CN206524789U - A kind of reactor cabinet controls circuit - Google Patents

A kind of reactor cabinet controls circuit Download PDF

Info

Publication number
CN206524789U
CN206524789U CN201720244424.1U CN201720244424U CN206524789U CN 206524789 U CN206524789 U CN 206524789U CN 201720244424 U CN201720244424 U CN 201720244424U CN 206524789 U CN206524789 U CN 206524789U
Authority
CN
China
Prior art keywords
circuit
vacuum contactor
opened contact
normal opened
loop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720244424.1U
Other languages
Chinese (zh)
Inventor
张正亮
曹祖正
李晓锐
李多燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Mining Group Co Ltd
Original Assignee
Huainan Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Mining Group Co Ltd filed Critical Huainan Mining Group Co Ltd
Priority to CN201720244424.1U priority Critical patent/CN206524789U/en
Application granted granted Critical
Publication of CN206524789U publication Critical patent/CN206524789U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of reactor cabinet controls circuit, including circuit breaker Q F, auxiliary reclay KA, relay 1ZJ, vacuum contactor KM, power supply;Circuit includes delay start loop, closing circuit, vacuum contactor control loop, and delay start loop, closing circuit, vacuum contactor control loop parallel connection are both connected to the two ends of power supply;Delay start loop is circuit breaker Q F, auxiliary reclay KA coil series connection;Closing circuit is that auxiliary reclay KA normal opened contact and relay 1ZJ coil are connected;Vacuum contactor control loop is connected for relay 1ZJ normal opened contact with vacuum contactor KM coil;Reactor cabinet is connected in parallel on the two ends of power supply.The advantage of the circuit is:Using vacuum contactor control loop come protection reactor cabinet, PLC alarms can be started when vacuum contactor control loop goes wrong.

Description

A kind of reactor cabinet controls circuit
Technical field
The utility model is related to reactor cabinet field, especially a kind of reactor cabinet control circuit.
Background technology
Jie's pump is closed as colliery factory building emphasis equipment, main pan feeding is provided for colliery system, once break down, will be direct Influence system is normally produced.Closing Jie's pump includes feeder cabinet and reactor cabinet, in use, it is necessary to which short circuit reactor, is prevented Reactor is overheated because long charged, so needing a kind of control circuit to carry out protection reactor.
Utility model content
Technical problem to be solved in the utility model is that reactor cabinet is long charged and overheats and damages, therefore This provides a kind of reactor cabinet control circuit.
A kind of reactor cabinet controls circuit, it is characterised in that including circuit breaker Q F, auxiliary reclay KA, relay 1ZJ, Vacuum contactor KM, power supply;The circuit includes delay start loop, closing circuit, vacuum contactor control loop, described to prolong Slow starting-up later time, closing circuit, vacuum contactor control loop parallel connection are both connected to the two ends of power supply;
Delay start loop is circuit breaker Q F, auxiliary reclay KA coil series connection;
Closing circuit is that auxiliary reclay KA normal opened contact and relay 1ZJ coil are connected;
Vacuum contactor control loop is connected for the normal opened contact of the relay 1ZJ with vacuum contactor KM coil;
The reactor cabinet is connected in parallel on the two ends of power supply.
Also include very first time relay KT1, the coils from parallel connection of coils of the very first time relay KT1 is in auxiliary reclay KA Coil two ends, the normal opened contact of the very first time relay KT1 is arranged on closing circuit, and with auxiliary reclay KA Normal opened contact series connection.
Also include stop button SB, conversion knob SB1, start button SB2, the conversion knob include automatic position switch and Manual position switch;
The stop button SB is connected on closing circuit again after being connected with the two ends of automatic position switch;
The manual position switch is connected with start button SB2, and the circuit in parallel of series connection is in the normal of very first time relay KT1 The two ends for opening the circuit after contact and the connection of automatic position switch form control locked loop.
The two ends of the manual position switch and start button SB2 series circuits are also parallel with relay 1ZJ normal opened contact Form self-holding circuit.
Also including starting timing transfinites loop, and startup timing loop first including vacuum contactor KM of transfiniting is normally closed The normal opened contact of contact, auxiliary reclay KA, the second time relay KT2;The startup timing loop of transfiniting is connected in parallel on power supply Two ends;The first normally closed contact, the auxiliary reclay KA normal opened contact of the vacuum contactor KM, second time relay KT2 is sequentially connected in series.
Also include vacuum contactor KM the second normally closed contact, the second normally closed contact of the vacuum contactor KM is connected in parallel on The two ends of vacuum contactor KM the first normally closed contact.
Including short circuit show circuit, the short circuit show circuit is connected in parallel on the two ends of power supply;The short circuit show circuit bag Include vacuum contactor KM normal opened contact, short circuit display lamp, the normal opened contact of the vacuum contactor KM, the series connection of short circuit display lamp Connection.
Also include the second time relay KT2 the second normal opened contact and PLC, the of second time relay KT2 Two normal opened contact one end are connected with PLC, and the other end is connected with power supply.
Also include start indicator lamp, the start indicator lamp is connected in parallel on the two ends of the second time relay KT2 coil.
The both positive and negative polarity output end of the power supply is connected having air switch 2ZK.
The utility model has the advantage of:
(1) breaker QF adhesives in the utility model, high-tension electricity by cable reach reactor cabinet upper port, now due to Vacuum contactor KM is also without adhesive in reactor cabinet, so high-tension electricity is added on reactor, when in delay start loop When circuit breaker Q F is closed, timing circuit starts, auxiliary reclay KA, time relay KT1 all adhesives, corresponding reactor cabinet Time relay KT1's in " closing circuit " and the auxiliary reclay KA closings of contact, if now control stop button SB is closed Close, conversion knob SB1 at automatic position switch and closure, " closing circuit " condition of reactor cabinet is met, and relay 1ZJ inhales Close, relay 1ZJ normally opened contacts closure, i.e. vacuum contactor control loop are turned on, i.e., the vacuum contactor KM lines in the loop Adhesive is enclosed, after vacuum contactor KM adhesives, because vacuum contactor and reactor are in parallel, its resistance is far smaller than reactor Resistance, electric current walks in shunt circuit from low-resistance contactor branch road, this completes the work of " short circuit " of reactor, To motor formation reduced-voltage starting, protection motor and current supply circuit safety.
(2) in the utility model during normal use, vacuum contactor KM auxiliary contact is because of overheat in reactance cabinet Plastic deformation is blocked, and vacuum contactor KM normally opened contact and vacuum contactor KM the first normally-closed contact are a pair of contact, very Empty contactor KM normally opened contact is changed into normally off, and vacuum contactor KM the first normally-closed contact is then changed into normally open, When driving again, after the normal adhesives of primary cut-out QF of feeder cabinet, vacuum contactor KM is blocked because of auxiliary contact, causes to connect Tentaculum actuating unit can not be operating normally, it is impossible to short circuit reactor, and reactor cabinet " starting timing transfinites " protection is because vacuum Contactor KM the first normally closed point is not normal closure state, and protective condition is unsatisfactory for, it is impossible to it is normal start the second time after Electrical equipment KT2.In feeder cabinet, the second time relay KT2 the first normal opened contact control circuit breaker Q F break-make, when second Between relay KT2 the first normal opened contact when obtaining electric closure, circuit breaker Q F adhesives conversely, circuit breaker Q F is opened, therefore cause true Empty contactor KM coils can not obtain electric, thus defencive function can not realize, and reactor cabinet " short circuit indicates loop " because of vacuum Contactor KM normally opened contact closure, causes the glitch of loop " short circuit ", the utility model in vacuum contactor KM first Second normally-closed contact of another pair contact in parallel on normally-closed contact, and two groups of auxiliary contact are separately mounted to vacuum contactor KM's Both sides, normally-closed contact used in parallel, accordingly even when a pair of failures therein, the normally-closed contact of another pair remains to normally act as With, reactor short circuit time-out loop, short circuit unsuccessfully trip also can normal work, excessive infringement will not be caused to reactor.
(3) time relay KT2 contacts of short circuit time-out are enabled in the utility model, its signal is returned into scheduling work On control machine, by writing corresponding program, alarm indication is made on scheduling industrial computer, if under driving state, when short circuit is super Constantly, display " alarm of short circuit time-out " on scheduling picture, dispatcher can notify to go inspection before electrician in time after alarm is found Look into, timely cut off high pressure feeder cabinet, cut off equipment, then search and solve corresponding failure, reduce the long-term mistake of reactor Heat burns possibility.
(4) short circuit indicator lamp is installed in the utility model, short circuit success so can be more intuitively checked whether.
Brief description of the drawings
Fig. 1 is a kind of schematic diagram of the control circuit of reactor cabinet of the utility model.
Embodiment
As shown in figure 1, a kind of reactor cabinet control circuit, including it is circuit breaker Q F, auxiliary reclay KA, relay 1ZJ, true Empty contactor KM, power supply, very first time relay KT1, vacuum contactor KM the second normally closed contact, second time relay KT2 the second normal opened contact and PLC.Stop button SB, conversion knob SB1, start button SB2, the conversion knob are included certainly Dynamic position switch and manual position switch.
The circuit includes delay start loop, closing circuit, vacuum contactor control loop, and the delay start is returned Road, closing circuit, vacuum contactor control loop parallel connection are both connected to the two ends of power supply.
Starting timing transfinites loop, the startup timing transfinite first normally closed contact of the loop including vacuum contactor KM, Auxiliary reclay KA normal opened contact, the second time relay KT2, startup timing loop of transfiniting is connected in parallel on the two of power supply End.
Including short circuit show circuit, the short circuit show circuit is connected in parallel on the two ends of power supply;The short circuit show circuit bag Include vacuum contactor KM normal opened contact, short circuit display lamp.
Delay start loop is circuit breaker Q F, auxiliary reclay KA coil series connection.
Closing circuit is that auxiliary reclay KA normal opened contact and relay 1ZJ coil are connected.
Vacuum contactor control loop is connected for the normal opened contact of the relay 1ZJ with vacuum contactor KM coil.
The reactor cabinet is connected in parallel on the two ends of power supply.
The two ends of coil of the coils from parallel connection of coils of the very first time relay KT1 in auxiliary reclay KA, when described first Between relay KT1 normal opened contact be arranged on closing circuit, and connected with auxiliary reclay KA normal opened contact.
The stop button SB is connected on closing circuit again after being connected with the two ends of automatic position switch;
The manual position switch is connected with start button SB2, and the circuit in parallel of series connection is in the normal of very first time relay KT1 The two ends for opening the circuit after contact and the connection of automatic position switch form control locked loop.
The two ends of the manual position switch and start button SB2 series circuits are also parallel with relay 1ZJ normal opened contact Form self-holding circuit.
The first normally closed contact, the auxiliary reclay KA normal opened contact of the vacuum contactor KM, second time relay KT2 is sequentially connected in series.
The second normally closed contact of the vacuum contactor KM is connected in parallel on the two ends of vacuum contactor KM the first normally closed contact.
Normal opened contact, the short circuit display lamp of the vacuum contactor KM is connected in series.
Second normal opened contact one end of second time relay KT2 is connected with PLC, and the other end is connected with power supply. In feeder cabinet, the second time relay KT2 the first normal opened contact control circuit breaker Q F break-make, when second time relay When KT2 the first normal opened contact obtains electric closure, circuit breaker Q F adhesives, conversely, circuit breaker Q F is opened.
Also include start indicator lamp, the start indicator lamp is connected in parallel on the two ends of the second time relay KT2 coil.
The both positive and negative polarity output end of the power supply is connected having air switch 2ZK.
The course of work of the system is as follows:
When the normal entry condition of feeder cabinet is met, circuit breaker Q F adhesives, high-tension electricity is reached by cable and air switch 2ZK Reactor cabinet upper port, now because vacuum contactor KM is also without adhesive in reactor cabinet, so high-tension electricity is to be added in reactance On device, when breaker QF is closed in delay start loop, timing circuit starts, auxiliary reclay KA, time relay KT1 Time relay KT1's in all adhesives, corresponding reactor cabinet " closing circuit " and the auxiliary reclay KA closings of contact, if Now control stop button SB closures, conversion knob SB1 at automatic position switch and closure, " closing circuit " bar of reactor cabinet Part is met, relay 1ZJ adhesives, and relay 1ZJ normally opened contacts closure, i.e. vacuum contactor control loop are turned on, i.e. the loop In vacuum contactor KM coil adhesives, after vacuum contactor KM adhesives, because vacuum contactor and reactor are in parallel, its Resistance is far smaller than the resistance of reactor, and electric current is walked in shunt circuit from low-resistance contactor branch road, this completes " short circuit " work of reactor, to motor formation reduced-voltage starting, protection motor and current supply circuit safety.
When vacuum contactor KM obtains electric, under normal circumstances, vacuum contactor KM normal opened contact closure, i.e. short circuit is indicated Lamp is lighted, and vacuum contactor KM the first normally closed contact and vacuum contactor KM the second normally closed contact are opened, and start-up technique surpasses Loop is limited to disconnect.When occurring abnormal conditions, vacuum contactor KM the first normally closed contact and the second of vacuum contactor KM normal Close contact and be in closure state, now the second time relay KT2 coil obtains electric, that is, starting timing transfinites loop start, the After two time relay KT2 delays 20s, the second time relay KT2 the first normal opened contact and the second time relay KT2's Second normal opened contact is closed, and the disconnection of the second time relay KT2 the first normal opened contact causes circuit breaker Q F to disconnect, and finally makes Vacuum contactor KM coil losing electricity, cause short circuit failure, at the same time, the second of the second time relay KT2 normally opened connects Point causes PLC to send the alarm signal of short-circuit reactance device failure.
The preferred embodiment that the utility model is created is these are only, is not created to limit the utility model, it is all Any modifications, equivalent substitutions and improvements made within the spirit and principle created in the utility model etc., should be included in this Within the protection domain that utility model is created.

Claims (10)

1. a kind of reactor cabinet controls circuit, it is characterised in that including circuit breaker Q F, auxiliary reclay KA, relay 1ZJ, true Empty contactor KM, power supply;The circuit includes delay start loop, closing circuit, vacuum contactor control loop, the delay Starting-up later time, closing circuit, vacuum contactor control loop parallel connection are both connected to the two ends of power supply;
Delay start loop is circuit breaker Q F, auxiliary reclay KA coil series connection;
Closing circuit is that auxiliary reclay KA normal opened contact and relay 1ZJ coil are connected;
Vacuum contactor control loop is connected for the normal opened contact of the relay 1ZJ with vacuum contactor KM coil;
The reactor cabinet is connected in parallel on the two ends of power supply.
2. a kind of reactor cabinet control circuit according to claim 1, it is characterised in that also including very first time relay The two ends of coil of KT1, the very first time relay KT1 coils from parallel connection of coils in auxiliary reclay KA, the very first time after Electrical equipment KT1 normal opened contact is arranged on closing circuit, and is connected with auxiliary reclay KA normal opened contact.
3. a kind of reactor cabinet control circuit according to claim 1, it is characterised in that also including stop button SB, turn Knob SB1, start button SB2 are changed, the conversion knob includes automatic position switch and manual position switch;
The stop button SB is connected on closing circuit again after being connected with the two ends of automatic position switch;
The manual position switch is connected with start button SB2, normally opened the connecing of the circuit in parallel of series connection in very first time relay KT1 The two ends of circuit after point and the connection of automatic position switch form control locked loop.
4. a kind of reactor cabinet control circuit according to claim 3, it is characterised in that the manual position switch is with starting The two ends of button SB2 series circuits are also parallel with relay 1ZJ normal opened contact formation self-holding circuit.
5. a kind of reactor cabinet control circuit according to claim 1, it is characterised in that also transfinited back including starting timing Road, startup timing loop of transfiniting includes vacuum contactor KM the first normally closed contact, auxiliary reclay KA normal opened contact, Second time relay KT2;The timing loop of transfiniting that starts is connected in parallel on the two ends of power supply;The first of the vacuum contactor KM The normal opened contact of normally closed contact, auxiliary reclay KA, the second time relay KT2 is sequentially connected in series.
6. a kind of reactor cabinet control circuit according to claim 5, it is characterised in that also including vacuum contactor KM's Second normally closed contact, the second normally closed contact of the vacuum contactor KM is connected in parallel on vacuum contactor KM the first normally closed contact Two ends.
7. a kind of reactor cabinet control circuit according to claim 5 or 6, it is characterised in that including short circuit show circuit, The short circuit show circuit is connected in parallel on the two ends of power supply;Normal opened contact of the short circuit show circuit including vacuum contactor KM, Short circuit display lamp, normal opened contact, the short circuit display lamp of the vacuum contactor KM are connected in series.
8. a kind of reactor cabinet control circuit according to claim 1, it is characterised in that also including second time relay KT2 the second normal opened contact and PLC, second normal opened contact one end of second time relay KT2 is connected with PLC, another End is connected with power supply.
9. a kind of reactor cabinet control circuit according to claim 5, it is characterised in that also including start indicator lamp, institute State the two ends that start indicator lamp is connected in parallel on the second time relay KT2 coil.
10. a kind of reactor cabinet control circuit according to claim 1, it is characterised in that the both positive and negative polarity of the power supply is defeated Go out end series connection having air switch 2ZK.
CN201720244424.1U 2017-03-13 2017-03-13 A kind of reactor cabinet controls circuit Active CN206524789U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720244424.1U CN206524789U (en) 2017-03-13 2017-03-13 A kind of reactor cabinet controls circuit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720244424.1U CN206524789U (en) 2017-03-13 2017-03-13 A kind of reactor cabinet controls circuit

Publications (1)

Publication Number Publication Date
CN206524789U true CN206524789U (en) 2017-09-26

Family

ID=59902954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720244424.1U Active CN206524789U (en) 2017-03-13 2017-03-13 A kind of reactor cabinet controls circuit

Country Status (1)

Country Link
CN (1) CN206524789U (en)

Similar Documents

Publication Publication Date Title
CN210835157U (en) Circuit breaker on-off fault detection circuit
CN202374037U (en) Double-power on-line automatic switching device
CN106655898A (en) Electric reactor cabinet control circuit
TWM637098U (en) An improved device for automatically toggle interlocking modules with three switches
CN106291141B (en) Automatic phase sequence identification device for three-phase power supply on construction site
CN206524789U (en) A kind of reactor cabinet controls circuit
CN106783457B (en) Emergency stop self-lock switch and automation equipment
CN103647306A (en) Automatic quasi-synchronization closing loop for preventing generator nonsynchronous closing
CN107919655B (en) Control circuit, control method and air conditioner
CN104076209A (en) Detection device for motor
JP6640956B1 (en) Power supply system, power supply device, and power supply method
CN205160042U (en) Protection device is controlled absolutely to rotary tablet machine
CN202475327U (en) Automatic alarm control device of motor
CN206790208U (en) Outside emergency power supply access device
CN201541221U (en) Electric control circuit
CN210778320U (en) Interlocking circuit and device for electrically operated drawer unit
CN218447718U (en) Convenient thermal relay reset system
CN104362578B (en) Can reclosing RCCB
CN203607816U (en) Control circuit used for controlling and protecting switching device
CN213753975U (en) Open-phase protection control circuit for three-phase motor
CN217672174U (en) New energy vehicle high-voltage cutoff system and new energy vehicle
CN211554781U (en) Control circuit and production system
CN215897139U (en) Multifunctional power distribution control drawer
CN219554844U (en) Control circuit for safely stopping DCS anti-interference electricity program
CN210350859U (en) Alarm device for monitoring circuit breaker

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant