CN206503315U - One bulb connects railing - Google Patents

One bulb connects railing Download PDF

Info

Publication number
CN206503315U
CN206503315U CN201720036450.5U CN201720036450U CN206503315U CN 206503315 U CN206503315 U CN 206503315U CN 201720036450 U CN201720036450 U CN 201720036450U CN 206503315 U CN206503315 U CN 206503315U
Authority
CN
China
Prior art keywords
ball contact
cross bar
pipe
handrail tube
column jecket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720036450.5U
Other languages
Chinese (zh)
Inventor
王中贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Changji Environmental Protection Polytron Technologies Inc
Original Assignee
Zhejiang Changji Environmental Protection Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Changji Environmental Protection Polytron Technologies Inc filed Critical Zhejiang Changji Environmental Protection Polytron Technologies Inc
Priority to CN201720036450.5U priority Critical patent/CN206503315U/en
Application granted granted Critical
Publication of CN206503315U publication Critical patent/CN206503315U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a bulb and connects railing, belongs to safeguard technical field, including some first column jeckets, the first cross bar pipe, the second cross bar pipe and handrail tube, it is characterised in that:The first column jecket top is welded with the first ball contact, the first ball contact upper weld has the second column jecket, the second column jecket top is welded with the second ball contact, the second ball contact upper weld has the 3rd column jecket, the 3rd column jecket top is welded with the 3rd ball contact, the first ball contact, second ball contact and the 3rd ball contact are hollow sphere, the first ball contact, second ball contact and the 3rd ball contact left and right sides offer the connecting hole of same level, bushing pipe is provided between the adjacent handrail tube, the bushing pipe is arranged on inside handrail tube, it is attached between the handrail tube and bushing pipe provided with taper bolt.The utility model device provides a kind of simple in construction, and easy for installation, the ball being connected firmly connects railing.

Description

One bulb connects railing
Technical field
The utility model discloses a bulb and connects railing, belongs to safeguard technical field.
Background technology
At present, railing is used in a kind of safety devices above passage, platform etc., needs to be arranged on people's walking when using Passage, on platform.Generally, the steel railing used on passage and platform according to being designed the need for structure, according to passage and The length and width of platform, or railing is split into some sections be designed.Existing ball, which connects railing, includes cylinder, in cylinder The place being connected with cross bar is provided with ball contact, and is provided with ball contact the connecting hole for installing cross bar.In order to save Material saving, tube reducing weight and reduction cost of transportation, the ball contact that ball connects railing use hollow ball, and when mounted, cross bar is easy It is crooked in ball contact, it is impossible to smoothly through connecting hole, largely effect on the efficiency of installation.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art there is provided a kind of simple in construction, simple installation, connected Firm ball connects railing.
To achieve the above object, the utility model provides following technical scheme to realize:
One bulb connects railing, including some first column jeckets, the first cross bar pipe, the second cross bar pipe and handrail tube, described first Column jecket top is welded with the first ball contact, and the first ball contact upper weld has the second column jecket, the second column jecket top weldering The second ball contact is connected to, the second ball contact upper weld has the 3rd column jecket, and the 3rd column jecket top is welded with the 3rd ball Contact, the first ball contact, the second ball contact and the 3rd ball contact are hollow sphere, and the first ball contact, the second ball connect Point and the 3rd ball contact left and right sides, which are offered, is provided with bushing pipe, institute between the connecting hole of same level, the adjacent handrail tube State bushing pipe to be arranged on inside handrail tube, be attached between the handrail tube and bushing pipe provided with taper bolt;The first ball contact, Pilot sleeve is provided with inside second ball contact and the 3rd ball contact, the pilot sleeve centre position is provided with pilot hole, described to lead It is spill to the sleeve left and right sides;The first cross bar pipe, the second cross bar pipe and handrail tube are each passed through the first ball contact, Two ball contacts and the 3rd ball contact are set.
As preferred:The aperture of the connecting hole is more than the diameter of the first cross bar pipe, the second cross bar pipe and handrail tube.
As preferred:The aperture of the pilot hole is more than the aperture of connecting hole.
As preferred:The length of second column jecket is equal to the length of the 3rd column jecket.
The beneficial effects of the utility model are to be provided with guiding in the first ball contact, the second ball contact and the 3rd ball contact Sleeve, the pilot sleeve left and right sides is spill, when installing the first cross bar pipe, the second cross bar pipe and handrail tube, it is possible to use lead The first cross bar pipe, the second cross bar pipe and handrail tube are oriented to sleeve, by the first cross bar pipe, the second cross bar pipe and handrail tube Front end is imported in pilot hole so that the first cross bar pipe, the second cross bar pipe and handrail tube can pass through pilot hole, so as to conveniently wear Cross connecting hole to be installed, accelerate the efficiency installed;Bushing pipe is provided between adjacent handrail tube, bushing pipe is arranged on inside handrail tube, Handrail tube and bushing pipe are fixed using taper bolt, so that adjacent handrail tube be linked together;Between adjacent handrail tube Ipt card in pilot hole, so as to play more preferable fixation.
Brief description of the drawings
Fig. 1 is the structural representation that the utility model ball connects railing;
Fig. 2 is the structural representation of the first ball contact, the second ball contact and the 3rd ball contact;
Fig. 3 is the sectional view at A in Fig. 1.
Reference:1st, the first column jecket;2nd, the first ball contact;3rd, the second column jecket;4th, the second ball contact;5th, the 3rd column jecket; 6th, the 3rd ball contact;7th, the first cross bar pipe;8th, the second cross bar pipe;9th, handrail tube;10th, connecting hole;11st, pilot sleeve;12nd, it is oriented to Hole;13rd, bushing pipe;14th, taper bolt.
Embodiment
It is shown below in conjunction with the accompanying drawings railing is connect to the bulb of the utility model one to be further described.
Ball as shown in Figure 1, 2, 3 connects railing, including some first column jeckets 1, the first cross bar pipe 7, the second cross bar pipe 8 and helps Hand pipe 9, the top of the first column jecket 1 is welded with the first ball contact 2, and the upper weld of the first ball contact 2 has the second column jecket 3, the second column jecket 3 Top is welded with the second ball contact 4, and the upper weld of the second ball contact 4 has the 3rd column jecket 5, and the top of the 3rd column jecket 5 is welded with the 3rd Ball contact 6, the first ball contact 2, the second ball contact 4 and the 3rd ball contact 6 are hollow sphere, the first ball contact 2, the second ball contact 4 and the left and right sides of the 3rd ball contact 6 offer and bushing pipe 13 be provided between the connecting hole 10 of same level, adjacent handrail tube 9, Bushing pipe 13 is arranged on inside handrail tube 9, is attached between handrail tube 9 and bushing pipe 13 provided with taper bolt 14;First ball contact 2, Second ball contact 4 and the inside of the 3rd ball contact 6 are provided with pilot sleeve 11, and the centre position of pilot sleeve 11 is provided with pilot hole 12, led It is spill to the left and right sides of sleeve 11;First cross bar pipe 7, the second cross bar pipe 8 and handrail tube 9 be each passed through the first ball contact 2, Second ball contact 4 and the 3rd ball contact 6 are set.The aperture of connecting hole 10 is more than the first cross bar pipe 7, the second cross bar pipe 8 and handrail The diameter of pipe 9.The aperture of pilot hole 12 is more than the aperture of connecting hole 10.The length of second column jecket 3 is equal to the length of the 3rd column jecket 5 Degree.
Pilot sleeve 11, pilot sleeve 11 or so are provided with first ball contact 2, the second ball contact 4 and the 3rd ball contact 6 Both sides are spill, when installing the first cross bar pipe 7, the second cross bar pipe 8 and handrail tube 9, it is possible to use 11 pair first of pilot sleeve Cross bar pipe 7, the second cross bar pipe 8 and handrail tube 9 are oriented to, and the first cross bar pipe 7, the second cross bar pipe 8 and the front end of handrail tube 9 are led Enter in pilot hole 12 so that the first cross bar pipe 7, the second cross bar pipe 8 and handrail tube 9 can pass through pilot hole 12, so that convenient Installed through connecting hole 10, accelerate the efficiency installed.
Bushing pipe 13 is provided between adjacent handrail tube 9, bushing pipe 13 is arranged on inside handrail tube 9, using taper bolt 14 to handrail Pipe 9 and bushing pipe 13 are fixed, so that adjacent handrail tube 9 be linked together.
Ipt card between adjacent handrail tube 9 is in pilot hole 12, so as to play more preferable fixation.
Described above is only preferred embodiment of the present utility model, and protection domain of the present utility model is not limited merely to Above-described embodiment, all technical schemes belonged under the utility model thinking belong to protection domain of the present utility model.It should refer to Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (4)

1. a bulb connects railing, including some first column jeckets, the first cross bar pipe, the second cross bar pipe and handrail tube, it is characterised in that: The first column jecket top is welded with the first ball contact, and the first ball contact upper weld has the second column jecket, second post Tube top end is welded with the second ball contact, and the second ball contact upper weld has the 3rd column jecket, the 3rd column jecket top welding There is a 3rd ball contact, the first ball contact, the second ball contact and the 3rd ball contact are hollow sphere, the first ball contact, Second ball contact and the 3rd ball contact left and right sides are offered to be provided between the connecting hole of same level, the adjacent handrail tube Bushing pipe, the bushing pipe is arranged on inside handrail tube, is attached between the handrail tube and bushing pipe provided with taper bolt;Described first Pilot sleeve is provided with inside ball contact, the second ball contact and the 3rd ball contact, the pilot sleeve centre position is provided with pilot hole, The pilot sleeve left and right sides is spill;The first cross bar pipe, the second cross bar pipe and handrail tube are each passed through the first ball Contact, the second ball contact and the 3rd ball contact are set.
2. a bulb according to claim 1 connects railing, it is characterised in that:The aperture of the connecting hole is more than the first cross bar The diameter of pipe, the second cross bar pipe and handrail tube.
3. a bulb according to claim 1 connects railing, it is characterised in that:The aperture of the pilot hole is more than connecting hole Aperture.
4. a bulb according to claim 1 connects railing, it is characterised in that:The length of second column jecket is equal to the 3rd post The length of pipe.
CN201720036450.5U 2017-01-12 2017-01-12 One bulb connects railing Expired - Fee Related CN206503315U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720036450.5U CN206503315U (en) 2017-01-12 2017-01-12 One bulb connects railing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720036450.5U CN206503315U (en) 2017-01-12 2017-01-12 One bulb connects railing

Publications (1)

Publication Number Publication Date
CN206503315U true CN206503315U (en) 2017-09-19

Family

ID=59837296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720036450.5U Expired - Fee Related CN206503315U (en) 2017-01-12 2017-01-12 One bulb connects railing

Country Status (1)

Country Link
CN (1) CN206503315U (en)

Similar Documents

Publication Publication Date Title
CN204098239U (en) The connected node of profile steel concrete column and reinforced concrete beam
CN105805112A (en) Universal joint device for rod piece space structure connection
CN206940293U (en) A kind of telescopic driver's lane device of derrick crane
CN206503315U (en) One bulb connects railing
CN204703495U (en) Aluminum alloy pattern plate back cord system
CN109958208A (en) A kind of friction-ellipse mild steel bar composite buffer and its working method
CN205000653U (en) Concrete pump pipe fixing device
CN205530712U (en) Concrete filled steel tube member slip casting bushing type interfacing apparatus
CN205116426U (en) Conversion node device
CN202194393U (en) Steel frame riding track triangle type hoisting structure
CN206498159U (en) Accumulate cable bearer in high-strength aluminum alloy 220kV heavies in section
CN208869123U (en) A kind of novel villa ladder steel structure derrick
CN206319410U (en) A kind of wind-resistant column and the fixed mechanism of girder steel for steel construction
CN202338106U (en) Wall-body hoisting ring of cantilever discharging platform
CN206085004U (en) Fender bracket that inclines is prevented to track board
CN207144797U (en) A kind of cat ladder for building
CN205444474U (en) Lightweight steel wall body and concrete foundation's mounting structure
CN207143752U (en) Drawing anchor device for steel box-girder incremental launching construction
CN206190647U (en) Many functional type material connecting piece
CN206874287U (en) A kind of metro shield section of jurisdiction
CN206015879U (en) A kind of steel building steel pipe column diagonal brace pin shaft structure
CN206231937U (en) A kind of steel cord ends fixing device
CN206385822U (en) A kind of civil engineering guard rail
CN206288910U (en) A kind of post straight top type slide unit of gantry two
CN202689492U (en) Construction platform of engineering people and goods elevator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170919

Termination date: 20180112

CF01 Termination of patent right due to non-payment of annual fee