CN206555613U - Pipeline - Google Patents

Pipeline Download PDF

Info

Publication number
CN206555613U
CN206555613U CN201720253219.1U CN201720253219U CN206555613U CN 206555613 U CN206555613 U CN 206555613U CN 201720253219 U CN201720253219 U CN 201720253219U CN 206555613 U CN206555613 U CN 206555613U
Authority
CN
China
Prior art keywords
boss
section
pipeline
pipe section
duct section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720253219.1U
Other languages
Chinese (zh)
Inventor
孙兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Tai Hong Landscape Construction Engineering Co Ltd
Original Assignee
Jiangsu Tai Hong Landscape Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Tai Hong Landscape Construction Engineering Co Ltd filed Critical Jiangsu Tai Hong Landscape Construction Engineering Co Ltd
Priority to CN201720253219.1U priority Critical patent/CN206555613U/en
Application granted granted Critical
Publication of CN206555613U publication Critical patent/CN206555613U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of pipeline, including the first duct section and second pipe section, boss is provided with first duct section inwall, boss includes the less first boss face of the gradient and the larger second boss face of the gradient, elastomer is provided between boss and the first duct section inwall, one end that second pipe section is connected with the first duct section extends to form shelving pipeline, projection is provided with shelving pipeline position corresponding with boss, the first duct section coordinates projection after clamping to be connected on second boss face with second pipe section;The shelving pipeline being extended in second pipe section is extended into the first duct section, the projection being arranged on shelving pipeline extrudes boss and elastomer during being stretched into forward with second pipe section, projection is stuck at second boss face, so that the first duct section and second pipe section are installed together;During dismounting, outside power is applied to second pipe section, projection extruding second boss comes off behind face.

Description

Pipeline
Technical field
The utility model is related to engineering technique with the apparatus field, more particularly to a kind of pipeline.
Background technology
The construction project that municipal works are extruded the most as China city, its construction quality quality is directly connected to people group Many securities of the lives and property and infrastructure level, the development in a city be unable to do without the construction of municipal works;Municipal pipeline is city Pipeline level crossing apptss on important component in political and ideological work journey, Road are important parts in city system.
A kind of pipeline as disclosed in the Chinese patent that notification number is " CN203036116U ", disclosed in above-mentioned patent In structure, it includes duct section, the metal ferrule to connecting pipe section that multistage is connected with each other, and is wound with outside metal ferrule Adhesive waterproof tape and concrete layer ensure that it seals water resistance;But buried for the pipeline of underground for some, work as pipe When blocking or inside need maintenance inside road, when being dismantled at the duct sections of every two sections interconnections, this set just shows Obtain extremely inconvenient, it is necessary to first peel off the concrete layer of outer layer and adhesive waterproof tape, then metal ferrule is removed from junction Two relative duct sections connect can just be separated afterwards.
Utility model content
The purpose of this utility model is to provide a kind of easy-to-mount pipeline.
Above-mentioned technical purpose of the present utility model technical scheme is that:A kind of pipeline, including the It is provided with boss on one duct section and second pipe section, second pipe section inwall, the boss includes the gradient less the Elastomer is provided between one boss face and the larger second boss face of the gradient, boss and second pipe the section inwall, it is described One end that first duct section and second pipe section are connected extends to form shelving pipeline, shelving pipeline position corresponding with boss Place is provided with projection, and first duct section coordinates projection after clamping to be connected on second boss face with second pipe section.
By using above-mentioned technical proposal, the shelving pipeline being extended on the first duct section is extended into second pipe In section, the projection being arranged on shelving pipeline extrudes boss and elastomer during being stretched into forward with the first duct section, Projection is stuck at second boss face, so that the first duct section and second pipe section are installed together;During dismounting, to the first pipe Road section applies outside power, and projection extruding second boss comes off behind face, because the gradient in second boss face is more than first boss face The gradient, so the dismounting of second pipe section needs to apply bigger power than installing.
Preferably, the first magnet is provided with the projection, position corresponding with the first magnet on first duct section The place of putting is provided with the second magnet.
By using above-mentioned technical proposal, when projection extruding boss make the first duct section and second pipe section dock successfully it Afterwards, on projection the first magnet and the second magnet coordinates magnetic-adsorption, makes the first duct section and the connection of second pipe section more Closely, it will not come off easily;Secondly during docking, the second magnet is to that under the magnetic force sucking action of the first magnet, can help Help projection easier by boss.
Preferably, being provided with sealing ring on the second pipe section outer wall.
By using above-mentioned technical proposal, after docking is finished, sealing ring is located at second pipe section outer wall and the first pipeline Sealed effect is played between section inwall.
Preferably, being provided with the first groove inserted for the first duct section end on the sealing ring.
By using above-mentioned technical proposal, as the first duct section and the duct section of cooperation first of second pipe section are inserted in In first groove, sealing function can be equally played;Secondly the skin-friction coefficient of this material of sealing ring is larger, can be with first Larger frictional force is produced between duct section end, spacing effect is played, it is to avoid the first duct section is in second pipe section outer wall Upper slip comes off.
Preferably, being provided with insulating layer on first duct section and second pipe section outer wall, the insulating layer is by XPS It is made.
By using above-mentioned technical proposal, most pipeline is directly to be in outdoor environment, the temperature difference in outdoor environment It is larger, XPS(extruded polystyrene)Full name be extrusion molding polystyrene polyfoam, this material has perfect Closed honeycomb structure, low thermal conductivity, high pressure resistance and ageing resistance;Because this perfect closed honeycomb structure, Vacuum layer is formd in structure, it is to avoid air flow radiates, it is ensured that its heat-insulating property lasting and stably.
Preferably, being coated with self-cleaning layer, the self-cleaning layer on first duct section and second pipe section inwall It is to be formed by super hydrophobic material coating.
By using above-mentioned technical proposal, coated using super hydrophobic material on the first duct section and second pipe section inwall One layer of self-cleaning layer is formed, due to the contact angle on super hydrophobic material surface(contact angle)More than 150 °, it is in rolling contact Angle is less than 10 °, and impurity particle etc. will not rest on self-cleaning layer surface, and blocking will not be also formed in pipeline.
Preferably, be provided with corrosion-resistant coating on the insulating layer, the corrosion-resistant coating is by anticorrosive coating coating Into.
By using above-mentioned technical proposal, if pipe fitting is imbedded in underground, if pipeline is buried under soil, by Containing acid, such as alkali element, P elements, nitrogen in soil, this dvielement is easy to after generation phosphate radical and nitrate anion Corrosivity is produced, the corrosion-resistant coating being coated on insulating layer is effective to completely cut off pipeline, insulating layer and these materials, it is to avoid corrosion Insulating layer and pipeline.
Multiple reflecting pieces are arranged at intervals with preferably, being provided with the corrosion-resistant coating.
By using above-mentioned technical proposal, multiple reflecting pieces are arranged at intervals with corrosion-resistant coating, in the landfill process of pipeline In, station is installed in the side of pipeline, by observing whether reflecting piece is located at always on so as to know pipeline in placement Whether installation is in line, if the pipeline that pipeline connects is not straight line, may influence the sealing of pipeline in joint formation gap Property.
