And Steel pipe can not preferably be fixed inside it, so as to cause it to be discharged in upper chamber, cleaning performance is poor.
Utility model content
In order to solve the above technical problems, the utility model, which provides one kind, can carry out internal observation, raising uses reliability;And And steel pipe can preferably be placed, improve the washing steel pipes device of cleaning performance.
Washing steel pipes device of the present utility model, including mounting table, main body and water tank, main body and water tank are installed in placement On platform, main body is internally provided with working chamber, and is horizontally arranged with working chamber dividing plate, by working chamber be divided into upper chamber and under It is provided with to be provided with multiple through holes, main body wall on chamber, dividing plate and picks and places mouth, and gear door is provided with picking and placeing mouthful, picks and places Mouth is communicated with upper chamber, and the input of water tank is connected by outlet pipe with the lower chambers of main body, and the output end of water tank is by entering water Pipe is communicated with the upper chamber of main body, is provided with shower nozzle in upper chamber, and shower nozzle is located at the output end of oral siphon, oral siphon with go out Water pump is provided with water pipe;Peep hole is provided with the side wall of the main body, and transparent baffle is provided with peep hole, institute Peep hole is stated to communicate with upper chamber;Upper junction plate, upper screwed pipe, upper threaded rod, train wheel bridge, lower company are provided with the upper chamber Fishplate bar, lower screwed pipe, lower threaded rod and lower plate, the upper junction plate are connected with upper chamber inner roof wall, and upper junction plate bottom is set Standing groove is equipped with, and upper ball bearing is provided with upper standing groove, the upper screwed pipe top is inserted into upper ball bearing Interior, simultaneously spiral shell is filled to screwed pipe bottom inner portion for upper threaded rod top insertion, and train wheel bridge is arranged on upper threaded rod bottom, lower connecting plate Top is provided with lower standing groove, and is provided with lower ball bearing in lower standing groove, and the lower screwed pipe bottom is inserted into lower rolling In pearl bearing, simultaneously spiral shell is filled to inside lower screwed pipe top for lower threaded rod bottom insertion, and lower plate is arranged on lower threaded rod top, steel Pipe clamp is mounted between train wheel bridge and lower plate.
Washing steel pipes device of the present utility model, in addition to handle, rotating shaft, band moving axis, bristle and sealing ring, the handle Positioned at the outside of main body, band moving axis, bristle and sealing ring are respectively positioned in upper chamber, and one end of the rotating shaft is connected with handle, are turned The other end of axle is connected through transparent baffle and stretch to upper chamber in with moving axis, and the bristle is installed in the band moving axis On, and the bristle is adjacent to the transparent baffle, and the ring set is adjacent in the outside of rotating shaft, and the sealing ring The rotating shaft and main body junction.
Washing steel pipes device of the present utility model, in addition to four groups of supporting legs, the tops of four groups of supporting legs respectively with placement Platform bottom front left side, forward right side, left rear side and right lateral side connection.
The beneficial effects of the utility model are compared with prior art:, can be by peep hole to upper by above-mentioned setting The information such as cleaning process, situation is observed in chamber, and raising uses reliability;While can be by the way that steel pipe be placed on Between on clamping plate and lower plate, upper screwed pipe and lower screwed pipe control train wheel bridge are rotated afterwards and lower plate is pressed from both sides to steel pipe Tightly, cleaned afterwards by shower nozzle, improve cleaning efficiency and effect.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Embodiment
With reference to the accompanying drawings and examples, embodiment of the present utility model is described in further detail.Below Embodiment is used to illustrate the utility model, but is not limited to scope of the present utility model.
As shown in figure 1, washing steel pipes device of the present utility model, including mounting table 1, main body 2 and water tank 3, main body and water Case is installed on mounting table, and main body is internally provided with working chamber, and in working chamber is horizontally arranged with dividing plate 4, by work Chamber, which is divided on upper chamber and lower chambers, dividing plate, is provided with multiple through holes, is provided with main body wall and picks and places mouth, and picked and placeed at mouth Gear door 5 is provided with, mouth is picked and placeed and is communicated with upper chamber, the input of water tank is connected by outlet pipe 22 with the lower chambers of main body, water The output end of case is communicated by oral siphon 23 with the upper chamber of main body, and shower nozzle 6 is provided with upper chamber, and shower nozzle is located at into water Water pump 7 is provided with the output end of pipe, oral siphon and outlet pipe;Peep hole is provided with the side wall of main body, and in peep hole Place is provided with transparent baffle 8, and peep hole is communicated with upper chamber;Upper junction plate 9, upper screwed pipe 10, upper spiral shell are provided with upper chamber Rasp bar 11, train wheel bridge 12, lower connecting plate, lower screwed pipe 13, lower threaded rod and lower plate 14, upper junction plate and upper chamber's inner roof wall Connection, upper junction plate bottom is provided with standing groove, and is provided with upper ball bearing in upper standing groove, and upper screwed pipe top is inserted Enter to upper ball bearing, simultaneously spiral shell is filled to screwed pipe bottom inner portion for upper threaded rod top insertion, and train wheel bridge is arranged on upper screw thread Bar bottom, lower connecting plate top is provided with lower standing groove, and is provided with lower standing groove lower ball bearing 15, lower screwed pipe bottom End is inserted into lower ball bearing, and simultaneously spiral shell is filled to inside lower screwed pipe top for lower threaded rod bottom insertion, and lower plate is arranged on down Threaded rod top, steel pipe 16 is installed between train wheel bridge and lower plate;, can be by peep hole to upper chamber by above-mentioned setting The information such as interior cleaning process, situation are observed, and raising uses reliability;While can be by the way that steel pipe be placed on into train wheel bridge And on lower plate between, upper screwed pipe and lower screwed pipe control train wheel bridge are rotated afterwards and lower plate is clamped to steel pipe, it Cleaned afterwards by shower nozzle, improve cleaning efficiency and effect.
Washing steel pipes device of the present utility model, in addition to handle 17, rotating shaft 18, band moving axis 19, bristle 20 and sealing ring 21, handle is located at the outside of main body, and band moving axis, bristle and sealing ring are respectively positioned in upper chamber, and one end of rotating shaft is connected with handle, The other end of rotating shaft is connected through transparent baffle and stretch to upper chamber in with moving axis, bristle installed in on moving axis, and Bristle is adjacent to transparent baffle, and ring set is in the outside of rotating shaft, and sealing ring is adjacent to rotating shaft and main body junction;By upper State setting, can when transparent baffle is dirty by handle drive bristle it is cleared up, it is more practical, while passing through sealing ring Design can prevent water from overflowing, and in figure it can also be seen that, gear door and pick and place a mouthful junction and also have rubber sealing device, purpose It is to prevent water from overflowing.
Washing steel pipes device of the present utility model, in addition to four groups of supporting legs 22, the tops of four groups of supporting legs respectively with mounting table Bottom front left side, forward right side, left rear side and right lateral side connection, improve support effect.
Described above is only preferred embodiment of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of the utility model technical principle is not departed from, some improvement and modification can also be made, these change Enter and protection domain of the present utility model is also should be regarded as with modification.

