CN206521659U - A kind of cracking resistance formula pavement structure and its system - Google Patents

A kind of cracking resistance formula pavement structure and its system Download PDF

Info

Publication number
CN206521659U
CN206521659U CN201720103704.0U CN201720103704U CN206521659U CN 206521659 U CN206521659 U CN 206521659U CN 201720103704 U CN201720103704 U CN 201720103704U CN 206521659 U CN206521659 U CN 206521659U
Authority
CN
China
Prior art keywords
cracking resistance
pavement structure
resistance formula
basic unit
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720103704.0U
Other languages
Chinese (zh)
Inventor
王志兵
黄亚琴
商健林
季杰
冒娟
王建锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Polar Star Traffic Industry Group Co ltd
Jiangsu Polaris Transportation Industry Co ltd
Nantong Economic And Technological Development Area Corp
Original Assignee
Jiangsu Road Engineering Technology Co Ltd
Nantong Economic And Technological Development Zone General Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Road Engineering Technology Co Ltd, Nantong Economic And Technological Development Zone General Corp filed Critical Jiangsu Road Engineering Technology Co Ltd
Priority to CN201720103704.0U priority Critical patent/CN206521659U/en
Application granted granted Critical
Publication of CN206521659U publication Critical patent/CN206521659U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a kind of cracking resistance formula pavement structure and its system, belongs to road-surface-paving technology field.This cracking resistance formula pavement structure, it includes the surface layer being arranged in order from top to bottom and basic unit, and basic unit is dense structure of skeleton;Basic unit includes the cement stabilized macadam base and lime-fly ash aggregate base set gradually from top to bottom, and vertical spaced supporting construction is provided between cement stabilized macadam base and lime-fly ash aggregate base.This pavement structure system uses above-mentioned pavement structure.This cracking resistance formula pavement structure and its system, basic unit uses dense structure of skeleton, with less constriction coefficient, good cracking resistance is respectively provided with the presence of temperature contracting and drying shrinkage, the reflective crack for avoiding surface layer from producing, and the anti-fatigue performance on road surface is improved, so that the service life on road surface is significantly extended.Moreover it is possible to effectively reduce cement consumption, Resources for construction is saved, and reduce the cost of pavement engineering.

Description

A kind of cracking resistance formula pavement structure and its system
Technical field
The utility model is related to road-surface-paving technology field, in particular to a kind of cracking resistance formula pavement structure and its is System.
Background technology
In the pavement structure of current main flow, semi-rigid type base is with its intensity high, rigidity big, fatigue endurance, easy construction etc. Advantage, the pavement structure bearing bed generally used as China's pavement structure.But, matched somebody with somebody due to conventional suspension compact-type level Cement stabilized macadam and lime and fly ash concrete have larger constriction coefficient, and contraction is easily produced under temperature contracting and drying shrinkage action Cracking, so as to cause bituminous paving to produce reflective crack, and the main cause as semi-rigid asphalt pavement earlier period damage One of.
Utility model content
The utility model provides a kind of cracking resistance formula pavement structure and its system, it is intended to improve existing pavement structure easy The problem of cracking, damage.
What the utility model was realized in:
A kind of cracking resistance formula pavement structure, it includes the surface layer being arranged in order from top to bottom and basic unit, and surface layer is pitch coagulation Soil layer, basic unit is crushed rock base course, and basic unit is dense structure of skeleton, and the thickness of basic unit is 2.5~3.5 times of the thickness of surface layer; Basic unit includes the cement stabilized macadam base and lime-fly ash aggregate base set gradually from top to bottom, cement stabilized macadam base and two Vertical spaced supporting construction is provided between ash broken stones basic unit.
Further, in the utility model preferred embodiment, supporting construction include the first panel that is oppositely arranged and Second panel, first panel is arranged at cement stabilized macadam base, and second panel is arranged at lime-fly ash aggregate base, first panel with Supporting plate is installed between second panel.
Further, in the utility model preferred embodiment, first panel and second panel include positive substrate and Substrate is carried on the back, the two ends of supporting plate are connected with positive substrate and back of the body substrate respectively, have sheet material space, plate between positive substrate and back of the body substrate Integrally formed supporting clapboard is provided with material space, supporting clapboard forms continuously arranged construction unit in sheet material space, Supporting clapboard is fixedly connected with positive substrate and back of the body substrate.
Further, in the utility model preferred embodiment, construction unit to be trapezoidal, it is two neighboring it is trapezoidal centered on Symmetrical structure.
Further, multigroup reinforcement, every group of reinforcement are provided with the utility model preferred embodiment, in supporting plate Muscle includes two reinforcing bars for setting and being fixedly connected that intersect, and one of angle that two reinforcing bars are formed is 80~90 ℃。
Further, in the utility model preferred embodiment, it is characterised in that supporting construction also includes being oppositely arranged At least two fixed supported slabs, one end of fixed supported slab is connected to supporting plate, and the other end of fixed supported slab is connected to first panel And/or second panel.
Further, in the utility model preferred embodiment, surface layer is included under asphalt uplayer, viscous oil layer and pitch Surface layer, viscous oil layer is emulsified asphalt, and viscous oil layer is arranged between pitch cutting optimal and asphalt uplayer, under asphalt uplayer pitch The ratio between thickness of surface layer is 1:1.8~2.2.
Further, in the utility model preferred embodiment, pitch cutting optimal is heat-conducting type asphalt concrete layer, drip Cross direction profiles in heat conduction steel pipe, pitch cutting optimal are provided with blue or green cutting optimal two layers of deep floor, and heat conduction steel pipe is arranged at two Between layer deep floor.
Further, in the utility model preferred embodiment, slurry seal, basic unit are provided between surface layer and basic unit One side away from surface layer is provided with bed course, bed course is graded broken stone layer.
Further, in the utility model preferred embodiment, it includes the cracking resistance formula of any one of claim 1~9 Pavement structure.
The beneficial effects of the utility model are:
Arrange vertical spaced between the cracking resistance formula pavement structure that the utility model is obtained by above-mentioned design, basic unit Supporting construction is that good carrying supporting role is integrally played on road surface, and basic unit uses dense structure of skeleton, with less Constriction coefficient, is respectively provided with good cracking resistance, it is to avoid the reflective crack that surface layer is produced, and carry in the presence of temperature contracting and drying shrinkage The anti-fatigue performance on high road surface, so that the service life on road surface is significantly extended.In addition, this pavement structure is effective Cement consumption is reduced, Resources for construction is saved, and reduce the cost of pavement engineering.
Brief description of the drawings
, below will be to required in embodiment in order to illustrate more clearly of the technical scheme of the utility model embodiment The accompanying drawing used is briefly described, it will be appreciated that the following drawings illustrate only some embodiments of the present utility model, therefore not The restriction to scope is should be considered as, for those of ordinary skill in the art, on the premise of not paying creative work, Other related accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of sectional view of the cracking resistance formula pavement structure provided in the utility model embodiment 1;
Fig. 2 is the structural representation of supporting construction in the cracking resistance formula pavement structure provided in the utility model embodiment 1;
Fig. 3 is the sectional view of another cracking resistance formula pavement structure provided in the utility model embodiment 1;
Fig. 4 is the sectional view of the cracking resistance formula pavement structure provided in the utility model embodiment 2.
Label:100- cracking resistance formula pavement structures;110- basic units;111- cement stabilized macadam bases;112- two-ash broken stones bases Layer;113- supporting constructions;114- first panels;115- second panels;116- supporting plates;The positive substrates of 117-;118- carries on the back substrate; 119- sheet materials space;120- supporting clapboards;121- construction units;130- surface layers;131- asphalt uplayers;132- viscous oils layer; 133- pitch cutting optimals;200- cracking resistance formula pavement structures;201- heat conduction steel pipes;202- deep floors;Tie on 300- cracking resistance formulas road surface Structure;301- slurry seals;302- bed courses.
Embodiment
To make the purpose, technical scheme and advantage of the utility model embodiment clearer, below in conjunction with this practicality Accompanying drawing in new embodiment, the technical scheme in the utility model embodiment is clearly and completely described, and shows So, described embodiment is a part of embodiment of the utility model, rather than whole embodiments.Based on this practicality Embodiment in new, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of the utility model protection.Therefore, implementation of the present utility model below to providing in the accompanying drawings The detailed description of mode is not intended to limit claimed scope of the present utility model, but is merely representative of of the present utility model Selected embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making creative labor The every other embodiment obtained under the premise of dynamic, belongs to the scope of the utility model protection.
In description of the present utility model, it is to be understood that term " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness The orientation or position relationship of the instruction such as degree ", " on ", " under ", " vertical ", " level " are based on orientation shown in the drawings or position pass System, is for only for ease of description the utility model and simplifies description, rather than indicate or imply that the equipment or element of meaning are necessary With specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.
In addition, term " first ", " second " are only used for describing purpose, and it is not intended that indicating or implying relative importance Or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", the feature of " second " can express or Implicitly include one or more this feature.In description of the present utility model, " multiple " are meant that two or two More than, unless otherwise specifically defined.
In the utility model, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection ", " Gu It is fixed " etc. term should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally;Can be Be joined directly together, can also be indirectly connected to by intermediary, can be two element internals connection or two elements it is mutual Interactively.For the ordinary skill in the art, it can understand that above-mentioned term is new in this practicality as the case may be Concrete meaning in type.
In the utility model, unless otherwise clearly defined and limited, fisrt feature second feature it " on " or it " under " can directly be contacted including the first and second features, it is not direct contact but logical that can also include the first and second features The other characterisation contact crossed between them.Moreover, fisrt feature second feature " on ", " top " and " above " include the One feature is directly over second feature and oblique upper, or is merely representative of fisrt feature level height higher than second feature.First is special Levy second feature " under ", " lower section " and " below " include fisrt feature immediately below second feature and obliquely downward, or only Represent that fisrt feature level height is less than second feature.
Embodiment 1, referring to figs. 1 to shown in Fig. 3
The utility model provides a kind of cracking resistance formula pavement structure 100, as shown in figure 1, this cracking resistance formula pavement structure 100 is wrapped Surface layer 130 and basic unit 110 are included, basic unit 110 is in contact with roadbed (not shown), surface layer 130 and the one of the remote roadbed of basic unit 110 Face is connected, and positioned at the upper strata of whole pavement structure.In this cracking resistance formula pavement structure 100, the thickness of basic unit 110 is face 2.5~3.5 times of the thickness of layer 130, for example in the present embodiment, the thickness of basic unit 110 is 54cm, and the thickness of surface layer 130 is 18cm。
In order to increase the anti-crack ability on road surface, the level of basic unit 110 is matched somebody with somebody matches somebody with somebody for framework compact type level, and the pitch that this level is matched somebody with somebody is mixed Material is closed, is the organic assembling of suspension compact structure and skeleton gap structure.The skeleton of its existing a number of coarse aggregate formation Structure, has in the space that enough fine aggregates are filled between coarse aggregate again, therefore, the asphalt of this structure it is close Solidity, strength and stability are all relatively good.
Basic unit 110 includes the cement stabilized macadam base 111 and lime-fly ash aggregate base 112 being arranged in order, two-ash broken stones base Layer 112 is in contact with roadbed, positioned at the top of roadbed;Cement stabilized macadam base 111 is located at surface layer 130 and lime-fly ash aggregate base Between 112.The ratio between thickness between lime-fly ash aggregate base 112 and cement stabilized macadam base 111 is 1:1.8~2.2, for example, In the present embodiment, the thickness of cement stabilized macadam base 111 is 36cm, and the thickness of lime-fly ash aggregate base 112 is 18cm.
Lime-fly ash aggregate base 112 have preferable cracking resistance, generally use gather materials for lime, flyash and rubble by It is obtained by mixing according to certain ratio.In the utility model, in order to save Resources for construction and environmental protection, lime-fly ash aggregate base 112 material is 50wt% using regenerated aggregate and the compound of virgin material, the wherein content of regenerated aggregate;Meanwhile, with fecula again Shape particle replaces 60wt% flyash;In addition, two grey dosage are 15wt%.
Regenerated aggregate in the utility model is that waste and old cement concrete fragment is obtained after broken, screening, cleaning Reworked material.Specially:Regenerated aggregate is after Deteriorated concrete pavement plate is crushed, in the factory that gathers materials, to pass through crusher in crushing, Yi Jitong Cross in broken production process after a series of performance boost mode, then surface of aggregate soil is removed by screening, washing process, from And the regenerated aggregate of basic cleaning is obtained, the technology that the indices of regenerated aggregate are satisfied by the construction of highway road surface 110 is thin Then.
Using this regenerated aggregate, it can either ensure that the properties of lime-fly ash aggregate base 112 are up to standard, again can be by waste and old water Cement concrete plate carries out refuse reclamation, can greatly save Resources for construction, and reduce the stacking production of waste and old cement road surface plate Raw pollution problem, is conducive to environmental protection.
Lime-fly ash aggregate base 112 is matched somebody with somebody using framework compact discontinuous form level, and its mineral aggregate gradation is as shown in table 1:
The mineral aggregate gradation of the lime-fly ash aggregate base 112 of table 1.
Cement stabilized macadam base 111 also has a preferable cracking resistance, its usual material be by cement and rubble by It is mixed to get according to certain proportion.In the utility model, in order to save Resources for construction and environmental protection, cement stabilized macadam base The material of layer 111, in construction, should strictly control the dosage of cement, cement dose using regenerated aggregate and the compound of virgin material Common cement stabilized macadam base should be less than;In the present embodiment, the consumption of cement is used in cement stabilized macadam base 111 3.5~3.7wt% of material.
Cement stabilized macadam base 111 is matched somebody with somebody using framework compact level, and its mineral aggregate gradation is as shown in table 2:
The mineral aggregate gradation of the cement stabilized macadam base 111 of table 2.
In order to further enhance the intensity and anti-rolling performance of basic unit 110, as shown in figure 1, cement stabilized macadam base Supporting construction 113 is provided between 111 and lime-fly ash aggregate base 112.Supporting construction 113 includes the first panel being oppositely arranged 114 and second panel 115, first panel 114 is horizontally placed on cement stabilized macadam base 111, and second panel 115 is horizontally disposed with In lime-fly ash aggregate base 112.As shown in Fig. 2 first panel 114 and second panel 115 include positive substrate 117 and back of the body substrate 118, have between positive substrate 117 and back of the body substrate 118 in sheet material space 119, sheet material space 119 and be provided with integrally formed support Dividing plate 120, supporting clapboard 120 forms continuously arranged construction unit 121, supporting clapboard 120 and positive group in sheet material space 119 Piece 117 is fixedly connected with back of the body substrate 118.In the present embodiment, the construction unit 121 is trapezoidal, it is two neighboring it is trapezoidal centered on Symmetrical structure.Because the first panel 114 of this structure and the section shape of second panel 115 have more preferable section using system Number, can save material, and the first panel 114 of this structure and the anti-bending strength of second panel 115 are good.
As shown in figure 1, supporting construction 113 also includes supporting plate 116, supporting plate 116 is vertically arranged at the first face Between plate 114 and second panel 115, and to be fixedly mounted.Multigroup reinforcement (not shown), every group are provided with supporting plate 116 Reinforcement includes to be fixedly connected between the reinforcing bar of two settings that intersect, this two reinforcing bars, and both it between formed Angle has four, and one of angle is α, and α is 80~90 °, and in the present embodiment, the angle between this two reinforcing bars is 4 Right angle, and connected with fixture therebetween, such as it is fastened with iron wire.Cement stabilized macadam base 111 and two-ash broken stones The reinforcement set between basic unit 112 is vertically is spaced, for example, just setting one group of reinforcement at interval of 5~10m;At this In embodiment, the spacing distance between two groups of reinforcements is 8m.
In order to strengthen the intensity of supporting plate 116, in other embodiments of the present utility model, supporting construction 113 also includes Fixed supported slab (not shown).One end of fixed supported slab is connected to supporting plate 116, and the other end of fixed supported slab is connected to first panel 114 and/or second panel 115.Fixed supported slab at least two and it is oppositely arranged, more preferred, fixed supported slab is set to 4 Individual, wherein 2 fixed supported slabs are relatively arranged between supporting plate 116 and upper mounted plate, 2 fixed supported slabs are relatively arranged in addition Between supporting plate 116 and bottom plate.
Surface layer 130 in the cracking resistance formula pavement structure 100 includes asphalt uplayer 131, viscous oil layer 132 and pitch cutting optimal 133, pitch cutting optimal 133 is connected with basic unit 110, and viscous oil layer 132 is layed in pitch cutting optimal 133 and asphalt uplayer 131 Between, viscous oil layer 132 is emulsified asphalt.Similarly, in line with the principle economized on resources with environmental protection, asphalt uplayer 131 and pitch Mixed in raw material in cutting optimal 133 equipped with regenerated aggregate, the content of regenerated aggregate is 30~40wt%, in the present embodiment, then The raw content gathered materials is 35wt%.In order to improve the performance of bituminous paving, asphalt uplayer 131 and pitch cutting optimal 133 Between the ratio between thickness be 1:1.8~2.2.More specifically, the thickness of asphalt uplayer 131 is 3~5cm, in the present embodiment In, preferably 4cm.The thickness of pitch cutting optimal 133 is 7~9cm, in the present embodiment, preferably 8cm.
In order to further improve the stability of pavement structure, it is to avoid the high temperature disease problem on road surface, the present embodiment provides another A kind of cracking resistance formula pavement structure 200 of structure.As shown in figure 3, in cracking resistance formula pavement structure 200, pitch cutting optimal is heat conduction It is provided with type asphalt concrete layer, pitch cutting optimal in heat conduction steel pipe 201, heat conduction steel pipe 201 and is packaged with phase-change material.Heat conduction The internal diameter of steel pipe 201 is 16~18mm, and external diameter is 20~22mm, in the present embodiment, and the internal diameter of heat conduction steel pipe 201 is 17mm, External diameter is 21mm.The phase-change material formation phase-change heat accumulation system of heat conduction steel pipe 201 and its enclosed inside, phase-change material includes stone Organic compound of the phase transition temperatures such as wax, lipid, fatty acid between 30~70 DEG C.The solar collecting performance of heat conduction steel pipe 201 is good, The phase-change material that it is encapsulated is heated or heat release by conducting heat, slow down the change of pavement temperature, it is to avoid at the long-time of road surface In under the condition of high temperature.In addition, heat conduction steel pipe 201 can also play a part of cross reinforcing, road surface longitudinal cracking is prevented.
As shown in figure 3, cross direction profiles have two layers of deep floor 202 in pitch cutting optimal, above and below heat conduction steel pipe 201 is arranged at Between two layers of deep floor 202.Because the two ends of heat conduction steel pipe 201 are easily by failure by shear, therefore, by heat conduction steel pipe 201 It is nested between two layers of deep floor 202, can effectively weakens the shearing force suffered by the two ends of heat conduction steel pipe 201, with reinforcing Stable effect.Deep floor 202 is polystyrol plastic foam plate, and this material has good corrosion resistance, also can Meet the mechanical requirements of the pavement structure.
Shown in the reference picture 4 of embodiment 2
The present embodiment provides a kind of cracking resistance formula Road System, and the cracking resistance formula Road System includes cracking resistance formula pavement structure 300, As shown in figure 4, the realization principle of this cracking resistance formula pavement structure 300 and the technique effect and embodiment 1 of generation are identical, it is brief Description, the present embodiment does not refer to part, refers to corresponding contents in embodiment 1.The cracking resistance formula pavement structure 300 and embodiment 1 Difference be:
Cracking resistance formula pavement structure 300 also includes slurry seal 301 and bed course 302, and slurry seal 301 is arranged at surface layer and base Between layer, specifically, slurry seal 301 is arranged between pitch cutting optimal and cement stabilized macadam base.Slurry seal 301 is adopted The emulsified asphalt matched somebody with somebody with appropriate level, thickness are gathered materials, water, filler (cement, lime, flyash, stone flour etc.) and additive etc. according to Design proportioning, which is mixed and stirred into slurry mixture and paved by the car of slurry seal 301 to cement stabilized macadam base surface, to be formed.Bed course 302 are arranged between lime-fly ash aggregate base and roadbed, to exclude the moisture being detained in roadbed, and ensure that pavement structure is in drying Or middle wet condition.Bed course 302 is using bulk particulate materials such as grit, rubble, cinders.
In summary, the cracking resistance formula pavement structure that the utility model is obtained by above-mentioned design, its basic unit is close using skeleton Full mold structure, with less constriction coefficient, is respectively provided with good cracking resistance, it is to avoid surface layer in the presence of temperature contracting and drying shrinkage The reflective crack of generation, and the anti-fatigue performance on road surface is improved, so that the service life on road surface is significantly extended.This Outside, this pavement structure effectively reduces cement consumption, saves Resources for construction, and reduce the cost of pavement engineering.
Preferred embodiment of the present utility model is the foregoing is only, the utility model is not limited to, for For those skilled in the art, the utility model can have various modifications and variations.It is all in spirit of the present utility model and former Within then, any modification, equivalent substitution and improvements made etc. should be included within protection domain of the present utility model.

Claims (10)

1. a kind of cracking resistance formula pavement structure, it is characterised in that it includes the surface layer being arranged in order from top to bottom and basic unit, the face Layer is asphalt concrete layer, and the basic unit is crushed rock base course, and the basic unit is dense structure of skeleton, and the thickness of the basic unit is 2.5~3.5 times of the thickness of the surface layer;The basic unit includes the cement stabilized macadam base and two set gradually from top to bottom Ash broken stones basic unit, is provided with vertical spaced support between the cement stabilized macadam base and the lime-fly ash aggregate base Structure.
2. cracking resistance formula pavement structure according to claim 1, it is characterised in that the supporting construction includes what is be oppositely arranged First panel and second panel, the first panel are arranged at the cement stabilized macadam base, and the second panel is arranged at The lime-fly ash aggregate base, supporting plate is installed between the first panel and the second panel.
3. cracking resistance formula pavement structure according to claim 2, it is characterised in that the first panel and the second panel Include positive substrate and back of the body substrate, the two ends of the supporting plate are connected with the positive substrate and the back of the body substrate respectively, it is described just Have between substrate and the back of the body substrate in sheet material space, the sheet material space and be provided with integrally formed supporting clapboard, it is described Supporting clapboard forms continuously arranged construction unit in the sheet material space, the supporting clapboard and the positive substrate and described Back of the body substrate is fixedly connected.
4. cracking resistance formula pavement structure according to claim 3, it is characterised in that the construction unit be it is trapezoidal, adjacent two It is individual it is described it is trapezoidal centered on symmetrical structure.
5. cracking resistance formula pavement structure according to claim 2, it is characterised in that multigroup reinforcement is provided with the supporting plate Muscle, reinforcement described in every group includes two and intersected to set and the reinforcing bars that are fixedly connected, two reinforcing bars formed its In an angle be 80~90 DEG C.
6. cracking resistance formula pavement structure according to claim 2, it is characterised in that the supporting construction also includes being oppositely arranged At least two fixed supported slabs, one end of the fixed supported slab is connected to the supporting plate, and the other end of the fixed supported slab connects It is connected to the first panel and/or the second panel.
7. cracking resistance formula pavement structure according to claim 1, it is characterised in that the surface layer includes asphalt uplayer, glued Oil reservoir and pitch cutting optimal, the viscous oil layer is emulsified asphalt, and the viscous oil layer is arranged at the pitch cutting optimal and the drip Between blue or green upper layer, the ratio between thickness of the asphalt uplayer and the pitch cutting optimal is 1:1.8~2.2.
8. cracking resistance formula pavement structure according to claim 7, it is characterised in that the pitch cutting optimal is heat-conducting type pitch Cross direction profiles in heat conduction steel pipe, the pitch cutting optimal are provided with concrete layer, the pitch cutting optimal two layers of ribs Plate, the heat conduction steel pipe is arranged between deep floor described in two layers.
9. cracking resistance formula pavement structure according to claim 1, it is characterised in that set between the surface layer and the basic unit There is slurry seal, the basic unit is provided with bed course in the one side away from the surface layer, and the bed course is graded broken stone layer.
10. a kind of cracking resistance formula Road System, it is characterised in that it includes the cracking resistance formula road surface described in any one of claim 1~9 Structure.
CN201720103704.0U 2017-01-24 2017-01-24 A kind of cracking resistance formula pavement structure and its system Expired - Fee Related CN206521659U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720103704.0U CN206521659U (en) 2017-01-24 2017-01-24 A kind of cracking resistance formula pavement structure and its system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720103704.0U CN206521659U (en) 2017-01-24 2017-01-24 A kind of cracking resistance formula pavement structure and its system

Publications (1)

Publication Number Publication Date
CN206521659U true CN206521659U (en) 2017-09-26

Family

ID=59890538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720103704.0U Expired - Fee Related CN206521659U (en) 2017-01-24 2017-01-24 A kind of cracking resistance formula pavement structure and its system

Country Status (1)

Country Link
CN (1) CN206521659U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107740318A (en) * 2017-10-10 2018-02-27 储君 A kind of laying method of cement road
CN108867233A (en) * 2018-06-15 2018-11-23 浙江名博建设有限公司 A kind of municipal works road pavement structure and laying method
CN110438861A (en) * 2019-07-16 2019-11-12 无锡市天合景观工程有限公司 A kind of double-colored asphalt pavement structure and its construction technology
CN113463458A (en) * 2021-08-04 2021-10-01 江苏阔景建设工程有限公司 Stable road structure and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107740318A (en) * 2017-10-10 2018-02-27 储君 A kind of laying method of cement road
CN108867233A (en) * 2018-06-15 2018-11-23 浙江名博建设有限公司 A kind of municipal works road pavement structure and laying method
CN110438861A (en) * 2019-07-16 2019-11-12 无锡市天合景观工程有限公司 A kind of double-colored asphalt pavement structure and its construction technology
CN113463458A (en) * 2021-08-04 2021-10-01 江苏阔景建设工程有限公司 Stable road structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN206521659U (en) A kind of cracking resistance formula pavement structure and its system
CN100572668C (en) A kind of half-flexible water drainage skid-free noise-reducing road surface pavement structure
CN100999890A (en) Road surface structure of felexiable fibre emulsifying asphalt stable material as base and construction method thereof
CN201296895Y (en) Vertical cracking pavement repair structure
CN103498399A (en) Novel asphalt concrete pavement structure
CN104594151B (en) Water drainage anti-cracking type cold-recycling pavement structure
CN111118999A (en) Road structure of urban intersection, bus station and bus lane
CN102051848B (en) HMA/CC (Hot-Mix Asphalt)/(Cement Concrete) composite type pavement structure and constructing method thereof
CN205171301U (en) Bituminous pavement structure of big flexible basic unit of particle diameter water permeability bituminous mixture
CN205917559U (en) Anti type road surface structure of splitting suitable for semi rigid base course
CN104846714B (en) Anti-rut pavement structure of Heat reflection fog sealing layer material for high temperature heavy duty conditions
CN110714389A (en) Ultrathin high-performance composite semi-flexible surface layer pavement structure and construction method thereof
CN203229873U (en) Low-noise bituminous pavement structure for bridge deck pavement layer
CN204151646U (en) Be applicable to the compound mixing device of cold district maintenance of surface
CN102173696A (en) Pavement permeable stress absorption layer and preparation process thereof
CN202323617U (en) Super-sticky seal coat for asphalt pavement
CN212000441U (en) Novel road surface structure of urban heavy-load traffic
CN112982081B (en) High-wear-resistance material for roads and preparation method and application thereof
CN104692719B (en) Pouring type cold-mixed pavement material
CN210085965U (en) High-modulus asphalt mixture road structure
CN208649823U (en) A kind of high ductility cement-base composite material prefabricated board pavement structure
CN208280000U (en) Attachment device for bridges and culverts and roadbed
CN206858985U (en) Asphalt pavements with flexible bases
CN206928158U (en) A kind of emulsified asphalt cold-regenerated road surface structure
CN205839509U (en) A kind of economic and practical type rural road pavement structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 226000 Jiangsu Province, Nantong City Economic Development Zone Xinghu building

Co-patentee after: JIANGSU POLAR STAR TRAFFIC INDUSTRY GROUP CO.,LTD.

Patentee after: NANTONG ECONOMIC AND TECHNOLOGICAL DEVELOPMENT AREA Corp.

Address before: 226000 Jiangsu Province, Nantong City Economic Development Zone Xinghu building

Co-patentee before: Jiangsu Polaris Transportation Industry Co.,Ltd.

Patentee before: NANTONG ECONOMIC AND TECHNOLOGICAL DEVELOPMENT AREA Corp.

Address after: 226000 Jiangsu Province, Nantong City Economic Development Zone Xinghu building

Co-patentee after: Jiangsu Polaris Transportation Industry Co.,Ltd.

Patentee after: NANTONG ECONOMIC AND TECHNOLOGICAL DEVELOPMENT AREA Corp.

Address before: 226000 Jiangsu Province, Nantong City Economic Development Zone Xinghu building

Co-patentee before: JIANGSU DAORUN ENGINEERING TECHNOLOGY CO.,LTD.

Patentee before: NANTONG ECONOMIC AND TECHNOLOGICAL DEVELOPMENT AREA Corp.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170926