CN206560937U - Spray equipment and the smoke processing system with it - Google Patents

Spray equipment and the smoke processing system with it Download PDF

Info

Publication number
CN206560937U
CN206560937U CN201720192287.1U CN201720192287U CN206560937U CN 206560937 U CN206560937 U CN 206560937U CN 201720192287 U CN201720192287 U CN 201720192287U CN 206560937 U CN206560937 U CN 206560937U
Authority
CN
China
Prior art keywords
branch pipe
supervisor
slurries
predetermined angular
spray equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720192287.1U
Other languages
Chinese (zh)
Inventor
李增枝
王炳章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shen Hua Guo Da Tianjin Dagang Power Plant Co Ltd
Shenhua Group Corp Ltd
Shenhua Guoneng Group Corp Ltd
Tianjin Dagang Power Plant of Shenhua Guoneng Group Co Ltd
Original Assignee
Shen Hua Guo Da Tianjin Dagang Power Plant Co Ltd
Shenhua Group Corp Ltd
Shenhua Guoneng Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shen Hua Guo Da Tianjin Dagang Power Plant Co Ltd, Shenhua Group Corp Ltd, Shenhua Guoneng Group Corp Ltd filed Critical Shen Hua Guo Da Tianjin Dagang Power Plant Co Ltd
Priority to CN201720192287.1U priority Critical patent/CN206560937U/en
Application granted granted Critical
Publication of CN206560937U publication Critical patent/CN206560937U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The utility model provides a kind of spray equipment and the smoke processing system with it, wherein, spray equipment, including:Supervisor;Branch pipe, branch pipe includes close to the first branch pipe of the inlet of supervisor and the second branch pipe away from the inlet being responsible for, first branch pipe and the second branch pipe are connected with supervisor, the side wall of first branch pipe and supervisor are into the first predetermined angular, second branch pipe and the side wall of supervisor are into the second predetermined angular, and the first predetermined angular is less than the second predetermined angular.The technical solution of the utility model efficiently solves the problem of being difficult to all atomizations when slurries of the prior art spray from branch pipe.

Description

Spray equipment and the smoke processing system with it
Technical field
The utility model is related to the technical field of fume treatment, in particular to a kind of spray equipment and with it Smoke processing system.
Background technology
Largely using spray countercurrent tower in current wet desulphurization, desulfurization slurry is delivered to by circulation slurry pump to be located at In the spray equipment on absorption tower top, the spray pipeline on spray equipment equably connects slurries branch pipe and nozzle, and slurries are through spray The downward spray of mouth atomization, mixes to reach the effect of scrubbing CO_2 with flue gas.
Because spray equipment and circulation pump delivery line are that single head is connected, sprayed slurry enters spray piping from one end In.Slurries enter after spray equipment, and slurries are constantly sprayed by nozzle, and the slurry flow, slurry pressure in pipeline will be reduced constantly, When reaching the end of shower, slurries flow and pressure ratio porch be greatly reduced, be even below nozzle atomization Required parameter.It is not enough of both so causing:One is slurry flow reduction causes stream of the slurries in shower Dynamic to become slow, after flow velocity is less than the critical speed that slurries are settled, slurries will be deposited in spray pipeline, cause shower Road is blocked, slurry flow rate is lower;The second is after slurries are less than atomizing pressure, slurries are difficult to be atomized after nozzle, it is impossible to have Effect forms covering of the slurries to flue gas, causes partial fume not by slurry wash, the performance of desulfurization significantly declines.
Utility model content
Main purpose of the present utility model is to provide a kind of spray equipment and the smoke processing system with it, to solve Slurries of the prior art are difficult to all atomizations when being sprayed from branch pipe the problem of.
To achieve these goals, according to one side of the present utility model there is provided a kind of spray equipment, including:It is main Pipe;Branch pipe, branch pipe includes close to the first branch pipe of the inlet of supervisor and the second branch pipe away from the inlet being responsible for, first Pipe and the second branch pipe are connected with supervisor, and the side wall of the first branch pipe and supervisor are into the first predetermined angular, and the second branch pipe is with supervisor's Side wall is less than the second predetermined angular into the second predetermined angular, the first predetermined angular.
Further, the first predetermined angular is between 52 ° to 86 °.
Further, the second predetermined angular is between 97 ° to 138 °.
Further, the first branch pipe is multiple, and multiple first branch pipes are connected to the both sides of supervisor.
Further, multiple first branch pipes are symmetrically disposed in the both sides of supervisor.
Further, the second branch pipe is multiple, and multiple second branch pipes are connected to one end of the inlet away from supervisor.
Further, multiple second branch pipes are symmetrically disposed in the both sides of supervisor.
Further, the length of the first branch pipe is different with the length of the second branch pipe.
Further, supervisor tapers into from the inlet of supervisor to the diameter of the end of supervisor.
According to another aspect of the present utility model, there is provided a kind of smoke processing system, including spray equipment, spray equipment For above-mentioned spray equipment.
Using the technical solution of the utility model, after slurries enter supervisor from the inlet of supervisor, slurries pass through supervisor Into multiple branch pipes, close to the first branch pipe of the inlet of supervisor and the side wall of supervisor into the first predetermined angular, away from supervisor's Second branch pipe of inlet and the side wall of supervisor are into the second predetermined angular, and the first predetermined angular is less than the second predetermined angular, so Resistance ratios of slurries when by the first branch pipe are big by the resistance of the second branch pipe, such slurries from branch pipe spray when pressure tend to It is identical, therefore slurries are easily atomized when being sprayed from each branch pipe.The technical solution of the utility model efficiently solves prior art In slurries the problem of be difficult to all atomizations when being sprayed from branch pipe.
Brief description of the drawings
The Figure of description for constituting the part of the application is used for providing further understanding to of the present utility model, this practicality New schematic description and description is used to explain the utility model, does not constitute to improper restriction of the present utility model. In the accompanying drawings:
Fig. 1 shows the structural representation of the embodiment one according to spray equipment of the present utility model;
Fig. 2 shows supervisor and the attachment structure schematic diagram of the first branch pipe of Fig. 1 spray equipment;And
Fig. 3 shows supervisor and the attachment structure schematic diagram of the second branch pipe of Fig. 1 spray equipment.
Wherein, above-mentioned accompanying drawing is marked including the following drawings:
10th, it is responsible for;20th, branch pipe;21st, the first branch pipe;22nd, the second branch pipe.
Embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combination.Describe the utility model in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
It is noted that described further below is all exemplary, it is intended to provide further instruction to the application.Unless another Indicate, all technologies used herein and scientific terminology are with usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
For the ease of description, space relative terms can be used herein, such as " ... on ", " ... top ", " ... upper surface ", " above " etc., for describing such as a device shown in the figure or feature and other devices or spy The spatial relation levied.It should be appreciated that space relative terms are intended to comprising the orientation except device described in figure Outside different azimuth in use or operation.If for example, the device in accompanying drawing is squeezed, be described as " in other devices It will be positioned as " under other devices or construction after the device of part or construction top " or " on other devices or construction " Side " or " under other devices or construction ".Thus, exemplary term " ... top " can include " ... top " and " in ... lower section " two kinds of orientation.The device can also other different modes positioning (being rotated by 90 ° or in other orientation), and And respective explanations are made to the relative description in space used herein above.
