CN206539790U - PE individual layer clamp water bands - Google Patents

PE individual layer clamp water bands Download PDF

Info

Publication number
CN206539790U
CN206539790U CN201720013346.4U CN201720013346U CN206539790U CN 206539790 U CN206539790 U CN 206539790U CN 201720013346 U CN201720013346 U CN 201720013346U CN 206539790 U CN206539790 U CN 206539790U
Authority
CN
China
Prior art keywords
band
connector
water
storage cylinder
opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720013346.4U
Other languages
Chinese (zh)
Inventor
亓跃东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weifang Iris Polymer Technology Co Ltd
Original Assignee
Weifang Iris Polymer Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weifang Iris Polymer Technology Co Ltd filed Critical Weifang Iris Polymer Technology Co Ltd
Priority to CN201720013346.4U priority Critical patent/CN206539790U/en
Application granted granted Critical
Publication of CN206539790U publication Critical patent/CN206539790U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Connector Housings Or Holding Contact Members (AREA)

Abstract

The utility model is related to PE individual layer clamp water bands, including band body, and the band body is made up of PE, and the band weaves netting twine provided with individual layer in vivo;The band in vivo provided with supply water stream through cavity, the connection end with body is provided with connector, the connector is enclosed on the outside with body, it is provided with the connector and fills water swellable liquid storage cylinder, the madial wall of the liquid storage cylinder is provided with opening, and the opening is extended into the cavity provided with gear liquid piece, the gear liquid piece, the gear liquid piece is less than 90 ° towards the direction of the internal current of the band, the gear liquid piece and the angle between body.After band supplies water in vivo, because the effect water for keeping off liquid piece is first flowed into liquid storage cylinder, liquid storage cylinder is filled and expanded by water, and two band body connections and clamping are formed sealing, good sealing effect by the connector after expansion.PE individual layer clamp water band structures are simple, solid, easy to connect, connect good sealing effect.

Description

PE individual layer clamp water bands
Technical field
The utility model is related to water band, more particularly to PE individual layer clamp water bands.
Background technology
Water band due to it there is the characteristics of conveniently rolling storage, convenient-laying to be widely used in water delivery operation, example Such as agricultural irrigation.Water band is due to the supportive that do not have of its own, and the connection of agricultural irrigation process reclaimed water band is extremely inconvenient, typically It is to insert a water band in another water band, because hydraulic pressure can not ensure and going out the problems such as fold during the connection of water band after water supply Existing, the problem of leak is seeped water can often occurs in two water band splicing position, and this just further have impact on the architecture of water band, connection Effect is very undesirable.
Utility model content
Technical problem to be solved in the utility model be to provide one kind two facilitate water band connection, good sealing effect, it is wear-resisting, Solid PE individual layer clamp water bands.
In order to solve the above technical problems, the technical solution of the utility model is:PE individual layer clamp water bands, including band body, institute State band body to be made up of PE, the band weaves netting twine provided with individual layer in vivo;The band in vivo provided with supply water stream through cavity, it is described Connection end with body is provided with connector, and the connector is enclosed in the outside with body, the connector provided with water-filling expansion Liquid storage cylinder, the madial wall of the liquid storage cylinder is provided with opening, and the downstream of the opening is provided with gear liquid piece, the gear liquid piece extension Enter in the cavity, the liquid piece that keeps off is towards the direction of the internal current of the band, the gear liquid piece and the folder between body Angle is less than 90 °.
As preferred technical scheme, the connector extends to the outside of the connection end with body, the connector Opening be arranged at the connector and overhang at the band body connection end.
As preferred technical scheme, the liquid storage cylinder is provided with described with the parallel and remote side wall with body of body Pull bar, the pull bar is through the side wall of the liquid storage cylinder and with body and stretches into the cavity, and the pull bar stretches into the cavity Interior one end is provided with block.
As preferred technical scheme, the side wall of the liquid storage cylinder is provided with fixed seat, the fixed seat and the pull bar Threaded connection.
As preferred technical scheme, the opening is the circular opening entirely circumferentially extended along the connector.
As preferred technical scheme, the opening is punctual openings, and the punctual openings are located under the connector Portion.
As preferred technical scheme, the opening is arranged on the connector and the band body overlapping region, described to open Mouth includes at least one punctual openings, and the band body is provided with through hole with the aperture position corresponding position, and the gear liquid piece passes through institute State through hole and stretch into the cavity.
As preferred technical scheme, the outer wall of the connector is provided with anti-slip veins, and the anti-slip veins include several The annular line that the circumferencial direction along the connector be arrangeding in parallel extends.
As preferred technical scheme, the connector is provided with the support member of arc, and the support member is arranged on described The top of connector.
By adopting the above-described technical solution, PE individual layer clamp water bands, including band body, the band body is made up of PE, described Band weaves netting twine provided with individual layer in vivo;The band body manufacturing process of the structure is simple, and cost is low.The band is flowed through provided with water supply in vivo The cavity crossed, the connection end with body is provided with connector, and the connector is enclosed in the outside with body, the connector Provided with water swellable liquid storage cylinder is filled, the madial wall of the liquid storage cylinder is provided with opening, and the opening is provided with gear liquid piece, the gear Liquid piece is extended into the cavity, and the liquid piece that keeps off is towards the direction of the internal current of the band, the gear liquid piece and the band body Between angle be less than 90 °.After band supplies water in vivo, because the effect water for keeping off liquid piece is first flowed into liquid storage cylinder, water fills liquid storage cylinder Expire and expand, the connector after expansion connects two band bodies and clampings, good sealing effect.
PE individual layer clamp water band structures are simple, solid, easy to connect, connect good sealing effect.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the accompanying drawing used required in description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, before creative labor is not paid Put, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of the utility model embodiment one;
Fig. 2 is the structural representation of the utility model embodiment two;
Fig. 3 is the structural representation of the utility model embodiment three;
Fig. 4 is the structural representation of the utility model example IV.
In figure:1- band bodies;2- individual layers weave netting twine;3- cavitys;4- connectors;5- circular openings;6- liquid storage cylinders;7- keeps off liquid Piece;8- the second water bands;9- the first water bands;10- punctual openings;11- blocks;12- pull bars;13- fixed seats;14- through holes.
Embodiment
Embodiment one:As shown in figure 1, PE individual layer clamp water bands, including with body 1, the band body 1 is made up of PE, the band In body 1 netting twine 2 is woven provided with individual layer.Individual layer braiding netting twine 2 is completely contained in band body 1, and individual layer braiding netting twine 2 is used as water band Skeleton, and the waterproof layer and wearing layer that water band is then formed with body 1 that PE is made.First water band 9 and the second water band 8 pass through connector 4 connections.Be the state after water-filling state lower band body 1 fully expansion in Fig. 1, it is described with body 1 provided with supply water stream through cavity 3, the connection end with body 1 is provided with connector 4, and connector 4 can be sleeved on the outside with body 1 by glue or other modes.Institute State provided with water swellable liquid storage cylinder 6 is filled in connector 4, the madial wall of the liquid storage cylinder 6 is provided with opening, and the connector 4 prolongs The outside of the connection end with body 1 is extended, the opening of the connector 4 is arranged at the connector 4 and overhangs the band body 1 At connection end.The opening is the circular opening 5 entirely circumferentially extended along the connector 4, and the downstream of the circular opening 5 is set Have gear liquid piece 7, the gear liquid piece 7 is extended into the cavity 3, the gear liquid piece 7 towards the direction with current in body 1, The gear liquid piece 7 and the angle between body 1 are less than 90 °.The operation principle of connector 4 is by water-filling in liquid storage cylinder 6 Expansion links together the first water band 9 and the second water band 8, forms sealing, it is to avoid seepage.Wherein, gear liquid piece 7 can effectively by Current retain and promote to move the water to flow into liquid storage cylinder 6.In order to keep self-water-supplying in liquid storage cylinder 6 to start to supplying water to terminate all the time in swollen Swollen state, gear liquid piece 7 need to have certain toughness to avoid it from causing the effect of dash to be lost along water (flow) direction bending in current Effect.
Embodiment two:As shown in Fig. 2 water band with body 1, individual layer braiding netting twine 2, the structure of connector 4 and embodiment one It is identical, it is unique the difference is that adding the device of fixedly connected part 4.The liquid storage cylinder 6 is parallel with the band body 1 and away from described Side wall with body 1 is provided with pull bar 12, and the pull bar 12 is through the side wall of the liquid storage cylinder 6 and with body 1 and stretches into the cavity 3 Interior, one end that the pull bar 12 is stretched into the cavity 3 is provided with block 11.It will can be connected after liquid storage cylinder 6 expands full of water Part 4 is fixed on band body 1, it is to avoid it is slipped.Further, the installation of connector 4 for convenience, the side wall of the liquid storage cylinder 6 Fixed seat 13 is provided with, the fixed seat 13 is threadedly coupled with the pull bar 12.When anhydrous in liquid storage cylinder 6, the length of pull bar 12 Degree be significantly more than liquid storage cylinder 6 with the wall thickness of body 1 and, easily installation.When water-filling expands in liquid storage cylinder 6, pull bar 12 Pulling force is then born to connect by connector 4 and with body 1.It need to only be worn pre-perforated confession pull bar 12 on band body 1 before installation connecting element 4 Cross, hole is closed automatically after the liquid storage cylinder 6 of connector 4 expands, seepage is not resulted in.
Embodiment three:As shown in figure 3, comparing embodiment one, the structure of connector 4 is optimized, different from embodiment one. The opening of connector 4 is set to punctual openings 10, and the punctual openings 10 are located at the bottom of the connector 4, as long as there is current Pass through wall 3, so that it may ensure that the water-filling of liquid storage cylinder 6 expands, it is ensured that the connection of the first water band 9 and the second water band 8, sealing effectiveness.When When flow is smaller in water band, the top seal failure of the connector 4 in embodiment one and embodiment two, and be applicable the depth of the night embodiment In the less situation of water-carrying capacity in water band, it can avoid well due to the small influence to the sealing effectiveness of connector 4 of water-carrying capacity.When So, the fixed form of pull bar can be also applied in embodiment three.
Example IV:As shown in figure 4, being arranged on connector 4 and with body from the opening of connector 4 unlike embodiment three 1 region overlapped, the opening includes at least one punctual openings 10, and the band body 1 is corresponding to the position of punctual openings 10 Place is provided with through hole 14, and the gear liquid piece 7 is through the through hole 14 and stretches into the cavity 3.Connector 4 after water-filling is in gear It can automatically be fixed on band body 1, will not be washed away by current, simple in construction, good sealing effect in the presence of blade 7.
In order to strengthen the bonding strength between the first water band 9 and the second water band 8, improve between the first water band 9 and connector 4 Frictional resistance, the outer wall of the connector 4 is provided with anti-slip veins, the anti-slip veins include that several be arranged in parallel along described The annular line of the circumferencial direction extension of connector 4.
The connector 4 is provided with the support member of arc, and the support member is arranged on the top of the connector 4.Support Part be provided with beneficial to band body 1 first water-filling when, the positioning of the water band 9 of connector 4 and first can effectively guide connector 4 to expand Deformation, preferably adapts to the shape of the cavity 3 of the first water band 9.Meanwhile, the setting of support member also avoids embodiment well First, the problem of medium and small water sealing effectiveness of embodiment two is not good, it is ensured that the sealing effectiveness of connector 4.
General principle of the present utility model, principal character and advantage of the present utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, on the premise of the utility model spirit and scope are not departed from, the utility model is also Various changes and modifications are had, these changes and improvements are both fallen within the range of claimed the utility model.The utility model Claimed scope is by appended claims and its equivalent thereof.

Claims (9)

1.PE individual layer clamp water bands, it is characterised in that:Including band body, the band body is made up of PE, and the band is provided with individual layer in vivo Weave netting twine;The band in vivo provided with supply water stream through cavity, the connection end with body be provided with connector, the connector It is enclosed on provided with water swellable liquid storage cylinder is filled in the outside with body, the connector, the madial wall of the liquid storage cylinder is provided with Opening, the downstream of the opening is provided with gear liquid piece, and the gear liquid piece is extended into the cavity, and the liquid piece that keeps off is towards the band The direction of internal current, the gear liquid piece and the angle between body are less than 90 °.
2. PE individual layers clamp water band as claimed in claim 1, it is characterised in that:The connector extends to the company with body The outside at end is connect, the opening of the connector is arranged at the connector and overhang at the band body connection end.
3. PE individual layers clamp water band as claimed in claim 2, it is characterised in that:The liquid storage cylinder is parallel and remote with the band body Pull bar is provided with from the side wall with body, the pull bar is through the side wall of the liquid storage cylinder and with body and stretches into the cavity Interior, one end that the pull bar is stretched into the cavity is provided with block.
4. PE individual layers clamp water band as claimed in claim 3, it is characterised in that:The side wall of the liquid storage cylinder is provided with fixation Seat, the fixed seat is connected with the pull rod screw.
5. the PE individual layer clamp water bands as any one of claim 2 to 4, it is characterised in that:The opening is along described The circular opening that connector entirely circumferentially extends.
6. the PE individual layer clamp water bands as any one of claim 2 to 4, it is characterised in that:The opening is opened for point-like Mouthful, the punctual openings are located at the bottom of the connector.
7. PE individual layers clamp water band as claimed in claim 1, it is characterised in that:The opening is arranged on the connector and institute Band body overlapping region is stated, the opening includes at least one punctual openings, and the band body is provided with the aperture position corresponding position Through hole, the gear liquid piece is through the through hole and stretches into the cavity.
8. PE individual layers clamp water band as claimed in claim 1, it is characterised in that:The outer wall of the connector is provided with anti-skidding Line, the anti-slip veins include the annular line that several circumferencial directions along the connector be arrangeding in parallel extend.
9. PE individual layers clamp water band as claimed in claim 1, it is characterised in that:The connector is provided with the support of arc Part, the support member is arranged on the top of the connector.
CN201720013346.4U 2017-01-06 2017-01-06 PE individual layer clamp water bands Expired - Fee Related CN206539790U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720013346.4U CN206539790U (en) 2017-01-06 2017-01-06 PE individual layer clamp water bands

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720013346.4U CN206539790U (en) 2017-01-06 2017-01-06 PE individual layer clamp water bands

Publications (1)

Publication Number Publication Date
CN206539790U true CN206539790U (en) 2017-10-03

Family

ID=59938709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720013346.4U Expired - Fee Related CN206539790U (en) 2017-01-06 2017-01-06 PE individual layer clamp water bands

Country Status (1)

Country Link
CN (1) CN206539790U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110307421A (en) * 2019-07-11 2019-10-08 万新 Composite connecting pipe

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110307421A (en) * 2019-07-11 2019-10-08 万新 Composite connecting pipe

Similar Documents

Publication Publication Date Title
CN206513338U (en) A kind of slip casting type hole packer of new blocked gas drainage hole
JP2010501249A5 (en)
CN105697034B (en) Backfill the grouting system and grouting method of slip casting behind for composite lining structure
CN206539790U (en) PE individual layer clamp water bands
CN206377370U (en) Drainpipe connecting apparatus in a kind of municipal works
CN203961896U (en) A kind of adjustable annular double-layer air bag hole sealing device
CN103273820B (en) Hydraulic interconnection suspension system and exhausting and sealing method for same
CN207405593U (en) A kind of integration pump lock of rotatable 90 ° of the unlatching of gate
CN203755310U (en) Pile washing nozzle of self-elevating platform pile shoe
CN204300546U (en) A kind of scalable connection hose
CN207005511U (en) A kind of water outlet base with disconnecting prevention structure
CN105042262A (en) Connecting assembly between delivery pipe and ultrafilter
CN207421024U (en) Food production line hydraulic system hydraulic cylinder
CN208533516U (en) Hydraulic extruding extender and expansion stake system
CN206637162U (en) A kind of fast-assembling elbow for changing drainage direction
CN206183713U (en) Drainage device for hepatobiliary surgery
CN206700459U (en) Nephrology dept.'s peritoneum dialysis catheter
CN206018281U (en) The disconnected de- device of pipe safety
CN205198773U (en) Fire fighting water band
CN203641715U (en) Composite pipe
CN204312918U (en) Manifold blocks
CN105013119A (en) Conveying pipe capable of being coiled
CN103785098A (en) Three-cavity double-air-bag nephrostomy tube
CN204187186U (en) Staircase fire hose reel joint connecting hose
CN207485667U (en) A kind of silica gel pump line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171003

Termination date: 20190106

CF01 Termination of patent right due to non-payment of annual fee