CN206505450U - A kind of power networks risk managing and control system - Google Patents
A kind of power networks risk managing and control system Download PDFInfo
- Publication number
- CN206505450U CN206505450U CN201620921899.5U CN201620921899U CN206505450U CN 206505450 U CN206505450 U CN 206505450U CN 201620921899 U CN201620921899 U CN 201620921899U CN 206505450 U CN206505450 U CN 206505450U
- Authority
- CN
- China
- Prior art keywords
- data
- interface
- portal interface
- unit
- storage cell
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012545 processing Methods 0.000 claims abstract description 21
- 238000013500 data storage Methods 0.000 claims abstract description 16
- 210000000352 storage cell Anatomy 0.000 claims abstract description 16
- 230000002452 interceptive effect Effects 0.000 claims abstract description 11
- 238000011144 upstream manufacturing Methods 0.000 claims abstract description 8
- 238000000034 method Methods 0.000 claims description 11
- 230000008569 process Effects 0.000 claims description 10
- 210000004027 cell Anatomy 0.000 claims description 8
- 230000003993 interaction Effects 0.000 claims description 3
- 238000012549 training Methods 0.000 abstract description 15
- 238000007726 management method Methods 0.000 abstract description 10
- 230000010354 integration Effects 0.000 abstract description 5
- 238000009412 basement excavation Methods 0.000 abstract description 4
- 230000008901 benefit Effects 0.000 abstract description 3
- 238000013461 design Methods 0.000 abstract description 3
- 238000010276 construction Methods 0.000 abstract description 2
- 238000007405 data analysis Methods 0.000 abstract 1
- 230000001747 exhibiting effect Effects 0.000 abstract 1
- 230000000007 visual effect Effects 0.000 abstract 1
- 230000008859 change Effects 0.000 description 3
- 230000009466 transformation Effects 0.000 description 2
- 241001269238 Data Species 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 210000004556 brain Anatomy 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000012216 screening Methods 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The utility model discloses a kind of power networks risk managing and control system, including Upstream Interface, downstream interface, portal interface, interactive unit, access unit, data processing unit and data storage cell.Advantage is, builds unified joint information management and training support platform, realizes the integrated of daily life function.The Technical Architecture and related request of integrated operation of power networks intelligence system are fully followed, carries out relevant design and construction under the system.Consider the interface of each operation system and the system as a whole, realize the data integration and information sharing of related system.Under the support of basic support platform and data center, realize integration to the knowledge of power network, it is excavation, integrated, pass through efficient and intelligent data analysis tool, the panorama of information is realized from many aspects such as time, space, Object Dimension, and the comprehensive utilization degree of data is lifted by visual data exhibiting mode, provide the user the whole network panorama, holographyization, highly integrated man-machine interface.
Description
Technical field
The utility model is related to a kind of power networks risk managing and control system.
Background technology
Electric power dispatching system is capital-intensive industry, even more knowledge-intensive industry, and each bar traffic direction is all in system
Possess the Knowledge Assets of preciousness.These Knowledge Assets are the important components of enterprise core competence, except with all kinds of specifications
The forms such as the document of code, the operating process of standard, rational management system are present, and are more known with recessiveness such as ability, experiences
The form of knowledge, be stored in employee's brains at different levels be in stealthy, scattered, unordered state, have pending profound excavation and
Specification.
Currently, there is problems with training shared system in some Knowledge Sets:
Knowledge Integration relative distribution, not architectonical.At present scheduling system Knowledge Integration be dispersed in scheduling institutions at different levels and
In each information system, fail in scheduling system architectonical and integrate, the classification criteria of knowledge, using standard also fail to unification,
Obstacle is caused for the knowledge utilization of the whole network.
Lack the work of knowledge transformation and knowledge excavation aspect.Information management is also rested on simply with utilizing in scheduling system
Knowledge Set in and statistics the stage, also lack deep work in knowledge transformation and knowledge excavation aspect, fail play play each province
Area's knowledge and training advantage, apart from the target that formation the whole network knowledge and training resource intercommunication are shared, length is complementary, efficiently utilize also
There is larger gap.
Information management lacks the unified platform with training.Scheduling system lacks in terms of information management with utilization, online training
The unified platform of one the whole network, is not easy to unified management the whole network scheduling systematic knowledge and material for training, and personnel training work
Make.
Lack effective online training instrument.The main training method of scheduling system also rests on traditional concentration and personally instructed
On, the flexibility of training, the deficient validity lack long-distance video training, electronic remote blank, remote online examination, trainer
The instruments such as member's personal management, it is more difficult to excite student's learning initiative, differential, personalized training conception innovation needs depth
Change, specific aim, completeness, the applicability of training program need to be improved.
Utility model content
In order to solve the above-mentioned technical problem, the utility model purpose is to provide a kind of effectively management operation of power networks and risk
The system of management.
A kind of power networks risk managing and control system described in the utility model, it is characterised in that including:
Upstream Interface, for being communicated with Upper system;
Downstream interface, for being communicated with external equipment;
Portal interface, for providing report control platform, passes through each controllable functional unit of report control platform user;Show each
Functional unit information and state;
Interactive unit, for the result of data processing unit to be fed back into user by portal interface;Receive user
From portal interface input data message and be sent to data processing unit;
Unit is consulted, for the control signal inputted according to user from portal interface, from data storage cell retrieval, screening
Go out to consult information and be shown to portal interface by information is consulted;
Data processing unit, the data message inputted to user from portal interface carries out logical process, after processing
Result is sent to portal interface while writing data storage cell;
Data storage cell, for storing the data variation in interactive process;Store preset data;Store at logic
Result after reason.
A kind of power networks risk managing and control system described in the utility model, the advantage is that, builds unified combining and knows
Know management and training support platform, realize the integrated of daily life function.Fully follow integrated operation of power networks intelligence system
(OS2 systems)Technical Architecture and related request, carry out relevant design and construction under the system.Consider each operation system as a whole
With the interface of the system, the data integration and information sharing of related system are realized.
Described logical process includes:Index, associate, counting, summing up, comparing and anticipation.
Described Upstream Interface connects and reads and writes portal interface, interactive unit, consult cell data processing unit and data
Memory cell.
Described downstream interface connects and reads and writes portal interface, interactive unit, consult cell data processing unit and data
Memory cell.
Described data storage cell preset data includes:Power grid knowledge base, power network case library, power network prediction scheme storehouse, power network
Courseware database, power network exam pool, power network talent bank.
Brief description of the drawings
Fig. 1 is a kind of structural representation of power networks risk managing and control system described in the utility model.
Embodiment
According to Fig. 1, a kind of power networks risk managing and control system described in the utility model, including Upstream Interface, use
Communicated in Upper system;Downstream interface, for being communicated with external equipment;Portal interface, it is flat for providing manipulation
Platform, passes through each controllable functional unit of report control platform user;Show each functional unit information and state;Interactive unit, is used
In the result of data processing unit is fed back into user by portal interface;Receive the data that user inputs from portal interface
Information is simultaneously sent to data processing unit;Unit is consulted, for the control signal inputted according to user from portal interface, from data
Memory cell is retrieved, filters out access information and is shown to portal interface by information is consulted;Data processing unit, to user from door
The data message inputted in the interface of family carries out logical process, and the result after processing is sent into portal interface while writing number
According to memory cell;Data storage cell, for storing the data variation in interactive process;Store preset data;Storage is patrolled
Collect the result after processing.
Upper system can be used in administrative staff, data storage cell is prestored some databases by Upstream Interface, for example:
Power grid knowledge base, power network case library, power network prediction scheme storehouse, power network courseware database, power network exam pool, power network talent bank etc..Connect by upstream
Mouth real-time online consults the interaction scenario and back-end data disposition of start-up.Back-end data processing unit is patrolled data
Collecting processing mainly includes:Index, associate, counting, summing up, comparing and anticipation.Interactively entering for start-up is stored
The index of data, then the data of association area are associated, checking is compared with reference to many item datas.By the result after comparison and the training
The characteristic information of instruction personnel is counted with summing up, and the interaction initial data that its input is combined after summing up is carried out in advance to its technical ability parameter
Sentence, data storage cell finally is arrived into the storage of all logic operation results.
Start-up can be controlled interactive unit by portal interface, consult unit and connection data processing unit.Also may be used
So that by the information of each functional unit, the extent of competence according to where it is output to the external equipment specified by downstream interface.
The embodiment of interactive unit can be on-line examination, online exercise or the evaluation of online technical ability of start-up etc., consult
The embodiment of unit can be all study that start-up is pre-stored in data storage cell by consulting unit retrieval
Data, skill improvement is carried out by various modes such as word, picture, video display or 3D displayings.
For those skilled in the art, technical scheme that can be as described above and design, make other each
Corresponding change and deformation are planted, and all these change and deformation should all belong to the guarantor of the utility model claim
Within the scope of shield.
Claims (5)
1. a kind of power networks risk managing and control system, it is characterised in that including:
Upstream Interface, for being communicated with Upper system;
Downstream interface, for being communicated with external equipment;
Portal interface, for providing report control platform;Described portal interface is configured to manipulate each functional unit;Show each work(
Can unit information and state;
Interactive unit, for the result of data processing unit to be fed back into user by portal interface;Described interaction is single
Member is configured to receive the data message that inputs from portal interface of user and is sent to data processing unit;
Unit is consulted, is configured to receive the control signal that user inputs from portal interface, from data storage cell retrieval, filters out
Consult information, displaying and consult information to portal interface;
Data processing unit, the data message for being configured to input user from portal interface carries out logical process, after processing
Result be sent to portal interface while writing data storage cell;
Data storage cell, for storing the data variation in interactive process;Described data storage cell is configured to deposit
Store up preset data;Store the result after logical process.
2. system according to claim 1, it is characterised in that described logical process includes:Index, associate, count, return
Always, compare and anticipation.
3. system according to claim 1, it is characterised in that described Upstream Interface connects and reads and writes portal interface, hands over
Mutual unit, access cell data processing unit and data storage cell.
4. system according to claim 1, it is characterised in that described downstream interface connects and reads and writes portal interface, hands over
Mutual unit, access cell data processing unit and data storage cell.
5. according to any described systems of claim 1-4, it is characterised in that described data storage cell preset data bag
Include:Power grid knowledge base, power network case library, power network prediction scheme storehouse, power network courseware database, power network exam pool, power network talent bank.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620921899.5U CN206505450U (en) | 2016-08-23 | 2016-08-23 | A kind of power networks risk managing and control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620921899.5U CN206505450U (en) | 2016-08-23 | 2016-08-23 | A kind of power networks risk managing and control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206505450U true CN206505450U (en) | 2017-09-19 |
Family
ID=59843792
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620921899.5U Expired - Fee Related CN206505450U (en) | 2016-08-23 | 2016-08-23 | A kind of power networks risk managing and control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206505450U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107679775A (en) * | 2017-10-31 | 2018-02-09 | 合肥天鹰高科技有限公司 | A kind of power networks risk control platform |
-
2016
- 2016-08-23 CN CN201620921899.5U patent/CN206505450U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107679775A (en) * | 2017-10-31 | 2018-02-09 | 合肥天鹰高科技有限公司 | A kind of power networks risk control platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Quan et al. | Artificial intelligence-aided design: Smart design for sustainable city development | |
Shankar et al. | A review of multimodal learning analytics architectures | |
CN114003586A (en) | Construction method of intelligent education big data platform | |
Bero et al. | Challenges in the development of environmental management systems on the modern university campus | |
KR102260591B1 (en) | Data-based decision support system and operation method | |
Kırış | AHP and multichoice goal programming integration for course planning | |
Mutanga | A context-based business intelligence solution for South African higher education | |
CN206505450U (en) | A kind of power networks risk managing and control system | |
Wu | Research on innovation and development of university instructional administration informatization in IoT and big data environment | |
CN111860895A (en) | BIM-based bridge auxiliary facility operation maintenance management system | |
Cao | [Retracted] Evaluation of Students’ Educational Management Quality Based on Intuitionistic Fuzzy Information | |
Wang | [Retracted] Construction and Effect Analysis of College Students’ Physical Education Teaching Mode Based on Data Mining Algorithm | |
KR102275986B1 (en) | Apparatus of solution-based data analysis and prediction and operation method | |
Gan et al. | [Retracted] Research on Optimization of Student Management Evaluation System under the Background of Big Data | |
Zheng | Business intelligence as a data-based decision support system and its roles in support of institutional research and planning | |
Hu et al. | Research on smart education service platform based on big data | |
Luo et al. | [Retracted] Prediction and Analysis of the Quality of Multimedia Professional Talents Combining Multiobjective Data Fuzzy Evolution | |
Fan | Exploring the potential of using Marxist network management to address the challenges of bioethics education in higher medical colleges | |
Liu et al. | Evaluation Method of Innovative Education Model of E‐Commerce Video Live Broadcast Based on Big Data Analysis Technology | |
Fang et al. | [Retracted] Analysis of Human Resource Allocation Scheme for Digital Media Big Data Based on Recurrent Neural Network Model | |
Zhao | Information fusion method for building grassroots teaching organization based on intelligent optimization | |
Luo | Application of Big Data Technology in Student Management Decision | |
Yang et al. | Design of University Laboratory Management System based on Problem and Goal Orientation | |
Zhao et al. | The Architecture Design of Medical College Data Integration Platform System Based on MBSE | |
Nan | The impact of the organizational innovation on strategic change: Cognitive and learning perspectives |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170919 Termination date: 20180823 |