Now, it is more fully described with reference to the accompanying drawings according to illustrative embodiments of the present utility model.However, these show Example property embodiment can be implemented by many different forms, and should not be construed to be limited solely to reality set forth herein Apply mode.It should be appreciated that these embodiments are provided so that disclosure of the present utility model is thoroughly and complete, and The design of these illustrative embodiments is fully conveyed to those of ordinary skill in the art, in the accompanying drawings, for the sake of clarity, Expand layer and the thickness in region, and make to be presented with like reference characters identical device, thus by omit to they Description.
As shown in figure 1, the spray equipment of embodiment one includes:Supervisor 10 and branch pipe 20.Branch pipe 20 is included close to supervisor 10 Inlet the first branch pipe 21 and away from supervisor 10 inlet the second branch pipe 22, the first branch pipe 21 and the second branch pipe 22 are equal 10 be connected with supervisor, the side wall of the first branch pipe 21 and supervisor 10 into the first predetermined angular, the second branch pipe 22 be responsible for 10 side wall Into the second predetermined angular, the first predetermined angular is less than the second predetermined angular.
The technical scheme of Application Example one, after slurries enter supervisor 10 from the inlet of supervisor 10, slurries pass through master Pipe 10 enters multiple branch pipes 20, and the first branch pipe 21 of inlet and the side wall of supervisor 10 close to supervisor 10 are into the first predetermined angular β 1, the second branch pipe 22 of the inlet away from supervisor 10 and the side wall of supervisor 10 are into the second predetermined angular β 2, the first predetermined angular β 1 is less than the second predetermined angular β 2, and resistance ratios of such slurries when by the first branch pipe 21 are big by the resistance of the second branch pipe 22, So slurries from branch pipe spray when pressure tend to be identical, therefore slurries are easily atomized when being sprayed from each branch pipe 20.The present embodiment Technical scheme efficiently solves the problem of being difficult to all atomizations when slurries of the prior art spray from branch pipe.
As depicted in figs. 1 and 2, in the technical scheme of embodiment one, the first predetermined angular β 1 is between 52 ° to 86 °.When Slurries are more larger from supervisor 10 into resistance during the first branch pipe 21, so that slurries are conducive to entering entering away from supervisor 10 Second branch pipe 22 of liquid mouthful, so that the pressure of the ejection slurries from the first branch pipe 21 and from the second branch pipe 22 tends to be identical.
As shown in figures 1 and 3, in the technical scheme of embodiment one, the second predetermined angular β 2 is between 97 ° to 138 °. Resistance when slurries enter the second branch pipe 22 from supervisor 10 is more larger, so that from the first branch pipe 21 and the spray from the second branch pipe 22 Going out the pressure of slurries tends to be identical.
As shown in figure 1, in the technical scheme of embodiment one, the first branch pipe 21 is identical with the angle of the side wall of supervisor 10, Second branch pipe 22 is identical with the angle of the side wall of supervisor 10.
As shown in figure 1, in the technical scheme of embodiment one, the first branch pipe 21 is multiple, and multiple first branch pipes 21 are connected In the both sides of supervisor 10.The structure of multiple first branch pipes 21 make it that the slurries of spray are more uniform, and the area of spray is bigger.Specifically Ground, the first branch pipe 21 occurs in pairs, and the first paired branch pipe 21 is symmetrically arranged on the both sides of supervisor 10.
As shown in figure 1, in the technical scheme of embodiment one, multiple first branch pipes 21 are symmetrically disposed in the two of supervisor 10 Side.So so that the pressure that each first branch pipe 21 sprays tends to be identical.Specifically, positioned at the first branch pipe 21 of the both sides of supervisor 10 Resistance it is identical, and then the pressure of the slurries sprayed from the liquid outlet of the first branch pipe 21 is identical.
As shown in figures 1 and 3, in the technical scheme of embodiment one, the second branch pipe 22 is multiple, multiple second branch pipes 22 It is connected to one end of the inlet away from supervisor 10.Multiple second branch pipes 22 are so that the slurries in the region that the second branch pipe 22 is sprayed More uniform, the area of spray is bigger.
As shown in figures 1 and 3, in the technical scheme of embodiment one, multiple second branch pipes 22 are symmetrically disposed in supervisor 10 both sides.So so that the pressure that each second branch pipe 22 sprays tends to be identical, specifically, second positioned at the both sides of supervisor 10 The resistance of branch pipe 22 is identical, and then the slurry pressure sprayed from the liquid outlet of the second branch pipe 22 is identical.
As shown in figure 1, in the technical scheme of embodiment one, supervisor 10 is from the inlet of supervisor 10 to the end of supervisor 10 Diameter taper into.The differing pressure for being so more beneficial for keeping in supervisor 10 is little.Specifically, slurries entering from supervisor 10 Liquid mouthful to the end of supervisor 10, its slurries are gradually decreased, and the slurries of reduction are conducive to protecting in the supervisor 10 that diameter is tapered into Pressure is held, that is, is responsible for 10 pressure change from inlet to end not too large.
The spray equipment of embodiment two and the difference of embodiment one be, the length of the first branch pipe 21 and the second branch pipe 22 Length is different.
The spray equipment of embodiment two includes:Supervisor 10 and branch pipe 20.Branch pipe 20 includes the inlet close to supervisor 10 First branch pipe 21 and the second branch pipe 22 away from the inlet for being responsible for 10, the first branch pipe 21 and the second branch pipe 22 connect with supervisor 10 Connect, the first branch pipe 21 and the side wall of supervisor 10 make a reservation for into the first predetermined angular, the second branch pipe 22 and the side wall of supervisor 10 into second Angle, the first predetermined angular is less than the second predetermined angular.
The technical scheme of Application Example two, after slurries enter supervisor 10 from the inlet of supervisor 10, slurries pass through master Pipe 10 enters multiple branch pipes 20, and the first branch pipe 21 of inlet and the side wall of supervisor 10 close to supervisor 10 are into the first predetermined angular β 1, the second branch pipe 22 of the inlet away from supervisor 10 and the side wall of supervisor 10 are into the second predetermined angular β 2, the first predetermined angular β 1 is less than the second predetermined angular β 2, and resistance ratios of such slurries when by the first branch pipe 21 are big by the resistance of the second branch pipe 22, So slurries from branch pipe spray when pressure tend to be identical, therefore slurries are easily atomized when being sprayed from each branch pipe 20.The present embodiment Technical scheme efficiently solves the problem of being difficult to all atomizations when slurries of the prior art spray from branch pipe.
In the technical scheme of embodiment two, the first predetermined angular β 1 is between 52 ° to 86 °.When slurries enter from supervisor 10 Resistance when entering the first branch pipe 21 is more larger, so that slurries are conducive to entering the second branch pipe of the inlet away from supervisor 10 22, so that the pressure of the ejection slurries from the first branch pipe 21 and from the second branch pipe 22 tends to be identical.
In the technical scheme of embodiment two, the second predetermined angular β 2 is between 97 ° to 138 °.When slurries enter from supervisor 10 Resistance when entering the second branch pipe 22 is more larger, so that the pressure of the ejection slurries from the first branch pipe 21 and from the second branch pipe 22 tends to It is identical.
In the technical scheme of embodiment two, the first branch pipe 21 is identical with the angle of the side wall of supervisor 10, the second branch pipe 22 It is identical with the angle of the side wall of supervisor 10.
In the technical scheme of embodiment two, the first branch pipe 21 is multiple, and multiple first branch pipes 21 are connected to supervisor's 10 Both sides.The structure of multiple first branch pipes 21 make it that the slurries of spray are more uniform, and the area of spray is bigger.Specifically, first Pipe 21 occurs in pairs, and the first paired branch pipe 21 is symmetrically arranged on the both sides of supervisor 10.
In the technical scheme of embodiment two, multiple first branch pipes 21 are symmetrically disposed in the both sides of supervisor 10.So make Obtaining the pressure of each ejection of first branch pipe 21 tends to be identical.Specifically, positioned at supervisor 10 both sides the first branch pipe 21 resistance phase Together, and then from the liquid outlet of the first branch pipe 21 pressure of the slurries sprayed is identical.
In the technical scheme of embodiment two, the second branch pipe 22 is multiple, and multiple second branch pipes 22 are connected to away from supervisor One end of 10 inlet.Multiple second branch pipes 22 make it that the slurries in region that the second branch pipe 22 is sprayed are more uniform, spray Area it is bigger.
In the technical scheme of embodiment two, multiple second branch pipes 22 are symmetrically disposed in the both sides of supervisor 10.So make Obtaining the pressure of each ejection of second branch pipe 22 tends to be identical, specifically, positioned at the resistance phase of the second branch pipe 22 of the both sides of supervisor 10 Together, the slurry pressure and then sprayed from the liquid outlet of the second branch pipe 22 is identical.
In the technical scheme of embodiment two, supervisor 10 from supervisor 10 inlet to supervisor 10 end diameter gradually Diminish.The differing pressure for being so more beneficial for keeping in supervisor 10 is little.Specifically, slurries are from the inlet of supervisor 10 to supervisor 10 end, its slurries are gradually decreased, and the slurries of reduction are conducive to keeping pressure in the supervisor 10 that diameter is tapered into, that is, lead Pressure change of the pipe 10 from inlet to end is not too large.
The difference for implementing three spray equipment and embodiment one is that the angle of multiple first branch pipes 21 can be different, example Angle such as symmetrical two the first branch pipes 21 of first row is identical, and the angle of symmetrical two the first branch pipes 21 of secondary series is identical, But the first branch pipe 21 of first row and secondary series is different, and from the inlet of supervisor 10 to the of the first branch pipe 21 of end One predetermined angular β 1 is in the trend become larger.For example, the first predetermined angular of two the first branch pipes 21 of first row is 52 °, First predetermined angular of two the first branch pipes 21 of secondary series is 55 °, the first predetermined angle of tertial two the first branch pipes 21 57 ° of degree, by that analogy ....Same reason, the angle of the second branch pipe 22 can also be different, symmetrical two of such as first row The angle of second branch pipe 22 is identical, and the angle of symmetrical two the second branch pipes 22 of secondary series is identical, but the second of first row The second branch pipe 22 of pipe 22 and secondary series is different, and second from the inlet of supervisor 10 to the second branch pipe 22 of end makes a reservation for Angle beta 2 is in the trend become larger.For example, the second predetermined angular of two the second branch pipes 22 of first row is 97 °, secondary series Two the second branch pipes 22 the second predetermined angular be 100 °, by that analogy ....It is worth noting that, no matter the first predetermined angle Degree how to change also can between 52 ° to 86 °, no matter the second predetermined angular how to change also can be between 97 ° to 138 °.
The spray equipment of embodiment three includes:Supervisor 10 and branch pipe 20.Branch pipe 20 includes the inlet close to supervisor 10 First branch pipe 21 and the second branch pipe 22 away from the inlet for being responsible for 10, the first branch pipe 21 and the second branch pipe 22 connect with supervisor 10 Connect, the first branch pipe 21 and the side wall of supervisor 10 make a reservation for into the first predetermined angular, the second branch pipe 22 and the side wall of supervisor 10 into second Angle, the first predetermined angular is less than the second predetermined angular.
The technical scheme of Application Example three, after slurries enter supervisor 10 from the inlet of supervisor 10, slurries pass through master Pipe 10 enters multiple branch pipes 20, and the first branch pipe 21 of inlet and the side wall of supervisor 10 close to supervisor 10 are into the first predetermined angular β 1, the second branch pipe 22 of the inlet away from supervisor 10 and the side wall of supervisor 10 are into the second predetermined angular β 2, the first predetermined angular β 1 is less than the second predetermined angular β 2, and resistance ratios of such slurries when by the first branch pipe 21 are big by the resistance of the second branch pipe 22, So slurries from branch pipe spray when pressure tend to be identical, therefore slurries are easily atomized when being sprayed from each branch pipe 20.The present embodiment Technical scheme efficiently solves the problem of being difficult to all atomizations when slurries of the prior art spray from branch pipe.
In the technical scheme of embodiment three, the first predetermined angular β 1 is between 52 ° to 86 °.When slurries enter from supervisor 10 Resistance when entering the first branch pipe 21 is more larger, so that slurries are conducive to entering the second branch pipe of the inlet away from supervisor 10 22, so that the pressure of the ejection slurries from the first branch pipe 21 and from the second branch pipe 22 tends to be identical.
In the technical scheme of embodiment three, the second predetermined angular β 2 is between 97 ° to 138 °.When slurries enter from supervisor 10 Resistance when entering the second branch pipe 22 is more larger, so that the pressure of the ejection slurries from the first branch pipe 21 and from the second branch pipe 22 tends to It is identical.
In the technical scheme of embodiment three, the first branch pipe 21 is multiple, and multiple first branch pipes 21 are connected to supervisor's 10 Both sides.The structure of multiple first branch pipes 21 make it that the slurries of spray are more uniform, and the area of spray is bigger.Specifically, first Pipe 21 occurs in pairs, and the first paired branch pipe 21 is symmetrically arranged on the both sides of supervisor 10.
In the technical scheme of embodiment three, multiple first branch pipes 21 are symmetrically disposed in the both sides of supervisor 10.So make Obtaining the pressure of each ejection of first branch pipe 21 tends to be identical.Specifically, positioned at supervisor 10 both sides the first branch pipe 21 resistance phase Together, and then from the liquid outlet of the first branch pipe 21 pressure of the slurries sprayed is identical.
In the technical scheme of embodiment three, the second branch pipe 22 is multiple, and multiple second branch pipes 22 are connected to away from supervisor One end of 10 inlet.Multiple second branch pipes 22 make it that the slurries in region that the second branch pipe 22 is sprayed are more uniform, spray Area it is bigger.
In the technical scheme of embodiment three, multiple second branch pipes 22 are symmetrically disposed in the both sides of supervisor 10.So make Obtaining the pressure of each ejection of second branch pipe 22 tends to be identical, specifically, positioned at the resistance phase of the second branch pipe 22 of the both sides of supervisor 10 Together, the slurry pressure and then sprayed from the liquid outlet of the second branch pipe 22 is identical.
In the technical scheme of embodiment three, supervisor 10 from supervisor 10 inlet to supervisor 10 end diameter gradually Diminish.The differing pressure for being so more beneficial for keeping in supervisor 10 is little.Specifically, slurries are from the inlet of supervisor 10 to supervisor 10 end, its slurries are gradually decreased, and the slurries of reduction are conducive to keeping pressure in the supervisor 10 that diameter is tapered into, that is, lead Pressure change of the pipe 10 from inlet to end is not too large.
Present invention also provides a kind of smoke processing system.According to the smoke processing system of the application, including spray equipment. Spray equipment is above-mentioned spray equipment.Using the smoke processing system of the application in sprayed slurry, the slurry of each mouth spray Liquid is easily atomized, and uniform spraying, spraying effect is preferable.
It should be noted that term used herein above is merely to describe embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in this manual using term "comprising" and/or " bag Include " when, it indicates existing characteristics, step, operation, device, component and/or combinations thereof.
It should be noted that term " first " in specification and claims of the present utility model and above-mentioned accompanying drawing, " second " etc. is for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so The data used can be exchanged in the appropriate case, so as to embodiment example of the present utility model described herein if with except Order beyond those for illustrating or describing herein is implemented.In addition, term " comprising " and " having " and theirs is any Deformation, it is intended that covering is non-exclusive to be included, for example, containing the process of series of steps or unit, method, system, production Product or equipment are not necessarily limited to those steps clearly listed or unit, but may include not list clearly or for this A little processes, method, product or the intrinsic other steps of equipment or unit.
Preferred embodiment of the present utility model is the foregoing is only, the utility model is not limited to, for this For the technical staff in field, the utility model can have various modifications and variations.It is all it is of the present utility model spirit and principle Within, any modification, equivalent substitution and improvements made etc. should be included within protection domain of the present utility model.

Claims (10)

1. a kind of spray equipment, it is characterised in that including:
It is responsible for (10);
Branch pipe (20), the branch pipe (20) is included close to the first branch pipe (21) of the inlet of the supervisor (10) and away from described Be responsible for the second branch pipe (22) of the inlet of (10), first branch pipe (21) and second branch pipe (22) with the supervisor (10) connect, the side wall of first branch pipe (21) and the supervisor (10) is into the first predetermined angular, second branch pipe (22) Side wall with the supervisor (10) is into the second predetermined angular, and first predetermined angular is less than second predetermined angular.
2. spray equipment according to claim 1, it is characterised in that first predetermined angular is between 52 ° to 86 °.
3. spray equipment according to claim 1, it is characterised in that second predetermined angular is between 97 ° to 138 °.
4. spray equipment according to claim 1, it is characterised in that first branch pipe (21) be it is multiple, it is multiple described First branch pipe (21) is connected to the both sides of the supervisor (10).
5. spray equipment according to claim 4, it is characterised in that multiple first branch pipes (21) are symmetrically disposed in The both sides of the supervisor (10).
6. spray equipment according to claim 1, it is characterised in that second branch pipe (22) be it is multiple, it is multiple described Second branch pipe (22) is connected to one end of the inlet away from the supervisor (10).
7. spray equipment according to claim 6, it is characterised in that multiple second branch pipes (12) are symmetrically disposed in The both sides of the supervisor (10).
8. spray equipment according to claim 1, it is characterised in that the length and described second of first branch pipe (21) The length of branch pipe (22) is different.
9. spray equipment according to claim 1, it is characterised in that feed liquor of the supervisor (10) from the supervisor (10) Mouth to the diameter of the end of the supervisor (10) is tapered into.
10. a kind of smoke processing system, including spray equipment, it is characterised in that the spray equipment is in claim 1 to 9 Spray equipment described in any one.
CN201720192287.1U 2017-03-01 2017-03-01 Spray equipment and the smoke processing system with it Active CN206560937U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720192287.1U CN206560937U (en) 2017-03-01 2017-03-01 Spray equipment and the smoke processing system with it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720192287.1U CN206560937U (en) 2017-03-01 2017-03-01 Spray equipment and the smoke processing system with it

Publications (1)

Publication Number Publication Date
CN206560937U true CN206560937U (en) 2017-10-17

Family

ID=60031712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720192287.1U Active CN206560937U (en) 2017-03-01 2017-03-01 Spray equipment and the smoke processing system with it

Country Status (1)

Country Link
CN (1) CN206560937U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108283828A (en) * 2018-03-14 2018-07-17 衢州市三诚化工有限公司 Glycerine pressurization dilution device and its dilution process
CN109502775A (en) * 2018-11-23 2019-03-22 临猗县鑫得利纺织印染有限公司 Shockproof aeration tube

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108283828A (en) * 2018-03-14 2018-07-17 衢州市三诚化工有限公司 Glycerine pressurization dilution device and its dilution process
CN108283828B (en) * 2018-03-14 2023-08-25 衢州市三诚化工有限公司 Glycerol pressurized dilution device and dilution method thereof
CN109502775A (en) * 2018-11-23 2019-03-22 临猗县鑫得利纺织印染有限公司 Shockproof aeration tube

Similar Documents

Publication Publication Date Title
CN206454833U (en) A kind of anti-blocking atomizer
CN206560937U (en) Spray equipment and the smoke processing system with it
DE102006019890A1 (en) Atomizer and associated operating method
CN205730852U (en) A kind of efficient spray device
CN206882252U (en) Nozzle and the novel foam wash mill using the nozzle
CN206425142U (en) A kind of special spray equipment of organic mat
CN211537015U (en) Liquid spraying device of wet dust collector and wet dust collector
CN205436082U (en) Self-mixing flat gun nozzle for spraying
CN206372686U (en) Tail gas desulfurization processing spray structure
CN207076330U (en) A kind of spraying device of desulfurizing tower
CN105937057A (en) Conical surface electrostatic spinning nozzle in helical line array mode
CN205868580U (en) Can fully refine two -way shower head of liquid drop
CN107899846A (en) A kind of ultrasonic atomizatio shower nozzle
AT516400B1 (en) Jet nozzle for air entry
CN106823728A (en) A kind of two step mass transfer wet desulphurization devices and its method
CN207210586U (en) A kind of shower head mechanism for the production of dissolvant type nanofiber
CN206561050U (en) Pipe body flattening prevention tool and pipe body processing equipment
CN206793971U (en) A kind of windproof shower nozzle
CN207188036U (en) A kind of novel porous nozzle
CN206746347U (en) Grey storehouse wetting stirrer
CN206518905U (en) A kind of feed distributor
CN201195138Y (en) A nozzle
CN206980457U (en) A kind of fiberglass eddy current type spray equipment
CN206492644U (en) Atomizer and the desulfurizer with it
CN206965401U (en) shortened type venturi scrubber

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant