CN206545244U - Flushing toiler - Google Patents
Flushing toiler Download PDFInfo
- Publication number
- CN206545244U CN206545244U CN201720060137.5U CN201720060137U CN206545244U CN 206545244 U CN206545244 U CN 206545244U CN 201720060137 U CN201720060137 U CN 201720060137U CN 206545244 U CN206545244 U CN 206545244U
- Authority
- CN
- China
- Prior art keywords
- water
- processing module
- injecting pipeline
- oral siphon
- bearing groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Brushes (AREA)
Abstract
A kind of flushing toiler, includes body, oral siphon road, flushing pipe, water injecting pipeline, processing module, automatically controlled valve member, generator unit and charge storage unit.The two ends on oral siphon road are connected with water source and automatically controlled valve member respectively, and the two ends of flushing pipe and water injecting pipeline are connected with bearing groove and automatically controlled valve member respectively.Generator unit is arranged at water injecting pipeline, and electric energy can be produced when source water is by water injecting pipeline, to deposit to charge storage unit, and can provide the electric energy needed for related accessory.Processing module can control automatically controlled valve member, optionally to make oral siphon road be connected with flushing pipe, water injecting pipeline., can be during flushing toiler be washed by water by the setting of generator unit and charge storage unit, using the flowing of current, correspondence produce electric power, whereby can as correlation automatically or semi-automatically equipment power source.
Description
Technical field
The utility model is related to a kind of flushing toiler, more particularly to a kind of can be corresponded in using process produces electric energy
Flushing toiler.
Background technology
In recent years, in response to the demand of various different users, the manufacturer of each flushing toiler releases different kenels respectively
The flush toilet apparatus automatically or semi-automatically of small power consumption, for example:Automatic sensing bath accessory etc..So, multiple accessories
It is to need to be plugged in socket to obtain electric power by electric wire mostly.In this way, causing the inconvenience of user, for example closestool sets position
Power outlet is not provided with around putting, electric wire is easy to be moist and occurs the problem of electric shock or damage.
Utility model content
Main purpose of the present utility model is to provide a kind of flushing toiler, to solve in known techniques, small power consumption
Flushing toiler accessory automatically or semi-automatically need to obtain the problem of power source, corresponding generation by electric wire.
To achieve these goals, the utility model provides a kind of flushing toiler, and it is included:One body, one enter water assembly
And a control assembly.Body has a bearing groove and a passing away, and bearing groove is recessed by the side of body, passing away
It is connected with bearing groove, and the thing to be arranged in bearing groove can be discharged by passing away.Enter water assembly to be arranged at
Body, enters water assembly and includes:One oral siphon road, a flushing pipe and a water injecting pipeline.Oral siphon road with a water source to be connected
It is logical.The two ends of flushing pipe are connected with oral siphon road and bearing groove respectively, and one end that flushing pipe is connected with bearing groove is determined
Justice is a water jet, and the opening that water jet is adjacent to passing away is set, and the liquid discharged by water jet can make bearing groove
In thing to be arranged moved into passing away.The two ends of water injecting pipeline are connected with oral siphon road and bearing groove respectively, water injection pipe
One end that road is connected with bearing groove is defined as a water injection end, and water injection end is set away from water jet, and water injection end is adjacent to carrying
Groove is set in the opening that body is formed.Control assembly is included:One processing module, an automatically controlled valve member, a generator unit and a storage
Electric unit.Automatically controlled valve member electrically connected processing module, automatically controlled valve member can be processed module control and optionally make oral siphon road
Interior liquid, flows at least one of water injecting pipeline, flushing pipe.Generator unit is arranged at water injecting pipeline, and generator unit can be in
Electric energy is produced when liquid in oral siphon road is by water injecting pipeline.Charge storage unit is electrically connected with generator unit, and charge storage unit is used to
Store the electric energy produced by generator unit.
Preferably, control assembly also includes a sensing unit, and sensing unit is arranged at body, when an object proximity sheet
Body, and when being adjacent to sensing unit, sensing unit can correspond to and produce an induced signal;Sensing unit electrically connected processing module,
Processing module receive induced signal, can correspond to control automatically controlled valve member so that oral siphon road sequentially with water injecting pipeline, flushing pipe and
Water injecting pipeline is connected.
Preferably, processing module persistently receives induced signal between one first scheduled time and one second scheduled time,
Processing module then corresponds to the automatically controlled valve member of control, so that flushing pipe injection one first water of discharge;Processing module persistently receives sense
Induction signal is more than second scheduled time, and processing module then controls automatically controlled valve member, so that flushing pipe injection one second water of discharge;
Wherein, the second water is more than the first water.
Preferably, processing module is in receiving induced signal in first scheduled time, and processing module controls automatically controlled valve member, so that
Oral siphon Lu Buyu water injecting pipelines and flushing pipe are connected.
Preferably, the time length that sensing unit can be according to object proximity body, correspondence produces different induced signals, and
Processing module can be according to different induced signals, the automatically controlled valve member of correspondence control so that oral siphon road sequentially with water injecting pipeline, bath
Pipeline and water injecting pipeline are connected, and make the liquid of flushing pipe discharge different flow.
Preferably, processing module can be when the electric energy stored by charge storage unit be less than an electric energy default value, correspondence control electricity
Valve member is controlled, so that oral siphon road is connected with water injecting pipeline, and the liquid in oral siphon road is passed through water injecting pipeline, Jin Errang
Generator unit correspondence produces electric energy, to carry out charging operation to charge storage unit.
Preferably, processing module controls automatically controlled valve member so that oral siphon road sequentially with water injecting pipeline, flushing pipe and water filling
Pipeline is connected, so make in bearing groove wait arrange thing discharged by passing away when, the water that water injecting pipeline is discharged is defined as
One first water yield;Processing module is when the electric energy stored by charge storage unit is less than electric energy default value, control oral siphon road and note
Water lines are connected, and the water for being discharged water injecting pipeline, are defined as one second water yield;Wherein, the first water yield is more than
Second water yield.
Preferably, control assembly also includes a water level sensing unit, its electrically connected processing module, the water in bearing groove
When position height reaches a predetermined altitude, correspondence is produced a water level signal by water level sensing unit, and processing module receives water level signal,
The automatically controlled valve member of control is then corresponded to, so that oral siphon Lu Buyu water injecting pipelines and flushing pipe are connected.
Preferably, water level sensing unit is arranged at the position in bearing groove, is oppositely arranged with a bending section of discharge channel,
Bending section is adjacent to bearing groove and set in the opening that body is formed.
Preferably, processing module controls automatically controlled valve member, and make oral siphon road sequentially with water injecting pipeline, flushing pipe and water filling
When pipeline is connected, the water pressure of water injecting pipeline discharge is less than the water pressure that flushing pipe is discharged.
The beneficial effects of the utility model can be:, can be in bath by the setting of generator unit and charge storage unit
During closet flushing, using the flowing of current, correspondence produces electric power, and related automatically or semi-automatically equipment can be used as whereby
Power source, so as to make related automatically or semi-automatically equipment (such as related inductive component of induction flushing, automatic lid-opening
Associated component etc.), without setting power line, the problem that can solving to set power line in addition according to this in addition.
Brief description of the drawings
Fig. 1 is the schematic diagram of flushing toiler of the present utility model.
Fig. 2 is the diagrammatic cross-section of flushing toiler of the present utility model.
Fig. 3 is the schematic diagram of oral siphon road, control assembly and the water injecting pipeline of flushing toiler of the present utility model.
Fig. 4 is the block schematic diagram of the control assembly of flushing toiler of the present utility model.
Embodiment
Also referring to Fig. 1 and Fig. 2, it is the solid and sectional view of flushing toiler of the present utility model.As illustrated, punching
Water closestool 1 is included:One body 10, one enters the control assembly 30 (as shown in Figure 3) of water assembly 20 and one;Enter water assembly 20 and be arranged at this
Body 10, to connect water source, control assembly 30 is connected with entering water assembly 20, to control into water assembly 20, and made into water group
Part 20 optionally carries out bath operation to body 10.
Furthermore, it is understood that body 10 has a bearing groove 101 and a passing away 102, bearing groove 101 is by body 10
Side is recessed, and one end of passing away 102 is connected with bearing groove 101, and the other end of passing away 102 can be then logical
Pipeline passing away (such as soil pipe) related to outside is crossed to be connected.Wherein, the external form of bearing groove 101 and passing away 102
It can be changed according to demand, not to be limited shown in scheming;It is preferred that passing away 102 be connected with bearing groove 101 one
End, can be the extreme lower position setting that correspondence is adjacent to bearing groove 101, whereby when carrying out bath operation, positioned at bearing groove 101
In thing to be arranged easily can be discharged by passing away 102.
Enter water assembly 20 and include an oral siphon road 21, a water injecting pipeline 22 and a flushing pipe 23.Use on oral siphon road 21
To be connected with external water source, the one end of one end of water injecting pipeline 22 and flushing pipe 23 respectively with oral siphon road 21 is connected,
And the source water entered by oral siphon road 21, then it can enter water injecting pipeline 22 and flushing pipe 23 according to this.Water injecting pipeline 22 and punching
Water lines 23 are then connected in contrast to the one end being connected with oral siphon road 21 with bearing groove 101, and are drawn by oral siphon road 21
The source water entered, can be entered in bearing groove 101 by the guiding of water injecting pipeline 22 and flushing pipe 23, according to this to bearing groove
101 surface carries out washing and cleaning operation and carries out bath operation to the thing (not shown) to be arranged in bearing groove 101, and to bearing groove
101 carry out moisturizing operation.Wherein, the oral siphon road 21, water injecting pipeline 22 and flushing pipe 23 for example can be water pipe or
It can be the passage that part is one of the forming in body 10, be not any limitation as in this.As shown in figure 3, in preferably applying,
It can include a distribution pipeline 21 ' (water pipe for being e.g. rendered as F type outward appearances) to enter water assembly 20, its include three that
This interconnected interface, and multiple interfaces are connected with oral siphon road 21, water injecting pipeline 22 and flushing pipe 23 respectively.
In actual applications, the opening of one end that the flushing pipe 23 is connected with bearing groove 101, is defined as a water spray
Mouth 231, the water jet 231 can be that the lowest part for being adjacent to bearing groove 101 is set, and the water jet 231 can be corresponding surface
The opening 102a being connected to passing away 102 with bearing groove 101 is set, whereby, the water source ejected by water jet 231
Water, can effectively make the thing to be arranged in bearing groove 101, be discharged along passing away 102.
Water injecting pipeline 22 is defined as a water injection end (figure is not indicated) with one end that bearing groove 101 is connected, and it, which is adjacent to, holds
Groove 101 is carried to set at the opening 10a that body 10 is formed;Water injecting pipeline 22 is to guide the water entered by oral siphon road 21
Source water, into bearing groove 101, is rinsed operation, and the water that water injecting pipeline 22 is guided to the surface of bearing groove 101 whereby
Source water can be also stored in bearing groove 101.Wherein, the water injecting pipeline 22 is to be cleaned and right to bearing groove 101
Bearing groove 101 carries out moisturizing, and therefore, hydraulic pressure, flow, the flow velocity of water injecting pipeline 22 are smaller than flushing pipe 23.Preferably should
In, it can have a guide channel 104 that body 10, which is adjacent at opening 10a, and the water injection end of water injecting pipeline 22 can be
It is adjacent to guide channel 104 to set, the source water discharged by water injection end whereby, by can be by the guiding of guide channel 104, and goes back
Operation comprehensively is rinsed to the surface of bearing groove 101.
Also referring to Fig. 2 to Fig. 4, control assembly 30 includes a processing module 31, two automatically controlled valve members 32,32 ', one
The charge storage unit 34 of generator unit 33 and one, processing module 31 is electrically connected with automatically controlled valve member 32, generator unit 33 and charge storage unit 34,
And the automatically controlled valve member 32 of control, generator unit 33 and charge storage unit 34 can be corresponded to according to this.In specific application, body 10 can be
With multiple storage tanks 103 not being connected with bearing groove 101, and entering water assembly 20 and control assembly 30 can then be correspondingly arranged
In multiple storage tanks 103.
Two automatically controlled valve members 32,32 ' are respectively arranged at water injecting pipeline 22 and flushing pipe 23, and each automatically controlled valve member 32
(32 ') can be separately processed module 31 and control, and optionally make oral siphon road 21 and water injecting pipeline 22, flushing pipe 23 its
In at least one be interconnected;That is, processing module 31 can optionally control two automatically controlled valve members 32,32 ', so that oral siphon
Road 21 is connected with water injecting pipeline 22, and oral siphon road 21 is not connected with flushing pipe 23, or allow oral siphon road 21 with
Flushing pipe 23 is connected, and oral siphon road 21 is not connected with flushing pipe 23, or be allow oral siphon road 21 simultaneously with
Water injecting pipeline 22 and flushing pipe 23 are connected.Certainly, in other applications, control assembly 30 can only include single
Individual automatically controlled valve member 32, and the position that oral siphon road 21, water injecting pipeline 22 and flushing pipe 23 are interconnected with one another is correspondingly arranged in,
It is not limited with two automatically controlled valve members 32 shown in scheming.
Generator unit 33 is arranged at a certain section of water injecting pipeline 22, and generator unit 33 can be in oral siphon road 21 and water injection pipe
Road 22 is connected, and the source water in oral siphon road 21 by water injecting pipeline 22 when, correspondence produce electric energy.The generator unit 33
It can be any component that can be flowed and be generated electricity by liquid, be not any limitation as in this.
Special instruction, flushing toiler 1 of the present utility model is that generator unit 33 is arranged at into water injecting pipeline 22, due to
Flow, hydraulic pressure and the flow velocity that liquid flows in water injecting pipeline 22 are all small relative to flushing pipe 23 or oral siphon road 21, therefore, hair
The problem of electric unit 33 will be difficult to damage because of hydraulic pressure, quick current or relatively great amount of flow of fluid.Change sentence
Talk about, the generator unit 33 is disposed on hydraulic pressure, water-carrying capacity and the relatively low water injecting pipeline 22 of water flow velocity (rather than oral siphon
Road 21 or flushing pipe 23), in this way, can will effectively extend the service life of generator unit 33.In actual applications, if will hair
Electric unit 33 is arranged at oral siphon road 21 or flushing pipe 23, and generator unit 33 will reduce (or the punching of script oral siphon road 21
Water lines 23) hydraulic pressure and flow, therefore, in order to maintain default hydraulic pressure and flow originally, it is necessary to which correspondence improves oral siphon road
The hydraulic pressure and flow of 21 (or flushing pipes 23), in this way, oral siphon road 21 (or flushing pipe 23) will be caused easily to occur water hammer
Effect (Water Hammer), so as to be easily caused breaking-up (such as leak, the component pine of oral siphon road 21 (or flushing pipe 23)
Move), and then the service life of overall flushing toiler 1 is shortened.Relatively, if generator unit 33 is arranged at into oral siphon
Road 21 or flushing pipe 23, the hydraulic pressure and flow of water lines 21 or flushing pipe 23 are lifted into without correspondence, then will hold and send out
The problem of occurring the thing to be arranged in bearing groove 101 effectively can not be removed into clean;Therefore flushing toiler 1 of the present utility model will
Generator unit 33 is arranged at water injecting pipeline 22, and the service life of generator unit 33 will effectively be extended, and overall flushing toiler 1
Service life will also be extended.
When user presses related flush button (such as the touch switch S shown in Fig. 1) or related inductive component sensing use
When body 10 is left at family, processing module 31 will correspondence control two automatically controlled valve members 32,32 ' so that oral siphon road 21 sequentially with note
Water lines 22, flushing pipe 23 and water injecting pipeline 22 are connected, so as to sequentially carry out the surface clean of bearing groove 101 to body 10
Operation, the bath operation of thing to be arranged and to bearing groove 101 carry out moisturizing operation.Certainly, in other applications, processing module 31
Can also, by automatically controlled valve member 32,32 ', first make oral siphon road 21 while being connected with water injecting pipeline 22 and flushing pipe 23,
With simultaneously carry out bearing groove 101 surface clean operation and thing to be arranged bath operation, and post-processing module 31 control again it is automatically controlled
Valve member 32 makes oral siphon road 21 only be connected with water injecting pipeline 22, to carry out the moisturizing operation of bearing groove 101.Wherein, generate electricity single
Member 33 passes through the guiding of water injecting pipeline 22 in source water, and carries out washing and cleaning operation and to bearing groove 101 to the surface of bearing groove 101
When carrying out moisturizing operation, it can all correspond to and produce electric energy, therefore, the electric energy produced by generator unit 33 can effectively drive correlation
Component automatically or semi-automatically.
The electrically connected processing module 31 of charge storage unit 34 and generator unit 33, and charge storage unit 34 can store generating list according to this
Electric energy produced by member 33, whereby, charge storage unit 34 can provide the electric energy of related component automatically or semi-automatically, and related automatic
Or automanual component, then without being connected additionally by electric wire with external power source, so as to avoid the electric wire institute additionally set
The problem of causing.In other words, flushing toiler 1 of the present utility model, can by the setting of generator unit 33 and charge storage unit 34
When flushing toiler 1 carries out bath operation, produce electric energy and store electric energy according to this, the correlation of flushing toiler 1 is arranged at whereby certainly
Dynamic or automanual component can directly utilize the electric energy of charge storage unit 34, set electric wire in addition without extra, can have according to this
Effect solves related component automatically or semi-automatically, the problem of correspondence is produced because setting electric wire.
It is noted that processing module 31 is electrically connected with charge storage unit 34, and processing module 31 can be in charge storage unit 34
Electric energy when being less than an electric energy default value 311, the automatically controlled valve member 32 of correspondence control, so that oral siphon road 21 is connected with water injecting pipeline 22
It is logical, so that the source water in oral siphon road 21 can enter water injecting pipeline 22, and then generator unit 33 is produced electric energy, with to storage
Electric unit 34 carries out charging operation.In actual applications, because water injecting pipeline 22 is to clean the surface of bearing groove 101 and right
Bearing groove 101 carries out moisturizing operation, and therefore, processing module 31 controls automatically controlled valve member 32, so that oral siphon road 21 and water injecting pipeline
22 are connected, so that when generator unit 33 carries out charging operation to charge storage unit 34, the too big sound will not be produced, without
User can be frightened.On the contrary, generator unit 33 such as is arranged at into flushing pipe 23, processing module 31 is automatic to charge storage unit
34 when carrying out charging operation, and sound when bath operation is carried out due to flushing pipe 23 is relatively large, thus easily scaring to making
User.In addition, special instruction, the bacterium in the state of long-time is not washed by water of bearing groove 101 easily grows, and bearing groove
The water seal water reserved in 101 can tail off because of natural evaporation, and then cause the effect (such as deodorization, insect prevention) of water seal not good, because
This, can be when the electric energy of charge storage unit 34 be less than electric energy default value 311 by processing module 31, and control associated components carry out moisturizing
The mode of operation, can be effectively reduced the bacteria breed of bearing groove 101, and can effectively keep the water level of water seal water high simultaneously
Degree, and keep the effect of water seal.
The one of value is mentioned that processing module 31 controls automatically controlled valve member 32,32 ' so that oral siphon road 21 sequentially with water injection pipe
Road 22, flushing pipe 23 and water injecting pipeline 22 are connected, and then the thing to be arranged in bearing groove 101 is discharged by passing away 102
When, the water that water injecting pipeline 22 is discharged is defined as one first water yield;Processing module 31 is in the electricity stored by charge storage unit 34
When can be less than electric energy default value 311, control oral siphon road 21 is connected with water injecting pipeline 22, and makes what water injecting pipeline 22 was discharged
Water, is defined as one second water yield.In preferably applying, the second water yield is less than the first water yield, whereby, can be effective
The sound that is sent when ground reduction water injecting pipeline 22 is run, and can be effectively saved and use water.
In actual applications, processing module 31 controls automatically controlled valve member 32, so that the source water on oral siphon road 21 passes through water filling
Pipeline 22 enters bearing groove 101 to carry out during moisturizing operation, and processing module 31 can be the automatically controlled valve member 32 of control in the scheduled time
In (such as 5 seconds), oral siphon road 21 and the connection of water injecting pipeline 22 are opened, so that the source water pair discharged by water injecting pipeline 22
The surface of bearing groove 101 carries out washing and cleaning operation, or the water in bearing groove 101 is complemented into ad-hoc location.
In not bad implementation aspect, body 10 can be provided with a water level sensing unit 35, its electrically connected processing
Module 31;When the height of water level in bearing groove 101 reaches a predetermined altitude, correspondence is produced a water level by water level sensing unit 35
Signal 351, processing module 31 is received after water level signal 351, then corresponds to the automatically controlled valve member 32 of control so that oral siphon road 21 not with note
Water lines 22 and flushing pipe 23 are connected, whereby, also can reach the effect for making the water in bearing groove 101 complement to ad-hoc location
Really.It is preferred that water level sensing unit 35 can set that (that is, water level sensing is single relative to the bending section 1021 of passing away 102
Member 35 is to be arranged substantially in identical height relative to the bottom of body 10 with bending section 1021), the row of water injecting pipeline 22 is avoided according to this
Go out excessive water, and directly discharged by passing away 102.Wherein, the bending section 1021 is to be adjacent to bearing groove 101 in this
The corresponding opening 10a formed of body 10 is set, and by the design of bending section 1021, passing away 102 can be made to have the effect of water seal
Really.
In preferably applying, control assembly 30 can also include a sensing unit 36, its electrically connected processing module
31 and charge storage unit 34, sensing unit 36 is arranged at body 10;The sensing unit 36, for example, can be condenser type proximity switch
(Proximity Switch), photoinduction unit (such as infrared induction), it is not any limitation as in this;And body 10 sets position
Putting then can be according to the different species of sensing unit 36, and is correspondingly arranged in the diverse location of body 10, for example, condenser type is near
The leading edge of body 10 can be disposed on (i.e. user squats when body 10, body 10 and the immediate position of user by connecing switch
Put).
When an object (not shown, such as user) is close to body 10, and when being adjacent to sensing unit 36, sensing unit 36
It can correspond to and produce an induced signal 361.Processing module 31 receive induced signal 361 after, can correspond to control automatically controlled valve member 32,
32 ', so that oral siphon road 21 is sequentially connected with water injecting pipeline 22, flushing pipe 23 and water injecting pipeline 22;In other words, pass through
The setting of sensing unit 36, after user has used flushing toiler 1, by the sensing of sensing unit 36, processing module 31 will
Automatically controlled valve member 32,32 ' is automatically controlled, so that water injecting pipeline 22, flushing pipe 23 correspondence discharge source water, and reach auto-flushing
Effect.
In preferably applying, sensing unit 36 and processing module 31 can be that the use state different according to user is (big
Cause can be divided into three kinds of states:Flushing toiler, short time are not used by flushing toiler 1 to be made using flushing toiler 1 and for a long time
With flushing toiler), and correspondence changes oral siphon road 21 and the connection of water injecting pipeline 22 and flushing pipe 23, and flushing pipe 23
Water yield, the effect of water-saving can be effectively reached whereby.
For example, sensing unit 36 can be continued for sensing operation, and sense object proximity body 10
When constantly produce induced signal 361;When processing module 31 persistently receives the time of induced signal 361 less than one first pre- timing
Between (such as in 10 seconds) when, represent the object that sensing unit 36 is sensed, it should simply by body 10 be not intended to using punching
Water closestool 1, now, processing module 31 will not control automatically controlled valve member 32,32 ' to be operated;Missed in this way, can be prevented effectively from
The problem of washing by water, and cause to waste water.
When processing module 31 between one first scheduled time and one second scheduled time (be, for example, between 10~60 seconds it
Between), induced signal 361 is persistently received, processing module 31 can be then the automatically controlled valve member 32,32 ' of correspondence control, so that flushing pipe
One first relatively small water of 23 injection discharges;When processing module 31 persistently receives induced signal 361 more than the second pre- timing
Between (be, for example, more than 60 seconds), processing module 31 can be then the automatically controlled valve member 32,32 ' of control, so that the injection row of flushing pipe 23
Go out one second relatively large water.In this way, can be effectively according to the different use state of user, and correspondence adjusts discharge
Water, so as to can reach the effect of water-saving.
In actual applications, processing module 31 can be by control the connection of oral siphon road 21 and flushing pipe 23 when
Between, to determine water that flushing pipe 23 is discharged, for example, processing module 31 can make oral siphon road 21 and jet water spout
Road 23 is respectively communicated with 4 seconds and 6 seconds or so, and the correspondence of flushing pipe 23 is discharged first water and second water, is borrowed
This can effectively achieve effect of water-saving, and in actually measuring, flushing toiler 1 of the present utility model can reach small size amount of flush water
(i.e. above-mentioned flushing pipe 23 is discharged the state of the first water by control) is less than 3 liters, and large size amount of flush water (i.e. above-mentioned jet water spout
The state of the second water is discharged by control in road 23) it is less than 4.8 liters.
In other words, flushing toiler 1 of the present utility model is by the setting of sensing unit 36 (such as infrared ray sensor),
Flushing toiler 1 is allowed to carry out bath operation automatically with automatic sensing, and sensing unit 36 can sense the use time of user, from
And judge that user is small size or large size, and then correspondence changes time and the water of bath, so as to reach effect of water-saving.
Specifically, when the use time of the sensing of sensing unit 36 user is less than 1 minute, processing module 31 will determine that it is
Trumpet, and will sequentially to control water injecting pipeline 22, flushing pipe 23 and water injecting pipeline 22 to carry out at least one respectively pre- for processing module 31
The bath operation fixed time.(it can be become certainly according to demand within 1 minute when the use time that sensing unit 36 senses user is more than
Change), processing module 31 will determine that it is large size, and processing module 31 will sequentially control water injecting pipeline 22, flushing pipe 23 and note
Water lines 22 carry out the bath operation of another scheduled time relative to the scheduled time length respectively.In preferably applying, place
Reason module 31 sequentially controls the water discharging time of water injecting pipeline 22, flushing pipe 23 and water injecting pipeline 22, can be defined as one first
Water discharging time, one second water discharging time and one the 3rd water discharging time, processing module 31 judged after small size or large size, can be pair
The length that the second water discharging time should be changed (is judged as corresponding second water discharging time during trumpet, is shorter than when being judged as large size pair
The second water discharging time answered).In this way, effect of water-saving will can be effectively achieved.
It is noted that in preferably applying, control assembly 30 can also include a Tip element 37, and its is electrical
Processing module 31, sensing unit 36 and touch switch S are connected, the Tip element 37 is used to and user interaction.For example, point out
Unit 37 can be LED, when user presses touch switch S, and Tip element 37 can be that correspondence sends particular color
Light, the signal for pointing out user's processing module 31 to receive touch switch S transmission according to this, and flushing toiler 1 will carry out bath work
Industry;Or when sensing unit 36 senses the use state of user, is intended to correspondence by the progress bath operation of processing module 31, point out
Unit 37 equally can be to send specific light or flicker etc., to point out user to carry out bath operation.
Summary, flushing toiler of the present utility model, by the setting of generator unit and charge storage unit, can allow bath horse
Correspondence produces electric power when bucket carries out bath operation, and the electric power of related component automatically or semi-automatically can be provided according to this, and makes multiple
The component automatically or semi-automatically can be prevented effectively from extra setting whereby without setting electric wire with externally connected power supply in addition
The electric wire trouble and problem brought.Furthermore, generator unit of the present utility model is arranged on water injecting pipeline, due to water injecting pipeline
The source water discharged is mainly to the surface of the bearing groove that cleans flushing toiler and to carry out moisturizing operation to bearing groove,
Therefore generator unit has relatively long service life.
Claims (10)
1. a kind of flushing toiler, it is characterised in that the flushing toiler is included:
One body, it has a bearing groove and a passing away, and the bearing groove is recessed by the side of the body, and the discharge is led to
Road is connected with the bearing groove, and the thing to be arranged in the bearing groove can be discharged by the passing away;
One enters water assembly, and it is arranged at the body, and this enters water assembly and included:
One oral siphon road, it with a water source to be connected;
One flushing pipe, its two ends are connected with the oral siphon road and the bearing groove respectively, the flushing pipe and the bearing groove phase
One end of connection is defined as a water jet, and the opening that the water jet is adjacent to the passing away is set, and is arranged by the water jet
The source water gone out can be such that the thing to be arranged in the bearing groove is moved into the passing away;And
One water injecting pipeline, its two ends are connected with the oral siphon road and the bearing groove respectively, the water injecting pipeline and the bearing groove phase
One end of connection is defined as a water injection end, the water injection end away from the water jet set, and the water injection end be adjacent to the bearing groove in
One opening of body formation is set;And
One control assembly, it is included:
One processing module;
At least one automatically controlled valve member, it is electrically connected with the processing module, and the automatically controlled valve member can be controlled and selectivity by the processing module
Ground makes the liquid in the oral siphon road, flows at least one of the water injecting pipeline, the flushing pipe;
One generator unit, it is arranged at the water injecting pipeline, and the generator unit can pass through the water filling in the liquid in the oral siphon road
Electric energy is produced during pipeline;And
One charge storage unit, it is electrically connected with the generator unit, electric energy of the charge storage unit produced by store the generator unit.
2., should according to the flushing toiler described in claim 1, it is characterised in that the control assembly also includes a sensing unit
Sensing unit is arranged at the body, and when the object proximity body, and when being adjacent to the sensing unit, the sensing unit can be corresponded to
Produce an induced signal;The sensing unit is electrically connected with the processing module, and the processing module receives the induced signal, can correspond to and control
The automatically controlled valve member is made, so that the oral siphon road is sequentially connected with the water injecting pipeline, the flushing pipe and the water injecting pipeline.
3. according to the flushing toiler described in claim 2, it is characterised in that the processing module is in one first scheduled time and one the
Between two scheduled times, the induced signal is persistently received, the processing module then corresponds to and controls the automatically controlled valve member, so that the jet water spout
Road injection one first water of discharge;The processing module persistently receives the induced signal more than second scheduled time, the processing mould
Block then controls the automatically controlled valve member, so that flushing pipe injection one second water of discharge;Wherein, second water be more than this first
Water.
4. according to the flushing toiler described in claim 3, it is characterised in that the processing module is in reception in first scheduled time
The induced signal, the processing module controls the automatically controlled valve member, so that the oral siphon Lu Buyu water injecting pipelines and the flushing pipe
It is connected.
5. according to the flushing toiler described in claim 2, it is characterised in that the sensing unit can be according to the object proximity body
Time length, correspondence produces different induced signals, and the processing module can be according to different induced signals, and correspondence control should
Automatically controlled valve member, so that the oral siphon road is sequentially connected with the water injecting pipeline, the flushing pipe and the water injecting pipeline, and makes the punching
Water lines discharge the liquid of different flow.
6. according to the flushing toiler described in claim 1, it is characterised in that the processing module can be in stored by the charge storage unit
When electric energy is less than an electric energy default value, correspondence controls the automatically controlled valve member, so that the oral siphon road is connected with the water injecting pipeline, and
Enable the liquid in the oral siphon road by the water injecting pipeline, and then allow generator unit correspondence to produce electric energy, with to the storing up electricity
Unit carries out charging operation.
7. according to the flushing toiler described in claim 6, it is characterised in that the processing module controls the automatically controlled valve member, so that should
Oral siphon road is sequentially connected with the water injecting pipeline, the flushing pipe and the water injecting pipeline, so make in the bearing groove this treat
When row's thing is discharged by the passing away, the water that the water injecting pipeline is discharged is defined as one first water yield;The processing module in
When electric energy stored by the charge storage unit is less than the electric energy default value, the oral siphon road is controlled to be connected with the water injecting pipeline, and
The water for being discharged the water injecting pipeline, is defined as one second water yield;Wherein, first water yield is more than second water outlet
Amount.
8. according to the flushing toiler described in claim 1, it is characterised in that it is single that the control assembly also includes water level sensing
Member, it is electrically connected with the processing module, when the height of water level in the bearing groove reaches a predetermined altitude, and the water level sensing unit will
Correspondence produces a water level signal, and the processing module receives the water level signal, then corresponds to and control the automatically controlled valve member, so that the oral siphon
The Lu Buyu water injecting pipelines and the flushing pipe are connected.
9. according to the flushing toiler described in claim 8, it is characterised in that the water level sensing unit is arranged in the bearing groove
Position, is oppositely arranged with a bending section of the passing away, and the bending section is adjacent to the bearing groove in opening that the body is formed
Mouth is set.
10. according to the flushing toiler described in claim 1, it is characterised in that the processing module controls the automatically controlled valve member, and makes this
When oral siphon road is sequentially connected with the water injecting pipeline, the flushing pipe and the water injecting pipeline, the hydraulic pressure of water injecting pipeline discharge
Power is less than the water pressure that the flushing pipe is discharged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720060137.5U CN206545244U (en) | 2017-01-18 | 2017-01-18 | Flushing toiler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720060137.5U CN206545244U (en) | 2017-01-18 | 2017-01-18 | Flushing toiler |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206545244U true CN206545244U (en) | 2017-10-10 |
Family
ID=59992496
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720060137.5U Expired - Fee Related CN206545244U (en) | 2017-01-18 | 2017-01-18 | Flushing toiler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206545244U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316429A (en) * | 2017-01-18 | 2018-07-24 | 凯撒卫浴股份有限公司 | Flushing toiler |
CN108775059A (en) * | 2018-05-30 | 2018-11-09 | 哈尔滨功达给排水技术有限公司 | A kind of spontaneous electric control saving toilet of cistern free |
-
2017
- 2017-01-18 CN CN201720060137.5U patent/CN206545244U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316429A (en) * | 2017-01-18 | 2018-07-24 | 凯撒卫浴股份有限公司 | Flushing toiler |
CN108775059A (en) * | 2018-05-30 | 2018-11-09 | 哈尔滨功达给排水技术有限公司 | A kind of spontaneous electric control saving toilet of cistern free |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206545244U (en) | Flushing toiler | |
CN104746312B (en) | Detergent instant dissolving water inlet box assembly | |
CN203640043U (en) | Sleeve-type Venturi siphon blow-off pipe | |
CN201911988U (en) | Energy-saving hand washing/drying integrated machine | |
CN206109789U (en) | Washing machine's washing agent throwing -in device and have its washing machine | |
CN211359244U (en) | Device capable of enabling shower head to spray shower gel or shampoo | |
CN108316429A (en) | Flushing toiler | |
CN201933586U (en) | Flushing toilet externally connected with water way | |
CN207863077U (en) | A kind of closet flushing water tank box | |
CN109056951A (en) | A kind of tap water of water tank type toilet seat is auxiliary to rush control method and intellectual water closet | |
CN205689870U (en) | A kind of domestic water saving system | |
CN206109792U (en) | Washing machine's washing agent throwing -in device and have its washing machine | |
TWM543894U (en) | Flush toilet | |
TWI612202B (en) | Flush toilet | |
CN209941821U (en) | Water-saving environment-friendly toilet | |
CN205289143U (en) | Spout washing terminals , shower nozzle spray lance subassembly and washing unit | |
CN104074242B (en) | Device for reusing domestic waste water | |
CN205077577U (en) | Intelligent energy -conserving closestool | |
CN206501830U (en) | A kind of portable vehicle cleaning apparatus | |
CN218596215U (en) | Intelligent wisdom water affairs system | |
CN205369474U (en) | Male urinal | |
CN208346937U (en) | A kind of closestool with detergent supply device | |
CN214417231U (en) | Cleaning device of disinfection purifier | |
CN215687471U (en) | Cleaning robot's workstation and clean system | |
CN203782817U (en) | Washing machine wastewater storing/recycling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171010 Termination date: 20210118 |
|
CF01 | Termination of patent right due to non-payment of annual fee |