CN206571526U - A kind of pin-connected panel tunnel-liner behind circle draining construction - Google Patents

A kind of pin-connected panel tunnel-liner behind circle draining construction Download PDF

Info

Publication number
CN206571526U
CN206571526U CN201720121968.9U CN201720121968U CN206571526U CN 206571526 U CN206571526 U CN 206571526U CN 201720121968 U CN201720121968 U CN 201720121968U CN 206571526 U CN206571526 U CN 206571526U
Authority
CN
China
Prior art keywords
tunnel
circle draining
pin
module unit
connected panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720121968.9U
Other languages
Chinese (zh)
Inventor
蒋雅君
潘基先
李彬
何雨帝
赵菊梅
李国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201720121968.9U priority Critical patent/CN206571526U/en
Application granted granted Critical
Publication of CN206571526U publication Critical patent/CN206571526U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of pin-connected panel tunnel-liner behind circle draining construction, including for assembled drain module unit, the drain module unit includes top plate and is vertically fixed on the side wall of top plate both sides, and multiple drain module units constitute circle draining space along the assembly of tunnel ring;The side wall is provided with permeable hole, and sidewall bottom is provided with the edge of a wing for being fixed on drain module unit on Tunnel basal plane.The utility model install convenient, joint be disposable, water permeability good to the adaptability of basal plane is good, at the same during also allowing for operation to the cleaning of circle draining system, maintenance, change, maintainability is good.

Description

A kind of pin-connected panel tunnel-liner behind circle draining construction
Technical field
The utility model is related to tunnel drainage technical field, specially a kind of pin-connected panel tunnel-liner behind circle draining structure Make.
Background technology
Generally consider that combined type tunnel lining structure is prevented by the way of " anti-row's combination " in Tunnel Engineering field at present Drain structure is designed, it is necessary to form perfect drainage system in lining cutting(Including circle draining blind pipe, longitudinal drainage blind pipe, horizontal stroke To draining blind pipe, Central drain etc.), wherein the ring direction drainpipe mesh laid along the m of Tunnel surface longitudinal 5~10 It is preceding to use more for flexible porous tube.Such as《The railway tunnel guarded drainage construction technology guides of TZ 331-2009》(Implement day Phase:On April 13rd, 2009, the 7th chapter lining cutting behind drainage system)Describe tunnel ring blind pipe applying using flexible porous tube Work technique;Document disclosed in Huang Caidou(《Earth working material --- flexible porous tube quality testing is inquired into》,《Build in Chongqing》, 2005, 8th phase, the 49-50 pages, in August, 2005), describe essential structure and the detection method of flexible porous tube.Flexible porous tube leads to Often it is the rolled products produced in factory, tunnel construction site is blocked or spliced according to the section girth in tunnel, and with swollen Swollen bolt and colligation silk are fixed on Tunnel surface, and the problem of easily existing in construction is usual for the length of flexible porous tube Can not be consistent with the section girth in tunnel, the problem of there is joint is difficult to deal carefully with.
In tunnel stratum due to underground water in the material that may be crystallized containing silt or easily, also can tunnel draining system Formed in system and block influence drainage effect(Especially in the lower curtate in tunnel), the document as disclosed in Chen Li《In railway tunnel construction Drainpipe blockage problem is probed into》,《Technology and market》, the 4th phase of volume 22, page 80, in April, 2015 in 2015), it is indicated that tunnel Road drainage system be vulnerable to silt, the influence of calcareous crystal and form blocking.Although also there is some to be directed to drainage system at present The method repaired, cleared up, but be typically only capable to be to carry out desilting at drainpipe mouth of pipe position, it is not easy to drainpipe in itself Damaged location is changed and repaired, and effect is limited.
Therefore, the examination and maintenance problem during the convenience for construction of current tunnel circle draining blind pipe, operation is not yet obtained To preferable solution.
Utility model content
The purpose of this utility model, which is to provide one kind, can improve in combined type tunnel-liner ring in drainage system and arrange The construction convenience of water pipe and the pin-connected panel tunnel-liner behind circle draining structure for solving the maintainable problem during its operation Make.Technical scheme is as follows:
A kind of pin-connected panel tunnel-liner behind circle draining construction, including for assembled drain module unit, the row Water modular unit includes top plate and is vertically fixed on the side wall of top plate both sides, and multiple drain module units are assembled along tunnel ring Constitute circle draining space;The side wall is provided with permeable hole, and sidewall bottom is provided with for drain module unit to be fixed on The edge of a wing on Tunnel basal plane.
Further, the circle draining spatial interpolation is equipped with the material with filtering and water permeability.
Further, the material with filtering and water permeability is ribbon plastic drainage French drain material material.
Further, the edge of a wing is to be fixed on the lath on the outside of sidewall bottom, mounting hole is offered thereon, with pad The nailing or expansion bolt of circle fix drain module unit through mounting hole.
Further, the stitching portion of adjacent drainage channel modular unit is closed by jointing tape.
Further, in addition to it is arranged on the circle draining facility checkout window of Tunnel Second Lining.
Further, the single splicing of the drain module unit is installed or multiple rows of parallel ring is installed.
The beneficial effects of the utility model are:Circle draining space in composite lining tunnel of the present utility model passes through Drain module unit splicing is formed, and install convenient, joint be disposable, water permeability good to the adaptability of basal plane is good, while also just It is maintainable good to the cleaning of circle draining system, maintenance, replacing during operation.
Brief description of the drawings
Fig. 1 is drain module unit of the present utility model and splices and combines schematic diagram.
Fig. 2 is diagrammatic cross-section of the utility model in combined type tunnel-liner.
Fig. 3 is that the structure for the embodiment that the utility model places the adrainage materials such as plastic drainage French drain in drainage space is shown It is intended to.
Fig. 4 is that the utility model structure of the embodiment provided with circle draining facility checkout window in Tunnel Second Lining is shown It is intended to.
Fig. 5 is the composite lining tunnel guarded drainage system of the utility model embodiment(Half bag water proof type)Schematic diagram.
Fig. 6 is the section arrangement schematic diagram of the utility model embodiment 1(1-1 sections in Fig. 5).
Fig. 7 is the section arrangement schematic diagram of the utility model embodiment 2(1-1 sections in Fig. 5).
In figure:1- drain module units;The 2- edges of a wing;3- mounting holes;4- sides wall;5- permeable holes;6- seam areas;7- is gluing Band;8- plastic drainage French drain material material;21- preliminary bracings;22- non-woven fabrics;23- splash guards;24- secondary linings;25- just branch infiltrations Point;26- carries the nailing or expansion bolt of packing ring;27- checks window.
Embodiment
Below in conjunction with the accompanying drawings and embodiment is further illustrated to the utility model.As shown in figure 1, a kind of pin-connected panel Tunnel-liner behind circle draining construction, it is characterised in that including for assembled drain module unit 1, the drain module Unit 1 includes top plate and is vertically fixed on the side walls 4 of top plate both sides, and multiple drain module units 1 are along the assembled structure of tunnel ring Cyclization is to drainage space;The side wall 4 is provided with permeable hole 5, and the bottom of side wall 4 is provided with for drain module unit 1 to be fixed The edge of a wing 2 on the basal plane of Tunnel 21.
The edge of a wing 2 is the lath for being fixed on the bottom outside of side wall 4, mounting hole 3 is offered thereon, the nailing with packing ring Or expansion bolt 26 fixes drain module unit 1 through mounting hole 3.
Embodiment 1:Can be in composite lining of tunnel(By taking half bag waterproof pattern shown in Fig. 5 as an example)Between realizing necessarily Every loopful or local ring drainage space.
Tunnel-liner behind circle draining tectonic type in the present embodiment is as shown in Figure 6:Loopful pumping equipment is along tunnel One determining deviation of road longitudinal direction is set, and is the longitudinal drainage facility from side arch springing to opposite side arch springing along the circumferentially disposed scope in tunnel Position;When the position of larger infiltration locally occurs in the surface of Tunnel 21, can also lay local ring pumping equipment will Longitudinal drainage facility at infiltration ejectment to homonymy arch springing;Above-mentioned loopful or local ring pumping equipment, using drain module list Member 1 is spliced to form along tunnel ring, and each drain module unit 1 is fixed on tunnel with nailing or expansion bolt 26 with packing ring The surface of preliminary bracing 21;Closed with adhesive tape 7 at drain module unit spliced seam position 6;It is spliced to form in drain module unit 1 Circle draining space in, the materials such as plastic drainage French drain 8 can be placed to prevent silting, the draining structure that the present embodiment is formed Make specifically as shown in Figure 2 and Figure 3.
Implementation step is as follows:
Step 1:Tunnel excavation and preliminary bracing 21 is applied after finishing, the surface of supporting in the early stage 21 determines loopful and local ring Position is applied to pumping equipment.
Step 2:By drain module unit 1 along the surface defined location of Tunnel 21, with penetrating with packing ring Nail or expansion bolt 26 are fixed on the surface of Tunnel 21 through its mounting hole 3.
Step 3:Drain module unit 1 is spliced fixed successively along the surface ring of Tunnel 21 and encircleed with tunnel The longitudinal drainage facility connection of pin both sides, also can gradually insert band in the circle draining space gradually formed in this step Shape plastic drainage French drain material material 8.
Step 4:Seam areas 6 between drain module unit 1 is closed with adhesive tape 7.
Step 5:After the tunnel circle draining facility of a section is applied and finished, other follow-up works of constructing tunnel are carried out Sequence, such as non-woven fabrics 22 and splash guard 23 are laid, the reinforcing bar colligation and concreting of secondary lining 24, are formed complete tunnel and are answered Box-like liner structure.
Embodiment 2:In composite lining of tunnel(By taking half bag waterproof pattern shown in Fig. 5 as an example)Realize certain intervals Loopful or local ring drainage space, and circle draining facility can be checked during runing, desilting, replacing.
Tunnel-liner behind circle draining tectonic type in the present embodiment is as shown in Figure 7:Loopful pumping equipment is along tunnel One determining deviation of road longitudinal direction is set, and is the longitudinal drainage facility from side arch springing to opposite side arch springing along the circumferentially disposed scope in tunnel Position;When the position of larger infiltration locally occurs in the surface of Tunnel 21, can also lay local ring pumping equipment will Longitudinal drainage facility at infiltration ejectment to homonymy arch springing;Above-mentioned loopful or local ring pumping equipment, using drain module list Member 1 is spliced to form along tunnel ring, and each drain module unit 1 is fixed on tunnel with nailing or expansion bolt 26 with packing ring The surface of preliminary bracing 21;Closed with adhesive tape 7 at drain module unit spliced seam position 6;It is spliced to form in drain module unit 1 Circle draining space in, the materials such as plastic drainage French drain 8 can be placed to prevent silting;It is local in Tunnel Second Lining 24 Provided with window 27 is checked, examination and maintenance can be carried out to circle draining facility.The drain structure that the present embodiment is formed is specific such as Shown in Fig. 4.
Implementation step is as follows:
Step 1~step 4:Be the same as Example 1.
Step 5:After the tunnel circle draining facility of a section is applied and finished, tunnel-liner non-woven fabrics 22 is carried out and anti- Water plate 23 is laid, and the device of repeatable opening and closing is set on the reserved splash guard 23 and non-woven fabrics 22 for checking the position of window 27 As zip mode is pulled open and locking device.
Step 6:In the reinforcing bar colligation and concreting of Tunnel Second Lining 24, window is checked in reserved pumping equipment 27 positions reserve the space for checking window with plank or other isolated materials, it is to avoid reinforcing bar colligation and concreting intrusion check window 27 headspace.
During tunnel is runed, periodically check that circle draining facility of 23 pairs of the splash guard of window portion position at this is carried out by opening Check and desilting, and the drain module unit 1 of damage is changed.When circle draining facility silting is serious, portion can be laid down Point drain module unit 1, extracts plastic drainage French drain material material 8 therein out, cleans out or is refilled after changing and backs into circle draining In facility, and the drain module unit 1 laid down is reinstalled.

Claims (7)

1. a kind of pin-connected panel tunnel-liner behind circle draining construction, it is characterised in that including for assembled drain module list Member(1), the drain module unit(1)Include top plate and be vertically fixed on the side wall of top plate both sides(4), multiple drain modules Unit(1)Circle draining space is constituted along the assembly of tunnel ring;The side wall(4)It is provided with permeable hole(5), side wall(4)Bottom Being provided with is used for drain module unit(1)It is fixed on Tunnel(21)The edge of a wing on basal plane(2).
2. circle draining construction in pin-connected panel tunnel-liner behind according to claim 1, it is characterised in that the ring row The material with filtering and water permeability is fitted with hydrospace.
3. circle draining construction in pin-connected panel tunnel-liner behind according to claim 2, it is characterised in that described to have The material of filter and water permeability is ribbon plastic drainage French drain material material(8).
4. circle draining construction in pin-connected panel tunnel-liner behind according to claim 1, it is characterised in that the edge of a wing (2)To be fixed on side wall(4)The lath of bottom outside, offers mounting hole thereon(3), nailing or expansion bolt with packing ring (26)Through mounting hole(3)By drain module unit(1)It is fixed.
5. circle draining construction in pin-connected panel tunnel-liner behind according to claim 1, it is characterised in that adjacent drainage channel mould Module unit(1)Stitching portion pass through jointing tape(7)Closing.
6. circle draining construction in pin-connected panel tunnel-liner behind according to claim 1, it is characterised in that also including setting In Tunnel Second Lining(24)Circle draining facility checkout window(27).
7. circle draining construction in pin-connected panel tunnel-liner behind according to claim 1, it is characterised in that the draining mould Module unit(1)Single splicing is installed or multiple rows of parallel ring is installed.
CN201720121968.9U 2017-02-10 2017-02-10 A kind of pin-connected panel tunnel-liner behind circle draining construction Expired - Fee Related CN206571526U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720121968.9U CN206571526U (en) 2017-02-10 2017-02-10 A kind of pin-connected panel tunnel-liner behind circle draining construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720121968.9U CN206571526U (en) 2017-02-10 2017-02-10 A kind of pin-connected panel tunnel-liner behind circle draining construction

Publications (1)

Publication Number Publication Date
CN206571526U true CN206571526U (en) 2017-10-20

Family

ID=60058395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720121968.9U Expired - Fee Related CN206571526U (en) 2017-02-10 2017-02-10 A kind of pin-connected panel tunnel-liner behind circle draining construction

Country Status (1)

Country Link
CN (1) CN206571526U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677821A (en) * 2017-02-10 2017-05-17 西南交通大学 Assembly type tunnel lining back circumferential drainage structure and implementation method thereof
CN112096427A (en) * 2020-09-14 2020-12-18 温州大学 Tunnel waterproof system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677821A (en) * 2017-02-10 2017-05-17 西南交通大学 Assembly type tunnel lining back circumferential drainage structure and implementation method thereof
CN106677821B (en) * 2017-02-10 2019-01-25 西南交通大学 A kind of pin-connected panel tunnel-liner behind circle draining construction and its implementation method
CN112096427A (en) * 2020-09-14 2020-12-18 温州大学 Tunnel waterproof system
CN112096427B (en) * 2020-09-14 2023-02-14 温州大学 Tunnel waterproof system

Similar Documents

Publication Publication Date Title
CN106194218B (en) shield end soil body reinforcing system in high-water-head deep-thick sand layer area
CN111691467B (en) Construction method for basement water prevention and drainage combination
CN106677821B (en) A kind of pin-connected panel tunnel-liner behind circle draining construction and its implementation method
ITMI952458A1 (en) SYSTEM FOR THE REALIZATION OF WATERPROOFING OF HYDRAULIC WORKS WITH RIGID SHEETS IN SYNTHETIC MATERIAL
ITMI20130560A1 (en) METHOD AND WATERPROOF COVERAGE DEVICE FOR JOINTS IN HYDRAULIC WORKS
CN206571526U (en) A kind of pin-connected panel tunnel-liner behind circle draining construction
ITMI982657A1 (en) METHOD FOR WATERPROOFING JOINTS AND / OR CRACKS IN HYDRAULIC WORKS AND CONCRETE AND / OR MASONRY STRUCTURES
CN101096850A (en) Plastics water discharge plate application method for underground engineering wall surface, bottom plating and top board
CN111706350A (en) Plugging side wall breaking method for communication of newly-built transfer hall and existing tunnel
CN110145364A (en) A kind of construction method of tunnel water handling structure
CN106988440A (en) A kind of waterproof construction and its construction method at subway station main body and accessory interface
CN103225318A (en) Anti-seepage and leaking-stoppage device for underground consecutive wall groove section joint point and construction method thereof
CN105370315A (en) Drainage construction technology for seasonally-frozen ground tunnel
US20050097845A1 (en) Device and a method for drainage of water from rock caves
KR100758504B1 (en) Method of construction for underground diaphragm wall and underground diaphragm wall structure
CN206616711U (en) A kind of waterproof construction at subway station main body and accessory interface
KR102037135B1 (en) Waterproof Sheet with Protective Material for Exterior-Waterproof of Underground Structure and Exterior-Waterproofing Method Using the Same
CN109667586B (en) Grouting method of double-layer well wall grouting system
KR101171037B1 (en) Method for compartmentalized tunnel waterproofing
CN111188648A (en) Tunnel water-proof and drainage system and construction method thereof
CN115898469A (en) Tunnel secondary lining construction method
CN107060878B (en) A kind of the inspection window and its application method of tunnel drainage system
DE19807036C1 (en) Sealing method for tunnel machined-lined with tube segments
KR100701630B1 (en) Center Wall of Two Arch Tunnel
KR100858239B1 (en) Water proof sheet structure and its construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171020

Termination date: 20200210

CF01 Termination of patent right due to non-payment of annual fee