CN206504694U CN201720192105.0U CN201720192105U CN206504694U CN 206504694 U CN206504694 U CN 206504694U CN 201720192105 U CN201720192105 U CN 201720192105U CN 206504694 U CN206504694 U CN 206504694U
Authority
CN
China
Prior art keywords
blasthole
explosive
main body
laryard
measured
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720192105.0U
Other languages
Chinese (zh)
Inventor
崔年生
王智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Xinhua Engineering Co Ltd
Original Assignee
Fujian Xinhua Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Xinhua Engineering Co Ltd filed Critical Fujian Xinhua Engineering Co Ltd
Priority to CN201720192105.0U priority Critical patent/CN206504694U/en
Application granted granted Critical
Publication of CN206504694U publication Critical patent/CN206504694U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

Implement the multi-functional laryard that blasthole is measured and explosive is lifted the utility model discloses a kind of, Counter weight metal bulb and the graduation mark being arranged on main body rope are measured comprising lifting explosive gib head, main body rope, blasthole, the lifting explosive gib head is arranged at one end of main body rope, the blasthole measures the other end that Counter weight metal bulb is arranged at main body rope, Counter weight metal bulb is measured using blasthole and carries out blast hole depth measurement, cost is low, simple and easy to apply, durable.

Description

It is a kind of to implement the multi-functional laryard that blasthole is measured and explosive is lifted
Technical field
The utility model is related to blasting engineering field, and in particular to a kind of to implement many work(that blasthole is measured and explosive is lifted Can laryard.
Background technology
The bursting work of the job sites such as mining, constructing tunnel, slope project and road and bridge engineering is applied to deeper Drillhole blasting, drilling depth from 1 meter to more than 30 meter Bu Tong, toward blasthole in the efficiency of blasting charge be to influence the weight of the blasting efficiency Want factor.Current outdoor medium-length hole blasting uses manual charging mostly, and charge loading tool is laryard(Powder charge rope), job site is used Laryard lifts explosive the bottom hole into blasthole.The laryard used at present in engineering is typically one that cleek is fixed on to the rope made of hemp It is made, this laryard can not measure blast hole depth before powder charge, it is impossible to timely and effectively whether in place to determine powder charge, cause Demolition effect is not good or loading rate is low.
Chinese patent CN201620025282.5 provides a kind of manual charging for outdoor medium-length hole blasting and restricted, the dress Medicine rope is simple to operate, and length can be adjusted according to blast hole depth, and powder charge rope and projectile filling groove can be replaced according to damaged condition, mainly by Powder charge rope, the projectile filling groove positioned at powder charge rope bottom is constituted, on the aligning plug of the powder charge rope and the part bearing bar of projectile filling groove Bayonet socket slot connection.Described powder charge rope, is made up of main body rope, aligning plug, bayonet socket slot, wherein:Aligning plug, bayonet socket Slot is fixed on the two ends of main body rope by fixed structure respectively;Bayonet socket slot and aligning plug, it passes through the convex of snap-in plug In the notch for playing insertion bayonet socket slot.Every meter of graduation mark is scribbled on described main body rope.Described main body rope, passes through its two ends Bayonet arrangement of the bayonet arrangement respectively with projectile filling groove, one end of the main body rope of another powder charge rope is connected.It is the disadvantage is that, structure is multiple Miscellaneous, cost is high, fragile, is not suitable for job site and uses.Chinese patent CN201410265571.8 provides a kind of Tsp blastholes are measured and powder charge integrated apparatus and method, and the device uses physics measuring staff, by powder charge process with measuring process one Change, including the measuring staff of graduated hollow structure is carved in an outer surface, one end of measuring staff is fixedly connected with measuring staff pedestal, inside measuring staff It is provided with slip powder charge mechanism;The measuring staff pedestal is also connected by a tumbler with angle measuring mechanism, angle measuring mechanism Mechanism is connected with range measurement, and the powder charge mechanism of sliding includes being arranged at the left side inside the projectile filling groove inside measuring staff, the measuring staff End is provided with into hole hauling block, and the hauling block that portals is provided with measuring staff pedestal;Enter one end of hole draught line through entering hole traction Pulley is fixedly connected after being oriented to projectile filling groove, and the other end is piercing in measuring staff;Portal draught line through portal hauling block be oriented to after with Projectile filling groove is fixedly connected, and the other end of the draught line that portals is piercing in measuring staff pedestal, and the tumbler is a bearing, bearing outer ring with Measuring staff pedestal is fixedly connected, and rotating bar is cased with bearing inner race, and rotating bar is connected with angle measuring mechanism.It is the disadvantage is that, knot Structure is complicated, and cost is high, fragile, is not suitable for job site and uses.Therefore it provides a kind of simple and easy to apply, with low cost, solid Durable multi-functional laryard, to substitute existing laryard, is very important.
Utility model content
The purpose of this utility model is to provide a kind of multi-functional laryard for implementing blasthole measurement and explosive lifting, is used to Solve existing laryard problems faced.
To achieve the above object, the technical solution of the utility model is as follows:
It is a kind of to implement the multi-functional laryard that blasthole is measured and explosive is lifted, include lifting explosive gib head, main body rope, blasthole Counter weight metal bulb and the graduation mark being arranged on main body rope are measured, the lifting explosive gib head is arranged at one end of main body rope, The blasthole measures the other end that Counter weight metal bulb is arranged at main body rope.
1 meter is provided with graduation mark on described main body rope.
The main body rope length degree is 10 ~ 30 meters.
It is iron ball that the blasthole, which measures Counter weight metal bulb,.
The blasthole measures gross weight of the gross weight more than main body rope of Counter weight metal bulb.
When blast working scene is toward blasting charge in blasthole, the blasthole is first measured into Counter weight metal bulb one end and sends into big gun In hole, under gravity, the blasthole measures Counter weight metal bulb and drives the constantly landing of main body rope until reaching blasthole bottom, The graduation mark recorded on main body rope obtains blast hole depth;Laryard is taken out;Explosive is hung on lifting explosive hook, blasthole is sent into It is interior, the main body rope of correspondence length is sent into according to the blast hole depth recorded, lifting explosive gib head is then released, packs up laryard, it is complete Into powder charge.
The utility model method has the following advantages that:
It is of the present utility model to implement the multi-functional laryard that blasthole is measured and explosive is lifted, Counter weight metal is measured using blasthole Bulb carries out blast hole depth measurement, and cost is low, simple and easy to apply, durable.
Brief description of the drawings
Fig. 1 can implement the multi-functional laryard schematic diagram that blasthole is measured and explosive is lifted.
Embodiment
Following examples are used to illustrate the utility model, but are not limited to scope of the present utility model.
Refer to Fig. 1, it is a kind of implement blasthole measure and explosive lifting multi-functional laryard, comprising lifting explosive gib head 1, Main body rope 4, blasthole measure Counter weight metal bulb 3 and the graduation mark 2 being arranged on main body rope, and the lifting explosive gib head 1 is set In one end of main body rope 4, the blasthole measures the other end that Counter weight metal bulb 3 is arranged at main body rope 4.
1 meter is provided with graduation mark 2 on described main body rope 4.
The length of main body rope 4 is 10 ~ 30 meters.
It is iron ball that the blasthole, which measures Counter weight metal bulb 3,.
The blasthole measures gross weight of the gross weight more than main body rope 4 of Counter weight metal bulb 3.
When blast working scene is toward blasting charge in blasthole, the blasthole is first measured into the one end of Counter weight metal bulb 3 and sent into In blasthole, under gravity, the blasthole measures Counter weight metal bulb 3 and drives the constantly landing of main body rope 4 until reaching blasthole Graduation mark on bottom, record main body rope 4 obtains blast hole depth;Laryard is taken out;Explosive is hung on lifting explosive gib head 1, Send into blasthole, the main body rope 4 of correspondence length is sent into according to the blast hole depth recorded, then release lifting explosive gib head 1, receive Laryard is played, powder charge is completed.
Although above having made detailed description to the utility model with generality explanation and specific embodiment, On the basis of the utility model, it can be made some modifications or improvements, this is apparent to those skilled in the art 's.Therefore, the these modifications or improvements on the basis of without departing from the utility model spirit, belonging to the utility model will Seek the scope of protection.

Claims (5)

1. a kind of implement the multi-functional laryard that blasthole is measured and explosive is lifted, it is characterised in that includes lifting explosive gib head, master Body rope, blasthole measure Counter weight metal bulb and the graduation mark being arranged on main body rope, and the lifting explosive gib head is arranged at main body One end of rope, the blasthole measures the other end that Counter weight metal bulb is arranged at main body rope.
2. the multi-functional laryard that blasthole is measured and explosive is lifted can be implemented as claimed in claim 1, it is characterised in that described 1 meter is provided with graduation mark on main body rope.
3. the multi-functional laryard that blasthole is measured and explosive is lifted can be implemented as claimed in claim 1, it is characterised in that the master Body rope length degree is 10 ~ 30 meters.
4. the multi-functional laryard that blasthole is measured and explosive is lifted can be implemented as claimed in claim 1, it is characterised in that the big gun It is iron ball that hole, which measures Counter weight metal bulb,.
5. the multi-functional laryard that blasthole is measured and explosive is lifted can be implemented as claimed in claim 1, it is characterised in that the big gun Hole measures gross weight of the gross weight more than main body rope of Counter weight metal bulb.
CN201720192105.0U 2017-03-01 2017-03-01 It is a kind of to implement the multi-functional laryard that blasthole is measured and explosive is lifted Expired - Fee Related CN206504694U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720192105.0U CN206504694U (en) 2017-03-01 2017-03-01 It is a kind of to implement the multi-functional laryard that blasthole is measured and explosive is lifted

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720192105.0U CN206504694U (en) 2017-03-01 2017-03-01 It is a kind of to implement the multi-functional laryard that blasthole is measured and explosive is lifted

Publications (1)

Publication Number Publication Date
CN206504694U true CN206504694U (en) 2017-09-19

Family

ID=59842085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720192105.0U Expired - Fee Related CN206504694U (en) 2017-03-01 2017-03-01 It is a kind of to implement the multi-functional laryard that blasthole is measured and explosive is lifted

Country Status (1)

Country Link
CN (1) CN206504694U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108007308A (en) * 2017-11-21 2018-05-08 贵州大学 A kind of hole length measuring device and measuring method
CN109000517A (en) * 2018-07-27 2018-12-14 中国矿业大学 A kind of explosive cartridge of deep hole blasting
CN109099820A (en) * 2018-08-22 2018-12-28 中国二十二冶集团有限公司 Hole depth detection device and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108007308A (en) * 2017-11-21 2018-05-08 贵州大学 A kind of hole length measuring device and measuring method
CN108007308B (en) * 2017-11-21 2024-01-23 贵州大学 Blasthole length measuring device and method
CN109000517A (en) * 2018-07-27 2018-12-14 中国矿业大学 A kind of explosive cartridge of deep hole blasting
CN109099820A (en) * 2018-08-22 2018-12-28 中国二十二冶集团有限公司 Hole depth detection device and method

Similar Documents

Publication Publication Date Title
CN206504694U (en) It is a kind of to implement the multi-functional laryard that blasthole is measured and explosive is lifted
CN207231367U (en) A kind of underground vertical hole hole depth survey tool
CN103174410B (en) Method for achieving time and depth conversion through weight change of downhole instrument tool
CN107237621A (en) A kind of unmanned measurement apparatus of the underground space explored for vertical pipe well
CN107288612B (en) Mounting device for vibration test sensor in hole
CN202361972U (en) Hole depth measuring device
CN204851233U (en) Bored concrete pile degree of depth exploring equipment
CN205638466U (en) Interval shield tunnel ground drilling cultellation retest device of speciality
CN105627985A (en) Mine shaft elevation transmission method
CN109057777B (en) Measuring device for drilling drift diameter description and using method thereof
CN110295848A (en) A kind of levelling boring method of blast hole bottom hole
CN107631676B (en) Just prop up the monitoring method of the relative vertical displacement between two linings in a kind of tunnel
CN206339188U (en) A kind of blast hole determines device
CN206056542U (en) A kind of construction coiling plummet for measuring height
CN205879071U (en) Simple and easy measuring device of floor thickness
CN205879155U (en) Medium -length hole angle measuring device
CN210220932U (en) Device for measuring inclination angle of blast hole
CN205532655U (en) Anchor rope tool to lock volume of shrinking back measuring device
CN202770446U (en) Quick anchoring convergence measuring point
CN210264825U (en) Device for identifying rock properties of coal mine tunnel roof
CN211085737U (en) Building concrete sampling device
CN208089281U (en) Based on the coal bed gas open hole well sand face detection device for using screw pump mining
CN209802207U (en) Nearly horizontal well deep hole powder charge big gun rod device
CN206830165U (en) A kind of unmanned measurement apparatus of the underground space for the exploration of vertical pipe well
CN202974087U (en) Potential energy-storing and energy-accumulating deep hole blasting construction device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170919

CF01 Termination of patent right due to non-payment of annual fee