In summary, the utility model has the advantages that:The shelving pipe in second pipe section will be extended on Road is extended into the first duct section, and the projection being arranged on shelving pipeline is squeezed during being stretched into forward with second pipe section Belling platform and elastomer, projection is stuck at second boss face, so that the first duct section and second pipe section are installed together; During dismounting, apply outside power to second pipe section, projection extruding second boss comes off behind face, because the gradient in second boss face More than the gradient in first boss face, so the dismounting of second pipe section needs to apply bigger power than installing.
Brief description of the drawings
Fig. 1 is the overall structure diagram in embodiment 1, for embodying the position relationship between each structure;
Fig. 2 is the structure enlarged diagram of part A in Fig. 1, for embodying the matching relationship between boss and projection;
Fig. 3 is the first duct section or second pipe section part-structure schematic diagram in embodiment 1, for embody coating every Warm layer, self-cleaning layer, corrosion-resistant coating;
Fig. 4 is the first duct section or second pipe section part-structure schematic diagram in embodiment 1, for embodying reflecting piece;
Fig. 5 is the overall structure diagram in embodiment 2;
Fig. 6 is part B structure enlarged diagram in Fig. 5, for being embodied in ring structures different in embodiment 1.
In figure, the 1, first duct section;11st, boss;111st, first boss face;112nd, second boss face;12nd, elastomer;13、 Shelving pipeline;131st, projection;132nd, the first magnet;133rd, the second magnet;2nd, second pipe section;3rd, insulating layer;4th, self-cleaning layer; 5th, sealing ring;51st, the first groove;6th, corrosion-resistant coating;7th, reflecting piece.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but As long as all being protected in right of the present utility model by Patent Law.
Embodiment 1:As depicted in figs. 1 and 2, a kind of pipeline, including the first duct section 1 and second pipe section 2, in the second pipe Array is provided with multiple boss 11 on the inwall of road section 2, is split at the golden section point of boss 11, respectively first is convex Table top 111 and second boss face 112, the gradient in first boss face 111 are smaller, and the gradient in second boss face 112 is larger, and first is convex Table top 111 is set at the opening of the first duct section 1, and one is provided between boss 11 and the inwall of second pipe section 2 Elastomer 12, elastomer 12 can use spring, and the other end of elastomer 12 is connected on the inwall of second pipe section 2;Second pipe One end that road section 2 is connected with the first duct section 1 extends to form one end shelving pipeline 13, with boss on the outer wall of shelving pipeline 13 Projection 131 is provided with 11 corresponding positions, the first magnet 132 is provided with projection 131 and on the inwall of the first duct section 1 With the second magnet 133, projection 131 is pressed after boss 11, is arranged on the first magnet 132 and the second magnet 133 on projection 131 Coordinate absorption.
As depicted in figs. 1 and 2, glued on the outer wall of the first duct section 1 provided with a circle sealing ring 5, with the first duct section 1 It is plugged among second pipe section 2, sealing ring 5 is located between the inwall of the outer wall of the first duct section 1 and second pipe section 2.
As shown in figure 3, the first duct section 1 and second pipe section 2 outer wall on glue be provided with insulating layer 3, insulating layer 3 be by XPS(extruded polystyrene)It is made;Corrosion-resistant coating 6 is coated with insulating layer 3, corrosion-resistant coating 6 is by anticorrosion Coating coating is formed, and refers to a kind of anticorrosion gluing disclosed in the Chinese patent that notification number is " CN106243808A ";Such as Fig. 4 It is shown, be spaced on corrosion-resistant coating 6 it is viscous be provided with multiple reflecting pieces 7, reflecting piece 7 is outer the first duct section 1 and second pipe section 2 Glued on wall and set in a row, be located on the same line.
As shown in figure 3, one layer of self-cleaning layer 4 is coated with the first duct section 1 and the inwall of second pipe section 2, from clearly Clean layer 4 is formed by super hydrophobic material coating, is referred to one kind disclosed in Publication No. " CN10148590A " Chinese patent and is surpassed Hydrophobic glued membrane.
Application method:In the installation process of pipe fitting, first by the grafting of shelving pipeline 13 being arranged on the first duct section 1 In second pipe section 2, projection 131 inwardly extrudes boss 11, and elastomer 12 compresses, and makes projection 131 smoothly by boss 11 It is connected to afterwards on the second boss face 112 of boss 11, sets the first magnet 132 and the second magnet 133 on projection 131 to coordinate and inhale Attached to make the closer of 2 grafting of the first duct section 1 and second pipe section, sealing ring 5 is located at the first duct section 1 and second pipe section 2 Between play sealing function;When needing to carry out pipeline internal overhaul, outside active force is applied from second to the first duct section 1 Extracted in duct section 2, in the process, the pressing second boss of projection 131 face 112, the inside compression of elastomer 12 makes projection 131 smoothly by boss 11, so that the first duct section 1 and second pipe section 2 be separated;It is coated in certainly clear on inner-walls of duct Because the special contact angle of material, in pipeline, the impurity of flowing is dirty etc. without being adhered on inner-walls of duct for clean layer 4, subtracts The possibility blocked in education and correction for juvenile offenders road;And the insulating layer 3 being arranged on pipeline outer wall plays the warming effect of thermal insulation, it is to avoid be exposed at outdoor Pipeline bursting by freezing phenomenon occurs because of cold weather.
Embodiment 2:As shown in Figure 5 and Figure 6, the structure of embodiment 2 and embodiment 1 is essentially identical, as shown in figure 1, a kind of Pipeline, sealing ring 5 is arranged on the first duct section 1, in sealing ring 5 towards depression forms the downwards on the face of second pipe section 2 One groove 51, can extend into second pipe section 2 in first groove 51.
Application method:The application method of the application method of embodiment 2 and embodiment 1 is essentially identical, the mistake installed when pipe fitting Cheng Zhong, by the first duct section 1 extend into second pipe section 2 during when, second pipe section 2 end extend into sealing ring 5 The first groove 51 in;Because the restriction effect of sealing ring 5, the first duct section 1 unconfined will not extend into the second pipe Pipeline is caused too closely to be difficult to pull up because what both connected in unloading process in road section 2.