Claims (3)

1. a kind of washing steel pipes device, including mounting table, main body and water tank, main body and water tank are installed on mounting table, main body Be internally provided with working chamber, and be horizontally arranged with dividing plate in working chamber, working chamber be divided into upper chamber and lower chambers, dividing plate On be provided with to be provided with multiple through holes, main body wall and pick and place mouth, and be provided with gear door at picking and placeing mouthful, pick and place mouth and upper chamber Communicate, the input of water tank is connected by outlet pipe with the lower chambers of main body, the output end of water tank passes through oral siphon and main body Upper chamber is communicated, and shower nozzle is provided with upper chamber, and shower nozzle is all provided with the output end of oral siphon, oral siphon and outlet pipe It is equipped with water pump;Characterized in that, be provided with peep hole on the side wall of the main body, and it is provided with peep hole transparent baffle, The peep hole is communicated with upper chamber;Be provided with the upper chamber upper junction plate, upper screwed pipe, upper threaded rod, train wheel bridge, under Connecting plate, lower screwed pipe, lower threaded rod and lower plate, the upper junction plate are connected with upper chamber inner roof wall, upper junction plate bottom Standing groove is provided with, and upper ball bearing is provided with upper standing groove, the upper screwed pipe top is inserted into ball axle In holding, simultaneously spiral shell is filled to screwed pipe bottom inner portion for upper threaded rod top insertion, and train wheel bridge is arranged on upper threaded rod bottom, lower connection Plate top is provided with lower standing groove, and is provided with lower ball bearing in lower standing groove, and the lower screwed pipe bottom is inserted into down In ball bearing, simultaneously spiral shell is filled to inside lower screwed pipe top for lower threaded rod bottom insertion, and lower plate is arranged on lower threaded rod top, Steel pipe is installed between train wheel bridge and lower plate.
2. washing steel pipes device as claimed in claim 1, it is characterised in that also including handle, rotating shaft, band moving axis, bristle and Sealing ring, the handle is located at the outside of main body, and band moving axis, bristle and sealing ring are respectively positioned in upper chamber, and the one of the rotating shaft End be connected with handle, and the other end of rotating shaft passes through transparent baffle and stretched in upper chamber and is connected with moving axis, and the bristle is pacified On the band moving axis, and the bristle is adjacent to the transparent baffle, the ring set in the outside of rotating shaft, and The sealing ring is adjacent to the rotating shaft and main body junction.
3. washing steel pipes device as claimed in claim 2, it is characterised in that also including four groups of supporting legs, four groups of supporting legs Top is connected with mounting table bottom front left side, forward right side, left rear side and right lateral side respectively.
CN201720133245.0U 2017-02-14 2017-02-14 Washing steel pipes device Expired - Fee Related CN206578100U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720133245.0U CN206578100U (en) 2017-02-14 2017-02-14 Washing steel pipes device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720133245.0U CN206578100U (en) 2017-02-14 2017-02-14 Washing steel pipes device

Publications (1)

Publication Number Publication Date
CN206578100U true CN206578100U (en) 2017-10-24

Family

ID=60092126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720133245.0U Expired - Fee Related CN206578100U (en) 2017-02-14 2017-02-14 Washing steel pipes device

Country Status (1)

Country Link
CN (1) CN206578100U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108080363A (en) * 2017-12-26 2018-05-29 大连大学 A kind of cleaning method of the double-deck chemical pipeline cleaning device separated

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108080363A (en) * 2017-12-26 2018-05-29 大连大学 A kind of cleaning method of the double-deck chemical pipeline cleaning device separated

Similar Documents

Publication Publication Date Title
CN206500392U (en) Mechanical washing device
CN206561000U (en) Mathematics education model cleaning device
CN204747003U (en) Cleaning machine of adaptation complicated shape PVC pipe
CN206622373U (en) Fresh ginseng cleaning device
CN206578100U (en) Washing steel pipes device
CN108146401A (en) A kind of water-saving car washing station
CN206285279U (en) Internal Medicine-Oncology sterilizer
CN206260670U (en) A kind of marine product soaks separator
CN107933511A (en) A kind of automobile cleaning smears ancillary equipment with cleaning solution
CN206591336U (en) Garment care equipment for making suit dried and sterilization
CN206214058U (en) A kind of novel dish-washing machines ultrasonic cleaning equipment
CN207308454U (en) Security protection head shell cleaning device
CN207413684U (en) A kind of Workpiece painting processing unit (plant)
CN206716468U (en) Grain screening installation
CN206749374U (en) A kind of Multifunctional fine art pen cleaning device
CN207013396U (en) Pipe fitting cleaning machine
CN205928294U (en) Glass sanding atomization plant
CN107281805A (en) Rainwater treatment reuse means
CN209210938U (en) A kind of metal tube cleaning equipment
CN204301714U (en) Concrete carbonization depth detects aid
CN206837640U (en) Rainwater treatment reuse means
CN207607133U (en) A kind of 3D printing material recuperating machines
CN109834095B (en) Cleaning equipment for hydraulic pipe production and operation method thereof
CN206837778U (en) Waste gas treatment equipment
CN206229366U (en) Polycarboxylate water-reducer reactor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171024