CN206522609U - A kind of LNG loading systems - Google Patents

A kind of LNG loading systems Download PDF

Info

Publication number
CN206522609U
CN206522609U CN201720042812.1U CN201720042812U CN206522609U CN 206522609 U CN206522609 U CN 206522609U CN 201720042812 U CN201720042812 U CN 201720042812U CN 206522609 U CN206522609 U CN 206522609U
Authority
CN
China
Prior art keywords
lng
bog
storage tank
tank
drainers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720042812.1U
Other languages
Chinese (zh)
Inventor
柳发干
彭涛
孙丹娜
丁佳敏
宋宏荣
杨坤明
曹卫斌
冯帅帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Xiang Xiang Energy Co Ltd
Hebei Bohai Coal Coking Co Ltd
Original Assignee
Hebei Xiang Xiang Energy Co Ltd
Hebei Bohai Coal Coking Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Xiang Xiang Energy Co Ltd, Hebei Bohai Coal Coking Co Ltd filed Critical Hebei Xiang Xiang Energy Co Ltd
Priority to CN201720042812.1U priority Critical patent/CN206522609U/en
Application granted granted Critical
Publication of CN206522609U publication Critical patent/CN206522609U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model discloses a kind of LNG loading systems, including LNG tank cars and LNG tank area.LNG tank area includes LNG storage tank I, LNG compressor, BOG surge tanks, BOG compressors, BOG drainers, the LNG storage tank II provided with immersed pump;LNG storage tank I bottoms and top connect LNG compressors and BOG thermostats respectively, BOG thermostats, BOG surge tanks, BOG compressors, BOG drainers are sequentially connected, LNG pump in LNG storage tank I is connected with BOG drainers, BOG condensation pot bottom connection LNG storage tanks II, LNG storage tank II, LNG tank cars are connected with BOG thermostats, LNG storage tank II connects LNG tank cars by liquid phase connecting pipe, in parallel be provided with unloads liquid pipe road on liquid pipe, LNG tank cars are provided with the fluid level measuring instrument and pressure detecting table being electrically connected with the controller, controller and LNG pump, immersed pump, power electric connection.The utility model reduces the wasting of resources to BOG recyclings;LNG tank car liquid levels can be accurately measured simultaneously, it is to avoid LNG overflows, safe;LNG handling one, it is convenient and swift.

Description

A kind of LNG loading systems
Technical field
The utility model is related to liquefied natural gas field, specifically a kind of LNG loading systems.
Background technology
Liquefied natural gas (LNG, Liquefied Natural Gas) is that natural gas is formed after purification and condensation liquefaction Liquified natural gas, be a kind of high-grade energy that can be utilized on a large scale, with the characteristics of calorific value is high, Air-pollution From Combustion is small, as The strategic energy of clean and effective, LNG turns into the new focus of world's oil and gas industry, is widely used in national economy. LNG is as the vehicle fuel of high-quality, and compared with vehicle fuel, with octane number height, anti-knock properties are good, burning is complete, exhaust pollution Less, the low advantage of engine life length, operating cost;It is compared with compressed natural gas, then high with efficiency of storage, continual mileage It is long, the advantages of storage bottle pressure is low, lightweight, quantity is small.
During BOG is LNG storages and runed, part LNG evaporations, the flash steam of generation, main component is methane, is one Kind of greenhouse effects very strong gas, if BOG is discharged into air, not only causes serious greenhouse effects, while also making clear Clean energy waste.Therefore, BOG must be handled well while to LNG entruckings, environmental protection and the work of energy-conservation is carried out.
The content of the invention
To solve the above problems, the utility model provides a kind of LNG loading systems.
To solve the above problems, the utility model is adopted the following technical scheme that:A kind of LNG loading systems, including LNG tank cars With LNG tank area, state LNG tank area including LNG storage tank I, LNG compressor, BOG surge tanks, BOG compressors, BOG drainers, be provided with The LNG storage tank II of immersed pump, the LNG compressors are connected by connecting pipe with the fluid inlet of the LNG storage tank I bottoms, BOG thermostats, the BOG thermostats and the BOG surge tanks air inlet are connected by gaseous phase outlet at the top of the LNG storage tank I Connection, BOG surge tanks gas outlet is connected by connecting pipe with the BOG compressors, the BOG compressors and BOG drainers LNG pump is provided with lower end inlet communication, the LNG storage tank I, the LNG pump outlet connection BOG drainers upper inlet end is described The outlet connection LNG storage tank II of BOG condensation pot bottoms import, the LNG storage tank II top exits end is controlled with the BOG Warm device is connected by pipeline, and the port of export of the LNG storage tank II connects LNG tank car inlets by liquid phase connecting pipe, described LNG tank cars gas phase mouth connects the BOG thermostats by gas phase connecting pipe, and be provided with parallel with the liquid pipe unloads liquid pipe Road, the LNG tank cars be provided with fluid level measuring instrument and pressure detecting table, the fluid level measuring instrument, pressure detecting table with control Device electrically connect, the controller also with LNG pump, immersed pump, power electric connection.
Further, the LNG storage tank I is holding vessel with pressure.
Further, liquid level detection device is equipped with the LNG storage tank I, LNG storage tank II, liquid level alarm is located at institute LNG storage tank I, LNG storage tank II surface are stated, and is electrically connected with liquid level detection device.
Further, the liquid phase connecting pipe is provided with flowmeter and control valve I, and the liquid pipe road that unloads is provided with control Valve II.
Further, between the LNG pump and BOG drainers, set respectively between the BOG drainers and LNG storage tank II There are choke valve and flow regulator.
Further, the liquid phase connecting pipe is connected by oil filling riser liquid phase joint with the LNG tank cars inlet, described Gas phase connecting pipe is connected by oil filling riser gas phase joint with the gas phase mouth of the LNG tank cars.
The beneficial effects of the utility model are:The utility model is easy to operate, will can produce in LNG transportations BOG recyclings, reduce the wasting of resources;Meanwhile, it is capable to accurately measure the content of LNG in LNG tank cars, it is to avoid LNG overflows, Unnecessary waste is caused, the security of operation is improved again;LNG handling one, it is convenient and swift.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is circuit block diagram of the present utility model.
In figure, 1, BOG thermostats, 2, BOG surge tanks, 3, BOG compressors, 4, gas phase connecting pipe, 5, BOG drainers, 6th, control valve I, 7, control valve II, 8, oil filling riser gas phase joint, 9, LNG tank cars, 10, oil filling riser liquid phase joint, 11, liquid phase connecting tube Road, 12, flowmeter, 13, LNG storage tank II, 14, LNG pump, 15, LNG compressors, 16, LNG storage tank I, 17, unload liquid pipe road, 18, section Flow valve
Embodiment
The utility model is done with reference to specific embodiment and further illustrated.
Embodiment 1
A kind of LNG loading systems as shown in Fig. 1 to 2, including LNG tank cars (9) and LNG tank area.LNG tank area includes LNG Storage tank I, LNG compressor (15), BOG surge tanks (2), BOG compressors (3), BOG drainers (5), the LNG storages provided with immersed pump Tank II (13), LNG compressors (15) are connected by connecting pipe with the fluid inlet of the LNG storage tank I bottoms, the LNG storages BOG thermostats (1), the BOG thermostats (1) and BOG surge tanks (2) air inlet are connected by gaseous phase outlet at the top of tank I Connection, BOG surge tanks (2) gas outlet is connected by connecting pipe with the BOG compressors (3), the BOG compressors (3) and LNG pump (14), LNG pump (14) the outlet connection BOG are provided with BOG drainers (5) lower end inlet communication, the LNG storage tank I Drainer (5) upper inlet end, the outlet of BOG drainers (5) bottom connects the import of the LNG storage tank II (13), described LNG storage tank II (13) top exit end is connected with the BOG thermostats (1) by pipeline, the outlet of the LNG storage tank II (13) End connects LNG tank cars (9) inlet by liquid phase connecting pipe (11), and LNG tank cars (9) gas phase mouth passes through gas phase connecting tube Road (4) connects the BOG thermostats (1), and be provided with parallel with the liquid pipe is unloaded on liquid pipe road (17), the LNG tank cars (9) Provided with fluid level measuring instrument and pressure detecting table, the fluid level measuring instrument, pressure detecting table are electrically connected with the controller, the control Device also with LNG pump (14), immersed pump, power electric connection.
As a kind of preferred embodiment, between the LNG pump (14) and the BOG drainers (5), the BOG condensations Choke valve (18) and flow regulator are respectively equipped between tank (5) and the LNG storage tank II (13).
As a kind of preferred embodiment, the liquid phase connecting pipe (11) is provided with flowmeter (12) and control valve (6), The liquid pipe road (17) that unloads is provided with control valve II (7), and the information detected according to liquid level detection device controls LNG flow to work as When needing to unload LNG, stop LNG conveying, and the control closed on the liquid phase connecting pipe (11) in parallel with unloading liquid pipe road (17) Valve II (7), opens the control valve I (6) unloaded on liquid pipe road (17), LNG is back in LNG storage tank II (13).
As a kind of preferred embodiment, liquid level detection device is equipped with the LNG storage tank I, LNG storage tank II (13), Liquid level alarm is electrically connected with liquid level detection device, and positioned at the LNG storage tank I, LNG storage tank II (13) surface.
As a kind of preferred embodiment, the liquid phase connecting pipe (11) by oil filling riser liquid phase joint (10) with it is described LNG tank cars (9) inlet is connected, and the gas phase connecting pipe (4) passes through oil filling riser gas phase joint (8) and the LNG tank cars (9) Gas phase mouth is connected.
It is cooled to when it is implemented, LNG will be carried out from ice chest after -162 DEG C, by reducing pressure by regulating flow to 0.015MPa, storage In Pressure Vessel LNG storage tank I, LNG enters BOG drainers (5) by LNG pump (14) from BOG drainers (5) upper inlet end Interior, then BOGBOG thermostats (1) re-heat flashed off in LNG storage tank I to normal temperature enters BOG surge tanks by connecting pipe (2) BOG drainers (5) are delivered to after being pressurized, then through BOG compressors (3), and are entered at BOG drainers (5) bottom inlet, it is complete Paired BOG recovery and recycling, generate LNG;LNG in BOG drainers (5) inputs LNG storage tank II by connecting pipe (13), immersed pump is carried in LNG storage tank II (13);LNG is directed to entrucking area by liquid phase connecting pipe (11);During entrucking, Liquid phase connecting pipe (11) is connected by oil filling riser liquid phase joint (10) with LNG tank cars (9) inlet, and gas phase connecting pipe (4) leads to The gas phase mouth that oil filling riser gas phase joint (8) is crossed with LNG tank cars (9) is connected, and starts the LNG conveyings in immersed pump, LNG storage tank II (13) To tank car, the gas phase in LNG tank cars (9) then returns to BOG thermostats (1), LNG storage tank II (13) from gas phase connecting pipe (4) The BOG of interior generation returns to BOG thermostats (1) with connecting pipe, carries out BOG recycling.
Although embodiment of the present utility model has been shown and described above, it is to be understood that above-described embodiment is Exemplary, it is impossible to it is interpreted as to limitation of the present utility model, one of ordinary skill in the art is in scope of the present utility model It is interior above-described embodiment to be changed, changed, replaced and modification.

Claims (6)

1. a kind of LNG loading systems, including LNG tank cars and LNG tank area, it is characterised in that:The LNG tank area includes LNG storage tank I, LNG compressor, BOG surge tanks, BOG compressors, BOG drainers, LNG storage tank II, the LNG storage tank I provided with immersed pump Bottom and top connect LNG compressors and BOG thermostats respectively, and the BOG thermostats, BOG surge tanks, BOG compressors are successively Connection, the BOG compressors are connected with BOG drainers lower end, the LNG pump connection BOG drainer upper inlets end, the LNG Storage tank II sides connect BOG drainers, and opposite side is connected by liquid phase connecting pipe with LNG tank cars, the liquid phase connecting pipe Upper one in parallel is unloaded liquid pipe road, and LNG storage tank II, the LNG tank car is connected by gas phase connecting pipe with BOG thermostats respectively, The LNG tank cars are provided with fluid level measuring instrument and pressure detecting table, and the fluid level measuring instrument, pressure detecting table are electric with controller Connection, the controller is also electrically connected with power supply, LNG pump, immersed pump.
2. a kind of LNG loading systems according to claim 1, it is characterised in that:The LNG storage tank I is holding vessel with pressure And LNG pump is provided with LNG storage tank I.
3. a kind of LNG loading systems according to claim 1, it is characterised in that:Liquid level inspection is equipped with the LNG storage tank Device is surveyed, liquid level alarm is located at the surface of the LNG storage tank and electrically connected with liquid level detection device.
4. a kind of LNG loading systems according to claim 1, it is characterised in that:The liquid phase connecting pipe is provided with stream Gauge and control valve I, unload liquid pipe road provided with control valve II.
5. a kind of LNG loading systems according to claim 1, it is characterised in that:Between the LNG pump and BOG drainers, Choke valve and flow regulator are respectively equipped between the BOG drainers and LNG storage tank II.
6. a kind of LNG loading systems according to claim 1, it is characterised in that:The liquid phase connecting pipe passes through oil filling riser Liquid phase joint is connected with the LNG tank cars inlet, and the gas phase connecting pipe passes through oil filling riser gas phase joint and the LNG tank cars Gas phase mouth connection.
CN201720042812.1U 2017-01-06 2017-01-06 A kind of LNG loading systems Active CN206522609U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720042812.1U CN206522609U (en) 2017-01-06 2017-01-06 A kind of LNG loading systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720042812.1U CN206522609U (en) 2017-01-06 2017-01-06 A kind of LNG loading systems

Publications (1)

Publication Number Publication Date
CN206522609U true CN206522609U (en) 2017-09-26

Family

ID=59890676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720042812.1U Active CN206522609U (en) 2017-01-06 2017-01-06 A kind of LNG loading systems

Country Status (1)

Country Link
CN (1) CN206522609U (en)

Similar Documents

Publication Publication Date Title
CN104265512B (en) High-pressure/low-pressure gas supply system of ship power plant
CN104697861B (en) A kind of low energy consumption it is multistage from supercharging high-pressure tank atmosphere cyclic test system
CN105864636A (en) Pump-free unloading, refueling and filling systems and pump-free filling technology of LNG refueling station
CN105387683B (en) High-efficiency Gas liquefaction recovery method and device
CN107524911A (en) The liquid oxygen filling of underwater operation platform and recovery system
CN204227033U (en) A kind of separated type ice chest being applicable to small liquid rock gas powered ship
WO2019227328A1 (en) Household alcohol-based fuel supply system
CN104110574B (en) A kind of cryogenic gas condensate recovery system and method thereof
CN203868681U (en) Liquefied natural gas flash steam recovery device
CN205316815U (en) High -efficient liquefaction recovery unit of natural gas
CN205781982U (en) LNG filling station is unloaded without pump, is filled and charging system
CN205560279U (en) Dodge vapor recovery storage device
CN206522609U (en) A kind of LNG loading systems
CN207708543U (en) Deethanization system
CN104865043B (en) A kind of LNG cold flow characteristics experimental provision
CN110410665B (en) Unloading system for low-temperature liquefied gas tank wagon
CN206247018U (en) LNG gasification air supply system
CN105805551B (en) A kind of gas cylinder static evaporation rate detection method with BOG recovery functions
CN205618974U (en) BOG loss recovery device of LNG system
CN212204024U (en) Marine natural gas pipeline system
CN206290966U (en) Removable bank base formula LNG loading systems
CN207316464U (en) Floating Liquefied Natural Gas stores and gasification installation, control system
CN102954345B (en) A kind of pressurization system of low-temperature heat-insulation storage tank
CN205447254U (en) Liquefied natural gas liquid feeding system
CN205618987U (en) Static evaporation rate detection device of gas cylinder with BOG retrieves function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant