CN206572502U - One kind loosens wind apparatus - Google Patents

One kind loosens wind apparatus Download PDF

Info

Publication number
CN206572502U
CN206572502U CN201720299377.0U CN201720299377U CN206572502U CN 206572502 U CN206572502 U CN 206572502U CN 201720299377 U CN201720299377 U CN 201720299377U CN 206572502 U CN206572502 U CN 206572502U
Authority
CN
China
Prior art keywords
blast cap
cap head
wind apparatus
airduct
loosened
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720299377.0U
Other languages
Chinese (zh)
Inventor
沈雪飞
房晔
吴东翰
周叶芊
吴月季
梅灵伶
高明亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Desen Changzhou Energy Equipment Co ltd
Guangzhou Devotion Thermal Technology Co Ltd
Original Assignee
SUZHOU DISEN BIOLOGICAL ENERGY CO Ltd
Guangzhou Devotion Thermal Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU DISEN BIOLOGICAL ENERGY CO Ltd, Guangzhou Devotion Thermal Technology Co Ltd filed Critical SUZHOU DISEN BIOLOGICAL ENERGY CO Ltd
Priority to CN201720299377.0U priority Critical patent/CN206572502U/en
Application granted granted Critical
Publication of CN206572502U publication Critical patent/CN206572502U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Supply (AREA)

Abstract

Wind apparatus is loosened the utility model discloses one kind, it includes top backplate, sheet iron underguard, airduct cloth wind group and multiple blast cap heads and support frame and channel-section steel;Airduct cloth wind group includes being arranged in order multiple airducts of setting;Wherein, top backplate, sheet iron underguard are sequentially connected setting from top to bottom;Top backplate, sheet iron underguard are exported to passage between the import of upper and lower two separators for parcel closing boiler furnace;Support frame is used to support channel-section steel, and channel-section steel is used to fix blast cap head;Installation settings has multiple blast cap heads on each airduct, and airduct is connected with corresponding multiple blast cap heads.The loosening wind apparatus that the utility model is provided, can between boiler furnace and separator structural attachments carry out, the effective blowing of large area processing, and then avoid junction dust stratification, so as to also avoid the material residual for burning insufficient, it is to avoid cause the waste of biomass fuel;It has been obviously improved efficiency of combustion simultaneously, it is ensured that the abundant burning of biomass fuel.

Description

One kind loosens wind apparatus
Technical field
The utility model is related to biomass boiler equipment technical field, more particularly to a kind of loosening wind apparatus.
Background technology
It is the boiler using biomass energy as fuel life it is well known that biomass boiler is a species of boiler Material boiler, can substantially be divided into biomass steam boiler, biomass hot water boiler, biomass thermal wind furnace, biomass heat-conduction oil Stove etc..
Existing biomass boiler system is main (i.e. main to include biology by feeding system, air inducing supply air system, combustion system Matter boiler), dust pelletizing system, dust removing system, the structure composition such as control system;After boiler furnace burning, into before separator, With structural attachments at one, but the junction is very easy to dust stratification, and is very easy to the insufficient material of residual combustion and (enters And cause biomass fuel combustion insufficient, the waste of biomass fuel is caused, while influenceing burning quality and combustion efficiency).
Therefore, the above-mentioned technological deficiency for how overcoming traditional biomass steam generator system is that those skilled in the art are badly in need of solution The problem of.
Utility model content
The purpose of this utility model is to provide a kind of loosening wind apparatus, to solve the above problems.
In order to achieve the above object, the technical solution of the utility model is realized in:
The utility model provide it is a kind of loosen wind apparatus, including top backplate, sheet iron underguard, airduct cloth wind group and multiple Blast cap head and support frame and channel-section steel;The airduct cloth wind group includes being arranged in order multiple airducts of setting;
Wherein, the top backplate, the sheet iron underguard are sequentially connected setting from top to bottom;It is the top backplate, described Sheet iron underguard is exported to passage between the import of upper and lower two separators for parcel closing boiler furnace;
Support frame as described above is used to support the channel-section steel, and the channel-section steel is used to fix the blast cap head;Each airduct Upper installation settings has multiple blast cap heads, and the airduct is connected with corresponding multiple blast cap heads.
It is preferred that, can embodiment as one kind;The blast cap head is the blast cap head of heat-resistance abrasion-resistance alloy cast steel structure;
It is preferred that, can embodiment as one kind;The blast cap head is specially ZGCr26Mn7N structural members.
It is preferred that, can embodiment as one kind;The airduct cloth wind group and multiple blast cap heads are arranged at boiler Junction between burner hearth and separator.
It is preferred that, can embodiment as one kind;The blast cap head include with cavity structure blast cap head body and The multiple through holes set gradually along the blast cap head body circumferential side wall;And multiple through holes respectively with the blast cap head sheet The cavity connection of body.
It is preferred that, can embodiment as one kind;The through hole is specially six.
It is preferred that, can embodiment as one kind;Circumferencial direction of six through holes along the blast cap head body is equal Lay at even interval.
It is preferred that, can embodiment as one kind;The bottom of the blast cap head body is cylindrical shape, and the blast cap The top of head body is cone shape.
It is preferred that, can embodiment as one kind;External screw thread is provided with the lower circumference wall of the blast cap head body.
It is preferred that, can embodiment as one kind;The diameter range of the through hole is 2-10mm.
Compared with prior art, the advantage of the utility model embodiment is:
A kind of loosening wind apparatus that the utility model is provided, it is mainly by including top backplate, sheet iron underguard, airduct cloth wind The composition such as group and multiple blast cap heads and support frame and channel-section steel.
There is following position relationship and layout between the said equipment;The airduct cloth wind group includes being arranged in order setting Multiple airducts;Wherein, the top backplate, the sheet iron underguard are symmetrical set;The top backplate, the sheet iron underguard are used Passage between upper and lower two separator A import is exported in parcel closing boiler furnace B;It should be noted that separator Import connects boiler furnace outlet, and separator outlet then enters back-end ductwork;Support frame as described above is used to support the channel-section steel, and institute Stating channel-section steel is used to fix the blast cap head;Installation settings has multiple blast cap heads on each airduct, and the airduct with it is corresponding Multiple blast cap heads connection.
Above-mentioned loosening wind apparatus, can between boiler furnace and separator structural attachments carry out, large area has The blowing processing of effect, and then junction dust stratification is avoided, so as to also avoid the material residual for burning insufficient, cause biomass fuel Waste;It will be apparent that a kind of loosening wind apparatus that the utility model is provided, has been obviously improved efficiency of combustion, it is ensured that biomass The abundant burning of fuel.
Brief description of the drawings
, below will be right in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art The accompanying drawing used required in embodiment or description of the prior art is briefly described, it should be apparent that, describe below In accompanying drawing be some embodiments of the present utility model, for those of ordinary skill in the art, do not paying creativeness On the premise of work, other accompanying drawings can also be obtained according to these accompanying drawings.
The assembling for loosening wind apparatus and two separators and a boiler furnace that Fig. 1 provides for the utility model embodiment Half section structural representation;
The inside partial enlargement structural representation for the loosening wind apparatus that Fig. 2 provides for the utility model embodiment;
The partial enlargement structural representation for the loosening wind apparatus that Fig. 3 provides for the utility model embodiment in Fig. 2;
The blast cap head broken section structural representation loosened in wind apparatus that Fig. 4 provides for the utility model embodiment;
The sectional structure in the blast cap head A-A directions for the loosening wind apparatus that Fig. 5 provides for Fig. 4 the utility model embodiment Schematic diagram;
Label:1- sheet iron underguards;2- airduct cloth wind groups;3- airducts;4- blast cap heads;41- blast cap head bodies;42- Through hole;5- support frames;6- channel-section steels;A- separators;B- boiler furnaces.
Embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with accompanying drawing, it is clear that described Embodiment is a part of embodiment of the utility model, rather than whole embodiments.Based on the embodiment in the utility model, sheet The every other embodiment that field those of ordinary skill is obtained under the premise of creative work is not made, belongs to this practicality Novel protected scope.
, it is necessary to illustrate in description of the present utility model, unless otherwise clearly defined and limited, term " connection " It should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can be that machinery connects Connect or electrically connect;Can be joined directly together, can also be indirectly connected to by intermediary, can be in two elements The connection in portion.For the ordinary skill in the art, it can understand above-mentioned term in the utility model with concrete condition Concrete meaning.
The utility model is described in further detail below by specific embodiment and with reference to accompanying drawing.
Referring to Fig. 1 and Fig. 2, a kind of loosening wind apparatus that the utility model embodiment is provided, including top backplate, bottom shield Plate 1, airduct cloth wind group 2 (i.e. described airduct cloth wind group 2 includes being arranged in order multiple airducts 3 of setting) and multiple blast caps first 4 are (another Referring to Fig. 3) and support frame 5 and channel-section steel 6;
Loosened in Fig. 1 wind apparatus its it is actual also include being provided with top backplate, it is relative with the position of sheet iron underguard 1 of bottom Set;Fig. 1 is the half section structural representation for loosening wind apparatus;It is to have splitted the first half, and then can illustrate upper half The structures such as the airduct cloth wind group 2 inside the top backplate in portion;The sheet iron underguard 1 of lower half has then blocked airduct cloth wind group 2 simultaneously Etc. structure;
Wherein, the top backplate, the sheet iron underguard 1 are sequentially connected setting from top to bottom;It is the top backplate, described Sheet iron underguard 1 is exported to passage between upper and lower two separator A import for parcel closing boiler furnace B's;Need explanation , separator A import connection boiler furnace B outlet, separator A outlet then enters back-end ductwork.
Support frame as described above 5 is used to support the channel-section steel 6, and the channel-section steel 6 is used to fix the blast cap first 4;It is each described Installation settings has multiple blast caps first 4 on airduct 3, and the airduct 3 is connected with corresponding multiple blast caps first 4.
The concrete structure for analyzing above-mentioned loosening wind apparatus understands that it is mainly by including top backplate, sheet iron underguard 1, airduct Cloth wind group 2 and multiple blast caps first 4 and support frame 5 and the grade of channel-section steel 6 composition.
There is following position relationship and layout between the said equipment;The airduct cloth wind group 2 includes being arranged in order setting Multiple airducts 3;Wherein, wherein, the top backplate, the sheet iron underguard 1 are sequentially connected setting from top to bottom;The top Backplate, the sheet iron underguard 1 lead to for wrapping up being exported between upper and lower two separator A import for closing boiler furnace B Road;It should be noted that separator import connects boiler furnace outlet, separator outlet then enters back-end ductwork;The support Frame 5 is used to support the channel-section steel 6, and the channel-section steel 6 is used to fix the blast cap first 4;There is installation settings on each airduct 3 Multiple blast caps first 4, and the airduct 3 connects with corresponding multiple blast caps first 4.
Above-mentioned loosening wind apparatus, can between boiler furnace and separator structural attachments carry out, large area has The blowing processing of effect, and then junction dust stratification is avoided, so as to also avoid the material residual for burning insufficient, cause biomass fuel Waste;It will be apparent that a kind of loosening wind apparatus that the utility model is provided, has been obviously improved efficiency of combustion, it is ensured that biomass The abundant burning of fuel.
The concrete structure and particular technique effect of the loosening wind apparatus provided below the utility model embodiment do one Lower detailed description:
It is preferred that, can embodiment as one kind;The blast cap first 4 is the blast cap head of heat-resistance abrasion-resistance alloy cast steel structure;
It is preferred that, can embodiment as one kind;The blast cap first 4 is specially ZGCr26Mn7N structural members.
It should be noted that Wind cap for boiler is mostly heat-resistance abrasion-resistance alloy cast steel.Material composition have FeCr, FeMn, The alloy materials such as FeMo, Ni, Re, FeSi and vanadium iron (FeV), ferro-niobium (FeNB), copper (Cu), make material both there is high alloy to cast Wearability, again have higher mechanical strength and shock resistance, while improving the solderability of material.Selection uses above-mentioned Its structure of blast cap head is difficult heated and abrasion deformation, can be used with permanently effective.
It is preferred that, can embodiment as one kind;The airduct cloth wind group 2 and multiple blast caps first 4 are arranged at pot Junction between stove burner hearth B and separator A.
It should be noted that above-mentioned airduct cloth wind group 2 and blast cap first 4 are arranged between boiler furnace B and separator A Junction;Above-mentioned position relationship has cleverly design theory, and it can ensure that the wind of first 4 blowout of blast cap is directly directed at Boiler Furnace Junction between thorax B and separator A, implements direct soot blowing dust removal process to it.
It is preferred that, can embodiment as one kind;Referring to Fig. 4 and Fig. 5, the blast cap first 4 is included with cavity structure Blast cap head body 41 and the multiple through holes 42 set gradually along the circumferential side wall of blast cap head body 41;And it is multiple described logical Cavity of the hole 42 respectively with the blast cap head body 41 is connected.The through hole 42 is specially six.
It should be noted that its specific blast cap head body 41 by cavity structure of above-mentioned blast cap first 4 and along the wind The grade of multiple through holes 42 part that the circumferential side wall of cap head body 41 is set gradually is constituted;The cavity structure of blast cap head body 41 can be real Now it is aerated, while realizing that blowing is handled by six through holes of its circumferencial direction.
It is preferred that, can embodiment as one kind;Circumference side of six through holes 42 along the blast cap head body 41 Laid to uniform intervals.
It should be noted that circumferencial direction uniform intervals of six through holes 42 along the blast cap head body 41 are laid, this Sample one can ensure that each blast cap head circumferentially can dry to surrounding, and uniform blowing processing is realized in progress.
It is preferred that, can embodiment as one kind;The bottom of the blast cap head body 41 is cylindrical shape, and the wind The top of cap head body 41 is cone shape.
It should be noted that above-mentioned blast cap head body 41 can select to use various shapes structure, it is preferred that in scheme, The bottom of above-mentioned blast cap head body 41 is cylindrical shape, and the top of the blast cap head body 41 is cone shape.
It is preferred that, can embodiment as one kind;External screw thread is provided with the lower circumference wall of the blast cap head body 41.
It should be noted that being provided with external screw thread on the lower circumference wall of above-mentioned blast cap head body 41, above-mentioned blast cap head is just It is to realize to be threaded on airduct by the external screw thread.
It is preferred that, can embodiment as one kind;The diameter range of the through hole 42 is 2-10mm.
It is preferred that, can embodiment as one kind;The surface of support frame as described above 5 is also coated with refractory coating.
It is preferred that, can embodiment as one kind;The surface of the channel-section steel 6 is also coated with refractory coating.
It should be noted that because above-mentioned support frame 5, channel-section steel 6 are used in hot environment, so in specific technology In scheme, it can select to coat refractory coating on the surface of support frame 5, channel-section steel 6, so that the further anti-thermal change of enhancing structure The performance of shape.
What the utility model embodiment was provided, which loosens wind apparatus, has the technical advantage of following aspect:
First, the loosening wind apparatus that the utility model embodiment is provided, it is mainly by including the first sheet iron underguard, the second bottom The structure such as backplate, airduct cloth wind group and multiple blast cap heads and support frame and channel-section steel is constituted.
2nd, the loosening wind apparatus that the utility model embodiment is provided, can be to the structure between boiler furnace and separator Junction carries out the effective blowing processing of large area, and then avoids junction dust stratification, so as to also avoid insufficient thing that burns Matter is remained, and causes the waste of biomass fuel.
3rd, the loosening wind apparatus provided using the utility model embodiment, it has been obviously improved efficiency of combustion, it is ensured that raw The abundant burning of biomass fuel, reduces the discharge of dusty gas, while realizing the purpose of energy-conserving and environment-protective.
Many significant technical advantages based on more than, the loosening wind apparatus that the utility model is provided will bring good city Field prospect and economic benefit.
Finally it should be noted that:Various embodiments above is only limited to illustrate the technical solution of the utility model, rather than to it System;Although the utility model is described in detail with reference to foregoing embodiments, one of ordinary skill in the art should Understand:It can still modify to the technical scheme described in foregoing embodiments, or to which part or whole Technical characteristic carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from this practicality newly The scope of each embodiment technical scheme of type.

Claims (10)

1. one kind loosens wind apparatus, it is characterised in that including top backplate, sheet iron underguard, airduct cloth wind group and multiple blast cap heads And support frame and channel-section steel;The airduct cloth wind group includes being arranged in order multiple airducts of setting;
Wherein, the top backplate, the sheet iron underguard are sequentially connected setting from top to bottom;The top backplate, the bottom Backplate is exported to passage between the import of upper and lower two separators for parcel closing boiler furnace;
Support frame as described above is used to support the channel-section steel, and the channel-section steel is used to fix the blast cap head;Pacify on each airduct Installing is equipped with multiple blast cap heads, and the airduct is connected with corresponding multiple blast cap heads.
2. wind apparatus is loosened as claimed in claim 1, it is characterised in that
The blast cap head is the blast cap head of heat-resistance abrasion-resistance alloy cast steel structure.
3. wind apparatus is loosened as claimed in claim 1, it is characterised in that
The blast cap head is specially ZGCr26Mn7N structural members.
4. wind apparatus is loosened as claimed in claim 1, it is characterised in that
The airduct cloth wind group and multiple blast cap heads are arranged at the junction between boiler furnace and separator.
5. the loosening wind apparatus as described in claim any one of 1-4, it is characterised in that
The blast cap head include with cavity structure blast cap head body and along the blast cap head body circumferential side wall successively The multiple through holes set;And cavity of multiple through holes respectively with the blast cap head body is connected.
6. wind apparatus is loosened as claimed in claim 5, it is characterised in that
The through hole is specially six.
7. wind apparatus is loosened as claimed in claim 6, it is characterised in that
Circumferencial direction uniform intervals of six through holes along the blast cap head body are laid.
8. wind apparatus is loosened as claimed in claim 7, it is characterised in that
The bottom of the blast cap head body is cylindrical shape, and the top of the blast cap head body is cone shape.
9. wind apparatus is loosened as claimed in claim 8, it is characterised in that
External screw thread is provided with the lower circumference wall of the blast cap head body.
10. wind apparatus is loosened as claimed in claim 5, it is characterised in that
The diameter range of the through hole is 2-10mm.
CN201720299377.0U 2017-03-24 2017-03-24 One kind loosens wind apparatus Active CN206572502U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720299377.0U CN206572502U (en) 2017-03-24 2017-03-24 One kind loosens wind apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720299377.0U CN206572502U (en) 2017-03-24 2017-03-24 One kind loosens wind apparatus

Publications (1)

Publication Number Publication Date
CN206572502U true CN206572502U (en) 2017-10-20

Family

ID=60053099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720299377.0U Active CN206572502U (en) 2017-03-24 2017-03-24 One kind loosens wind apparatus

Country Status (1)

Country Link
CN (1) CN206572502U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106801864A (en) * 2017-03-24 2017-06-06 苏州迪森生物能源有限公司 One kind loosens wind apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106801864A (en) * 2017-03-24 2017-06-06 苏州迪森生物能源有限公司 One kind loosens wind apparatus

Similar Documents

Publication Publication Date Title
CN103980925B (en) A kind of process damaged tire pyrolysis oven and treatment process
CN105157043A (en) Special boiling furnace for strong-oxygen combustion sludge
CN206572502U (en) One kind loosens wind apparatus
CN204554840U (en) A kind of industrial waste gas combustion apparatus
CN203656940U (en) Blast cap of biomass boiler burning high-concentration organic wastewater
CN205909315U (en) Boiler fire grate
CN104165521B (en) Living beings furnace burner
CN106801864A (en) One kind loosens wind apparatus
CN205662495U (en) A hood that is used for fluidized bed export wind speed in service adjustable
CN205227307U (en) High temperature resistant, anti -oxidant buggy spout
CN207702732U (en) A kind of efficient burning hot-blast stove
CN210140564U (en) Gas purifying device
CN209759491U (en) Forced circulation cooling flue
CN209295112U (en) A kind of eight pawl combustion tubes
CN205878140U (en) Biomass boiler secondary anemochory wind structure
CN207378807U (en) A kind of boiler secondary bellows
CN101786632B (en) Heating deacidification furnace used for white carbon black technique in gas phase method
CN207685586U (en) A kind of combustion of natural gas rifle pipette tips for alkali recovery furnace
CN206572491U (en) A kind of shoe
CN104654263A (en) Kiln tail and bypath wind releasing residual heat boiler of cement kiln
CN210107389U (en) Furnace and kiln liquefied gas burner
CN204534559U (en) A kind of burner for improving the large electric power plant coal-burning boiler thermal efficiency
CN209726267U (en) A kind of clean-burning secondary air honeycomb briquette stove
CN107869738A (en) A kind of burner
CN208382123U (en) Cluster type steam generator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 215004 No. 1 Lu Road, taicanggang Port Development Zone, Suzhou, Jiangsu

Patentee after: SUZHOU DISEN ENERGY TECHNOLOGY CO.,LTD.

Patentee after: GUANGZHOU DEVOTION THERMAL TECHNOLOGY Co.,Ltd.

Address before: 215423 Kingnet Wusong Bang Road, Kingnet, Taicang, Suzhou, Jiangsu

Patentee before: SUZHOU DISEN BIOLOGICAL ENERGY Co.,Ltd.

Patentee before: GUANGZHOU DEVOTION THERMAL TECHNOLOGY Co.,Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20220519

Address after: 213002 No. 21, Chuangye West Road, Xinbei District, Changzhou City, Jiangsu Province

Patentee after: DEVOTION (CHANGZHOU) BOILER Co.,Ltd.

Patentee after: GUANGZHOU DEVOTION THERMAL TECHNOLOGY Co.,Ltd.

Address before: 215004 No. 1 Lu Road, taicanggang Port Development Zone, Suzhou, Jiangsu

Patentee before: SUZHOU DISEN ENERGY TECHNOLOGY CO.,LTD.

Patentee before: GUANGZHOU DEVOTION THERMAL TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: No. 21, Chuangye West Road, Xinbei District, Changzhou City, Jiangsu Province, 212300

Patentee after: Desen (Changzhou) Energy Equipment Co.,Ltd.

Patentee after: GUANGZHOU DEVOTION THERMAL TECHNOLOGY Co.,Ltd.

Address before: 213002 No. 21, Chuangye West Road, Xinbei District, Changzhou City, Jiangsu Province

Patentee before: DEVOTION (CHANGZHOU) BOILER Co.,Ltd.

Patentee before: GUANGZHOU DEVOTION THERMAL TECHNOLOGY Co.,Ltd.

CP03 Change of name, title or address