CN206496896U - Brush seal test experience platform - Google Patents
Brush seal test experience platform Download PDFInfo
- Publication number
- CN206496896U CN206496896U CN201720029110.XU CN201720029110U CN206496896U CN 206496896 U CN206496896 U CN 206496896U CN 201720029110 U CN201720029110 U CN 201720029110U CN 206496896 U CN206496896 U CN 206496896U
- Authority
- CN
- China
- Prior art keywords
- pressure
- brush seal
- ring
- experiment
- supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of brush seal test experience platform, it is characterized in that, the test experience platform includes base member, rotatable parts, drive disk assembly, cover unit, end face seal part, measurement part and outside matching component, the base member is integral cast steel part, end face seal part is provided with the base member, plane machining has screwed hole on base member, for installing cover unit, rotatable parts, hole is threaded on the left of base member, for installing drive disk assembly, the technical scheme by under different operating modes to the leakage rate of brush seal, wear extent, the experiment detection of service life, there is provided accurate, effective experimental data, binding isotherm research is more stablized so as to develop performance, sealing effectiveness is more preferable, the longer brush seal product of service life.
Description
Technical field
The utility model is related to a kind of brush seal test experience platform, is particularly suitable for use in large rotor plant equipment dynamic sealing
The detection of the brush seal used, belongs to the experiment detection field of Sealing Technology.
Background technology
Brush seal technology is the novel seal technology grown up in recent years, is mainly used in aero-engine, combustion vapour
In the rotor dynamic sealing of the rotating machineries such as turbine, steam turbine, its leakage rate is traditional sealed 10%-20% of comb tooth, sealing effect
Really good, brush seal is made up of brush ring and brush filament, and brush filament is not less than 80HB, tension from a diameter of 0.05-0.2mm, hardness
High-temperature alloy silk of the intensity not less than 800Mpa, be into thickness by rotor direction of rotation set angle 20-60 degree close-packed arrays
0.5---5mm annular solid, so as to reduce the rotary resistance to rotor, reduces friction, reduction abrasion.On the rotor runway of antithesis
It is sprayed with wear-resistant coating.Brush seal test experience platform primarily directed to brush seal the leakage rate in the case of different operating modes,
The wear extent of brush filament itself, brush filament carries out experiment detection to wear extent, the brush filament service life of rotor.Operating mode refers to gas temperature
Degree, gas pressure, spinner velocity.Can be preferably to improve brush seal structure, brush filament material by experimental test data
From, rotor runway coating from effective data reference and foundation is provided, test experience platform of the prior art is substantially
All it is cantilever structure, laboratory is small, single-stage brush seal structure can only be measured, and when working, particularly runs at high speed
When Pivot axle occur beat, shake than larger, the accuracy of measurement data and making for product are have impact on to a certain extent
With the life-span, therefore, a kind of new scheme of exigence solves the technical problem.
Utility model content
There is provided a kind of brush seal test experience exactly for technical problem present in prior art for the utility model
Platform, by detecting that there is provided accurate and effective to the experiment of the leakage rate, wear extent, service life of brush seal under different operating modes
Experimental data, binding isotherm research is more stablized so as to develop performance, sealing effectiveness more preferably, longer brush close of service life
Seal product.
To achieve these goals, the technical solution of the utility model is as follows:A kind of brush seal test experience platform, it is special
Levy and be, the test experience platform includes base member, rotatable parts, drive disk assembly, cover unit, end face seal part, survey
Part and outside matching component are measured, the base member is to be provided with end face seal portion on integral cast steel part, the base member
Plane machining has screwed hole on part, base member, and spiral shell is machined with the left of cover unit, rotatable parts, base member for installing
Pit, for installing drive disk assembly.
As it is of the present utility model it is a kind of improve, be experiment chamber lower half chamber in the middle part of the base member, inside have it is multiple every
Storehouse plate, experiment chamber is divided on multiple storehouses, each partition panel top and is machined with annular T-slot for installing experiment brush seal
Part.In the technical scheme, there are four partition panels in lower half chamber, experiment chamber is divided on five storehouses, each partition panel top and added
Work has annular T-slot to be machined with the manometric screwed hole of installation, peace on the left of experiment brush seal, each storehouse for installing
The screwed hole that supply and exhaust are machined with the right side of the screwed hole of thermocouple, each storehouse is filled for installing supply and gas exhaust piping.
As it is of the present utility model it is a kind of improve, the rotatable parts include rotating shaft, bearing, bearing block, gland, bolt,
Front and rear back-up ring, O-ring seal and locking nut I, rotatable parts use dual-support structure, and bearing is arranged on pair by outer ring
In the bearing block of title, gland is connected by bolt and bearing block, and bearing outer ring is compressed, O is machined with the cylindrical step surface of gland
The groove of type sealing ring, for mounting O-shaped sealing ring, gland and the road annular grooves of bearing block Jun Jia tri-, bearing and front and rear back-up ring are logical
Inner hole sleeve is crossed in rotating shaft, and is compressed with locking nut I, the groove of O-ring seal is machined with front and rear back-up ring endoporus, is used for
Mounting O-shaped sealing ring, front and rear back-up ring processes three road annular grooves, corresponding with the annular groove on gland and bearing block to interlock, and is formed
Labyrinth seal, it is ensured that lubricant grease is not thrown out of when bearing is rotated.
As it is of the present utility model it is a kind of improve, the drive disk assembly includes motor, motor supporting base, big belt pulley, big
Belt pulley fixed disk, key I, bolt, small belt pulley, key II, locking nut II, belt and belt stretcher, motor branch
Hole is threaded on support seat, mounting hole is machined with for fixing on motor, motor supporting base, is connected by bolt with base,
Belt stretcher is separately fixed on base and motor supporting base, and elastic, the big belt of belt is adjusted by the regulation of bolt
Wheel fixed disk is connected by key I with motor output shaft, while being fixed big belt pulley by bolt and cone match, small belt pulley
It is connected by key II with rotating shaft, and is fixed with locking nut II, belt is inlaid between large and small belt pulley, and motor speed passes through
Frequency converter is adjusted.Can be by the regulation to adjusting nut, displacement regulation of the company's of realization motor supporting base on base body, from
And the displacement regulation to big belt pulley can be realized, that is, the tensioning regulation to belt is realized, it is simple in construction, it is easy to adjust.
As a kind of improvement of the present utility model, the cover unit is on experiment chamber in the middle part of integral cast steel part, upper lid
Half chamber, inside there is multiple partition panels, is divided into and is machined with annular T-slot on multiple storehouses, each partition panel top and is used for experiment chamber
Install and be threaded hole on experiment brush seal, upper lid front and rear end, for installation end face seal portion part, upper lid is put down
Through hole is machined with face, is fixed by bolt with base 1.In the technical scheme, inside there are four partition panels, experiment chamber is divided into five
Annular T-slot is machined with individual storehouse, each partition panel top to be used to install experiment brush seal.
As it is of the present utility model it is a kind of improve, the end face seal part include carbon ring seal part, wear-resistant sleeve, pin,
Back-up ring is and locking nut III that wear-resistant sleeve endoporus is provided with short keyway and positioned by pin and rotating shaft, and passes through back-up ring and locking
Nut III is fixed with rotating shaft, and carbon ring seal part is fixed by bolt with experiment chamber front and rear end.Carbon ring seal part is provided with road stone
Black sealing ring, material is M254D, heat resistant and wear resistant.
As a kind of improvement of the present utility model, the measurement part includes flowmeter, temperature thermocouple, pressure gauge, stream
Gauge is separately mounted on supply supervisor and exhaust supervisor, and for measuring leakage rate, temperature thermocouple is arranged on experiment chamber lower half
On the left of chamber, for the gas temperature of each bin of measurement experiment chamber, temperature thermocouple is installed on supply supervisor, is easy to observation to supply
Temperature thermocouple is installed on temperature, exhaust supervisor, is easy to observe delivery temperature.Pressure gauge is arranged on the left of experiment chamber lower half chamber,
For the gas pressure of each bin of measurement experiment chamber, pressure gauge is installed on supply supervisor, is easy to observe the change of supply gas pressure,
Pressure gauge is installed on exhaust supervisor, is easy to observe the change of pressure at expulsion.Wherein flow is calculated as vortex-shedding meter, temperature thermocouple
For K-type thermocouple, 0--800 DEG C of temperature-measuring range, pressure gauge selects the high temperature resistant pressure gauge of stainless steel, and pressure measurement scope 0-
1.6Mpa。
As a kind of improvement of the present utility model, four road runways, two road stage teeth runways, two are machined with the rotating shaft
Also be threaded in road flat tooth runway, runway correspondence brush seal brush filament position spray wear-resistant coating, rotating shaft, keyway and pin
Hole.Can increase brush seal with rotor runway is corresponding contact when working condition, to detect brush seal not
The change of each data, further enhancing accurate testing degree of this testing stand to brush seal in same environment.
As a kind of improvement of the present utility model, the wear-resistant coating material is one in tungsten carbide, chromium carbide, chromium oxide
Kind.
As a kind of improvement of the present utility model, the outside matching component includes screw compressor, air accumulator, filtering
Device, cooling driers, heater, cooling water tank, console, pipeline, valve, pressure-reducing valve, screw compressor, air accumulator, filter
And cooling driers, linked together by pipeline and valve, form air supply source, compressed air becomes high pressure gas by heater heating
Pressure-reducing valve is housed on body feeding supply Trunk Line, supply Trunk Line, for controlling aspirated pressure, flowmeter is also mounted at pressure-reducing valve
On supply Trunk Line afterwards, for measuring gas supply flow, while temperature thermocouple and pressure gauge are also installed on supply Trunk Line, just
In the temperature and pressure for observing steam supply, connect, use respectively with experiment five bins of chamber respectively from five bypasses of supply Trunk Line point
Five Valve controllings, fill flowmeter, for measuring extraction flow, while temperature thermocouple and pressure gauge on exhaust Trunk Line
Install on exhaust Trunk Line, the temperature and pressure for being easy to observation to be vented, from points of five bypasses of exhaust Trunk Line respectively with experiment chamber
Five bin connections, it is by the way that exhaust supervisor is accessed into cooling water tank after flowmeter, steam is cold respectively with five Valve controllings
But.Console is used for the unlatching and stopping of controlled motor, can adjust motor speed.
Relative to prior art, advantage of the present utility model is as follows:Brush seal test experience platform master of the present utility model
If the wear extent of the leakage rate in the case of different operating modes, brush filament itself for brush seal, abrasion of the brush filament to rotor
Amount, brush filament service life carry out experiment detection.Operating mode refers to gas temperature, gas pressure, spinner velocity.By testing detection number
According to can be preferably improve brush seal structure, the selection of brush filament material, rotor runway coating it is effective several from providing
According to reference and foundation, detailed process is that compressed air enters compressed air cylinder, is filtered, and cooling driers dry feeding heating
Device, the gas for forming high temperature with pressure is in charge of the laboratory that line enters experimental bench, main supply through main supply Trunk Line and bypass
The pressure-reducing valve that is filled on Trunk Line can control the pressure of air inlet, the measurable gas supply flow of flowmeter of dress, the temperature thermocouple of dress and
The temperature and pressure of pressure gauge observable steam supply, each bypass is in charge of line and is equipped with intake & exhaust valves door, can be wanted according to experiment
It is supply chamber or discharge chamber to ask flexibly control to test chamber.Supply experiment chamber is by the air-supplying valve opening of the chamber, air bleeding valve
Door is closed.Exhaust experiment chamber is to open the air-supplying valve closing of the chamber, drain tap.Brush seal ring load experiment chamber every
In plate T-slot, brush ring correspond to rotor runway, when rotor does not rotate, and high temperature and high pressure gas can be let out from lateral exhaust side is supplied
Leakage, is now static leakage, when the rotor rotates, and high temperature and high pressure gas can now be from lateral exhaust side leakage is supplied
The leakage of state, now brush seal ring has with runway contacts, and long-play can measure brush filament and the abrasion feelings of runway
Condition.Each experiment chamber is equipped with the temperature and pressure of temperature thermocouple and pressure gauge, observable supply intracavitary and exhaust intracavity gas
Power.The gas temperature and pressure of leakage can all weaken, and enter cooling water tank cooling through exhaust charge line and exhaust Trunk Line, subtract
Pressure, forms condensing hot air furnace and uses.The measurable extraction flow of flowmeter filled on exhaust Trunk Line, the temperature thermocouple and pressure of dress
The temperature and pressure of power table observable exhaust.All measurement data can be all varied from the case where working condition changes;
The experimental bench integral rigidity is good, using dual-support structure, is operated steadily when running at high speed, and the experimental bench can both measure height
Low tooth brush seal structure, also measurable flat tooth brush seal structure, realizes the measurement of single-stage or multistage brush seal, using model
Enclose extensively, the data of measurement are accurate, and use time is longer.The technical scheme can be formed preceding back-up ring, rear back-up ring respectively with gland,
Formation labyrinth seal between bearing block, it is ensured that lubricant grease will not be thrown out of when bearing is rotated, and further increase this experiment
The sealing of platform.
Brief description of the drawings
Fig. 1 is the structural representation of brush seal test experience platform;
Fig. 2 is rotatable parts partial enlargement structural representation;
Fig. 3-1, Fig. 3-2 are drive disk assembly partial enlargement structural representations;
Fig. 4 is end face seal part partial enlargement structural representation;
Fig. 5 is brush seal experimental bench and outside supporting floor map;
In figure:1 is base member, and 2 be rotatable parts, and 3 be drive disk assembly, and 4 be cover unit, and 5 be end face seal part,
2-1 is rotating shaft, and 2-2 is bearing, and 2-3 is bearing block, and 2-4 is gland, and 2-5 is bolt, and 2-6 is front and rear back-up ring I, and 2-7 is O-shaped close
Seal, 2-8 is locking nut, and 3-1 is motor, and 3-2 is motor supporting base, and 3-3 is big belt pulley, and 3-4 is that big belt pulley is fixed
Disk, 3-5 is key I, and 3-6 is bolt, and 3-7 is small belt pulley, and 3-8 keys II, 3-9 are locking nut II, and 3-10 is belt, and 3-11 is
Belt stretcher, 5-1 is carbon ring seal part, and 5-2 is wear-resistant sleeve, and 5-3 is pin, and 5-4 is back-up ring, 5-5 locking nuts III.
Embodiment
The utility model is further described with embodiment with reference to Figure of description, but the embodiment is only used for this reality
With new rather than limitation the utility model.
Embodiment 1:Referring to Fig. 1, a kind of brush seal test experience platform, the test experience platform includes base member 1, turned
Dynamic component 2, drive disk assembly 3, cover unit 4, end face seal part 5, measurement part and outside matching component, the base member
1 is to be provided with plane machining on end face seal part 5, base member on integral cast steel part, the base member to have screwed hole, is used
Hole is threaded on the left of cover unit 4, rotatable parts 2, base member in installing, for installing drive disk assembly 3.
The middle part of base member 1 is experiment chamber lower half chamber, inside there is multiple partition panels, and experiment chamber is divided into multiple storehouses,
Annular T-slot is machined with each partition panel top to be used to install experiment brush seal.In the technical scheme, lower half chamber
Inside have four partition panels, will experiment chamber be divided on five storehouses, each partition panel top be machined with annular T-slot be used for install experiment
With brush seal, the screwed hole be machined with the left of each storehouse and install manometric screwed hole, installed thermocouple, each storehouse is right
Side, which is machined with supply and the screwed hole of exhaust, to be used to install supply and gas exhaust piping.Brush seal detection in the technical scheme is real
Platform is tested primarily directed to the leakage rate in the case of different operating modes of brush seal, the wear extent of brush filament itself, brush filament is to rotor
Wear extent, brush filament service life carry out experiment detection.Operating mode refers to gas temperature, gas pressure, spinner velocity.Pass through experiment
Detection data preferably can be provided with for improvement brush seal structure, the selection of brush filament material, the selection of rotor runway coating
Effect, accurate data reference foundation.
Embodiment 2:Referring to Fig. 2, as a kind of improvement of the present utility model, the rotatable parts 2 include rotating shaft 2-
1st, bearing 2-2, bearing block 2-3, gland 2-4, bolt 2-5, front and rear back-up ring 2-6, O-ring seal 2-7 and locking nut I 2-8
Rotatable parts 2 use dual-support structure, and bearing 2-2 is arranged in symmetrical bearing block 2-3 by outer ring, and gland 2-4 passes through spiral shell
Bolt 2-5 and bearing block 2-3 connections, bearing 2-2 outer rings are compressed, and O-ring seal 2-7 is machined with the cylindrical step surfaces of gland 2-4
Groove, for the road annular grooves of mounting O-shaped sealing ring 2-7, gland 2-4 and bearing block 2-3 Jun Jia tri-, bearing 2-2 and front-and-back stop
2-6 is enclosed by inner hole sleeve on rotating shaft 2-1, and is compressed with locking nut I2-8, is machined with front and rear back-up ring 2-6 endoporus O-shaped
Sealing ring 2-7 groove, for mounting O-shaped sealing ring 2-7, front and rear back-up ring 2-6 processes three road annular grooves, with gland 2-4 and
Annular groove correspondence on bearing block 2-3 is interlocked, and forms labyrinth seal, it is ensured that lubricant grease is not thrown out of when bearing 2-2 is rotated,
Further ensure that the accuracy of detection data.Remaining structure and advantage are identical with embodiment 1.
Embodiment 3:Referring to Fig. 3-1, Fig. 3-2 as a kind of improvement of the present utility model, the drive disk assembly 3 includes motor
3-1, motor supporting base 3-2, big belt pulley 3-3, big belt pulley fixed disk 3-4, key I 3-5, bolt 3-6, small belt pulley 3-7,
Spiral shell is machined with key II3-8, locking nut II 3-9, belt 3-10 and belt stretcher 3-11, motor supporting base 3-2
Pit, is machined with mounting hole for fixing on motor 3-1, motor supporting base 3-2, is connected by bolt with base 1, belt tension
Device 3-11 is separately fixed on base 1 and motor supporting base 3-2, adjusts the elastic of belt 3-10 by the regulation of bolt, greatly
Belt pulley fixed disk 3-4 is connected by key I3-5 with motor 3-1 output shafts, while by bolt 3-6 and cone match by great Pi
Belt wheel 3-3 is fixed, and small belt pulley 3-7 is connected by key II3-8 with rotating shaft 2-1, and is fixed with locking nut II3-9, belt 3-
10 are inlaid between large and small belt pulley, and motor 3-1 rotating speeds are adjusted by frequency converter.Remaining structure and advantage and embodiment 1 are complete
It is identical.
Embodiment 4:Referring to Fig. 1, as a kind of improvement of the present utility model, the cover unit 4 is integral cast steel part, on
The middle part of lid 4 is experiment chamber upper half chamber, inside there is multiple partition panels, and experiment chamber is divided on multiple storehouses, each partition panel top and added
Work has annular T-slot to be used to install to be threaded hole on experiment brush seal, upper lid front and rear end, for installation end
Through hole is machined with face seal portion part 5, upper lid plane, is fixed by bolt with base 1.In the technical scheme, inside have four every
Storehouse plate, experiment chamber is divided on five storehouses, each partition panel top and is machined with annular T-slot for installing experiment brush seal
Part, the whole chamber of cover unit 4 and the formation experiment chamber of base member 1.Remaining structure and advantage are identical with embodiment 1.
Embodiment 5:Referring to Fig. 4, as a kind of improvement of the present utility model, it is close that the end face seal part 5 includes carbocyclic ring
Sealing 5-1, wear-resistant sleeve 5-2, pin 5-3, back-up ring are 5-4 and locking nut III5-5, and wear-resistant sleeve 5-2 endoporus is provided with short keyway
Positioned, and fixed by back-up ring 5-4 and locking nut III5-5 and rotating shaft 2-1, carbon ring seal by pin 5-3 and rotating shaft 2-1
Part 5-1 is fixed by bolt with experiment chamber front and rear end.Carbon ring seal part is provided with 6-10 roads graphite-seal ring, and material is
M254D, heat resistant and wear resistant.Remaining structure and advantage are identical with embodiment 1.
Embodiment 6:Referring to Fig. 1, the base member is made up of ZG310-570 materials.By using above-mentioned technical proposal,
Base member employs yield strength for 310MPa, and tensile strength is 570MPa high-strength cast steel material, enhances this experiment
The overall fastness and security of platform.The pressure gauge is made up of stainless steel, the manometric pressure measurement scope be 0-
1.6Mpa.By using above-mentioned technical proposal, pressure gauge employs stainless steel material, can strengthen the manometric life-span.Remaining
Structure and advantage are identical with embodiment 1.
Embodiment 7:Referring to Fig. 5, as a kind of improvement of the present utility model, the measurement part includes flowmeter, thermometric
Thermocouple, pressure gauge, flowmeter are separately mounted on supply supervisor and exhaust supervisor, for measuring leakage rate, temperature thermocouple
On the left of experiment chamber lower half chamber, for the gas temperature of each bin of measurement experiment chamber, thermometric heat is installed on supply supervisor
Galvanic couple, is easy to observe on feed air temperature, exhaust supervisor and installs temperature thermocouple, be easy to observe delivery temperature.Pressure gauge is arranged on
Test on the left of chamber lower half chamber, for the gas pressure of each bin of measurement experiment chamber, pressure gauge is installed on supply supervisor, is easy to see
Examine and pressure gauge is installed on the change of supply gas pressure, exhaust supervisor, be easy to observe the change of pressure at expulsion.Wherein flow is calculated as vortex street
Flowmeter, temperature thermocouple is K-type thermocouple, and 0--800 DEG C of temperature-measuring range, pressure gauge selects the high temperature resistant pressure of stainless steel
Power table, 0-1.6Mpa of pressure measurement scope.Remaining structure and advantage are identical with embodiment 1.
Embodiment 8:Referring to Fig. 2, as a kind of improvement of the present utility model, four road runways are machined with the rotating shaft 2-1,
On two road stage teeth runways, two road flat tooth runways, runway correspondence brush seal brush filament position spray wear-resistant coating, rotating shaft 2-1
Also be threaded, keyway and pin-and-hole, the wear-resistant coating material is one kind in tungsten carbide, chromium carbide, chromium oxide.Remaining knot
Structure and advantage are identical with embodiment 1.
Embodiment 9:Referring to Fig. 5, as a kind of improvement of the present utility model, the outside matching component includes screw pressure
Contracting machine, air accumulator, filter, cooling driers, heater, cooling water tank, console, pipeline, valve, pressure-reducing valve, screw-compression
Machine, air accumulator, filter and cooling driers, are linked together by pipeline and valve, form air supply source, compressed air is by heating
Device heating becomes that pressure-reducing valve is housed on gases at high pressure feeding supply Trunk Line, supply Trunk Line, for controlling aspirated pressure, flow
Meter is also mounted on the supply Trunk Line after pressure-reducing valve, for measuring gas supply flow, while temperature thermocouple and pressure gauge are also pacified
On dress supply Trunk Line, be easy to observe the temperature and pressure of steam supply, from points of five bypasses of supply Trunk Line respectively with experiment chamber five
Individual bin connection, respectively with five Valve controllings, flowmeter is filled on exhaust Trunk Line, for measuring extraction flow, is surveyed simultaneously
Warm galvanic couple and pressure gauge are also installed on exhaust Trunk Line, the temperature and pressure for being easy to observation to be vented, from exhaust Trunk Line point five
Individual bypass is connected with experiment five bins of chamber respectively, respectively with five Valve controllings, by the way that exhaust is responsible for into access after flowmeter
Cooling water tank, steam is cooled down.Console is used for the unlatching and stopping of controlled motor, can adjust motor speed.Remaining structure and
Advantage is identical with embodiment 1.
Operation principle:Referring to Fig. 1-Fig. 5, compressed air enters compressed air cylinder, is filtered, and cooling driers are dried and sent
Enter heater, the gas for forming high temperature with pressure is in charge of the laboratory that line enters experimental bench through main supply Trunk Line and bypass,
The pressure-reducing valve filled on main supply Trunk Line can control the pressure of air inlet, the measurable gas supply flow of flowmeter of dress, the thermometric heat of dress
The temperature and pressure of galvanic couple and pressure gauge observable steam supply, each bypass is in charge of line and is equipped with intake & exhaust valves door, can basis
Requirement of experiment flexibly controls experiment chamber to be supply chamber or discharge chamber.Supply experiment chamber be the air-supplying valve of the chamber is opened,
Drain tap is closed.Exhaust experiment chamber is to open the air-supplying valve closing of the chamber, drain tap.Brush seal ring loads real
Test in chamber dividing plate T-slot, brush ring correspond to rotor runway, when rotor does not rotate, high temperature and high pressure gas can be from supply lateral row
Gas side is leaked, and is now static leakage, when the rotor rotates, and high temperature and high pressure gas can be leaked from lateral exhaust side is supplied, this
When be dynamic leakage, now brush seal ring has with runway contacts, and long-play can measure brush filament and runway
Abrasion condition.Each experiment chamber is equipped with the temperature of temperature thermocouple and pressure gauge, observable supply intracavitary and exhaust intracavity gas
Degree and pressure.The gas temperature and pressure of leakage can all weaken, and it is cold to enter cooling water tank through exhaust charge line and exhaust Trunk Line
But, depressurize, form condensing hot air furnace and use.The measurable extraction flow of flowmeter filled on exhaust Trunk Line, the thermometric thermoelectricity of dress
The temperature and pressure of even summation pressure gauge observable exhaust.All measurement data all can be in the case where working condition changes
Change.
The utility model can also be by least one in technical characteristic described in embodiment 2,3,4,5,6,6,7,8,9 and reality
Apply the combination of example 1 and form new embodiment.
It should be noted that above-described embodiment is only preferred embodiment of the present utility model, it is not for limiting this reality
With new protection domain, the equivalent substitution or replacement made on the basis of the above belong to protection model of the present utility model
Enclose, protection domain of the present utility model is defined by claims.
Claims (10)
1. a kind of brush seal test experience platform, it is characterised in that the test experience platform include base member, rotatable parts,
Drive disk assembly, cover unit, end face seal part, measurement part and outside matching component, the base member is integral cast steel
Plane machining on end face seal part, base member is provided with part, the base member screwed hole, for installing upper cover part
Hole is threaded on the left of part, rotatable parts, base member, for installing drive disk assembly.
2. brush seal test experience platform according to claim 1, it is characterised in that be experiment in the middle part of the base member
Chamber lower half chamber, inside there is multiple partition panels, and experiment chamber is divided on multiple storehouses, each partition panel top and is machined with annular T-slot
For installing experiment brush seal.
3. brush seal test experience platform according to claim 1, it is characterised in that the rotatable parts include rotating shaft,
Bearing, bearing block, gland, bolt, front and rear back-up ring, O-ring seal and locking nut I, rotatable parts use dual-gripper knot
Structure, bearing is arranged in symmetrical bearing block by outer ring, and gland is connected by bolt and bearing block, and bearing outer ring is compressed,
The groove of O-ring seal is machined with the cylindrical step surface of gland, for mounting O-shaped sealing ring, gland and the roads of bearing block Jun Jia tri-
Annular groove, bearing and front and rear back-up ring are compressed by inner hole sleeve in rotating shaft, and with locking nut I, are added on front and rear back-up ring endoporus
Work has the groove of O-ring seal, for mounting O-shaped sealing ring, and front and rear back-up ring processes three road annular grooves, with gland and bearing block
On annular groove correspondence interlock, formed labyrinth seal, it is ensured that bearing rotate when lubricant grease be not thrown out of.
4. the brush seal test experience platform according to Claims 2 or 3, it is characterised in that the drive disk assembly includes electricity
Mechanical, electrical machine support base, big belt pulley, big belt pulley fixed disk, key I, bolt, small belt pulley, key II, locking nut II, skin
Hole is threaded on band and belt stretcher, motor supporting base, waist is machined with for fixing on motor, motor supporting base
Shape hole, is connected by bolt with base, and belt stretcher is separately fixed on base and motor supporting base, passes through the tune of bolt
Section adjusts the elastic of belt, and big belt pulley fixed disk is connected by key I with motor output shaft, while passing through bolt and cone match
Big belt pulley is fixed, small belt pulley is connected by key II with rotating shaft, and fixed with locking nut II, belt is inlaid in large and small
Between belt pulley, motor speed is adjusted by frequency converter.
5. the brush seal test experience platform according to Claims 2 or 3, it is characterised in that the cover unit is overall
It is experiment chamber upper half chamber in the middle part of steel-casting, upper lid, inside there are multiple partition panels, experiment chamber is divided into multiple storehouses, each partition panel
Annular T-slot is machined with top to be used to install to be threaded hole on experiment brush seal, upper lid front and rear end, is used
In being machined with through hole on installation end face seal portion part, upper lid plane, fixed by bolt with base 1.
6. the brush seal test experience platform according to Claims 2 or 3, it is characterised in that the end face seal part bag
Including carbon ring seal part, wear-resistant sleeve, pin, back-up ring is and locking nut III, wear-resistant sleeve endoporus be provided with short keyway by pin with
Rotating shaft is positioned, and is fixed by back-up ring and locking nut III with rotating shaft, and carbon ring seal part passes through bolt and experiment chamber front and back ends
Face is fixed.
7. the brush seal test experience platform according to Claims 2 or 3, it is characterised in that the measurement part includes stream
Gauge, temperature thermocouple, pressure gauge, flowmeter are separately mounted on supply supervisor and exhaust supervisor, for measuring leakage rate, are surveyed
Warm galvanic couple to be arranged on the left of experiment chamber lower half chamber, for the gas temperature of each bin of measurement experiment chamber, pacify on supply supervisor
Temperature thermocouple is filled, is easy to observe on feed air temperature, exhaust supervisor and temperature thermocouple is installed, be easy to observe delivery temperature, pressure
Table is arranged on the left of experiment chamber lower half chamber, for the gas pressure of each bin of measurement experiment chamber, and pressure is installed on supply supervisor
Table, is easy to observe to install pressure gauge on the change of supply gas pressure, exhaust supervisor, is easy to observe the change of pressure at expulsion.
8. brush seal test experience platform according to claim 3, it is characterised in that the race of four roads is machined with the rotating shaft
In road, two road stage teeth runways, two road flat tooth runways, runway correspondence brush seal brush filament position spray wear-resistant coating, rotating shaft
Also be threaded, keyway and pin-and-hole.
9. brush seal test experience platform according to claim 8, it is characterised in that the wear-resistant coating material is carbonization
One kind in tungsten, chromium carbide, chromium oxide.
10. the brush seal test experience platform according to Claims 2 or 3, it is characterised in that the outside matching component bag
Include screw compressor, air accumulator, filter, cooling driers, heater, cooling water tank, console, pipeline, valve, pressure-reducing valve,
Screw compressor, air accumulator, filter and cooling driers, are linked together by pipeline and valve, form air supply source, and compression is empty
Gas becomes that pressure-reducing valve is housed on gases at high pressure feeding supply Trunk Line, supply Trunk Line by heater heating, for controlling to send
Atmospheric pressure, flowmeter is also mounted on the supply Trunk Line after pressure-reducing valve, for measuring gas supply flow, at the same temperature thermocouple and
Pressure gauge is also installed on supply Trunk Line, is easy to observe the temperature and pressure of steam supply, from five bypass difference of supply Trunk Line point
With the five bin connections of experiment chamber, respectively with five Valve controllings, flowmeter is filled on exhaust Trunk Line, for measuring exhaust stream
Amount, while temperature thermocouple and pressure gauge are also installed on exhaust Trunk Line, the temperature and pressure for being easy to observation to be vented, from exhaust main
Pipeline divides five bypasses to be connected respectively with experiment five bins of chamber, respectively with five Valve controllings, by that will be vented after flowmeter
Supervisor's access cooling water tank, steam is cooled down, console is used for the unlatching and stopping of controlled motor, can adjust motor speed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720029110.XU CN206496896U (en) | 2017-01-11 | 2017-01-11 | Brush seal test experience platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720029110.XU CN206496896U (en) | 2017-01-11 | 2017-01-11 | Brush seal test experience platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206496896U true CN206496896U (en) | 2017-09-15 |
Family
ID=59802034
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720029110.XU Active CN206496896U (en) | 2017-01-11 | 2017-01-11 | Brush seal test experience platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206496896U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107063653A (en) * | 2017-01-11 | 2017-08-18 | 江苏鑫信润科技有限公司 | Brush seal test experience platform |
RU208534U1 (en) * | 2020-07-17 | 2021-12-23 | Общество с ограниченной ответственностью "ГАЗПРОМ ТРАНСГАЗ МОСКВА" | DEVICE FOR DETERMINING THE LEAK TIGHTNESS OF THE SEALING RODS OF THE ROTOR BUSHING OF A GAS PUMPING UNIT |
CN114295235A (en) * | 2021-12-24 | 2022-04-08 | 西安交通大学 | Contact type brush type sealing brush wire tip temperature measuring method |
CN114961891A (en) * | 2022-06-16 | 2022-08-30 | 江西中发天信航空发动机科技有限公司 | Method and device for measuring leakage amount of aero-engine labyrinth seal structure |
-
2017
- 2017-01-11 CN CN201720029110.XU patent/CN206496896U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107063653A (en) * | 2017-01-11 | 2017-08-18 | 江苏鑫信润科技有限公司 | Brush seal test experience platform |
CN107063653B (en) * | 2017-01-11 | 2023-10-10 | 江苏鑫信润科技股份有限公司 | Brush seal detection experiment table |
RU208534U1 (en) * | 2020-07-17 | 2021-12-23 | Общество с ограниченной ответственностью "ГАЗПРОМ ТРАНСГАЗ МОСКВА" | DEVICE FOR DETERMINING THE LEAK TIGHTNESS OF THE SEALING RODS OF THE ROTOR BUSHING OF A GAS PUMPING UNIT |
CN114295235A (en) * | 2021-12-24 | 2022-04-08 | 西安交通大学 | Contact type brush type sealing brush wire tip temperature measuring method |
CN114961891A (en) * | 2022-06-16 | 2022-08-30 | 江西中发天信航空发动机科技有限公司 | Method and device for measuring leakage amount of aero-engine labyrinth seal structure |
CN114961891B (en) * | 2022-06-16 | 2023-05-09 | 江西中发天信航空发动机科技有限公司 | Method and device for measuring leakage quantity of aero-engine comb tooth sealing structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206496896U (en) | Brush seal test experience platform | |
CN107063653A (en) | Brush seal test experience platform | |
US5279262A (en) | Mechanical liquid vaporizing waterbrake | |
CN108519235A (en) | Air impeller drive-type birotor testing stand | |
CN100374846C (en) | Work condition analogue rolling contact fatigue tester | |
CN105136457B (en) | The controllable many specification rolling bearing test tables of high/low temperature | |
CN105973600B (en) | A kind of multifunctional water lubricating thrust bearing systems test bed | |
CN104359679B (en) | Method for measuring micropore flow coefficient under rotating condition | |
CN106948864A (en) | A kind of combustion gas screwed pipe rotary engine power set | |
CN106644207A (en) | Torque measuring mechanism | |
CN106017908B (en) | Rotary turbine flow and cooling test device and method | |
CN108731729A (en) | A kind of generator sealing bearing bush simulated experiment rack | |
CN206670918U (en) | Steam turbine experimental rig | |
Kolomoets et al. | Experimental investigation «Dry» gas-dynamic seals used for gas-compressor unit | |
Puzik et al. | The ways to increase the efficiency of the stage of low specific speed | |
CN105952681A (en) | Balance gas cavity type shaft end sealing mechanism and sealing gas adjustment device of compressor | |
CN208885549U (en) | A kind of compressor host | |
CN1033601C (en) | Displacement-type rotary system steam-turbine engine | |
CN207064641U (en) | Tetrafluoro constant pressure mechanically-sealing apparatus and the material mixing equipment with the device | |
CN110346202A (en) | A kind of high temperature and pressure wear testing testing machine | |
CN220356606U (en) | Carbocycle sealing leakage detection device | |
CN108144788A (en) | A kind of gear box casing production line | |
Yiling et al. | Wear prediction for unlubricated piston rings | |
RU2640460C1 (en) | Stand for "cold" reeling of electric power plant turbochargers | |
Morris | Performance of Multiple-Disk-Rotor Pumps with varied interdisk spacings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |