CN206515892U - Distribution repairing scheduling of resource platform based on power grid GIS - Google Patents

Distribution repairing scheduling of resource platform based on power grid GIS Download PDF

Info

Publication number
CN206515892U
CN206515892U CN201720194788.3U CN201720194788U CN206515892U CN 206515892 U CN206515892 U CN 206515892U CN 201720194788 U CN201720194788 U CN 201720194788U CN 206515892 U CN206515892 U CN 206515892U
Authority
CN
China
Prior art keywords
information
distribution
platform
power
repair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720194788.3U
Other languages
Chinese (zh)
Inventor
刘伟生
邱夕兆
刘远龙
公伟勇
瞿寒冰
游大宁
晋飞
辛刚
苏彪
李颖
韩福成
高建峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Shandong Electric Power Co Ltd
Shandong Luruan Digital Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Shandong Electric Power Co Ltd
Shandong Luneng Software Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Shandong Electric Power Co Ltd, Shandong Luneng Software Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201720194788.3U priority Critical patent/CN206515892U/en
Application granted granted Critical
Publication of CN206515892U publication Critical patent/CN206515892U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • Y04S10/54

Landscapes

  • Traffic Control Systems (AREA)

Abstract

Scheduling of resource platform is rushed to repair the utility model discloses the distribution based on power grid GIS, including:Production management system PMS, power network GIS platform, marketing management system, 95598 customer service systems, EMS system, electrical power distribution automatization system, dispatching management information system OMS, vehicle management system, distribution repairing maneuvering platform, power information acquisition system and mobile terminal;The power network GIS platform is connected with production management system PMS and marketing management system respectively, and the power network GIS platform also passes sequentially through ESB ESBs and interexchange bus gateway is connected with information interactive bus;95598 customer service system is connected with ESB ESBs;It relies on power grid GIS geography information basic platform, by information integration, communication integration technology, with a variety of electric power system data information, mobile terminal, recovery vehicle, goods and materials storage system organic combination.

Description

Distribution repairing scheduling of resource platform based on power grid GIS
Technical field
The utility model is related to the distribution repairing scheduling of resource platform based on power grid GIS.
Background technology
With the increasing rapidly of expanding economy and electricity needs, constantly expand to power network scale, on number of faults is continuous Rise, corresponding repair personnel, vehicle, repairing goods and materials quantity are also increasing, and each resource has single management system, and information can not be whole Close, it is impossible to which the overall situation grasps resource information, causes the workload of dispatcher also increasing, realizes scheduling resource reasonable distribution It is more and more important.
Utility model content
The purpose of this utility model is exactly to rush to repair money there is provided a kind of distribution based on power grid GIS to solve the above problems Source dispatching platform, it relies on power grid GIS geography information basic platform, by information integration, communication integration technology, with a variety of electric power System data information, mobile terminal, recovery vehicle, goods and materials storage system organic combination, realize that directly perceivedization displaying, multi-angle are looked into Ask, lifting distribution repairing maneuvering platform handle power failure in terms of commanding and decision-making, scheduling of resource emergency capability.
To achieve these goals, the utility model is adopted the following technical scheme that:
Distribution repairing scheduling of resource platform based on power grid GIS, including:Production management system PMS, power network GIS platform, battalion Sell management system, 95598 customer service systems, EMS system, electrical power distribution automatization system, dispatching management information system OMS, vehicle management system, Distribution repairing maneuvering platform, power information acquisition system and mobile terminal;
The power network GIS platform is connected with production management system PMS and marketing management system respectively, and the power grid GIS is put down Platform also passes sequentially through ESB ESBs and interexchange bus gateway is connected with information interactive bus;95598 customer service System is connected with ESB ESBs;
Described information interaction bus and distribution repairing maneuvering platform, power information acquisition system, dispatching management information system OMS and Vehicle management system is connected;The distribution repairing maneuvering platform is connected by secure accessing platform with mobile terminal;The distribution Repairing maneuvering platform is connected with Cloud Server;
Described information interaction bus by the first power distribution automation information interactive bus, the first reverse physical isolation apparatus and Second power distribution automation information interactive bus is connected with EMS system;
Described information interaction bus passes through the first power distribution automation information interactive bus, positive physical isolation device and second Power distribution automation information interactive bus is connected with electrical power distribution automatization system;Electrical power distribution automatization system is sent out to distribution repairing maneuvering platform Send the real time information of Distribution Network Failure.The EMS system is connected with electrical power distribution automatization system.
Distribution repairing maneuvering platform also by the second reverse physical isolation apparatus respectively with weather server and road conditions Server is connected, and the weather server is connected with meteorological sensor, and the road conditions server is connected with image collecting device.
The weather server rushes to repair maneuvering platform to distribution by the second reverse physical isolation apparatus and sends weather information;
The road conditions server thinks that distribution rushes to repair maneuvering platform and sends traffic information by the second reverse physical isolation apparatus.
The production management system PMS rushes to repair maneuvering platform to distribution by power network GIS platform and sends equipment deficiency information With account information;Power network GIS platform sends adapted electric model information and power network geography information to distribution repairing maneuvering platform;It is described Marketing management system rushes to repair maneuvering platform to distribution by power network GIS platform and sends User Profile information;The 95598 customer service system Unite and send electricity consumption repairing information and processing feedback information to distribution repairing maneuvering platform;
Dispatch EMS system and send outlet switch real time information to distribution repairing maneuvering platform;Dispatching management information system OMS to Net repairing maneuvering platform sends power failure plan information and change of plan information;The power information acquisition system refers to distribution repairing Wave platform transmission distribution transformer monitoring information and user calls measurement information together;The mobile terminal is referred to by secure accessing platform to distribution repairing Wave platform and send breakdown repair real time information, picture and terminal GPS;Vehicle management system sends car to distribution repairing maneuvering platform Essential information and vehicle GIS information.
The advantage of the Cloud Server, when distribution repairing maneuvering platform data space is inadequate, Cloud Server auxiliary Maneuvering platform data storage is rushed to repair in distribution.
The advantage of reverse physical isolation apparatus:Reverse isolation device is used for power system security area III to place of safety I/II One-way data transmission.Clear and definite secure border delimited so that the controllability enhancing of network, and match somebody with somebody for the server at two ends Corresponding reversely virtual ip address is put, can recognize and shield illegal request, effectively prevent the data access across authority, improve prison Control system is to being likely to result in the attacking of power grid safety accident, virus, the defence level divulged a secret etc..Eliminate the safety of the overwhelming majority Hidden danger, it is ensured that safe operation of power system.
Positive physical isolation device advantage:Positive isolating device is used for power system security area I/II to place of safety III's One-way data is transmitted.Aggregation of data filtering function can provide basic safety guarantee, positive physical isolation dress for isolating device Put and packet is checked to determine the different rights of different pieces of information transmission according to system administration rule set in advance, protection is internal to be pacified Whole network is from external attack.
The real time information of the Distribution Network Failure includes:10kV circuit Distribution Network Failure information, including failure ID, electric company's name Title, power supply unit coding, time of failure, failure recovery time, transformer station, circuit, failure-description, fault coverage, power failure Type, city agriculture mark, circuit types, fault type, reclosing situation and failure cause.
The user calls measurement information together, including:Measurement information is called together to user's electric energy meter.For example:Electric current, voltage, active power, Reactive power.
The vehicle essential information, including:License plate number, type of vehicle, task status, contact person, telephone number, affiliated rob Repair team, repair personnel, work order number.
The outlet switch real time information, including:The displacement information of outlet switch, that is, switch gone off by closure or It is changed into the real time information of closure from disconnection.
The adapted electric model information, including:Transformer station-distribution line-transformer-batch meter-electric energy meter-use Family corresponding informance.
The beneficial effects of the utility model:
Using informationization technology, using power grid GIS as carrier, to electric power capital equipment, recovery vehicle, goods and materials, breakdown gang etc. Key element is shown, and the data for having gathered related to electric power geography information are organically combined, and carries out map displaying directly perceived.Therefore Barrier position be automatically positioned on map, show coverage, and show the repairing resource location in abort situation certain area with Corresponding information, carries out the optimum operation trajectory analysis of repair personnel, saves the time of artificial enquiry resource service condition and scheduling, Troubleshooting responding ability is lifted, shortens repairing duration, increases customer satisfaction degree.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Embodiment
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings.
As shown in figure 1, the distribution repairing scheduling of resource platform based on power grid GIS, including:Production management system PMS, power network GIS platform, marketing management system, 95598 customer service systems, EMS system, electrical power distribution automatization system, dispatching management information system OMS, car Management system, distribution repairing maneuvering platform, power information acquisition system and mobile terminal;
The power network GIS platform is connected with production management system PMS and marketing management system respectively, and the power grid GIS is put down Platform also passes sequentially through ESB ESBs and interexchange bus gateway is connected with information interactive bus;95598 customer service System is connected with ESB ESBs;
Described information interaction bus and distribution repairing maneuvering platform, power information acquisition system, dispatching management information system OMS and Vehicle management system is connected;The distribution repairing maneuvering platform is connected by secure accessing platform with mobile terminal;The distribution Repairing maneuvering platform is connected with Cloud Server;
Described information interaction bus by the first power distribution automation information interactive bus, the first reverse physical isolation apparatus and Second power distribution automation information interactive bus is connected with EMS system;
Described information interaction bus passes through the first power distribution automation information interactive bus, positive physical isolation device and second Power distribution automation information interactive bus is connected with electrical power distribution automatization system;Electrical power distribution automatization system is sent out to distribution repairing maneuvering platform Send the real time information of Distribution Network Failure.
Distribution repairing maneuvering platform also by the second reverse physical isolation apparatus respectively with weather server and road conditions Server is connected, and the weather server is connected with meteorological sensor, and the road conditions server is connected with image collecting device.
The weather server rushes to repair maneuvering platform to distribution by the second reverse physical isolation apparatus and sends weather information;
The road conditions server thinks that distribution rushes to repair maneuvering platform and sends traffic information by the second reverse physical isolation apparatus.
The production management system PMS rushes to repair maneuvering platform to distribution by power network GIS platform and sends equipment deficiency information With account information;Power network GIS platform sends adapted electric model information and power network geography information to distribution repairing maneuvering platform;It is described Marketing management system rushes to repair maneuvering platform to distribution by power network GIS platform and sends User Profile information;The 95598 customer service system Unite and send electricity consumption repairing information and processing feedback information to distribution repairing maneuvering platform;
Dispatch EMS system and send outlet switch real time information to distribution repairing maneuvering platform;Dispatching management information system OMS to Net repairing maneuvering platform sends power failure plan information and change of plan information;The power information acquisition system refers to distribution repairing Wave platform transmission distribution transformer monitoring information and user calls measurement information together;The mobile terminal is referred to by secure accessing platform to distribution repairing Wave platform and send breakdown repair real time information, picture and terminal GPS;Vehicle management system sends car to distribution repairing maneuvering platform Essential information and vehicle GIS information.
By shown in power grid GIS repairing point, recovery vehicle and repairing goods and materials, and combine grid equipment running situation and Fault occurrences, configuration repairing scheduling resource of making rational planning for;When a failure occurs, dispatcher rushes to repair according in power grid GIS Scheduling resource configuring condition, rationally distributes fault ticket, repair personnel is according to position of failure point and repairing goods and materials real-time condition, peace Arrange optimal Rush Repair Scheme.It is specific to decompose as follows:
1. number of devices and running situation are obtained according to power grid GIS;
2. rushing to repair maneuvering platform according to distribution obtains historic user repairing information;
3. machine operation and user report situation for repairment as with reference to foundation using in power grid GIS, provided with reference to scheduling recovery vehicle Source, recovery vehicle configuration information of being made rational planning in power grid GIS, and shown in real time on power grid GIS map;
4. machine operation and user report situation for repairment as with reference to foundation using in power grid GIS, provided with reference to scheduling material stock Source situation, goods and materials configuration information of being made rational planning in power grid GIS, and each goods and materials point is shown on power grid GIS map in real time Goods and materials situation;
5. when a failure occurs, dispatcher is according to repairing scheduling resource configuring condition, weather information, road in power grid GIS The consideration of condition informix rationally distributes fault ticket, and repair personnel arranges according to position of failure point and repairing goods and materials real-time condition Optimal Rush Repair Scheme.
It is not new to this practicality although above-mentioned embodiment of the present utility model is described with reference to accompanying drawing The limitation of type protection domain, one of ordinary skill in the art should be understood that on the basis of the technical solution of the utility model, ability Field technique personnel need not pay the various modifications that creative work can make or deform still in protection model of the present utility model Within enclosing.

Claims (10)

1. the distribution repairing scheduling of resource platform based on power grid GIS, it is characterized in that, including:Production management system PMS, power grid GIS Platform, marketing management system, 95598 customer service systems, EMS system, electrical power distribution automatization system, dispatching management information system OMS, vehicle pipe Reason system, distribution repairing maneuvering platform, power information acquisition system and mobile terminal;
The power network GIS platform is connected with production management system PMS and marketing management system respectively, and the power network GIS platform is also Pass sequentially through ESB ESBs and interexchange bus gateway is connected with information interactive bus;95598 customer service system It is connected with ESB ESBs;
Described information interaction bus and distribution repairing maneuvering platform, power information acquisition system, dispatching management information system OMS and vehicle Management system is connected;The distribution repairing maneuvering platform is connected by secure accessing platform with mobile terminal;The distribution repairing Maneuvering platform is connected with Cloud Server;
Described information interaction bus passes through the first power distribution automation information interactive bus, the first reverse physical isolation apparatus and second Power distribution automation information interactive bus is connected with EMS system;
Described information interaction bus passes through the first power distribution automation information interactive bus, positive physical isolation device and the second distribution Automated information interaction bus is connected with electrical power distribution automatization system;Electrical power distribution automatization system is sent to distribution repairing maneuvering platform matches somebody with somebody The real time information of net failure;The EMS system is connected with electrical power distribution automatization system;
Distribution repairing maneuvering platform also by the second reverse physical isolation apparatus respectively with weather server and road conditions service Device is connected, and the weather server is connected with meteorological sensor, and the road conditions server is connected with image collecting device.
2. scheduling of resource platform is rushed to repair in the distribution based on power grid GIS as claimed in claim 1, it is characterized in that,
The weather server rushes to repair maneuvering platform to distribution by the second reverse physical isolation apparatus and sends weather information.
3. scheduling of resource platform is rushed to repair in the distribution based on power grid GIS as claimed in claim 1, it is characterized in that,
The road conditions server thinks that distribution rushes to repair maneuvering platform and sends traffic information by the second reverse physical isolation apparatus.
4. scheduling of resource platform is rushed to repair in the distribution based on power grid GIS as claimed in claim 1, it is characterized in that,
The production management system PMS rushes to repair maneuvering platform to distribution by power network GIS platform and sends equipment deficiency information and platform Account information.
5. scheduling of resource platform is rushed to repair in the distribution based on power grid GIS as claimed in claim 1, it is characterized in that,
Power network GIS platform sends adapted electric model information and power network geography information to distribution repairing maneuvering platform.
6. scheduling of resource platform is rushed to repair in the distribution based on power grid GIS as claimed in claim 1, it is characterized in that,
The marketing management system rushes to repair maneuvering platform to distribution by power network GIS platform and sends User Profile information.
7. scheduling of resource platform is rushed to repair in the distribution based on power grid GIS as claimed in claim 1, it is characterized in that,
95598 customer service system sends electricity consumption repairing information and processing feedback information to distribution repairing maneuvering platform.
8. scheduling of resource platform is rushed to repair in the distribution based on power grid GIS as claimed in claim 1, it is characterized in that,
Dispatch EMS system and send outlet switch real time information to distribution repairing maneuvering platform.
9. scheduling of resource platform is rushed to repair in the distribution based on power grid GIS as claimed in claim 1, it is characterized in that,
Dispatching management information system OMS sends power failure plan information and change of plan information to distribution repairing maneuvering platform;The electricity consumption Information acquisition system sends distribution transformer monitoring information to distribution repairing maneuvering platform and user calls measurement information together.
10. scheduling of resource platform is rushed to repair in the distribution based on power grid GIS as claimed in claim 1, it is characterized in that,
The mobile terminal by secure accessing platform to distribution rush to repair maneuvering platform send breakdown repair real time information, picture and Terminal GPS;Vehicle management system sends vehicle essential information and vehicle GIS information to distribution repairing maneuvering platform.
CN201720194788.3U 2017-03-01 2017-03-01 Distribution repairing scheduling of resource platform based on power grid GIS Active CN206515892U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720194788.3U CN206515892U (en) 2017-03-01 2017-03-01 Distribution repairing scheduling of resource platform based on power grid GIS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720194788.3U CN206515892U (en) 2017-03-01 2017-03-01 Distribution repairing scheduling of resource platform based on power grid GIS

Publications (1)

Publication Number Publication Date
CN206515892U true CN206515892U (en) 2017-09-22

Family

ID=59868282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720194788.3U Active CN206515892U (en) 2017-03-01 2017-03-01 Distribution repairing scheduling of resource platform based on power grid GIS

Country Status (1)

Country Link
CN (1) CN206515892U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107948100A (en) * 2017-12-28 2018-04-20 广西大学 Cloud back scheduling automates main station system and implementation method
CN108460517A (en) * 2018-01-23 2018-08-28 国网江西省电力有限公司电力科学研究院 A kind of power distribution network management-control method and device
CN111967789A (en) * 2020-08-27 2020-11-20 广东电网有限责任公司东莞供电局 Debugging system is transferred in distribution automation terminal warehouse debugging
CN112328717A (en) * 2020-10-30 2021-02-05 国网山东省电力公司临沂供电公司 Geographic information acquisition and visualization system for power supply equipment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107948100A (en) * 2017-12-28 2018-04-20 广西大学 Cloud back scheduling automates main station system and implementation method
CN108460517A (en) * 2018-01-23 2018-08-28 国网江西省电力有限公司电力科学研究院 A kind of power distribution network management-control method and device
CN111967789A (en) * 2020-08-27 2020-11-20 广东电网有限责任公司东莞供电局 Debugging system is transferred in distribution automation terminal warehouse debugging
CN112328717A (en) * 2020-10-30 2021-02-05 国网山东省电力公司临沂供电公司 Geographic information acquisition and visualization system for power supply equipment

Similar Documents

Publication Publication Date Title
CN206515892U (en) Distribution repairing scheduling of resource platform based on power grid GIS
CN103065270B (en) Visual monitored control system is salvageed to electric wire netting trouble
CN110071579A (en) Power grid power supply based on ubiquitous electric power Internet of Things ensures and intelligent managing and control system
CN106685074B (en) A kind of electric command system of guarantor and method
CN202840641U (en) Electric automobile charging facilities
CN110027427A (en) A kind of shared monitoring management system of electric automobile charging pile timesharing
CN106875114A (en) The SMS platform optimization system and method for distribution repairing maneuvering platform
CN106990328A (en) The analysis of distribution repairing abnormal data, fault location system and method
CN106796701A (en) Managed using the computing device of modulation electric energy
CN204774704U (en) Stake of electric automobile integral type alternating -current charging
CN103679559A (en) Visual grid system and fault identification method thereof
CN109447284B (en) Distribution network fault information sending method and system for power supply service command platform
CN207677507U (en) Intelligent cloud acquisition system for monitoring power distribution
CN107989753A (en) A kind of wind power plant wind power generating set monitoring system and monitoring method based on exploitation map
CN103986227A (en) Electric power distribution network operation monitoring method and system based on GIS platform
CN106872856A (en) Distribution network failure based on polynary fault collection actively rushes to repair system, method
CN105100252A (en) Network topology structure of distributed power monitoring system
CN206584222U (en) A kind of supercentral station's centralized monitoring system
CN104269040A (en) Power utilization information acquisition and orderly power utilization management system
CN104331777A (en) Error-preventing management system for county level power grid dispatching operation
CN105871068A (en) Electrical TD-LTE (time division-long term evolution) double-core network construction structure and method
CN104377824A (en) Monitoring system of low-voltage power distribution transformer
CN204030730U (en) Be applied to the electric power small wireless private network system of intelligent grid
CN103545805B (en) Modeling-based railway power supply arm monitoring method
CN104201781A (en) Small-power wireless private network system applied to smart grid

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 250001 No. two, No. 150, Shizhong Road, Shizhong District, Shandong, Ji'nan

Patentee after: STATE GRID SHANDONG ELECTRIC POWER Co.

Patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: Shandong luruan Digital Technology Co.,Ltd.

Address before: 250001 No. two, No. 150, Shizhong Road, Shizhong District, Shandong, Ji'nan

Patentee before: STATE GRID SHANDONG ELECTRIC POWER Co.

Patentee before: State Grid Corporation of China

Patentee before: SHANDONG LUNENG SOFTWARE TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder