CN206523572U - A kind of communication base station rack test platform - Google Patents
A kind of communication base station rack test platform Download PDFInfo
- Publication number
- CN206523572U CN206523572U CN201720010287.5U CN201720010287U CN206523572U CN 206523572 U CN206523572 U CN 206523572U CN 201720010287 U CN201720010287 U CN 201720010287U CN 206523572 U CN206523572 U CN 206523572U
- Authority
- CN
- China
- Prior art keywords
- body frame
- rack
- rack body
- air switch
- test platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Structure Of Telephone Exchanges (AREA)
- Monitoring And Testing Of Transmission In General (AREA)
Abstract
The utility model discloses a kind of communication base station rack test platform, including rack body frame, supporting table is installed at the top of rack body frame, left plate and right plate are respectively equipped with the both sides of rack body frame, the front and rear of rack body frame is provided with front side board and back side panel, supporting table is provided with indicator gate, button and instruction socket, front side board and back side panel are hinged on rack body frame, left plate is inputted provided with three phase mains, exchange output 4P air switch and direct current output 2P air switch, right plate is provided with 4P air switch and 2P air switch, battery output interface is sequentially installed with the top of rack body frame, fast joint, DB9 adapters, load connector.The utility model is placed all detection devices to avoid interfering with each other by performance, classification, it is placed in premised on safe and reliable in test platform, and be integrated with aesthetic property, security, effectively improve rack detection efficiency, furtherly both allowed rack assembly site succinct, it is attractive in appearance, raising production efficiency is played again, saves the effect of production cost.
Description
Technical field
The utility model is related to communication base station rack test platform, belongs to rack test platform field.
Background technology
With the network coverage of China's mobile communication and being continuously increased for capacity, base station number is sharply increased, therewith phase
The rack quantity matched somebody with somebody also is sharply increased therewith.And due to the continuous progress of technology, constantly upgrade for the configuration requirement of rack, it is right
The quality requirement of rack also more and more higher therewith in itself.The electric property of wherein rack be rack it is most basic be also most important property
One of can.When dispatching from the factory, if the electric property of rack is not up to standard, the normal operation of communication apparatus will be directly affected, it is more serious
Base station may be caused to occur security incident.
Communication base station is sharply increased with the quantity of rack, is also driven manufacturer's searching and is more saved efficiency, improves equipment
The mode of production of quality.While production technology is improved constantly, detection mode, method are also constantly improved.Efficiently, it is safe
Detection method, is also the important means for improving production efficiency.
At present because mechanics of communication constantly improves, cause the configuration feature of rack need to be more and more, what rack need to be detected
Project is also more and more, becomes increasingly complex, so as to add the equipment needed for rack detection.Traditional rack detection, it is different
Detection device is individually operated, after a detection terminates, needs more exchange device, detects another.In frequently operating, it is easy to lead
Cause situations such as leakage of detection, data are forbidden.Scene is also because frequently more exchange device, wiring, and taking out stitches causes confusion, triggers peace
Full accident.
Utility model content
Utility model purpose:In order to overcome the deficiencies in the prior art, the utility model provides a kind of communication base station
Use rack test platform, by all detection devices by performance, classification place to avoid interfering with each other, it is safe and reliable premised on dispose
It is integrated in test platform, and with aesthetic property, security, effectively improves rack detection efficiency, furtherly both allows rack
Assembly site is succinct, attractive in appearance, and raising production efficiency is played again, saves the effect of production cost.
Technical scheme:In order to solve the above technical problems, a kind of communication base station rack test platform of the present utility model, bag
Include and supporting table is installed at the top of rack body frame, the rack body frame, left plate and right side are respectively equipped with the both sides of rack body frame
Plate, the front and rear of rack body frame is provided with front side board and back side panel, and the supporting table is provided with indicator gate, button and indicator lamp
Mouthful, the front side board and back side panel be hinged on rack body frame, provided with first point of storehouse, second point of storehouse, the in rack body frame
Key board drawer is installed, the left plate is defeated provided with three phase mains above three points of storehouses and the 4th point of storehouse, first point of storehouse
Enter, exchange output 4P air switch and direct current output 2P air switch, three phase mains input, exchange output 4P air switch and direct current output 2P air switch
The top of left plate is respectively positioned on, the right plate is provided with the top of 4P air switch and 2P air switch, the rack body frame and is sequentially installed with electricity
Pond output interface, fast joint, DB9 adapters, load connector.
Preferably, the left plate is provided with several fan exhausts mouthful.
Preferably, the fan exhaust mouthful there are four, it is arranged in what two rows two arranged on left plate.
Preferably, being provided with four rolling below the rack body frame.
Beneficial effect:All detection devices are pressed performance, classification by communication base station of the present utility model rack test platform
Place to avoid interfering with each other, it is safe and reliable premised on be placed in test platform, and be integrated with aesthetic property, security,
Rack detection efficiency is effectively improved, had furtherly both allowed rack assembly site succinct, it is attractive in appearance, raising production efficiency is played again, is saved
The about effect of production cost.
Brief description of the drawings
Fig. 1 is positive structure schematic of the present utility model;
Fig. 2 is structure schematic diagram of the present utility model;
Fig. 3 is side structure schematic diagram of the present utility model.
Embodiment
As shown in Figure 1 to Figure 3, a kind of communication base station rack test platform of the present utility model, including rack body frame, institute
State and supporting table is installed at the top of rack body frame, supporting table at the top of rack body frame in angle with being connected, preferably 60 °~75 ° of angle,
The both sides of rack body frame are respectively equipped with left plate and right plate, and the front and rear of rack body frame is provided with front side board and back side panel, the branch
Platform is supportted provided with indicator gate 1, button and socket 2 is indicated, 3 buttons and corresponding 3 indicator lamps is respectively provided with, it is described before
Side plate and back side panel are hinged on rack body frame, provided with first point of storehouse 4, second point of storehouse 5, the 3rd point of storehouse 6 in rack body frame
With the 4th point of storehouse 7, first point of storehouse 4 is used to place main frame and terminal plate, and the top in first point of storehouse 4 is provided with Key board drawer 3
And mouse, second point of placement of storehouse 5 universal meter, contactor, 485 adapters, interim instrument is placed in the 3rd point of storehouse 6, and it is empty to make reason line
Between, it is ensured that cabling is attractive in appearance, does not interfere with each other.Rectification module is placed in 4th point of storehouse 7, and the left plate is inputted provided with three phase mains
15th, exchange output 4P air switch 16 and direct current output 2P air switch 17, three phase mains input 15, exchange output 4P air switch 16 and direct current are defeated
Go out the top that 2P air switch 17 is respectively positioned on left plate, the live three-phase alternating current input of the connection of three phase mains input 15, is that test platform is carried
For working power.Exchange output 4P air switch 16 connects tested rack, and there is provided tested rack working power.Direct current output 2P air switch 17
The tested rack battery input of connection, simulated battery condition of supplying power is provided for tested rack.The right plate is provided with 4P air switch 8 and 2P
Air switch 9,4P air switch 8 is connected with the load of tested rack, can be breaking respectively when lower electric, and 2P air switch 9 is computer power air switch, the machine
Battery output interface 11, fast joint 12, DB9 adapters 13, load connector 14 are sequentially installed with the top of cabinet body frame, battery output connects
Mouth 11, fast joint 12, DB9 adapters 13, load connector 14 are located on the interface panel at the rear portion of indicator gate 11, battery output
Interface 11 is equipped with 37 core Anderson fast joints 12, is exported including simulated battery output and rack three-phase alternating-current supply.Connect soon
First 12 be tested rack load input, and the load of 4 tunnels is accessed in order.DB9 adapters 13 are respectively rectification module, tested rack control
Panel processed and it is standby be connected with 485 converters, rectification module, tested rack is converted to USB outputs through 485 converters and connected with PC
Connect, and input backstage.The load of the connecting test of load connector 14 is exported with detecting under rack band load state.Set on the left plate
There are several fan exhausts mouthful 18, the fan exhaust mouthful 18 there are four, is arranged in what two rows two arranged on left plate, the machine
Four rolling 10 is installed below cabinet body frame.
Design feature and its advantage of the present utility model:The utility model is real by the way that body interior is optimized into a point storehouse
The integration of existing test equipment.Its all output and feedback are connected by fast joint 12 with equipment under test.Interior of equipment cabinet column
Binding muscle is carried, wire loop is managed.Rack power line is unified by right side cabling, and signal wire is unified by left side cabling, different classes of line
Between distinguish cabling, with the case of avoiding high current higher to measuring accuracy requirement feedback signal disturb, cause test it is not smart
True situation.
The utility model is essential part in communication base station rack project, and it effectively sets all tests
It is standby to concentrate on inside identical platform, and test operation is converged control.Not only increase the simple operation of test equipment
Property, while reducing the Capability Requirement to operating personnel again, while also allowing installation environment succinct, attractive in appearance, safe, test result is accurate
Really, reliably.
Described above is only preferred embodiment of the present utility model, it should be pointed out that:For the common skill of the art
For art personnel, on the premise of the utility model principle is not departed from, some improvements and modifications can also be made, these improve and
Retouching also should be regarded as protection domain of the present utility model.
Claims (4)
1. a kind of communication base station rack test platform, it is characterised in that:Including rack body frame, installed at the top of the rack body frame
There is supporting table, left plate and right plate are respectively equipped with the both sides of rack body frame, the front and rear front side board that is provided with of rack body frame is with after
Side plate, the supporting table is provided with indicator gate, button and indicates socket, and the front side board and back side panel are hinged on rack
On body frame, in rack body frame be provided with first point of storehouse, second point of storehouse, the 3rd point of storehouse and the 4th point of storehouse, first point of storehouse it is upper
Side is provided with Key board drawer, and the left plate exports 4P air switch and direct current output 2P air switch provided with three phase mains input, exchange,
Three phase mains input, exchange output 4P air switch and direct current output 2P air switch are respectively positioned on the top of left plate, and the right plate is provided with
Battery output interface, fast joint, DB9 adapters, load is sequentially installed with the top of 4P air switch and 2P air switch, the rack body frame to connect
Head.
2. communication base station according to claim 1 rack test platform, it is characterised in that:If the left plate is provided with
Dry fan exhaust mouthful.
3. communication base station according to claim 2 rack test platform, it is characterised in that:The fan exhaust mouthful has four
It is individual, it is arranged in what two rows two arranged on left plate.
4. communication base station according to claim 2 rack test platform, it is characterised in that:The lower section of the rack body frame
Four rolling is installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720010287.5U CN206523572U (en) | 2017-01-05 | 2017-01-05 | A kind of communication base station rack test platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720010287.5U CN206523572U (en) | 2017-01-05 | 2017-01-05 | A kind of communication base station rack test platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206523572U true CN206523572U (en) | 2017-09-26 |
Family
ID=59889581
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720010287.5U Expired - Fee Related CN206523572U (en) | 2017-01-05 | 2017-01-05 | A kind of communication base station rack test platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206523572U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112098747A (en) * | 2020-08-24 | 2020-12-18 | 桂林长海发展有限责任公司 | Multifunctional electronic equipment maintenance platform |
CN113049856A (en) * | 2021-03-19 | 2021-06-29 | 山东英信计算机技术有限公司 | Test jig and cabinet assembly |
-
2017
- 2017-01-05 CN CN201720010287.5U patent/CN206523572U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112098747A (en) * | 2020-08-24 | 2020-12-18 | 桂林长海发展有限责任公司 | Multifunctional electronic equipment maintenance platform |
CN113049856A (en) * | 2021-03-19 | 2021-06-29 | 山东英信计算机技术有限公司 | Test jig and cabinet assembly |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204627281U (en) | A kind of intelligent safe and intelligent safe system | |
CN206523572U (en) | A kind of communication base station rack test platform | |
CN205484656U (en) | Be used for 95598 automatic power failure detection device of electric power | |
CN203164350U (en) | Intelligent distribution instrument | |
CN206057463U (en) | The comprehensive test device of gate inhibition's control system on the spot | |
CN206594284U (en) | Portable type current transformer secondary connection polarity test device | |
CN202057736U (en) | Handheld power load control equipment fault detector | |
CN205861219U (en) | Steam generator system wireless type multipoint temperature monitoring test system | |
CN206096369U (en) | A equipment for detecting PCB function | |
CN109256865A (en) | A kind of distribution network automated terminal with self-checking function | |
CN205451456U (en) | Real -time temperature measured module of transformer substation based on wifi wireless communication | |
CN204906005U (en) | Detection device and transformer substation of high frequency protection passageway | |
CN203190565U (en) | Air conditioner control module | |
CN206235883U (en) | Injection machine station movement controller fault detect testing stand | |
CN207992408U (en) | A kind of battery inspection device | |
CN207232300U (en) | Wire harnesses detection device | |
CN208207193U (en) | A kind of family table examination device | |
CN203148881U (en) | Wireless-network-based methane sensor for mining | |
CN207651614U (en) | A kind of device that battery pole group is assembled to battery case | |
CN207199074U (en) | For debugging the portable terminal device and electric-power metering terminal system of electric-power metering terminal | |
CN207586327U (en) | High-voltage parallel capacitor on-line monitoring system | |
CN106209657A (en) | A kind of dust-proof router | |
CN206593729U (en) | A kind of hand-held detection configurating terminal of intellectual water meter | |
CN207215161U (en) | A kind of portable electric relay detection device | |
CN206684937U (en) | A kind of centralized meter reading terminal failure detector |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170926 Termination date: 20200105 |