CN206553951U - Traversing roller box attachment means are held in the palm in a kind of Bridge Erector - Google Patents

Traversing roller box attachment means are held in the palm in a kind of Bridge Erector Download PDF

Info

Publication number
CN206553951U
CN206553951U CN201720232517.2U CN201720232517U CN206553951U CN 206553951 U CN206553951 U CN 206553951U CN 201720232517 U CN201720232517 U CN 201720232517U CN 206553951 U CN206553951 U CN 206553951U
Authority
CN
China
Prior art keywords
flange block
roller box
camber beam
support
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720232517.2U
Other languages
Chinese (zh)
Inventor
王宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN GAOYUAN HEAVY CRANE CO Ltd
Original Assignee
HENAN GAOYUAN HEAVY CRANE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN GAOYUAN HEAVY CRANE CO Ltd filed Critical HENAN GAOYUAN HEAVY CRANE CO Ltd
Priority to CN201720232517.2U priority Critical patent/CN206553951U/en
Application granted granted Critical
Publication of CN206553951U publication Critical patent/CN206553951U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

Traversing roller box attachment means are held in the palm in a kind of Bridge Erector, including load-bearing camber beam, the traversing roller box of middle support, the middle traversing wheel upper box part of support is one group of hinged-support saddle, the upper surface of the hinged-support saddle coordinated with load-bearing camber beam is flange block I, and flange block I is bolted with being fixed on the flange block II of camber beam lower surface.The upper surface that one group of hinged-support saddle of traversing wheel upper box part is held in the palm in the utility model is flange block I, it is connected by bolt with being fixed on the flange block II of load-bearing camber beam lower surface, so that the middle traversing roller box of support and load-bearing camber beam convenient disassembly, it can separate and transport, the two is connected again on construction ground, reduce to in-site installation environment and the harsh requirement of objective condition, improve comprehensive benefit when secondary transition is used, improve the value created in the Bridge Erector life-span, and this changes compact conformation, outward appearance is beautiful, and comprehensive cost performance is high.

Description

Traversing roller box attachment means are held in the palm in a kind of Bridge Erector
Technical field
The utility model is related to Bridge Erector field, and traversing roller box attachment means are held in the palm in specially a kind of Bridge Erector.
Background technology
It is one group of hinged-support saddle that traversing wheel upper box part is held in the palm in current Bridge Erector, in the last assembled completion of Bridge Erector, Need the upper flat plate of saddle and the lower plane circumference full weld of load-bearing camber beam, so weld it is firm after could use Bridge Erector.
The welding job of saddle and load-bearing camber beam, if welded in plant area, the inconvenience of loading-unloading vehicle when can cause to transport, There is the collision-deformed hidden danger of hinged-support horse blanket during this.If at the scene welding need specialty solder technologist and Equipment, the requirement to in-site installation condition is harsh, causes field erected very big inconvenience and restricted gender.In secondary transition, Also need to technical professional to separate both with burning torch, camber beam and the traversing roller box of middle support can be cut during separation Wound, causes difficulty assembled herein to increase the decrease with weight capacity, and whole process is to the professional technique water of operating personnel It is flat to require higher, the equipment at scene is equipped with and requires higher, it is not only inconvenient but also have very big operation restricted gender, objectively add The unreasonable and economic benefit of man-machine efficacy it is low.
The need for according to job site, the size of the middle traversing roller box of support is larger at present, is assembled to after load-bearing camber beam, its following table The face lower surface overall higher than load-bearing camber beam, if the middle traversing roller box of support directly is welded into one piece with load-bearing camber beam in plant area, It is very inconvenient in transport.
Utility model content
To ask the hinged-support saddle of traversing roller box to be welded on load-bearing camber beam in solution, and the middle traversing roller box of support is assembled to After load-bearing camber beam, its lower surface lower surface overall higher than load-bearing camber beam, the inconvenient technical problem of dismounting, transport, installation is carried For holding in the palm traversing roller box attachment means in a kind of Bridge Erector.
The technical solution of the utility model is:
Traversing roller box attachment means, including load-bearing camber beam, the traversing roller box of middle support, the traversing wheel of middle support are held in the palm in a kind of Bridge Erector Upper box part is one group of hinged-support saddle, and the upper surface of the hinged-support saddle coordinated with camber beam is flange block I, and flange block I is with fixing It is bolted in the flange block II of load-bearing camber beam lower surface.
The flange block I, flange block II are shaped as rectangle.
Set respectively on flange block I, flange block II bolt hole on the bolt hole that two rows are parallel to each other, flange block I with Bolt hole on flange block II is corresponding, so as to flange block I and the stable and firm fixation of flange block II.
The center hollow out of the flange block I, mitigates its weight, saves material.
Compared with the prior art, the upper surface that one group of hinged-support saddle of traversing wheel upper box part is held in the palm in the utility model is flange Block I, is connected so that the traversing roller box of middle support is torn open with load-bearing camber beam by bolt with being fixed on the flange block II of load-bearing camber beam lower surface Unload conveniently, can separate and transport, the two is connected again on construction ground, reduced to in-site installation environment and objective condition Harsh requirement, is assembled to after load-bearing camber beam, its lower surface is higher than load-bearing camber beam entirety while solving the middle traversing roller box of support Lower surface, it has not been convenient to the problem of transport etc., improves comprehensive benefit when secondary transition is used, improves wound in the Bridge Erector life-span The value made, and this changes compact conformation, and outward appearance is beautiful, and comprehensive cost performance is high.
Brief description of the drawings
Fig. 1 is schematic diagram of the present utility model;
Fig. 2 is the schematic diagram of the center hollow out of flange block I.
Embodiment
As shown in Figure 1 and Figure 2, the traversing attachment means of roller box 4 are held in the palm in a kind of Bridge Erector, including load-bearing camber beam 5, middle support are traversing Roller box 4, load-bearing camber beam 5 is welded by several I-steel, and the traversing top of roller box 4 of middle support is one group of hinged-support saddle 3, and curved The upper surface for the hinged-support saddle 3 that beam coordinates is flange block I 2, flange block I 2 and the flange block for being fixed on the lower surface of load-bearing camber beam 5 II 1 are bolted, and the bolt hole of same size is provided with flange block I 2, flange block II 1.
Load-bearing camber beam 5 includes two crossbeams, flange block II 1 is respectively welded in the lower surface of two crossbeams, in welded flange During block II 1, directly the flange block I 2 of hinged-support top is painted on the lower surface of crossbeam, both sides roller box draws positive wheel line when painting dress Position is mixed up, it is afterwards that the flange of the lower surface against crossbeam and camber beam welding is firm.
The flange block I 2, flange block II 1 are shaped as rectangle.
Bolt on flange block I 2, the upper bolt hole for setting two rows to be parallel to each other respectively of flange block II 1, flange block I 2 Hole is corresponding with the bolt hole on flange block II 1, so as to flange block I 2 and the stable and firm fixation of flange block II 1.
The center hollow out of the flange block I 2, mitigates its weight, saves material.
The utility model uses high-strength bolt, it is ensured that the bonding strength of the middle traversing roller box 4 of support and load-bearing camber beam 5;Bolt Kong Jun uses the perforating mold reequiped by specific aim, it is ensured that the precision of bolt hole, disclosure satisfy that connection precision.

Claims (4)

1. traversing roller box attachment means are held in the palm in a kind of Bridge Erector, including load-bearing camber beam, the traversing roller box of middle support, the middle traversing roller box of support Top is one group of hinged-support saddle, it is characterised in that:The upper surface of the hinged-support saddle coordinated with load-bearing camber beam is flange block I, Flange block I is bolted with being fixed on the flange block II of camber beam lower surface.
2. traversing roller box attachment means are held in the palm in Bridge Erector as claimed in claim 1, it is characterised in that:The flange block I, flange Block II is shaped as rectangle.
3. traversing roller box attachment means are held in the palm in Bridge Erector as claimed in claim 2, it is characterised in that:In flange block I, flange block Bolt hole on the bolt hole for setting two rows to be parallel to each other on II respectively, flange block I is corresponding with the bolt hole on flange block II.
4. traversing roller box attachment means are held in the palm in Bridge Erector as claimed in claim 3, it is characterised in that:In the flange block I Heart hollow out.
CN201720232517.2U 2017-03-10 2017-03-10 Traversing roller box attachment means are held in the palm in a kind of Bridge Erector Expired - Fee Related CN206553951U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720232517.2U CN206553951U (en) 2017-03-10 2017-03-10 Traversing roller box attachment means are held in the palm in a kind of Bridge Erector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720232517.2U CN206553951U (en) 2017-03-10 2017-03-10 Traversing roller box attachment means are held in the palm in a kind of Bridge Erector

Publications (1)

Publication Number Publication Date
CN206553951U true CN206553951U (en) 2017-10-13

Family

ID=60363835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720232517.2U Expired - Fee Related CN206553951U (en) 2017-03-10 2017-03-10 Traversing roller box attachment means are held in the palm in a kind of Bridge Erector

Country Status (1)

Country Link
CN (1) CN206553951U (en)

Similar Documents

Publication Publication Date Title
CN203201562U (en) Shield tunneling machine initial counter-force frame convenient to detach, install and transport
CN206588517U (en) Diagonal brace frock is used in a kind of modularization floor positioning
CN206553951U (en) Traversing roller box attachment means are held in the palm in a kind of Bridge Erector
CN204248277U (en) Bogie frame welding tooling
CN204751934U (en) Metallurgy crane girder web crackle reinforcing apparatus
CN206883062U (en) Steel member welds double thread bar elevating mechanism
CN206553954U (en) The moveable attachment means of traversing roller box are held in the palm in a kind of Bridge Erector
CN206375600U (en) A kind of adjustable counterweight self-unloading frame
CN205129244U (en) Truss welding template
CN205010359U (en) Connection structure of detachable semitrailer automobile body
CN204778376U (en) Gantry crane landing leg
CN205703033U (en) A kind of revolution pylon tower cap butt riveting mounted welder
CN206984058U (en) A kind of construction MPV
CN206553955U (en) The moveable attachment means of rotating disk are held in the palm in a kind of Bridge Erector
CN209334961U (en) Lift truck platform rail pedal welder
CN203956485U (en) A kind of portable mounting plate
CN205314911U (en) Ladder
CN204817568U (en) Workstation is rectified to fixed base crane end beam
CN204198261U (en) Girder on single-beam crane
CN205437596U (en) Tower crane jib loading boom pull rod welding frock
CN206174465U (en) Can dismantle platform of unloading that turnover was used
CN209206126U (en) A kind of truck side sill simmering and bending tooling
CN204571295U (en) A kind of structure improving aluminum alloy mould plate opposing side bearing capacity
CN206553956U (en) Rotating disk and the attachment means of load-bearing camber beam are held in the palm in a kind of Bridge Erector
CN104002075B (en) Link welding tooling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171013

Termination date: 20210310

CF01 Termination of patent right due to non-payment of annual fee