CN206553056U - A kind of hanging apparatus for steel structure modularization unit - Google Patents

A kind of hanging apparatus for steel structure modularization unit Download PDF

Info

Publication number
CN206553056U
CN206553056U CN201720274958.9U CN201720274958U CN206553056U CN 206553056 U CN206553056 U CN 206553056U CN 201720274958 U CN201720274958 U CN 201720274958U CN 206553056 U CN206553056 U CN 206553056U
Authority
CN
China
Prior art keywords
crossbeam
adjusting rod
steel structure
hanging apparatus
modularization unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720274958.9U
Other languages
Chinese (zh)
Inventor
张海霞
孟凡文
李帼昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201720274958.9U priority Critical patent/CN206553056U/en
Application granted granted Critical
Publication of CN206553056U publication Critical patent/CN206553056U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

A kind of hanging apparatus for steel structure modularization unit, belong to structure hoisting field of engineering technology, the hanging apparatus includes two crossbeams being parallel to each other, the longeron being parallel to each other is connected between crossbeam, longeron is mutually perpendicular to crossbeam, crossbeam and the symmetrical lifting skeleton of longeron composition, two the first adjusting rods parallel to longeron are provided between crossbeam, first adjusting rod is placed in the two ends of crossbeam length direction, the two ends of crossbeam length direction are provided with supporting plate, the second adjusting rod parallel to crossbeam is provided between two supporting plates of homonymy, first adjusting rod lifting skeleton relative with the second adjusting rod is symmetrical arranged, first adjusting rod and the second adjusting rod are all provided with regulating block, regulating block can be moved along the first adjusting rod or the second adjusting rod, four upper hangers are arranged with the top of lifting skeleton, bottom symmetrical is provided with four lower hangers.Hanging apparatus described in the utility model is simple in construction, can effectively solve eccentricity issues during steel structure modularization unit lifting of the center of gravity not at geometric center.

Description

A kind of hanging apparatus for steel structure modularization unit
Technical field
The utility model belongs to structure hoisting field of engineering technology, more particularly to a kind of to be used for steel structure modularization unit Hanging apparatus.
Background technology
In the hoisting process of steel structure modularization unit, because of the requirement of mounting process, it usually needs make steel structure module Change unit lifting after is spatially in horizontal level, prevent steel structure modularization unit lift by crane when run-off the straight in the air and Situations such as being rotated around suspension hook, and the gravity of suspension hook pulling force and steel structure modularization unit also needs to meet balance between two forces. For the steel structure modularization unit of regular geometry, its position of centre of gravity is overlapped with symmetrical centre, therefore in symmetrical The hoist cable of equal length is arranged at heart position, you can steel structure modularization unit is horizontal after lifting by crane.For center of gravity not For steel structure modularization unit at geometric center, the problem of usually occurring bias in lifting is generally hung using examination Method estimates the position of center of gravity.But use examination is hung during method, steel structure modularization unit can be surrounded after ground is hung and hung Hook is rotated, and can run-off the straight.In order that the steel structure modularization unit after lifting is returned to and generally adopted in horizontal level, engineering With the method for adjustment sling length, but this method can make the internal force skewness of hoist cable, can not only increase extra amount of calculation, And the probability of accident generation can be increased.Accordingly, it would be desirable to which a kind of new device solves the above problems.
Utility model content
The problem of existing for prior art, the utility model provides a kind of lifting for steel structure modularization unit and filled Put, the hanging apparatus is simple in construction, highly versatile, can effectively solve steel structure modularization unit of the center of gravity not at geometric center Eccentricity issues during lifting.
To achieve these goals, the utility model is adopted the following technical scheme that:
A kind of hanging apparatus for steel structure modularization unit, including two crossbeams being parallel to each other, the crossbeam it Between be fixedly connected with the longeron being parallel to each other, the longeron is mutually perpendicular to crossbeam, and crossbeam is collectively constituted with longeron and symmetrically hung Fill and be fixed with two the first adjusting rods parallel to longeron between skeleton, the crossbeam, first adjusting rod is respectively placed in horizontal stroke The two ends in beam length direction, the two ends of the crossbeam length direction are respectively and fixedly provided with supporting plate, and it is remote that the supporting plate is located at crossbeam The outside of skeleton is lifted, the second adjusting rod parallel to crossbeam is fixed between two supporting plates of crossbeam homonymy, it is described First adjusting rod lifting skeleton relative with the second adjusting rod is symmetrical arranged, and first adjusting rod on the second adjusting rod with being all provided with Regulating block is equipped with, the regulating block can be moved along the length direction of the first adjusting rod or the second adjusting rod, the lifting skeleton Top is symmetrically arranged with four upper hangers, and the bottom symmetrical of lifting skeleton is provided with four lower hangers.
Some support beams are provided between the crossbeam, the relative lifting skeleton of the support beam is symmetrical.
The support beam uses the form of cross support, the support of K shapes or cross support and K shape support combinations.
First adjusting rod and the second adjusting rod are external thread rod, and the regulating block is provided with what is coordinated with external thread rod Internal thread hole.
Two regulating blocks are provided with each first adjusting rod and the second adjusting rod.
The bottom symmetrical of the lifting skeleton sets up multiple lower hangers.
The crossbeam uses H profile steel with longeron.
The beneficial effects of the utility model:
The utility model has supplied a kind of hanging apparatus for steel structure modularization unit, and the hanging apparatus is simple in construction, Highly versatile, and it is easy to processing and manufacturing, production cost is low.In steel structure modularization unit of the lifting center of gravity not at geometric center When, only need to be by adjusting the regulating block position on the first adjusting rod or the second adjusting rod, you can adjust steel structure modularization unit The horizontal level for meeting mounting process requirement is saved, solves in hoisting process and tilts or rotates problem caused by bias, fast Efficiently.
Brief description of the drawings
Fig. 1 is the front view for the hanging apparatus that the utility model is used for steel structure modularization unit;
Fig. 2 is Fig. 1 top view;
Fig. 3 is Fig. 1 left view;
In figure:1- crossbeams, 2- longerons, 3- lifting skeletons, the adjusting rods of 4- first, 5- supporting plates, the adjusting rods of 6- second, 7- is adjusted Hanger, 10- support beams under locking nub, the upper hangers of 8-, 9-.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
As shown in Figure 1 to Figure 3, a kind of hanging apparatus for steel structure modularization unit, belongs to structure hoisting engineering skill Art field, for when lifting steel structure modularization unit of the center of gravity not at geometric center, steel structure modularization unit to be adjusted It is whole to the horizontal level for meeting mounting process requirement.
The hanging apparatus that the utility model is used for steel structure modularization unit includes two crossbeams 1 being parallel to each other, crossbeam 1 Between be fixedly connected with the longeron 2 being parallel to each other, longeron 2 is mutually perpendicular to crossbeam 1, and crossbeam 1 and longeron 2 are collectively constituted symmetrically Skeleton 3 is lifted, lifting skeleton 3 is the stress main body of whole hanging apparatus.In the present embodiment, crossbeam 1 uses H with longeron 2 Shaped steel, can make hanging apparatus reduce cost while intensity requirement is met.Some support beams 10 are provided between crossbeam 1, are propped up The relative lifting skeleton 3 of support beam 10 is symmetrical, and support beam 10 can strengthen the rigidity of lifting skeleton 3, prevent from hanging in lifting operation Fill skeleton 3 and produce local deformation.In the present embodiment, support beam 10 uses cross support form, in other embodiments, support Beam 10 can also be supported or cross support and the form of K shape support combinations using K shapes.
Two the first adjusting rods 4 parallel to longeron 2 are fixed between crossbeam 1, the first adjusting rod 4 is respectively placed in crossbeam 1 The two ends of length direction, to cause adjustment process more to facilitate, while also allowing for construction and installation.The two ends of the length direction of crossbeam 1 Supporting plate 5 is respectively and fixedly provided with, supporting plate 5 is located at outside of the crossbeam 1 away from lifting skeleton 3, to cause adjustment process more to facilitate, together When also allow for construction and installation, the second adjusting rod parallel to crossbeam 1 is fixed between two supporting plates 5 of the homonymy of crossbeam 1 6.In the present embodiment, the first adjusting rod 4 lifting skeleton 3 relative with the second adjusting rod 6 is symmetrical arranged, so that whole lifting dress The center of gravity put coincides with its geometric center.Regulating block 7, regulating block 7 are provided with first adjusting rod 4 and the second adjusting rod 6 It can be moved along the length direction of the first adjusting rod 4 or the second adjusting rod 6, to adjust steel structure modularization unit extremely in lifting Horizontal level.In the present embodiment, the first adjusting rod 4 and the second adjusting rod 6 are external thread rod, and regulating block 7 is provided with and outer spiral shell Rasp bar coordinate internal thread hole, connected using screw thread pair, can make regulating block 7 move into place after holding position it is constant, prevent adjust Locking nub 7 is shifted in hoisting process, and it also avoid thus caused steel structure modularization unit need to be again adjusted to level The generation of situation.Two regulating blocks 7 are provided with each adjusting rod 6 of first adjusting rod 4 and second, so that regulation process It is more convenient and efficient, in other embodiments, also can be according to actual conditions, in each adjusting rod 6 of first adjusting rod 4 and second On be respectively provided with one or more regulating blocks 7.
The top of lifting skeleton 3 is symmetrically arranged with four upper hangers 8, and upper hanger 8 can pass through steel wire rope and the suspension hook of lifting It is connected.The bottom symmetrical of lifting skeleton 3 is provided with four lower hangers 9, and lower hanger 9 can pass through steel wire rope and steel structure modularization list Member is connected.In other embodiments, multiple lower hangers 9 can be set up in the bottom symmetrical of lifting skeleton 3, it is various sizes of to adapt to The lifting of steel structure modularization unit, reaches optimal lifting using effect.
Illustrate first use process of the present utility model below in conjunction with the accompanying drawings.
As shown in Figure 1 to Figure 3, before lifting operation is carried out using this hanging apparatus, need first to be placed in hanging apparatus initially Regulating block 7, i.e., be separately adjusted to angularly the two ends of the first adjusting rod 4 and the second adjusting rod 6 by equilbrium position, makes its relative lifting skeleton 3 is symmetrical.
Center of gravity is located at the hoisting process of the steel structure modularization unit at geometric center:
Equal length steel wire rope through upper hanger 8 is connected to the suspension hook of lifting, suspension hook is located in hanging apparatus geometry The surface of the heart, and ensure that hanging apparatus is horizontal.One end of four sections of equal length steel wire ropes is respectively connecting to four Lower hanger 9, the other end is respectively connecting to symmetrically arranged four Hoisting Positions at the top of steel structure modularization unit to be lifted.It Afterwards, directly lift by crane, you can steel structure modularization unit is in the horizontal level for meeting mounting process requirement.
The hoisting process of steel structure modularization unit of the center of gravity not at geometric center;
Equal length steel wire rope through upper hanger 8 is connected to the suspension hook of lifting, suspension hook is located in hanging apparatus geometry The surface of the heart, and ensure that hanging apparatus is horizontal.One end of four sections of equal length steel wire ropes is respectively connecting to four Lower hanger 9, the other end is respectively connecting to symmetrically arranged four Hoisting Positions at the top of steel structure modularization unit to be lifted.Start Examination is hung, during examination is hung, because center of gravity is not at the geometric center of steel structure modularization unit, steel structure modularization unit meeting Run-off the straight.Now, according to actual conditions, by the regulating block 7 on the first adjusting rod 4 or the second adjusting rod 6 to steel structure module Change the higher side of unit and be adjusted movement, until steel structure modularization unit is in the horizontal position for meeting mounting process requirement It is set to only.Afterwards, directly lift by crane.
Above example is only unrestricted to illustrate the technical solution of the utility model, although with reference to preferred embodiment pair The utility model is described in detail, it will be appreciated by those skilled in the art that can enter to the technical solution of the utility model Row modification or equivalent substitution, without departing from the objective and scope of the technical program, it all should cover in power of the present utility model In sharp claimed range.

Claims (7)

1. a kind of hanging apparatus for steel structure modularization unit, it is characterised in that including:Two crossbeams for being parallel to each other, The longeron being parallel to each other is fixedly connected between the crossbeam, the longeron is mutually perpendicular to crossbeam, crossbeam and common group of longeron Into symmetrical lifting skeleton, two the first adjusting rods parallel to longeron, first adjusting rod are fixed between the crossbeam The two ends of crossbeam length direction are respectively placed in, the two ends of the crossbeam length direction are respectively and fixedly provided with supporting plate, the supporting plate position In outside of the crossbeam away from lifting skeleton, it is fixed with and is adjusted parallel to the second of crossbeam between two supporting plates of crossbeam homonymy Pole, first adjusting rod lifting skeleton relative with the second adjusting rod is symmetrical arranged, and first adjusting rod and second is adjusted Regulating block is provided with pole, the regulating block can be moved along the length direction of the first adjusting rod or the second adjusting rod, described Four upper hangers are symmetrically arranged with the top of lifting skeleton, the bottom symmetrical of lifting skeleton is provided with four lower hangers.
2. the hanging apparatus according to claim 1 for steel structure modularization unit, it is characterised in that:The crossbeam it Between be provided with some support beams, the relative lifting skeleton of the support beam is symmetrical.
3. the hanging apparatus according to claim 2 for steel structure modularization unit, it is characterised in that:The support beam Using the form of cross support, the support of K shapes or cross support and K shape support combinations.
4. the hanging apparatus according to claim 1 for steel structure modularization unit, it is characterised in that:Described first adjusts Pole and the second adjusting rod are external thread rod, and the regulating block is provided with the internal thread hole coordinated with external thread rod.
5. the hanging apparatus according to claim 1 for steel structure modularization unit, it is characterised in that:Each described the Two regulating blocks are provided with one adjusting rod and the second adjusting rod.
6. the hanging apparatus according to claim 1 for steel structure modularization unit, it is characterised in that:The lifting bone The bottom symmetrical of frame sets up multiple lower hangers.
7. the hanging apparatus according to claim 1 for steel structure modularization unit, it is characterised in that:The crossbeam with Longeron uses H profile steel.
CN201720274958.9U 2017-03-21 2017-03-21 A kind of hanging apparatus for steel structure modularization unit Withdrawn - After Issue CN206553056U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720274958.9U CN206553056U (en) 2017-03-21 2017-03-21 A kind of hanging apparatus for steel structure modularization unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720274958.9U CN206553056U (en) 2017-03-21 2017-03-21 A kind of hanging apparatus for steel structure modularization unit

Publications (1)

Publication Number Publication Date
CN206553056U true CN206553056U (en) 2017-10-13

Family

ID=60365269

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720274958.9U Withdrawn - After Issue CN206553056U (en) 2017-03-21 2017-03-21 A kind of hanging apparatus for steel structure modularization unit

Country Status (1)

Country Link
CN (1) CN206553056U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106744251A (en) * 2017-03-21 2017-05-31 沈阳建筑大学 A kind of hanging apparatus for steel structure modularization unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106744251A (en) * 2017-03-21 2017-05-31 沈阳建筑大学 A kind of hanging apparatus for steel structure modularization unit

Similar Documents

Publication Publication Date Title
CN107338733A (en) A kind of hanging apparatus and hanging method for adjusting and positioning for steel box arch rib aerial statue
CN207244465U (en) A kind of hanging apparatus for adjusting and positioning for steel box arch rib aerial statue
CN201620358U (en) Gantry crane for down-type bridge-erecting machine
CN207986489U (en) Hang regulating device in large diameter pile foundation steel reinforcement cage aperture
CN106744251A (en) A kind of hanging apparatus for steel structure modularization unit
CN204454226U (en) A kind of welded suspension centre adjustable and balancing beam of I-shaped steel
CN207030720U (en) A kind of reactor lifting device
CN102303821B (en) Luffing tower crane with balanced type suspension arm based on traction luffing of steel rope
CN206553056U (en) A kind of hanging apparatus for steel structure modularization unit
CN203144459U (en) Tool hanger for quenching slender shaft workpiece
CN210763880U (en) A driving hoist device for steam turbine rotor lifts by crane
CN204980821U (en) Pressure -bearing formula lifting device and pressure -bearing formula compensating beam
CN203112332U (en) Eccentric lifting device for dome
CN203159036U (en) Line-shaped lifting appliance
CN206940257U (en) Novel mechanical equipment hoisting frame
CN205838328U (en) A kind of reel lifting tool
CN204689351U (en) A kind of H profile steel structural elements suspender
CN209817390U (en) Hanging basket system for inward-inclined wall construction
CN106410671B (en) A kind of device for aiding in changing tube type bus support porcelain vase
CN207259107U (en) A kind of lifting gear for working at height
CN103397772B (en) Hanging basket counterweight supporting structure
CN203319508U (en) Hoisting auxiliary element for large thin-wall steel containment vessel
CN206278835U (en) A kind of detachable adjustable hoisting balance beam
CN208500108U (en) A kind of balance hanging beam
CN112125171A (en) Coal economizer hoisting device and hoisting method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20171013

Effective date of abandoning: 20181019

AV01 Patent right actively abandoned