Claims (8)

1. a kind of pipeline, including the first duct section(1)With second pipe section(2), it is characterised in that:The second pipe section(2) Boss is provided with inwall(11), the boss(11)Including the less first boss face of the gradient(111)Larger with the gradient Two boss faces(112), the boss(11)With second pipe section(2)Elastomer is provided between inwall(12), first pipe Road section(1)With second pipe section(2)One end of connection extends to form shelving pipeline(13), the shelving pipeline(13)With boss (11)Projection is provided with corresponding position(131), first duct section(1)With second pipe section(2)Coordinate convex after clamping Block(131)It is connected to second boss face(112)On.
2. a kind of pipeline according to claim 1, it is characterised in that:The projection(131)On be provided with the first magnet (132), the second pipe section(2)Upper and the first magnet(132)The second magnet is provided with corresponding position(133).
3. a kind of pipeline according to claim 2, it is characterised in that:First duct section(1)It is provided with outer wall close Seal(5).
4. a kind of pipeline according to claim 3, it is characterised in that:The sealing ring(5)On be provided with for the first pipeline Section(1)First groove of end insertion(51).
5. a kind of pipeline according to claim 3, it is characterised in that:First duct section(1)With second pipe section(2) Insulating layer is provided with outer wall(3), the insulating layer(3)It is made up of XPS.
6. a kind of pipeline according to claim 5, it is characterised in that:First duct section(1)With second pipe section(2) Self-cleaning layer is coated with inwall(4), the self-cleaning layer(4)It is to be formed by super hydrophobic material coating.
7. a kind of pipeline according to claim 6, it is characterised in that:The insulating layer(3)On be provided with corrosion-resistant coating (6), the corrosion-resistant coating(6)It is to be formed by anticorrosive coating coating.
8. a kind of pipeline according to claim 7, it is characterised in that:The corrosion-resistant coating(6)On be provided with interval setting There are multiple reflecting pieces(7).
CN201720253219.1U 2017-03-15 2017-03-15 Pipeline Active CN206555613U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720253219.1U CN206555613U (en) 2017-03-15 2017-03-15 Pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720253219.1U CN206555613U (en) 2017-03-15 2017-03-15 Pipeline

Publications (1)

Publication Number Publication Date
CN206555613U true CN206555613U (en) 2017-10-13

Family

ID=60365215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720253219.1U Active CN206555613U (en) 2017-03-15 2017-03-15 Pipeline

Country Status (1)

Country Link
CN (1) CN206555613U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109169191A (en) * 2018-10-10 2019-01-11 湖州金洁塑业有限公司 A kind of gardens water supplying pipe

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109169191A (en) * 2018-10-10 2019-01-11 湖州金洁塑业有限公司 A kind of gardens water supplying pipe

Similar Documents

Publication Publication Date Title
CN108980488A (en) Flange and construction for air hose connection
CN206555613U (en) Pipeline
CN201964091U (en) Exterior thermal insulation pipe connecting piece of thermal insulation water pipe
CN207484706U (en) A kind of seamless mounting structure of construction and decoration plank
CN208041380U (en) A kind of card pressure attachment device of thin-wall stainless steel water pipe
CN203614944U (en) Compression thread bonding type pipe connecting piece
CN108548050B (en) Highly waterproof detachable energy-saving heat-insulating shell
CN206514071U (en) A kind of pipeline
CN210950293U (en) Heat supply pipeline
CN211344343U (en) Building heating and ventilation pipeline connecting device
CN2655008Y (en) Flexible jointing part for fluid pipeline
CN207279105U (en) A kind of connection structure for building flexible ventilation duct and main ventilation pipeline
CN110822217A (en) Rapid bonding method of pipeline heat-insulating material
CN217234890U (en) Northern city user outer drainage pipe insulation sleeve
CN206738801U (en) A kind of fiberglass geothermal tube joint for sealing connecting
CN204510286U (en) A kind of waterproofing of movement joints process structure
CN208204349U (en) A kind of corrosion resistant idle call rubber-plastic thermal insulation pipe
CN204420320U (en) A kind of seal arrangement connecting protective well through hole and ground deferent
CN204040325U (en) Corrugated roof plate waterproof connected structure
CN203463802U (en) Anti-cracking combined glass magnesium air pipe
CN207687496U (en) A kind of heat preservation pvc pipe
CN203374788U (en) Flange gasket
CN210770914U (en) Assembled building drainage connects
CN219712575U (en) Frosting prevention pipeline for building water supply and drainage
CN219258372U (en) Denitration sampling pipe drainage device that prevents frostbite

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant