CN206571451U - Rotary drilling rig construction slurry is circulated and dregs processing structure - Google Patents

Rotary drilling rig construction slurry is circulated and dregs processing structure Download PDF

Info

Publication number
CN206571451U
CN206571451U CN201621433782.9U CN201621433782U CN206571451U CN 206571451 U CN206571451 U CN 206571451U CN 201621433782 U CN201621433782 U CN 201621433782U CN 206571451 U CN206571451 U CN 206571451U
Authority
CN
China
Prior art keywords
slurry
pipeline
dregs
mud
drilling rig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621433782.9U
Other languages
Chinese (zh)
Inventor
陈斌
李君�
苏辉
顾建生
陈伟明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongdi Junhao Construction Engineering Co ltd
Zhongdi Junhao Hi Tech Co ltd
Original Assignee
Harbin Junhao Building Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Junhao Building Foundation Engineering Co Ltd filed Critical Harbin Junhao Building Foundation Engineering Co Ltd
Priority to CN201621433782.9U priority Critical patent/CN206571451U/en
Application granted granted Critical
Publication of CN206571451U publication Critical patent/CN206571451U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model is related to the technical field of rotary drilling rig construction, disclose the circulation of rotary drilling rig construction slurry and dregs processing structure, including place collect the mud pit of mud, overfall pipeline, by mud by the slurry recirculating pump of overfall pipeline pump to mud pit, send slurry pipeline, into stake holes send stock pump and slag case for device dregs by the slush pump of mud pit;One end connection stake holes of overfall pipeline, the other end connection mud pit of overfall pipeline send one end connection stake holes of slurry pipeline, send the other end connection mud pit of slurry pipeline;Stock pump is sent to be plugged on mud pit.The circulation of rotary drilling rig construction slurry and dregs processing structure that the utility model is provided, it is ensured that mud is not excessive in construction overall process of the rotary drilling rig in rotary digging stake holes;When digging stake holes, dig out the dregs come and reclaimed by slag case, accomplish dregs less than in place, after dregs is filled, slag tapping box is cleared up in time, outward transport processing is carried out;Whole work progress is difficult, and meets civilized construction requirement.

Description

Rotary drilling rig construction slurry is circulated and dregs processing structure
Technical field
The utility model is related to the technical field of rotary drilling rig construction, more particularly to the circulation of rotary drilling rig construction slurry and slag Native processing structure.
Background technology
At present, in rotary drilling rig work progress, mud circulation and the processing of dregs very not environmentally, in work progress, are applied Mud cross flow everywhere in the ground of workshop, dregs collection is slagged tap, and mode is original, if meeting rainy season, construction site is often one Thick layer mud, not only constructional difficulties, construct in downtown area and do not reach the requirement of environmental protection and civilized construction at all, simultaneously Also larger potential safety hazard is brought.
Utility model content
The purpose of this utility model is to provide the circulation of rotary drilling rig construction slurry and dregs processing structure, it is intended to solve existing Have in technology, in rotary drilling rig work progress, mud cross flow and dregs collect coarse in construction site, cause constructional difficulties with And the problem of be unsatisfactory for civilized construction requirement.
The utility model is achieved in that the circulation of rotary drilling rig construction slurry and dregs processing structure, including places receipts Collect the mud pit of mud, overfall pipeline, by mud by the slurry recirculating pump of the overfall pipeline pump to the mud pit, send slurry to manage Road, by the slush pump of the mud pit send stock pump and slag case for device dregs into stake holes;The overfall pipeline One end connects stake holes, and the other end of the overfall pipeline connects the mud pit, and described one end for sending slurry pipeline connects stake holes, institute State and send the other end of slurry pipeline to connect the mud pit;It is described to send stock pump to be plugged on the mud pit.
Further, the slag case is provided with hoisting structure.
Further, the rotary drilling rig construction slurry circulation and dregs processing structure include collection stock tank, the collection stock tank The outside of the stake holes is arranged on, and one end of the overfall pipeline is connected with the collection stock tank.
Further, the slurry recirculating pump is plugged in the collection stock tank.
Further, the collection stock tank is arranged in juxtaposition with the stake holes.
Further, the other end of the overfall pipeline and send slurry pipeline the other end be connected respectively with the mud pit, And along the mud pit to the bearing of trend of stake holes, the other end for sending slurry pipeline is positioned at the other end of the overfall pipeline Front.
Compared with prior art, the utility model is provided the circulation of rotary drilling rig construction slurry and dregs processing structure, when When digging stake holes, the mud pumping precipitated in mud pit is subjected to retaining wall into stake holes using slush pump, concrete filling is being carried out During note, the mud in stake holes is pumped back in mud pit by overfall pipeline by slurry recirculating pump and carries out cycling and reutilization, it is ensured that Rotary drilling rig mud in the construction overall process of rotary digging stake holes is not excessive;When digging stake holes, dig out the dregs come and entered by slag case Row is reclaimed, and accomplishes dregs less than in place, after dregs is filled, and slag tapping box is cleared up in time, carries out outward transport processing;Entirely constructed Journey is difficult, and meets civilized construction requirement.
Brief description of the drawings
Fig. 1 is that the rotary drilling rig construction slurry circulation that the utility model embodiment is provided and the brief of dregs processing structure are shown It is intended to.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only to explain The utility model, is not used to limit the utility model.
Realization of the present utility model is described in detail below in conjunction with specific embodiment.
Shown in reference picture 1, the preferred embodiment provided for the utility model.
The circulation of rotary drilling rig construction slurry and dregs processing structure that the present embodiment is provided, for interior to mud on construction ground Slurry is recycled and dregs collection processing.
Rotary drilling rig construction slurry is circulated and dregs processing structure includes mud pit 101, overfall pipeline 104, send slurry pipeline 103rd, slurry recirculating pump 108, send stock pump 102 and slag case, wherein, mud pit 101 is used to place the mud collected from stake holes 105, One end connection stake holes 105 of overfall pipeline 104, the other end is connected with mud pit 101, and slurry recirculating pump 108 is used in stake holes 105 Mud pumping is into mud pit 101;One end connection stake holes 105 of slurry pipeline 103 is sent, other end connection mud pit 101 send stock pump 102 are used for the mud pumping that will have been precipitated in mud pit 101 into stake holes 105, and send stock pump 102 to be plugged on mud pit 101; Slag case is used for the dregs precipitated in dregs when device digs stake holes 105 and mud pit 101.
The rotary drilling rig construction slurry circulation of above-mentioned offer and dregs processing structure, when digging stake holes 105, utilize slush pump The mud pumping precipitated in mud pit 101 is subjected to retaining wall into stake holes 105, when carrying out filling concrete, passes through overfall Mud in stake holes 105 is pumped back in mud pit 101 and carries out cycling and reutilization by pump 108 by overfall pipeline 104, it is ensured that in rotation Dig rig mud in the construction overall process of rotary digging stake holes 105 not excessive;Also, mud can be precipitated in mud pit 101, be made Obtain dregs to be deposited in mud pit 101, it is ensured that the mud in blowback stake holes 105 meets needs;When digging stake holes 105, dig out and Dregs reclaimed by slag case, accomplish dregs less than in place, after dregs is filled, clear up slag tapping box in time, carry out outer Fortune processing.Whole work progress is difficult, and meets civilized construction requirement.
In the present embodiment, it is necessary to which the dregs in cleaning slag case carries out outward transport processing, slag case in time after dregs fills slag case Hoisting structure is set, so, can be transported outward by integral hoisting, operating efficiency is improved.
In the present embodiment, the circulation of rotary drilling rig construction slurry and dregs processing structure include collection stock tank 107, the collection stock tank 107 are arranged on the outside of stake holes 105, so, and mud, which can be first passed through, in stake holes 105 concentrates on stock tank 107, overfall pipeline 104 one end is then connected with the collection stock tank 107, meanwhile, also allow for mud and precipitated in advance in collection stock tank 107.
Slurry recirculating pump 108 is then plugged in collection stock tank 107, is easy to mud in collection stock tank 107 passing through the blowback of overfall pipeline 104 In mud pit 101.
In the present embodiment, the other end of overfall pipeline 104 and send slurry pipeline 103 the other end connect respectively with mud pit 101 Connect, and send the other end of slurry pipeline 103 to be located at the another of overfall pipeline 104 to the bearing of trend of stake holes 105 along mud pit 101 The front at end, so, is easy to the mud that overfall pipeline 104 enters mud pit 101 in the rear portion of mud pit 101, is easy to mud The mud of the forward portion of stock tank 101 is by sending slurry pipeline 103 to enter in mud pit 101.
Collection stock tank 107 is arranged on the outside of stake holes 105, and is arranged in juxtaposition with stake holes 105.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Any modifications, equivalent substitutions and improvements made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (6)

1. rotary drilling rig construction slurry is circulated and dregs processing structure, it is characterised in that the mud pit including placement collection mud, Overfall pipeline, by mud by the slurry recirculating pump of the overfall pipeline pump to the mud pit, send slurry pipeline, by the mud pit Slush pump send stock pump and the slag case for device dregs into stake holes;One end connection stake holes of the overfall pipeline, it is described The other end of overfall pipeline connects the mud pit, and described one end for sending slurry pipeline connects stake holes, described to send the another of slurry pipeline The end connection mud pit;It is described to send stock pump to be plugged on the mud pit.
2. rotary drilling rig construction slurry circulation as claimed in claim 1 and dregs processing structure, it is characterised in that the slag case Provided with hoisting structure.
3. rotary drilling rig construction slurry circulation as claimed in claim 1 or 2 and dregs processing structure, it is characterised in that described Rotary drilling rig construction slurry is circulated and dregs processing structure includes collection stock tank, and the collection stock tank is arranged on the outside of the stake holes, And one end of the overfall pipeline is connected with the collection stock tank.
4. rotary drilling rig construction slurry circulation as claimed in claim 3 and dregs processing structure, it is characterised in that the overfall Pump is plugged in the collection stock tank.
5. rotary drilling rig construction slurry circulation as claimed in claim 3 and dregs processing structure, it is characterised in that the collection slurry Pond is arranged in juxtaposition with the stake holes.
6. rotary drilling rig construction slurry circulation as claimed in claim 1 or 2 and dregs processing structure, it is characterised in that described The other end of overfall pipeline and the other end of slurry pipeline is sent to be connected respectively with the mud pit, and along the mud pit to stake holes Bearing of trend, the other end for sending slurry pipeline is positioned at the front of the other end of the overfall pipeline.
CN201621433782.9U 2016-12-23 2016-12-23 Rotary drilling rig construction slurry is circulated and dregs processing structure Expired - Fee Related CN206571451U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621433782.9U CN206571451U (en) 2016-12-23 2016-12-23 Rotary drilling rig construction slurry is circulated and dregs processing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621433782.9U CN206571451U (en) 2016-12-23 2016-12-23 Rotary drilling rig construction slurry is circulated and dregs processing structure

Publications (1)

Publication Number Publication Date
CN206571451U true CN206571451U (en) 2017-10-20

Family

ID=60063136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621433782.9U Expired - Fee Related CN206571451U (en) 2016-12-23 2016-12-23 Rotary drilling rig construction slurry is circulated and dregs processing structure

Country Status (1)

Country Link
CN (1) CN206571451U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111894449A (en) * 2020-07-28 2020-11-06 成蜀电力集团有限公司 Portable water injection type rotary excavating equipment for construction of foundation pile hole of mountain and hilly land tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111894449A (en) * 2020-07-28 2020-11-06 成蜀电力集团有限公司 Portable water injection type rotary excavating equipment for construction of foundation pile hole of mountain and hilly land tower

Similar Documents

Publication Publication Date Title
CN104529126A (en) Recycling and using method of oil-gas exploration water-base mud well drilling solid waste
CN103603339A (en) Method for long spiral drilling machine grouting retaining wall hole forming and system thereof
CN206571451U (en) Rotary drilling rig construction slurry is circulated and dregs processing structure
CN204283276U (en) Oil drilling equipment and solid controlling environment protection circulation of drilling fluid treatment system thereof
CN113482531A (en) Long-distance directional drilling pipeline back-dragging slurry circulation construction process
CN207092997U (en) A kind of mud circulating system
CN103266852B (en) Drilling-type quick pore-forming system and drilling-type quick pore-forming process
CN210439994U (en) Percussion drilling mud circulation system
CN207776822U (en) A kind of drilling wastes harmless treatment engineering truck
CN203781226U (en) Auger sludge excavator
CN103266863B (en) Gravity type slurry-mud piece-rate system and slurry mud separating technology
CN106223351A (en) Self priming pump reduces local groundwater level construction method
CN212898300U (en) Push bench drill bit and push bench
CN205805514U (en) A kind of portable drilling wastes comprehensive utilization focuses on equipment
CN105401899A (en) Primary mud processing and backfilling reutilization system and method thereof
CN205804362U (en) The long screw auger drilling deposited pile constructing device of rock can be entered
CN203626607U (en) Vehicle-mounted water circulation type movable piling machine
CN207988977U (en) A kind of gravity type slurry sand separation system
CN204941597U (en) A kind of mine coal slime cleaning plant
CN106149681A (en) Combined type pile foundation construction treatment of the earth and combined type pile foundation construction process
CN207048708U (en) A kind of mud does not land intelligent environment protection press filtration skid equipment
CN206359980U (en) A kind of cast-in-situ bored pile mud desanding system
CN206844194U (en) Multi-functional silt remover
CN104196471A (en) Roof bolt drilling machine
CN206052694U (en) Combined type pile foundation construction treatment of the earth

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 518000 Room 501, building a, innovation building, 198 Daxin Road, majialong community, Nantou street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: Zhongdi Junhao Hi Tech Co.,Ltd.

Address before: No.2401, 24 / F, West building, Huizhi Plaza, No.399, Qunli Fourth Avenue, Daoli District, Harbin City, Heilongjiang Province

Patentee before: ZHONGDI JUNHAO CONSTRUCTION ENGINEERING Co.,Ltd.

Address after: No.2401, 24 / F, West building, Huizhi Plaza, No.399, Qunli Fourth Avenue, Daoli District, Harbin City, Heilongjiang Province

Patentee after: ZHONGDI JUNHAO CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: No.6, 5th floor, 162 youyou street, Nangang District, Harbin City, Heilongjiang Province

Patentee before: HARBIN JUNHAO CONSTRUCTION FOUNDATION ENGINEERING Co.,Ltd.

CP03 Change of name, title or address
CP02 Change in the address of a patent holder

Address after: 518000 b1-701-21, building B, Kexing Science Park, 15 Keyuan Road, Science Park community, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: Zhongdi Junhao Hi Tech Co.,Ltd.

Address before: 518000 Room 501, building a, innovation building, 198 Daxin Road, majialong community, Nantou street, Nanshan District, Shenzhen City, Guangdong Province

Patentee before: Zhongdi Junhao Hi Tech Co.,Ltd.

CP02 Change in the address of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171020

CF01 Termination of patent right due to non-payment of annual fee