CN206540759U - Online sample gas pretreating system - Google Patents

Online sample gas pretreating system Download PDF

Info

Publication number
CN206540759U
CN206540759U CN201720213212.7U CN201720213212U CN206540759U CN 206540759 U CN206540759 U CN 206540759U CN 201720213212 U CN201720213212 U CN 201720213212U CN 206540759 U CN206540759 U CN 206540759U
Authority
CN
China
Prior art keywords
pipeline
purge gas
gas
sample gas
drying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720213212.7U
Other languages
Chinese (zh)
Inventor
孙国栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO KEDIBO ELECTRON TECHNOLOGY CO LTD
Original Assignee
QINGDAO KEDIBO ELECTRON TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO KEDIBO ELECTRON TECHNOLOGY CO LTD filed Critical QINGDAO KEDIBO ELECTRON TECHNOLOGY CO LTD
Application granted granted Critical
Publication of CN206540759U publication Critical patent/CN206540759U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides online sample gas pretreating system, and it includes drying pipeline, blowback pipeline and fluid conduit, wherein:The drying pipeline sets gradually sample gas inlet, stop valve, automatic drainage filter, drying tube, dew point hygrometer, the outlet of sample gas;The blowback pipeline includes purge gas air inlet pipeline and purge gas outlet pipe, and the purge gas air inlet pipeline sets flowmeter, drier, compressed air inlet;The purge gas outlet pipe sets compressed air outlet, pressure regulation button, negtive-pressure implement.In the system, by the reasonable setting of drying pipeline, blowback pipeline, fluid conduit and control system, make in the online preprocessing process of sample gas, degranulation is removed from air-flow, acid mist, vapor are without losing analyte gas, and it does not interfere with SO2It is that accurate measurement provides safeguard Deng gas content.

Description

Online sample gas pretreating system
Technical field
The utility model is related to flue gas sample gas disposal technical field, specifically, is related to online sample gas pretreating system.
Background technology
Existing flue gas processing device to flue gas when carrying out on-line analysis, it usually needs flue gas sample gas is carried out necessary Pretreatment, while the level of the sulfur dioxide and nitrogen oxides in sample gas is not influenceed, when standard condenser can not be dried to enough Low dew point is to reduce during sour dew point, and traditional pretreatment system can not meet the requirement;On the other hand, in flue gas on-line continuous In monitoring system, when need to be pre-processed to high flow capacity, high humility sample gas, acid mist, the moisture in gas in sample gas are effectively removed, together When retain need monitor gas component, such as SO2、NO、CO、O2, the composition such as HCl and HF, be also traditional flue gas pretreatment What system can not accomplish.
Utility model content
In order to solve the problem of current flue gas on-line continuous monitoring system is present, the utility model provides a kind of online sample gas Pretreatment system, its specific technical scheme is as follows:
Online sample gas pretreating system, it includes drying pipeline, blowback pipeline and fluid conduit, wherein:
The drying pipeline include be sequentially connected sample gas inlet 2, stop valve 3, automatic drainage filter 4, drying tube 5, Dew point hygrometer 6, sample gas outlet 7;
The blowback pipeline includes purge gas air inlet pipeline and purge gas outlet pipe, the purge gas air inlet pipe Road sets compressed air inlet 16, drier 15, flowmeter 14;The purge gas outlet pipe sets negtive-pressure implement 13, pressure regulation Button 9, compressed air outlet 8;The purge gas air inlet pipeline is connected to the dry of drying pipeline with purge gas outlet pipe The two ends of dry pipe 5;
The fluid conduit has two-way:The automatic drainage filter 4 of drying pipeline, pipeline access jet are wherein started from all the way Pump A10, the jet pump A10 set three-way interface, and one connects the pipeline drawn into automatic drainage filter 4;Two-way is run in water Mouth A17;Purge gas outlet pipe is stated in threeway access;
Another road fluid conduit is drawn from purge gas outlet pipe, the pipe between negtive-pressure implement 13 and pressure regulation button 9 Set jet pump B11, the jet pump B11 that three-way interface, a logical and two-way access purge gas outlet pipe are set in road;Three Lead to the mouth of a river B12 that runs in.
Further, heat tracing pipe 1 is set at the sample gas inlet 2.
Further, the system also includes PLC control system, and the gas dewpoint that the PLC system exports 7 to sample gas enters Row monitoring, if dew point value is too high, PLC can produce alarm signal, and set PID control loops, adjust the temperature of drying tube 5 With the drainage period time interval of automatic drainage filter 4.
Online sample gas pretreating system provided by the utility model, with advantages below:
First:In the system, by the reasonable setting of drying pipeline, blowback pipeline, fluid conduit and control system, make sample In the online preprocessing process of gas, degranulation is removed from air-flow, acid mist, vapor are without losing analyte gas, and it will not shadow Ring SO2Content.In low sulfur content application, traditional condenser can lose up to 90% analyte gas, therefore cannot be used for Accurate measurement, can not be used for minimum discharge monitoring and use;The system can retain 90% analyte gas, be accurate measurement Provide safeguard.
Second:Purge gas in air enters after drier from the outlet of sample gas, can cool down the partially dried device.Reversely Air-flow flows along drier, forms thermograde.When purge gas is by drier, preferable sample gas air inlet is reached by heating Temperature.Thermograde can remove vapor rapidly, and reduce final dew point.If blowback air temperature begins to decline setting temperature Below degree, System Backplane can be begun to warm up.The heat in backboard is passed to by aluminium heat block the package of drier.Purge gas Flow through drier shell and heat is obtained from shell.The final temperature of purge gas, and the company of holding can be tightly controlled by this process Continuous thermograde.
3rd:System provides the gas sampling of heat for high performance gas analysis.In the case where not losing gas molecule Degranulation, acid mist and aqueous vapor are removed from gas.When water or aqueous vapor intrusion gas analyzer, due to blocking or corroding, many point Analyzer can run into performance reduction and maintenance issues.System well below condensation point can remove moisture removal in temperature, can typically reach as little as- 25 DEG C of dew point.And the system can be directly mounted at flue, it is not necessary to heat pipeline.It can reach that explosion-proof environment occasion is used. The product is continuous discharge and the choosing of process monitoring system CEMS ideal.
Brief description of the drawings
Fig. 1 is the gas circuit structure schematic diagram of the online sample gas pretreating system of the utility model.
Label in figure:
1:Heat tracing pipe;2:Sample gas inlet;3:Stop valve;4:Automatic drainage filter;5:Drying tube;6:Dew point hygrometer;7:Sample Gas is exported;8:Compressed air outlet;9:Pressure regulation button;10:Jet pump A;11:Jet pump B;12:Discharge outlet B;13:Vacuum table; 14:Flowmeter;15:Drier;16:Compressed air inlet;17:Discharge outlet A.
Embodiment
Below in conjunction with the accompanying drawings and embodiment makees further details of theory to online sample gas pretreating system of the present utility model It is bright.
Reference picture 1, online sample gas pretreating system, it includes drying pipeline, blowback pipeline and fluid conduit, wherein:Institute State drying pipeline and set gradually sample gas inlet 2, stop valve 3, automatic drainage filter 4, drying tube 5, dew point hygrometer 6, the outlet of sample gas 7;Drying tube 5 is preferred to use membrane type drying tube, installed in the downstream of automatic drainage filter 4.Sample gas enters after drying tube 5, point In the gas drying tube for flowing to several minor diameters, gas drying tube is arranged in parallel beam, is dried purge gas and is entered drier Inversely dry membrane tube wall with gas afterwards to contact, selectively the vapor in sample gas is balanced from sample gas by osmotic distillation And take out of.The difference that gas dries side steam partial pressure inside and outside periosteum drives the vapor in sample gas by tube wall, into drying Purge gas in, as wet sample gas from air inlet flows to gas outlet, it is outer that moisture is constantly entered pipe by gas drying tube Drying blowback air.Therefore sample gas is lowered by by its dew point during drier.
Dew point hygrometer 6 is used to protect the dew point inductor of sensitivity not damaged by corrosive gas and condensed water, in real time display Dew point value, relative humidity/dew point and the temperature of sample gas, and in dew point>Alarm is produced at 5 DEG C.The one of electricity volt pressure of dew point hygrometer Output is 0-5VDC, corresponding thereto be relative humidity (RH) in air chamber, another voltage output is 0-5VDC, with it Corresponding is the temperature of gas indoor gas.These signals are transferred to PLC, and then PLC can be calculated according to corresponding calculation formula Go out corresponding dew point value, and be shown on screen.If the numerical value detected is not in the range of PLC program settings, System will send alarm signal.
The blowback pipeline includes purge gas air inlet pipeline and purge gas outlet pipe, the purge gas air inlet pipe Road sets flowmeter 14, drier 15, compressed air inlet 16;The purge gas outlet pipe setting compressed air outlet 8, Pressure regulation button 9, negtive-pressure implement 13;The purge gas air inlet pipeline is parallel to the drying of drying pipeline with purge gas outlet pipe The two ends of pipe 5;The fluid conduit starts from the automatic drainage filter 4 of drying pipeline, and sets gradually three-way connection 11, jet Pump A10, discharge outlet A17;Automatic drainage filter periodically removes the liquid and dust being collected into.Majority of case, these liquid Usually acid mist and aerosol.Automatic drainage filter carries vacuum drainage performance.Compressed gas is passed through into text using jet pump Mound pipe produces vacuum, is discharged the liquid collected on filter water trap using vacuum.This is a cyclic process, passes through PLC Timer controls the on off state of magnetic valve, so as to control compressed gas supplying.The liquid mist being collected into must be discharged to by pipeline The place of safety.It is recommended that liquid is discharged into the container containing lime stone chip, in order to neutralize the acid solution of discharge.
The blowback pipeline includes purge gas air inlet pipeline and purge gas outlet pipe, the purge gas air inlet pipe Road sets compressed air inlet 16, drier 15, flowmeter 14;The purge gas outlet pipe sets negtive-pressure implement 13, pressure regulation Button 9, compressed air outlet 8;The purge gas air inlet pipeline is connected to the dry of drying pipeline with purge gas outlet pipe The two ends of dry pipe 5;
The fluid conduit has two-way:The automatic drainage filter 4 of drying pipeline, pipeline access jet are wherein started from all the way Pump A10, the jet pump A10 set three-way interface, and one connects the pipeline drawn into automatic drainage filter 4;Two-way is run in water Mouth A17;Purge gas outlet pipe is stated in threeway access;
Another road fluid conduit is drawn from purge gas outlet pipe, the pipe between negtive-pressure implement 13 and pressure regulation button 9 Set jet pump B11, the jet pump B11 that three-way interface, a logical and two-way access purge gas outlet pipe are set in road;Three Lead to the mouth of a river B12 that runs in.
Protection filter can also be set in the purge gas outlet pipe.The protection filter is preferred to use 0.1 μ M filtration cores, to remove the particulate and suspension of oiliness and acidity.Preferably tetrafluoro element filters core.The tolerable height of the part Wet body.Except in addition to particulate, the element can also flocculate liquid suspension and droplet.Heat tracing pipe is set at the sample gas inlet 2 1, for being preheated with sample gas.The system also includes PLC control system, and the PLC system exports 7 gas dewpoint to sample gas It is monitored, if dew point value is too high, PLC can produce alarm signal, and by pid control circuit, adjust the temperature of drying tube 5 With the drainage period time interval of automatic drainage filter 4.The system uses drying tube dehydration technique, and the technology can be direct Extraction method is sampled at the beginning, and moisture is removed under gas phase state, it is to avoid sample air cooling is solidifying to form acid mist;Simultaneously because not producing cold Solidifying water, therefore do not result in the loss of any composition soluble in water, such as SO2、NOX、HCL、HF。
It the foregoing is only better embodiment of the present utility model, it is all to be made according to present utility model application the scope of the claims Equivalent changes and modifications, should all belong to the covering scope of the utility model patent.

Claims (3)

1. online sample gas pretreating system, it is characterised in that:It includes drying pipeline, blowback pipeline and fluid conduit, wherein:
The drying pipeline includes the sample gas inlet being sequentially connected(2), stop valve(3), automatic drainage filter(4), drying tube (5), dew point hygrometer(6), sample gas outlet(7);
The blowback pipeline includes purge gas air inlet pipeline and purge gas outlet pipe, and the purge gas air inlet pipeline is set Put compressed air inlet(16), drier(15), flowmeter(14);The purge gas outlet pipe sets negtive-pressure implement(13)、 Pressure regulation button(9), compressed air outlet(8);The purge gas air inlet pipeline is connected to drying with purge gas outlet pipe The drying tube of pipeline(5)Two ends;
The fluid conduit has two-way:The automatic drainage filter of drying pipeline is wherein started from all the way(4), pipeline access jet pump A(10), the jet pump A(10)Three-way interface is set, and one connects into automatic drainage filter(4)The pipeline of extraction;Two connect Discharge outlet A(17);Purge gas outlet pipe is stated in threeway access;
Another road fluid conduit is drawn from purge gas outlet pipe, in negtive-pressure implement(13)With pressure regulation button(9)Between pipe Jet pump B is set in road(11), the jet pump B(11)Three-way interface, a logical and two-way access purge gas escape pipe are set Road;Threeway connection discharge outlet B(12).
2. online sample gas pretreating system according to claim 1, it is characterised in that:The sample gas inlet(2)Place is set Heat tracing pipe(1).
3. online sample gas pretreating system according to claim 1, it is characterised in that:The system also includes PLC and controls system System, the PLC system is exported to sample gas(7)Gas dewpoint be monitored, if dew point value is too high, PLC can produce report Alert signal, and PID control loops are set, adjust drying tube(5)Temperature and automatic drainage filter(4)Drainage period when Between be spaced.
CN201720213212.7U 2016-04-17 2017-03-07 Online sample gas pretreating system Active CN206540759U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201620316441 2016-04-17
CN2016203164417 2016-04-17

Publications (1)

Publication Number Publication Date
CN206540759U true CN206540759U (en) 2017-10-03

Family

ID=59940953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720213212.7U Active CN206540759U (en) 2016-04-17 2017-03-07 Online sample gas pretreating system

Country Status (1)

Country Link
CN (1) CN206540759U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108333218A (en) * 2018-04-13 2018-07-27 福建双环能源科技股份有限公司 A kind of online gas detection analysis and filtration treatment system
CN108525423A (en) * 2018-06-13 2018-09-14 锦州华冠环境科技实业股份有限公司 Flue gas membrane type is dried system
CN109856186A (en) * 2019-02-01 2019-06-07 中国石油天然气集团公司 A kind of gas pipeline hydrocarbon dew point on-line real-time measuremen device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108333218A (en) * 2018-04-13 2018-07-27 福建双环能源科技股份有限公司 A kind of online gas detection analysis and filtration treatment system
CN108525423A (en) * 2018-06-13 2018-09-14 锦州华冠环境科技实业股份有限公司 Flue gas membrane type is dried system
CN109856186A (en) * 2019-02-01 2019-06-07 中国石油天然气集团公司 A kind of gas pipeline hydrocarbon dew point on-line real-time measuremen device

Similar Documents

Publication Publication Date Title
CN206235608U (en) A kind of Flue Gas Pretreatment Device of flue gas automatic monitored control system
CN105865855B (en) A kind of flue gas sampling purification system for dioxin on-line checking
CN204964281U (en) Flue gas analysis's pretreatment systems
CN206540759U (en) Online sample gas pretreating system
CN104406826B (en) The method of sampling of condensable particle sampling device
CN106124443B (en) A kind of marine exhaust emission analysis pretreatment system
CN109959538B (en) Device and method for testing sulfur trioxide and condensable particles emitted by fixed pollution source
CN105588777A (en) Device and method for simultaneously testing PM2.5 and coagulated particulate matters discharged by fixing source
CN203587579U (en) Online continuous smoke monitoring system
CN207636359U (en) The SO of rotatory sealing multichannel3And H2SO4Sampling detector for multifunctional
CN101524617A (en) Method for removing moisture in gases by a Nafion tube
CN203869919U (en) Sampling and separating apparatus for sulfur trioxide in smoke
CN101545838B (en) Intrinsically safe type sample gas processing system
CN208766151U (en) SO in a kind of on-line checking flue gas3The system of content
CN110346190A (en) A kind of test device and method of fixed source smoke discharge soluble-salt
CN206756533U (en) A kind of flue gas sampler
CN207541048U (en) A kind of exhaust gas on-line period monitoring device
CN205280445U (en) Flue gas sampling device
KR20140147826A (en) Process and device for treating volatile organic compound
CN204964265U (en) Sampling case of preliminary treatment can carry out flue gas
CN110275000A (en) A kind of continuous on-line monitoring system of flue gas and method
CN208512224U (en) The on-line monitoring system of VOCs exhaust gas lower explosion limit
CN210037385U (en) Coke oven gas benzene series on-line analysis pretreatment system
CN219799374U (en) Incinerator oxygen content detection device
CN105822387B (en) Underground engineering diesel-driven generator station tail gas comprehensive treatment advanced treatment apparatus and processing method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant