CN206508795U - It is a kind of to include adsorption tower and possess the flue gas processing device that flue gas heat reclaims function - Google Patents
It is a kind of to include adsorption tower and possess the flue gas processing device that flue gas heat reclaims function Download PDFInfo
- Publication number
- CN206508795U CN206508795U CN201621233537.3U CN201621233537U CN206508795U CN 206508795 U CN206508795 U CN 206508795U CN 201621233537 U CN201621233537 U CN 201621233537U CN 206508795 U CN206508795 U CN 206508795U
- Authority
- CN
- China
- Prior art keywords
- flue gas
- tower
- chamber
- adsorption
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/10—Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working
Landscapes
- Treating Waste Gases (AREA)
Abstract
It is a kind of to include adsorption tower and possess the flue gas processing device that flue gas heat reclaims function, it is related to a kind of flue gas processing device.The utility model is in order to which solve in the prior art can be while the unit efficiency for carrying out desulfurization and denitration be low, common brick and hardened cement are difficult to the problem of thermal loss is big in recycle and combustion product gases in building waste.Device includes dryer, condenser, adsorption tower, denitrating tower, dry desulfurizing tower, fog room, cyclone separator, wet desulfuration tower and block machine.It is building waste that the utility model device, which possesses absorption material in splendid desulphurization denitration function, adsorption tower, it is possible to reduce flue gas is to desulfurization and the pollution of the equipment of denitration and desulfurizing agent, the consumption of denitrfying agent;Building waste cost is low, and the common brick particle or hardened cement particle for having adsorbed flying dust and dust are directly molded through block machine, consume substantial amounts of solid waste.The utility model is suitable for combustion product gases processing.
Description
Technical field
The utility model is related to a kind of flue gas processing device for including adsorption tower and possessing flue gas heat recovery function.
Background technology
Meanwhile, with developing rapidly for urban construction, the construction of new building, the dismounting of old building are brought
Substantial amounts of building waste.Building waste is solid, mainly based on common brick and the major class of hardened cement two, is directed in the prior art
The processing mode of common brick and hardened cement uses or prepared again construction material for filling after crushing again.Common brick and hardened cement
For porous material, with high porosity, stomata is intensive, average and stomata is perforate, therefore common brick and hardened cement also may be used
Using as filtering material or sorbing material, common brick and the but seldom application in the prior art of this characteristic of hardened cement.
SO2It is two kinds of main gaseousness atmosphere pollutions with NOx, they are mainly produced by burning or other chemical processes
And with fume emission into air.The desulfurization of flue gas mainly has wet method and the class of dry method two at present, and dry method is sprayed into using lime slurry
Desulfurizing tower, in the presence of high-temperature flue gas, the water in slurries is evaporated quickly, and the lime in slurries is analysed with the form of solid particle
Go out, and by the SO in flue gas2Absorption is removed on its surface;SO is adsorbed2Solid lime particle then with the dust in flue gas
Together, removed by sack cleaner below;Wet desulphurization then elutes SO using diluter lime liquor in spray column2, stone
The addition of ash is added according to pH control requirement, acid range of the pH general controls 6 or so.SO2Water is absorbed into first
Phase, forms sulfurous acid and and CaCO in water3(or Ca (OH)2) reaction generation calcium sulfite, calcium bisulfite and calcium sulfate.Remove
Lime or lime stone, the basic matterial as flue gas desulfurization also have NaOH, ammoniacal liquor, MgO etc..The denitration of flue gas is divided into reducing process
With the class of oxidizing process two, reducing process uses ammonia or urea as reducing agent, uses V2O5Temperature as catalyst at 300-400 DEG C
Under the conditions of carry out, or the NOx in flue gas is optionally reduced into nitrogen under 1000 DEG C of temperature conditionss without using catalyst.
Selective catalytic reduction is due to needing to use the catalyst containing transition metal, and catalyst can be ground by dust in flue gas
Damage and need often to change, while there is the problems such as NH_3 leakage and temperature conditionss are harsh, it is using being subject to certain restrictions, selectivity
Non-catalytic reduction rule denitration effect can not meet strict NOx emission standard, thus its use it is also restrained.And oxidizing process
Then use ozone and H2O2The NO (account for NOx in flue gas more than 90%) in NOx is oxidized to what is easily eluted Deng oxidant
NO2Or N2O5(NO2Account for more than 90%), and with the SO in flue gas2Removed together in wet scrubber tower.Oxidizing process denitration is due to work
Skill is simple, and without using catalyst, Applicable temperature scope is wide, therefore has some superiority in use cost and applicability.Existing
Some SO2In NOx abjection devices, the device that desulfurization and denitration can be carried out simultaneously is seldom, even there is this function
Device, its eliminating efficiency is also very low, as environmental problem is increasingly serious, and more efficient desulfurization and the device of denitration are current rings
The primary study direction that border is administered.
Utility model content
The utility model is in order to which solve in the prior art can be while the unit efficiency for carrying out desulfurization and denitration be low, building rubbish
Common brick and hardened cement are difficult to the problem of thermal loss is big in recycle and combustion product gases in rubbish, it is proposed that one kind includes suction
Attached tower and the flue gas processing device for possessing flue gas heat recovery function;
It is a kind of comprising adsorption tower and possess flue gas heat reclaim function flue gas processing device, including dryer, condenser,
Adsorption tower, denitrating tower, dry desulfurizing tower, fog room, cyclone separator, wet desulfuration tower and block machine;
The dryer top is drying chamber, and bottom is exhaust gases passes, is heat transfer plate, cigarette between drying chamber and exhaust gases passes
It is provided with the left of gas passage on the right side of exhanst gas outlet, exhaust gases passes and is provided with gas approach;Drying chamber top is provided with humidity discharging mouthful;
The adsorption tower is made up of the first absorbing unit and the second absorbing unit, the first absorbing unit and the second absorbing unit
It is set up in parallel;The first absorbing unit top is the first absorption material humidifying chamber, and middle part is the first flue gas adsorption chamber, and bottom is the
One absorption material locker room, the first humidifying chamber top is provided with the first spray head;The second absorbing unit top is the second absorption
Expect humidifying chamber, middle part is the second flue gas adsorption chamber, and bottom is the second absorption material locker room, and the second humidifying chamber top is provided with second
Spray head;
The dry desulfurizing tower is made up of several desulfurization units, is connected between adjacent desulfurization unit by flue,
Valve is provided with flue between adjacent desulfurization unit;Desulfurization unit be internally provided with vertical desulfurization unit every
Several desulfurizing agent agitators, adjacent desulfurizing agent agitator are provided with plate, the desulfurization unit inwall of desulfurization unit dividing plate both sides
Direction of rotation is opposite;The exhanst gas outlet of multiple desulfurization units is collected to a pipeline;
The drying chamber, the first smoking gas alcove, the second smoking gas alcove, denitrating tower, dry desulfurizing tower, fog room, rotation
Wind separator and wet desulfuration tower pass sequentially through pipeline connection;The drying chamber is connected with condenser by jet chimney, condensation
Device is connected with wet desulfuration tower by aqueduct, and slurries pipeline is provided between drying chamber and wet desulfuration tower;The drying
Pipeline between room and the first smoking gas alcove is a pipeline close to drying chamber side, drying chamber and the first flue gas adsorption chamber it
Between pipeline of the pipeline close to the first flue gas adsorption chamber side be many pipelines;Between the second flue gas adsorption chamber and denitrating tower
Pipeline on be provided with booster fan;Air-introduced machine is provided with pipeline between the cyclone separator and wet desulfuration tower;
The first absorption material absorption of the locker room second material locker room is connected by the first conveyer with block machine, is built
Block forming machine connects through second conveyor and is connected with fog room;
The heat transfer plate is stainless steel plate;The denitrating tower is spray column;The denitrfying agent used in the denitrating tower is liquid
Ammonia, ammonia or urea;The wet desulfuration tower is spray column;The desulfurizing agent used in the wet desulfuration tower is lime;It is described
The desulfurizing agent used in dry desulfurizing tower is lime;Absorption material in the first flue gas adsorption chamber is common brick in building waste
Grain or hardened cement particle;The particle diameter of common brick particle or hardened cement particle in building waste in the first flue gas adsorption chamber
For 2~10cm;
Absorption material in the second flue gas adsorption chamber is common brick particle or hardened cement particle in building waste;Described
The particle diameter of common brick particle or hardened cement particle is 0.5~2cm in building waste in two flue gas adsorption chambers.
Operation principle of the present utility model is:
The heat that the flue gas that burning is produced is initially entered in the exhaust gases passes in dryer, flue gas passes to baking through heat transfer plate
It is the slurries produced after wet desulfuration tower desulfurization in dry chamber, drying chamber, slurries can be dried in drying chamber, slurries drying course
The water produced after the condensed device processing of steam of middle generation is supplemented in wet desulfuration tower;Flue gas temperature after the heat exchange of drying machine
Reduction, the adsorption chamber that then flue gas enters in adsorption tower, in adsorption chamber the absorption material of filling be in building waste common brick particle or
Hardened cement particle, absorption material is porous material and absorption material can be adsorbed after humidifying chamber humidification process to flue gas, is passed through
Flue gas after adsorption tower processing, which enters, carries out denitration process in denitrating tower, the first absorption material locker room and the second absorption material locker room
Interior absorption material is delivered to block machine as the aggregate of building block through the first conveyer and prepares concrete segment, concrete segment
Fog room is delivered to through second conveyor to be conserved;Flue gas after adsorption chamber is handled, which enters, carries out the in dry desulfurizing tower
Once desulfurization processing, dry desulfurizing tower is made up of multiple desulfurization units interconnected, can be controlled according to exhaust gas volumn de-
Flue gas after the unlatching quantity of sulphur unit, dry desulfurization enters in fog room, and flue gas carries out heat exchange in fog room, exchanges
The heat arrived is block curing heat supply, and flue gas temperature after fog room is reduced, and then flue gas enters in cyclone separator and carried out
Gas-solid body separating treatment, the flue gas after being handled through cyclone separator, which enters, carries out second of desulfurization process inside wet desulfuration tower,
Dust, SO after the completion of second of desulfurization process in flue gas2It is cleaned with NOx, the flue gas containing pollutant becomes clean cigarette
Gas is discharged into air.
The utility model possesses following beneficial effect:
1st, the utility model device can carry out denitration process, a dry and wet and combine progress desulfurization process, possess
Splendid desulphurization denitration function, desulfurization degree and denitration rate are above the setting in national standard;
2nd, the utility model device has the adsorption tower of two absorbing units, the absorption of different absorbing units due to being provided with
The absorption material of indoor filling is the common brick particle or the hardened cement particle of different-grain diameter of different-grain diameter in building waste, absorption material
For porous material and absorption material can be to the flying dust in flue gas, dust and SO after humidifying chamber humidification process2Inhaled with NOx
Attached, most flying dust, dust are adsorbed in adsorption tower, it is possible to reduce flue gas is reduced to desulfurization and the pollution of the equipment of denitration
Pollution to desulfurizing agent, denitrfying agent, and then the consumption of desulfurizing agent, denitrfying agent can be reduced, wherein between drying chamber and adsorption chamber
Pipeline be changed into many pipelines from one, flue gas can be evenly dispersed, improve adsorption effect, common brick particle or petrifying water
Mud particle source is wide, cost is low and recovery utilization rate is low, and the utility model is also equipped with the effect of comprehensive utilization of resources;
3rd, dry desulfurizing tower is provided with the desulfurization unit composition of several connections in the utility model device, can be according to flue gas
Amount is controlled the unlatching quantity of desulfurization unit, and desulfurization unit is internally provided with vertical desulfurization unit dividing plate, extends
The flow path of flue gas, improves the efficiency of dry desulfurization, desulfurizing agent is fully reacted with flue gas;
4th, reclaimed after the steam that adsorption tower is produced in the utility model device is handled by condenser and obtain water, obtained water can
To be delivered in wet method adsorption tower, the effect of saving water resource is realized;
5th, the flying dust and dust in flue gas contain substantial amounts of micron order even more small flying dust and dust, these flying dusts and powder
Dirt is good cement mixture, and the utility model is by the common brick particle or hardened cement that have adsorbed flying dust and dust of generation
Grain is directly molded through block machine, consumes substantial amounts of solid waste, and the fog room in the utility model can
So that the heat recovery in flue gas is used for into building block or the maintenance of concrete product, the purpose for reclaiming the energy is realized;
6th, flue gas contains higher moisture after adsorption tower, in flue gas in the utility model device, and flue gas is by inhaling
Enter after attached tower in denitrating tower, existing denitrating tower needs extra humidification device, and the utility model can reduce denitrating tower
Humidification process degree.
Brief description of the drawings
Fig. 1 is the utility model schematic device;
Fig. 2 is dryer schematic diagram in the utility model device;
Fig. 3 is adsorption tower schematic diagram in the utility model device;
Fig. 4 is dry desulfurizing tower schematic diagram in the utility model device;
Embodiment:
Technical solution of the present invention is not limited to act embodiment set forth below, in addition between each embodiment
Any reasonable combination.
Embodiment one:At a kind of flue gas for including adsorption tower and possessing flue gas heat recovery function of present embodiment
Device is managed, the device includes dryer 1, condenser 2, adsorption tower 3, denitrating tower 4, dry desulfurizing tower 5, fog room 6, cyclonic separation
Device 7, wet desulfuration tower 8 and block machine 12;
The top of dryer 1 be drying chamber 1-1, bottom be exhaust gases passes 1-2, drying chamber 1-1 and exhaust gases passes 1-2 it
Between be heat transfer plate 1-3, be provided with the left of exhaust gases passes 1-2 on the right side of exhanst gas outlet 1-4, exhaust gases passes 1-2 and be provided with gas approach
1-5;Drying chamber 1-1 tops are provided with humidity discharging mouthful 1-6;
The adsorption tower 3 is made up of the first absorbing unit 3-8 and the second absorbing unit 3-9, the first absorbing unit 3-8 and
Two absorbing unit 3-9 are set up in parallel;The first absorbing unit 3-8 tops are the first absorption material humidifying chamber 3-1, and middle part is first
Flue gas adsorption chamber 3-2, bottom is the first absorption material locker room 3-3, and the first humidifying chamber 3-1 tops are provided with the first spray head 3-4;
The second absorbing unit 3-8 tops are the second absorption material humidifying chamber 3-5, and middle part is the second flue gas adsorption chamber 3-6, and bottom is the
Two absorption material locker room 3-7, the second humidifying chamber 3-5 tops are provided with the second spray head 3-10;
The dry desulfurizing tower 5 is made up of several desulfurization unit 5-1, and fume pipe is passed through between adjacent desulfurization unit 5-1
Road 5-2 is connected, and valve 5-3 is provided with the flue 5-2 between adjacent desulfurization unit 5-1;Set inside desulfurization unit 5-1
It is equipped with vertical desulfurization unit dividing plate 5-4, the desulfurization unit 5-1 inwalls of desulfurization unit dividing plate 5-4 both sides and is provided with several take off
Sulphur agent agitator 5-5, adjacent desulfurizing agent agitator 5-5 direction of rotation is opposite;Multiple desulfurization unit 5-1 exhanst gas outlet collects
To a pipeline;
The drying chamber 1-1, the first smoking gas alcove 3-2, the second smoking gas alcove 3-6, denitrating tower 4, dry desulfurizing tower
5th, fog room 6, cyclone separator 7 and wet desulfuration tower 8 pass sequentially through pipeline connection;The drying chamber 1-1 passes through with condenser 2
Jet chimney is connected, and condenser 2 is connected with wet desulfuration tower 8 by aqueduct, between drying chamber 1-1 and wet desulfuration tower 8
It is provided with slurries pipeline 11;Pipeline between the drying chamber 1-1 and the first smoking gas alcove 3-2 is close to drying chamber 1-1 sides
For a pipeline, the pipeline between drying chamber 1-1 and the first flue gas adsorption chamber 3-2 is close to the first flue gas adsorption chamber 3-2 sides
Pipeline is many pipelines;Booster fan 9 is provided with pipeline between the second flue gas adsorption chamber 3-6 and denitrating tower 4;It is described
Air-introduced machine 10 is provided with pipeline between cyclone separator 7 and wet desulfuration tower 8;
The first absorption material absorption material of the locker room 3-3 second locker room 3-7 passes through the first conveyer 13 and block forming
Machine 12 is connected, and block machine 12 connects through second conveyor 14 and is connected with fog room 6;
Absorption material in the first flue gas adsorption chamber 3-2 is common brick particle or hardened cement particle in building waste;Institute
The particle diameter for stating common brick particle or hardened cement particle in the building waste in the first flue gas adsorption chamber 3-2 is 2~10cm;
Absorption material in the second flue gas adsorption chamber 3-6 is common brick particle or hardened cement particle in building waste;Institute
The particle diameter for stating common brick particle or hardened cement particle in the building waste in the second flue gas adsorption chamber 3-6 is 0.5~2cm.
Present embodiment possesses following beneficial effect:
1st, present embodiment device can carry out denitration process, a dry and wet and combine progress desulfurization process, possess
Splendid desulphurization denitration function, desulfurization degree and denitration rate are above the setting in national standard;
2nd, present embodiment device has the adsorption tower of two absorbing units, the absorption of different absorbing units due to being provided with
The absorption material of indoor filling is the common brick particle or the hardened cement particle of different-grain diameter of different-grain diameter in building waste, absorption material
For porous material and absorption material can be to the flying dust in flue gas, dust and SO after humidifying chamber humidification process2Inhaled with NOx
Attached, most flying dust, dust are adsorbed in adsorption tower, it is possible to reduce flue gas is reduced to desulfurization and the pollution of the equipment of denitration
Pollution to desulfurizing agent, denitrfying agent, and then the consumption of desulfurizing agent, denitrfying agent can be reduced, wherein between drying chamber and adsorption chamber
Pipeline be changed into many pipelines from one, flue gas can be evenly dispersed, improve adsorption effect, common brick particle or petrifying water
Mud particle source is wide, cost is low and recovery utilization rate is low, and present embodiment is also equipped with the effect of comprehensive utilization of resources;
3rd, dry desulfurizing tower is provided with the desulfurization unit composition of several connections in present embodiment device, can be according to flue gas
Amount is controlled the unlatching quantity of desulfurization unit, and desulfurization unit is internally provided with vertical desulfurization unit dividing plate, extends
The flow path of flue gas, improves the efficiency of dry desulfurization, desulfurizing agent is fully reacted with flue gas;
4th, reclaimed after the steam that adsorption tower is produced in present embodiment device is handled by condenser and obtain water, obtained water can
To be delivered in wet method adsorption tower, the effect of saving water resource is realized;
5th, the flying dust and dust in flue gas contain substantial amounts of micron order even more small flying dust and dust, these flying dusts and powder
Dirt is good cement mixture, and present embodiment is by the common brick particle or hardened cement that have adsorbed flying dust and dust of generation
Grain is directly molded through block machine, consumes substantial amounts of solid waste, and the fog room in present embodiment can
So that the heat recovery in flue gas is used for into building block or the maintenance of concrete product, the purpose for reclaiming the energy is realized;
6th, flue gas contains higher moisture after adsorption tower, in flue gas in present embodiment device, and flue gas is by inhaling
Enter after attached tower in denitrating tower, existing denitrating tower needs extra humidification device, and present embodiment can reduce denitrating tower
Humidification process degree.
Embodiment two:Present embodiment from unlike embodiment one:The heat transfer plate 1-3 is stainless
Steel plate.Other steps and parameter are identical with embodiment one.
Embodiment three:Present embodiment from unlike embodiment one or two:The denitrating tower 4 is spray
Drench tower.Other steps and parameter are identical with embodiment one or two.
Embodiment four:Unlike one of present embodiment and embodiment one to three:The denitrating tower 4
The middle denitrfying agent used is liquefied ammonia, ammonia or urea.Other steps and parameter are identical with one of embodiment one to three.
Embodiment five:Unlike one of present embodiment and embodiment one to four:The wet method takes off
Sulphur tower 8 is spray column.Other steps and parameter are identical with one of embodiment one to four.
Embodiment six:Unlike one of present embodiment and embodiment one to five:The wet method takes off
The desulfurizing agent used in sulphur tower 8 is lime.Other steps and parameter are identical with one of embodiment one to five.
Embodiment seven:Unlike one of present embodiment and embodiment one to six:The dry method takes off
The desulfurizing agent used in sulphur tower 5 is lime.Other steps and parameter are identical with one of embodiment one to six.
Claims (7)
1. a kind of include adsorption tower and possess the flue gas processing device that flue gas heat reclaims function, it is characterised in that:The device bag
Include dryer (1), condenser (2), adsorption tower (3), denitrating tower (4), dry desulfurizing tower (5), fog room (6), cyclone separator
(7), wet desulfuration tower (8) and block machine (12);
Dryer (1) top is drying chamber (1-1), and bottom is exhaust gases passes (1-2), drying chamber (1-1) and exhaust gases passes
It is to be provided with the left of heat transfer plate (1-3), exhaust gases passes (1-2) on the right side of exhanst gas outlet (1-4), exhaust gases passes (1-2) between (1-2)
It is provided with gas approach (1-5);Drying chamber (1-1) top is provided with humidity discharging mouthful (1-6);
The adsorption tower (3) is made up of the first absorbing unit (3-8) and the second absorbing unit (3-9), the first absorbing unit (3-8)
It is set up in parallel with the second absorbing unit (3-9);First absorbing unit (3-8) top is the first absorption material humidifying chamber (3-1),
Middle part is the first flue gas adsorption chamber (3-2), and bottom is the first absorption material locker room (3-3), and the first humidifying chamber (3-1) top is set
There is the first spray head (3-4);Second absorbing unit (3-8) top is the second absorption material humidifying chamber (3-5), and middle part is second
Flue gas adsorption chamber (3-6), bottom is the second absorption material locker room (3-7), and the second humidifying chamber (3-5) top is provided with the second spray
Head (3-10);
The dry desulfurizing tower (5) is made up of several desulfurization units (5-1), and flue gas is passed through between adjacent desulfurization unit (5-1)
Pipeline (5-2) is connected, and valve (5-3) is provided with the flue (5-2) between adjacent desulfurization unit (5-1);Desulfurization list
First (5-1) is internally provided with vertical desulfurization unit dividing plate (5-4), the desulfurization unit (5-1) of desulfurization unit dividing plate (5-4) both sides
Several desulfurizing agent agitators (5-5) are provided with inwall, adjacent desulfurizing agent agitator (5-5) direction of rotation is opposite;It is multiple de-
The exhanst gas outlet of sulphur unit (5-1) is collected to a pipeline;
The drying chamber (1-1), the first smoking gas alcove (3-2), the second smoking gas alcove (3-6), denitrating tower (4), dry method take off
Sulphur tower (5), fog room (6), cyclone separator (7) and wet desulfuration tower (8) pass sequentially through pipeline connection;Drying chamber (the 1-
1) it is connected with condenser (2) by jet chimney, condenser (2) is connected with wet desulfuration tower (8) by aqueduct, drying chamber
Slurries pipeline (11) is provided between (1-1) and wet desulfuration tower (8);The drying chamber (1-1) and the first smoking gas alcove (3-
2) pipeline between is a pipeline close to drying chamber (1-1) side, drying chamber (1-1) and the first flue gas adsorption chamber (3-2) it
Between pipeline of the pipeline close to first flue gas adsorption chamber (3-2) side be many pipelines;The second flue gas adsorption chamber (3-6) with
Booster fan (9) is provided with pipeline between denitrating tower (4);Between the cyclone separator (7) and wet desulfuration tower (8)
Air-introduced machine (10) is provided with pipeline;
The first absorption material absorption material of locker room (3-3) second locker room (3-7) by the first conveyer (13) and building block into
Type machine (12) is connected, and block machine (12) connects through second conveyor (14) and is connected with fog room (6);
Absorption material in the first flue gas adsorption chamber (3-2) is common brick particle or hardened cement particle in building waste;It is described
The particle diameter of common brick particle or hardened cement particle is 2~10cm in building waste in first flue gas adsorption chamber (3-2);
Absorption material in the second flue gas adsorption chamber (3-6) is common brick particle or hardened cement particle in building waste;It is described
The particle diameter of common brick particle or hardened cement particle is 0.5~2cm in building waste in second flue gas adsorption chamber (3-6).
2. a kind of flue gas processing device for including adsorption tower and possessing flue gas heat recovery function according to claim 1,
It is characterized in that:The heat transfer plate (1-3) is stainless steel plate.
3. a kind of flue gas processing device for including adsorption tower and possessing flue gas heat recovery function according to claim 1,
It is characterized in that:The denitrating tower (4) is spray column.
4. a kind of flue gas processing device for including adsorption tower and possessing flue gas heat recovery function according to claim 1,
It is characterized in that:The denitrfying agent used in the denitrating tower (4) is liquefied ammonia, ammonia or urea.
5. a kind of flue gas processing device for including adsorption tower and possessing flue gas heat recovery function according to claim 1,
It is characterized in that:The wet desulfuration tower (8) is spray column.
6. a kind of flue gas processing device for including adsorption tower and possessing flue gas heat recovery function according to claim 1,
It is characterized in that:The desulfurizing agent used in the wet desulfuration tower (8) is lime.
7. a kind of flue gas processing device for including adsorption tower and possessing flue gas heat recovery function according to claim 1,
It is characterized in that:The desulfurizing agent used in the dry desulfurizing tower (5) is lime.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621233537.3U CN206508795U (en) | 2016-11-17 | 2016-11-17 | It is a kind of to include adsorption tower and possess the flue gas processing device that flue gas heat reclaims function |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621233537.3U CN206508795U (en) | 2016-11-17 | 2016-11-17 | It is a kind of to include adsorption tower and possess the flue gas processing device that flue gas heat reclaims function |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206508795U true CN206508795U (en) | 2017-09-22 |
Family
ID=59860705
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621233537.3U Expired - Fee Related CN206508795U (en) | 2016-11-17 | 2016-11-17 | It is a kind of to include adsorption tower and possess the flue gas processing device that flue gas heat reclaims function |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206508795U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108644763A (en) * | 2018-05-11 | 2018-10-12 | 清华大学 | A kind of circulating fluidized bed boiler and its operation method |
CN110358596A (en) * | 2019-08-09 | 2019-10-22 | 浙江知瑞科技集团有限公司 | It is a kind of for improving the purification processes device of biogas combustion quality |
CN110947290A (en) * | 2019-12-06 | 2020-04-03 | 付顺坤 | Two medium block plasma SOx/NOx control devices |
CN115634522A (en) * | 2022-10-20 | 2023-01-24 | 云南曲靖钢铁集团呈钢钢铁有限公司 | Environment-friendly energy-saving type deep purification system and method for flue gas of belt type sintering machine |
-
2016
- 2016-11-17 CN CN201621233537.3U patent/CN206508795U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108644763A (en) * | 2018-05-11 | 2018-10-12 | 清华大学 | A kind of circulating fluidized bed boiler and its operation method |
CN108644763B (en) * | 2018-05-11 | 2024-04-09 | 清华大学 | Circulating fluidized bed boiler and operation method thereof |
CN110358596A (en) * | 2019-08-09 | 2019-10-22 | 浙江知瑞科技集团有限公司 | It is a kind of for improving the purification processes device of biogas combustion quality |
CN110358596B (en) * | 2019-08-09 | 2020-03-17 | 浙江知瑞科技集团有限公司 | Purification treatment device for improving methane combustion quality |
CN110947290A (en) * | 2019-12-06 | 2020-04-03 | 付顺坤 | Two medium block plasma SOx/NOx control devices |
CN115634522A (en) * | 2022-10-20 | 2023-01-24 | 云南曲靖钢铁集团呈钢钢铁有限公司 | Environment-friendly energy-saving type deep purification system and method for flue gas of belt type sintering machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101274193B (en) | System for purifying flue gas and recovering sulfur and technique | |
CN101157003B (en) | Wet-type ammonia flue gas purification technics for associated desulfuration demercuration and system | |
CN206508795U (en) | It is a kind of to include adsorption tower and possess the flue gas processing device that flue gas heat reclaims function | |
CN102974185B (en) | Modularized integrated smoke purification system and method for removing plurality of pollutants | |
CN206372687U (en) | The desulfuring and denitrifying apparatus that a kind of wet-dry change for reclaiming function with flue gas heat is combined | |
CN105642104B (en) | Wet-method desulfurized fume deep-purifying method and device | |
CN103990375A (en) | Integrated semi-dry purifying method for sintering flue gas | |
CN204320062U (en) | A kind of high effective flue gas cleaning system | |
CN109331649A (en) | Coke oven flue gas semi-dry desulphurization, dedusting and low-temperature denitration device and its process | |
CN108554145A (en) | A kind of flue gas desulfurization denitration dust-removing takes off white device | |
CN105617851B (en) | A kind of method and its device of efficient double tower semi-dry desulphurization | |
CN209138324U (en) | A kind of high effective flue gas fair current dust-removal and desulfurizing disappears white device | |
CN109289475A (en) | A kind of high effective flue gas fair current dust-removal and desulfurizing disappears white processing method and its device | |
CN106524205A (en) | Smoke ultra-low emission purification equipment of coal-fired industrial boiler | |
CN104692689A (en) | Method and device for producing modified calcium oxide expansion agent after dry desulfurization of flue gas | |
CN206621980U (en) | A kind of coal steam-electric plant smoke sulfur dioxide, dust and waste water coprocessing system | |
CN101085411A (en) | Device and method for purifying flue gas | |
CN107899408A (en) | A kind of wet method combines flue gas desulphurization system and sulfur method with dry method | |
CN204952658U (en) | Sintering pelletizing flue gas resource system | |
CN206262311U (en) | A kind of flue gas processing equipment of boiler | |
CN204582933U (en) | A kind of fire coal boiler fume two-grade desulfurizing SCR denitration device | |
CN204582930U (en) | A kind of low cost coal-fired flue-gas multiple pollutant minimum discharge system | |
CN206621985U (en) | A kind of coal steam-electric plant smoke sulfur dioxide and waste water coprocessing system | |
CN106039980A (en) | High temperature flue gas mercury removal device and technology | |
CN206295800U (en) | A kind of semi-dry flue gas desulfurization device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170922 Termination date: 20181117 |
|
CF01 | Termination of patent right due to non-payment of annual fee |