CN206553111U - One kind balance arm brace installs auxiliary body - Google Patents

One kind balance arm brace installs auxiliary body Download PDF

Info

Publication number
CN206553111U
CN206553111U CN201720193564.0U CN201720193564U CN206553111U CN 206553111 U CN206553111 U CN 206553111U CN 201720193564 U CN201720193564 U CN 201720193564U CN 206553111 U CN206553111 U CN 206553111U
Authority
CN
China
Prior art keywords
pull bar
shaft hole
pin shaft
arm joint
type groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720193564.0U
Other languages
Chinese (zh)
Inventor
郭纪斌
陈光忠
李青云
张乐
钱萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan College of Information
Original Assignee
Hunan College of Information
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan College of Information filed Critical Hunan College of Information
Priority to CN201720193564.0U priority Critical patent/CN206553111U/en
Application granted granted Critical
Publication of CN206553111U publication Critical patent/CN206553111U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

Auxiliary body is installed the utility model discloses one kind balance arm brace, installation for aiding in balance arm of tower-type crane, including hydraulic jacking device and U-type groove, the lower end of hydraulic jacking device is secured by bolts in rear arm joint, and U-type groove is located at the top of hydraulic jacking device;Pull bar is provided with pull bar pin shaft hole close to one end of preceding arm joint, and bearing pin sequentially fixes pull bar with top boom with top boom pin shaft hole through the pull bar pin shaft hole, and the other end of pull bar is fixed by pin joint with rear arm joint;During normal mounting, pull bar is positioned in U-type groove.In installation process, without the use of external equipment raising rod, mounting cost is reduced;Balance arm brace is positioned in U-type groove, pull bar swing can be prevented effectively from, prevents pull bar is collided with miscellaneous part from causing to damage;By the effect of lifting of hydraulic jacking device, it can be greatly improved the speed that pull bar pin shaft hole and top boom pin shaft hole are aligned with the height of adjusting yoke pin shaft hole, improve the installation effectiveness of bearing pin.

Description

One kind balance arm brace installs auxiliary body
Technical field
The utility model belongs to engineering machinery field, and in particular to a kind of balance arm brace suitable for derrick crane is pacified Fill auxiliary body.
Background technology
With the development of engineering machinery technology, derrick crane develops toward large-scale, ultra-large type direction.Generally, Counter-balance Boom for Big Tower Crane is generally generally to be attached between multi-arm nodule structure, arm joint by pull bar.Counter-balance Boom for Big Tower Crane is general Including counter-jib arm joint and counter-jib periproct, the wherein lower boom of counter-jib arm joint is connected with counter-jib periproct, counter-jib Be connected between the top boom of arm joint and counter-jib periproct by pull bar, pull bar when the top boom with counter-jib arm joint is connected, Need first to raise the end of pull bar by hanger by external equipment (such as truck crane), then slowly putting down makes the bearing pin of pull bar The pin shaft hole of hole and top boom is aligned, and could be installed connection bearing pin, is connected pull bar and the top boom of counter-jib arm joint.
General to align pin shaft hole using two ways when installing connection bearing pin, one is to use external equipment (such as truck crane) Hanger (referring to the mark 8 in Fig. 1) on pulling pull bar lifts tie rod end pin shaft hole and top boom pin shaft hole is aligned, and two are Pull bar is lifted using the artificial mode of lifting.During using first method, the cost of use of external equipment (such as truck crane) is higher, meeting Increase cost, during using second method, personnel are easily tired, can cause security incident.Moreover, both the above method all can not Ensure the stabilization in pull bar installation process, cause pull bar easily to touch counter-jib other structures and cause damage, simultaneously for large-scale Derrick crane for, pull bar weight is bigger, and aligning for pin shaft hole is also more difficult.
Utility model content
The purpose of this utility model is that providing one kind can solve to balance installation hardly possible when arm brace row is installed in the prior art Degree is big, cost is high, bearing pin installation difficulty balance arm brace installs auxiliary body.
To achieve the above object, the utility model provides a kind of balance arm brace and installs auxiliary body, tower for aiding in The installation of crane balance arm, the counter-jib includes preceding arm joint, rear arm joint and pull bar, the lower boom and postbrachium of the preceding arm joint The front end connection of section, the top boom of the preceding arm joint is connected to realize with after by bearing pin through top boom pin shaft hole with pull bar The connection of arm joint rear end;The auxiliary body includes hydraulic jacking device and U-type groove, and the lower end of the hydraulic jacking device passes through spiral shell Bolt is fixed in the rear arm joint, and the U-type groove is located at the top of the hydraulic jacking device;The pull bar is close to preceding arm joint One end is provided with pull bar pin shaft hole, bearing pin sequentially through the pull bar pin shaft hole and top boom pin shaft hole by the pull bar with it is described on Chord member is fixed, and the other end of the pull bar is fixed by pin joint with the rear arm joint;And during normal mounting, the pull bar is placed In in the U-type groove.
During installation, first pull bar is positioned in U-type groove, by adjusting hydraulic jacking device, to adjust pull bar around pin joint Rotate, and then adjust the relative position of pull bar pin shaft hole and top boom pin shaft hole, until pull bar pin shaft hole and top boom pin shaft hole Align;After pull bar pin shaft hole and top boom pin shaft hole are aligned, in the presence of hydraulic jacking device, supported by U-type groove Firmly pull bar, bearing pin is sequentially fixed pull bar with top boom with top boom pin shaft hole through pull bar pin shaft hole.
Compared with prior art, the utility model has the advantages that:
1st, in installation process, will balance arm brace be positioned in U-type groove, can be prevented effectively from pull bar swing, prevent pull bar with Miscellaneous part collision causes to damage, and extends the service life of derrick crane and pull bar;
2nd,, can be with the height of adjusting yoke pin shaft hole, greatly by the effect of lifting of hydraulic jacking device in installation process Improve the speed that pull bar pin shaft hole and top boom pin shaft hole are aligned, improve the installation effectiveness of bearing pin;
3rd, this patent is without the use of external equipment (such as truck crane) raising rod, reduces mounting cost;It is not required to artificial support Lift pull bar, it is to avoid the generation of personal security accident;
4th, using ripe hydraulic technique, safety simple to operate, reliability is high, and maintenance is convenient.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model, wherein:
Arm joint, 7- after 1- bearing pins, 2- pull bar pin shaft holes, 3-U type grooves, 4- top boom pin shaft holes, 5- hydraulic jacking devices, 6- Preceding arm joint, 71- lower booms, 72- top booms, 8- hangers, 9- pull bars, 10- pin joints.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
1 is referred to, the present embodiment provides a kind of balance arm brace and installs auxiliary body, for aiding in tower crane balance The installation of arm, the counter-jib includes preceding arm joint 7, rear arm joint 6 and pull bar 9, lower boom 71 and the rear arm joint 6 of the preceding arm joint 7 Front end connection, the top boom 72 of the preceding arm joint 7 is connected by bearing pin 1 through top boom pin shaft hole 4 with pull bar 9 so as to realize With the connection of the rear rear end of arm joint 6.
The auxiliary body includes hydraulic jacking device 5 and U-type groove 3, and the lower end of the hydraulic jacking device 5 is solid by bolt Due in the rear arm joint 6, the U-type groove 3 is located at the top of the hydraulic jacking device 5;The pull bar 9 is close to preceding arm joint 7 One end be provided with pull bar pin shaft hole 2, bearing pin 1 is sequentially through the pull bar pin shaft hole 2 and top boom pin shaft hole 4 by the pull bar 9 Fixed with the top boom 72, the other end of the pull bar 9 is fixed by pin joint 10 with the rear arm joint 6;And normal mounting When, the pull bar 9 is positioned in the U-type groove 3.
During installation, first pull bar 9 is positioned in U-type groove 3, by adjusting hydraulic jacking device 5, to adjust pull bar 9 around hinge Contact 10 is rotated, and then adjusts the relative position of pull bar pin shaft hole 2 and top boom pin shaft hole 4, until pull bar pin shaft hole 2 is with winding up Lever pin axis hole 4 is aligned;After pull bar pin shaft hole 2 and top boom pin shaft hole 4 are aligned, in the presence of hydraulic jacking device 5, lead to Cross U-type groove 3 and support pull bar 9, bearing pin 1 is sequentially passed through to pull bar pin shaft hole 2 and top boom pin shaft hole 4 by pull bar 9 and top boom 72 fix.
To sum up, balance arm brace 9 is positioned in U-type groove 3 in installation process, can be prevented effectively from pull bar by the present embodiment Swing, prevent pull bar is collided with miscellaneous part from causing to damage, extend the service life of derrick crane and pull bar;Pass through hydraulic pressure The effect of lifting of jacking apparatus 5, can be greatly improved pull bar pin shaft hole 2 and top boom with the height of adjusting yoke pin shaft hole 2 The speed that pin shaft hole 4 is aligned, improves the installation effectiveness of bearing pin 1;Without the use of external equipment (such as truck crane) raising rod 9, Reduce mounting cost;It is not required to manually to lift pull bar 9, it is to avoid the generation of personal security accident;Using ripe hydraulic technique, Safety simple to operate, reliability is high, and maintenance is convenient.
The hanger 8 used in prior art installation process is still remained in counter-jib involved by the present embodiment, can be Auxiliary body must not be out of order the situation that oneself uses and the installation of bearing pin carried out using original technology.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (1)

1. one kind balance arm brace installs auxiliary body, the installation for aiding in balance arm of tower-type crane, the counter-jib bag Preceding arm joint (7), rear arm joint (6) and pull bar (9) are included, the lower boom (71) of the preceding arm joint (7) connects with the front end of rear arm joint (6) Connect, the top boom (72) of the preceding arm joint (7) is connected so as to real by bearing pin (1) through top boom pin shaft hole (4) with pull bar (9) Now with the connection of rear arm joint (6) rear end, it is characterised in that the auxiliary body includes hydraulic jacking device (5) and U-type groove (3), institute The lower end for stating hydraulic jacking device (5) is secured by bolts on the rear arm joint (6), and the U-type groove (3) is located at the hydraulic pressure The top of jacking apparatus (5);The pull bar (9) is provided with pull bar pin shaft hole (2) close to one end of preceding arm joint (7), and bearing pin (1) is sequentially It is through the pull bar pin shaft hole (2) and top boom pin shaft hole (4) that the pull bar (9) and the top boom (72) is fixed, it is described The other end of pull bar (9) is fixed by pin joint (10) and the rear arm joint (6);And during normal mounting, the pull bar (9) is placed In the U-type groove (3).
CN201720193564.0U 2017-03-01 2017-03-01 One kind balance arm brace installs auxiliary body Expired - Fee Related CN206553111U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720193564.0U CN206553111U (en) 2017-03-01 2017-03-01 One kind balance arm brace installs auxiliary body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720193564.0U CN206553111U (en) 2017-03-01 2017-03-01 One kind balance arm brace installs auxiliary body

Publications (1)

Publication Number Publication Date
CN206553111U true CN206553111U (en) 2017-10-13

Family

ID=60360243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720193564.0U Expired - Fee Related CN206553111U (en) 2017-03-01 2017-03-01 One kind balance arm brace installs auxiliary body

Country Status (1)

Country Link
CN (1) CN206553111U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110759233A (en) * 2019-10-31 2020-02-07 三一海洋重工有限公司 Pull rod system and shore bridge crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110759233A (en) * 2019-10-31 2020-02-07 三一海洋重工有限公司 Pull rod system and shore bridge crane

Similar Documents

Publication Publication Date Title
US10865077B2 (en) System for assembling/disassembling windmills
CN106115500B (en) A kind of high-rise building is special, and tearing formula roofing open hangs and tears open certainly method certainly
CN201272663Y (en) Telescopic arm crane and its super-lifting apparatus
CN106395645B (en) Wind-powered electricity generation arm method for turning and crane
CN202451081U (en) Automatic discharge device of racking platform drill pipe
CN101284628B (en) Hoisting method for framework of large tonnage pressing machine
CN102659015A (en) Lifting machine tool for impellers of offshore wind turbines
CN211689943U (en) Assembled pier stud template upset buffer
CN114174209A (en) Wind turbine tower with crane connection elements and crane with tower flange connection elements
WO2023221302A1 (en) Boom system for independently mounting wind turbine and large-scale construction apparatus
CN111762699A (en) Safety tower crane and implementation method thereof
CN102303821B (en) Luffing tower crane with balanced type suspension arm based on traction luffing of steel rope
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN206553111U (en) One kind balance arm brace installs auxiliary body
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN103061521A (en) Torque type mounting method for cantilever steel truss of large stadium
CN201272674Y (en) Engineering machinery working aloft and its lifting jib
CN206590793U (en) Connect arm assembly and the movable arm tower crane comprising the device in the air
CN201334770Y (en) Wall-attached supporting seat
CN111891944A (en) Integral self-lifting device for upper equipment of tower crane
CN110562850B (en) Main tower integral hoisting system and method
CN107487724B (en) Non-crane-assisted large floating crane arm support mounting device and mounting method
CN206693060U (en) A kind of hoisting device for the lifting of suspension bridge saddle bearing plate
CN202744237U (en) Introducing hook and tower crane comprising same
CN106744391A (en) One kind balance arm brace installs auxiliary body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171013

Termination date: 20180301