CN206554025U - 覆盖层边坡过流保护结构 - Google Patents
覆盖层边坡过流保护结构 Download PDFInfo
- Publication number
- CN206554025U CN206554025U CN201720224960.5U CN201720224960U CN206554025U CN 206554025 U CN206554025 U CN 206554025U CN 201720224960 U CN201720224960 U CN 201720224960U CN 206554025 U CN206554025 U CN 206554025U
- Authority
- CN
- China
- Prior art keywords
- covering layer
- geotextiles
- cutting
- layer slope
- slope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本实用新型涉及一种覆盖层边坡过流保护结构,属于水利水电工程施工领域。本实用新型包括已开挖至稳定的覆盖层边坡,覆盖层边坡在其迎水面设置有刻槽,覆盖层边坡的迎水面铺设有土工布,土工布通过设于刻槽内的混凝土固定。本实用新型充分应用了土工布良好的反滤性能,防止覆盖层颗粒被水流带出;利用刻槽处混凝土固定土工布,防止土工布被水流带走;通过固定土工布保护覆盖层边坡,防止被水流冲刷破坏;该结构在保护覆盖层边坡过流的同时,亦能提高边坡稳定性。该方案施工简单快速,能迅速形成覆盖层过流保护结构,后期的土工布及刻槽内混凝土拆除简单,后续施工方便。
Description
技术领域
本实用新型涉及一种覆盖层边坡过流保护结构,属于水利水电工程施工领域。
背景技术
水利水电工程建设施工过程中,涉水部分的覆盖层边坡存在过水流的情况。例如,采用枯期围堰分期导流的水电站施工中,一个枯水期明渠未建成,基坑需要汛期过流,必须对基坑的边坡进行防护,确保边坡汛期过流的稳定安全。覆盖层抗冲流速低、抗水流冲刷能力差,通常采用大块石、钢筋石笼、铅丝石笼、混凝土面板护面等方法。上述方法施工相对复杂、工期长、成本高。尤其在低流速水流情况下,混凝土面板护面造价过高;采用钢筋石笼、铅丝石笼,需要现场制作并进行现场堆放,施工程序复杂,工期长;采用大块石护坡,仍需要外部搬运到护坡部位,大块石的堆筑需要人工堆筑,此外,大块石底部被淘刷的后上部容易失稳。因此,在工期紧张、如何以最低成本尽快形成覆盖层过流保护结构,对急需过流的覆盖层边坡具有重要意义。
实用新型内容
本实用新型所要解决的技术问题是:提供一种能快速施工,且投资少、经济有效的覆盖层边坡过流保护结构。
为解决上述技术问题本实用新型所采用的技术方案是:覆盖层边坡过流保护结构,包括已开挖至稳定的覆盖层边坡,覆盖层边坡在其迎水面设置有刻槽,刻槽横断面宽度为30cm~50cm、高度为20cm~40cm,刻槽可采用人工或者小型机械进行开挖,覆盖层边坡的迎水面铺设有土工布,土工布通过设于刻槽内的混凝土固定。该结构在保护覆盖层边坡过流的同时,亦能提高边坡稳定性。
进一步的是:混凝土填充满刻槽。
进一步的是:土工布数量为多件,相邻两件土工布之间在混凝土底部进行搭接。
进一步的是:土工布数量为多件,相邻两件土工布之间在接头处以缝合的方式搭接。
进一步的是:刻槽为平行设置的多个,刻槽长度方向与覆盖层边坡迎水面倾斜方向一致。
进一步的是:还具有沿水平向设置的多个刻槽。
进一步的是:刻槽为矩形槽或者梯形槽。
本实用新型的有益效果是:该方案充分应用了土工布良好的反滤性能,防止覆盖层颗粒被水流带出;利用刻槽处混凝土固定土工布,防止土工布被水流带走;通过固定土工布保护覆盖层边坡,防止被水流冲刷破坏;该结构在保护覆盖层边坡过流的同时,亦能提高边坡稳定性。该方案施工简单快速,能迅速形成覆盖层过流保护结构,后期的土工布及刻槽内混凝土拆除简单,后续施工方便。
附图说明
图1是本实用新型的平面布置图;
图2是图1的A-A剖面;
图3是图1的B-B剖面;
图4是图1的C-C剖面;
图中标记:1-覆盖层边坡、2-刻槽、3-土工布、4-混凝土。
具体实施方式
下面结合附图对本实用新型作进一步说明。
如图1~图4所示,本实用新型包括已开挖至稳定的覆盖层边坡1,覆盖层边坡1在其迎水面设置有刻槽2,刻槽2横断面宽度为30cm~50cm、高度为20cm~40cm,刻槽可采用人工或者小型机械进行开挖,覆盖层边坡1的迎水面铺设有土工布3,土工布3通过设于刻槽2内的混凝土4固定。
为使土工布3固定牢靠,土工布3应沿着刻槽2断面的轮廓线铺设,以使得混凝土4可填充满刻槽2。
土工布3数量为多件,为充分利用土工布的反滤性能,相邻两件土工布3之间在混凝土4底部进行搭接。相邻两件土工布3之间在接头处还可采用缝合的方式搭接,此时搭接位置则可任意设置,可采用手提缝纫机进行缝合。
为方便实施,同时保证过流保护结构的稳固,刻槽2为平行设置的多个,刻槽2长度方向与覆盖层边坡1迎水面倾斜方向一致。另外,为提高稳固性,还可设置沿水平向设置的多个刻槽2,形成“井”字型分布的刻槽2,尤其适用于当保护的覆盖层边坡1较高时。
刻槽2优选采用矩形槽或者梯形槽,刻槽2可采用人工或者小型机械进行开挖。
优选实施例:在过水之前,首先将覆盖层边坡1开挖至设计稳定坡比,并找平;在坡面上每隔一段距离掏垂直方向刻槽2;若保护的覆盖层边坡1较高,需要在垂直方向增加水平方向的刻槽2;沿着坡面铺设一层土工布3,在刻槽2处,土工布3需要沿着刻槽2断面的轮廓线铺设铺设,土工布3分缝接头处需要设置在刻槽2底部处,搭接处具有一定的搭接长度;然后在刻槽2处浇筑满压重的混凝土4,利用混凝土4固定并压实土工布;过流后,后期可根据施工需要,进行土工布3及刻槽2内混凝土4的拆除,方便后续施工。
Claims (7)
1.覆盖层边坡过流保护结构,包括已开挖至稳定的覆盖层边坡(1),其特征在于:覆盖层边坡(1)在其迎水面设置有刻槽(2),覆盖层边坡(1)的迎水面铺设有土工布(3),土工布(3)通过设于刻槽(2)内的混凝土(4)固定。
2.如权利要求1所述的覆盖层边坡过流保护结构,其特征在于:混凝土(4)填充满刻槽(2)。
3.如权利要求1所述的覆盖层边坡过流保护结构,其特征在于:土工布(3)数量为多件,相邻两件土工布(3)之间在混凝土(4)底部进行搭接。
4.如权利要求1所述的覆盖层边坡过流保护结构,其特征在于:土工布(3)数量为多件,相邻两件土工布(3)之间在接头处以缝合的方式搭接。
5.如权利要求1~4中任意一项所述的覆盖层边坡过流保护结构,其特征在于:刻槽(2)为平行设置的多个,刻槽(2)长度方向与覆盖层边坡(1)迎水面倾斜方向一致。
6.如权利要求5所述的覆盖层边坡过流保护结构,其特征在于:还具有沿水平向设置的多个刻槽(2)。
7.如权利要求1~4中任意一项所述的覆盖层边坡过流保护结构,其特征在于:刻槽(2)为矩形槽或者梯形槽。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720224960.5U CN206554025U (zh) | 2017-03-09 | 2017-03-09 | 覆盖层边坡过流保护结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720224960.5U CN206554025U (zh) | 2017-03-09 | 2017-03-09 | 覆盖层边坡过流保护结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206554025U true CN206554025U (zh) | 2017-10-13 |
Family
ID=60362175
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720224960.5U Withdrawn - After Issue CN206554025U (zh) | 2017-03-09 | 2017-03-09 | 覆盖层边坡过流保护结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206554025U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638472A (zh) * | 2017-03-09 | 2017-05-10 | 中国电建集团成都勘测设计研究院有限公司 | 覆盖层边坡过流保护结构 |
-
2017
- 2017-03-09 CN CN201720224960.5U patent/CN206554025U/zh not_active Withdrawn - After Issue
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638472A (zh) * | 2017-03-09 | 2017-05-10 | 中国电建集团成都勘测设计研究院有限公司 | 覆盖层边坡过流保护结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107060840B (zh) | 一种大断面隧道v级围岩开挖支护的施工方法 | |
CN103643672A (zh) | 一种真空预压地基处理施工方法 | |
CN107724334A (zh) | 模袋混凝土护坡结构及具有锚固结构的钢筋笼 | |
CN107119624A (zh) | 一种泥石流沟内大型弃渣场的防治体系及实施方法 | |
CN206495187U (zh) | 一种稳固加筋连接型砂枕坝 | |
CN207267975U (zh) | 一种用于盾构隧道下穿河流的河床加固结构 | |
CN206554025U (zh) | 覆盖层边坡过流保护结构 | |
CN106049379A (zh) | 溢洪道下游施工滞后时的临时发电方法及堆石自溃坝 | |
CN208763033U (zh) | 充砂土工管袋围堰 | |
CN202989859U (zh) | 一种生态型柔性护岸结构 | |
CN207211100U (zh) | 竖井式水电站厂房结构 | |
CN207228038U (zh) | 一种泥石流沟内大型弃渣场的防治体系 | |
CN207314271U (zh) | 模袋混凝土护坡结构及具有锚固结构的钢筋笼 | |
CN105926660B (zh) | 一种潮间带风电低桩承台基础的施工方法 | |
CN206928250U (zh) | 峡谷区高坝水电工程渣场沟水导流系统 | |
CN206319297U (zh) | 生态护坡用生态袋及由其构成的单层生态袋生态护坡系统 | |
CN105951667A (zh) | 采用充泥管袋在围垦区域中预留成河道结构及其施工方法 | |
CN208604552U (zh) | 用于复杂地质条件下的桩林坝 | |
CN106638472B (zh) | 覆盖层边坡过流保护结构 | |
CN207277284U (zh) | 一种组合抽屉式护岸结构 | |
CN205875096U (zh) | 一种堆石自溃坝 | |
CN206768831U (zh) | 一种钢管前撑、锚索后拉hu型围护结构 | |
CN205742221U (zh) | 一种适用于松散堆积覆盖层边坡的暗梁式锚拉支护结构 | |
CN107386222A (zh) | 竖井式水电站厂房结构 | |
CN108301384A (zh) | 沥青混凝土心墙与坝基混凝土防渗墙接头结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20171013 Effective date of abandoning: 20190215 |
|
AV01 | Patent right actively abandoned |