CN206496133U - Pipe connections - Google Patents
Pipe connections Download PDFInfo
- Publication number
- CN206496133U CN206496133U CN201620977159.3U CN201620977159U CN206496133U CN 206496133 U CN206496133 U CN 206496133U CN 201620977159 U CN201620977159 U CN 201620977159U CN 206496133 U CN206496133 U CN 206496133U
- Authority
- CN
- China
- Prior art keywords
- connector
- transition duct
- platform
- duct bodies
- pipe connections
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Branch Pipes, Bends, And The Like (AREA)
Abstract
The utility model discloses a kind of pipe connections, including joint body;And transition duct bodies, the transition duct bodies are fixedly connected with the joint body, and the transition duct bodies are connected with the junction block body phase;Strengthen body, the enhancing body is fixedly connected with the transition duct bodies, the enhancing body is connected with the transition duct bodies;Connector, the connector is fixed and is set in the enhancing tubular body, and the connector is connected with the transition duct bodies;Sealing water channel is provided with the connector.The utility model is limited to a certain degree by metal Reinforced Hoop to be divided between plastics and metal connector, it is to avoid is produced crack, is improved the safety coefficient of pipe connections.The circuit for setting sealing water channel to extend fluid seepage is further advanced by, can effectively mitigate Seepage.
Description
Technical field
The utility model is related to pipe fitting, especially a kind of pipe connections for PPR pipe.
Background technology
PPR pipe is called three type PA tubes, has the advantages that heat-resisting, pressure-resistant, heat preservation energy-saving, service life length and economic,
Just progressively taking turns into leading products for existing other species water pipes.PPR pipe has energy-saving material-saving, environmental protection, high-strength light, resistance to
Burn into inner wall smooth non-scaling, the advantages of construction and maintenance are easy, service life is long, it is widely used in building water supply and drainage, town and country
Construction industry, municipal administration, industry and the agricultural such as plumbing, gas, electric power and cable jacket, industrial fluids conveying, agricultural irrigation
Field.
But this kind of tubing is not perfect, and there is also certain limitation.For example:The limited length of every section of pipe, and
Construction can not be bent, if when pipe laying distance or chance corner, generally requiring to use joint, joint is generally comprised directly
Used as needed on joint and bent sub, some joints and threaded metal insert is provided with articulating joint, i.e. joint, with
It is convenient to be connected with other objects.In addition when tubing operating temperature is more than 70 DEG C, because temperature rise is long under pressure
Creep can occur for the phase, cause interface to occur fluid seepage.It is known that for high-temp liquid or having the liquid of harm once
There is seepage, it will bring about great losses.Therefore the temperature tolerance of joint tubing, resistance to pressure how are improved, fluid seepage is prevented, is improved
Reliability turns into industry urgent problem to be solved.
Utility model content
In view of the shortcomings of the prior art, the utility model provides a kind of pipe connections.
To achieve the above object, the utility model adopts the technical scheme that pipe connections, including joint body;And mistake
Body is crossed, the transition duct bodies are fixedly connected with the joint body, and the transition duct bodies are connected with the junction block body phase;Increase
Strong body, the enhancing body is fixedly connected with the transition duct bodies, and the enhancing body is connected with the transition duct bodies;Even
Joint, the connector is fixed and is set in the enhancing tubular body, and the connector is connected with the transition duct bodies;It is described
Sealing water channel is provided with connector.
In the embodiment of the utility model one, the sealing water channel has several, the recessed connector of sealing water channel.
In the embodiment of the utility model one, the first water shutoff platform, end seal water platform, described first are provided with the connector
Water shutoff platform protrudes along the connector axial direction, and the end seal water platform is outwardly along the connector radial direction;It is described
Sealing water channel is located between the first water shutoff platform and end seal water platform.
In the embodiment of the utility model one, end seal tank is provided with the end seal water platform.
In the embodiment of the utility model one, connection screw thread is set on the connector.
In the embodiment of the utility model one, the enhancing body includes bulge loop, and ladder platform, the ladder platform and institute
State bulge loop to be fixedly connected, Reinforced Hoop is set in the ladder platform periphery;The thickness of the wall of the bulge loop is more than the transition duct bodies
Wall thickness.
In the embodiment of the utility model one, the transition duct bodies include arc tube wall, and the arc tube wall connects with described
Seamlessly transitted between the tube wall of head tube body.
The utility model has the advantages that:
By setting Reinforced Hoop so that metal connector is tightly encased by enhancing body outside, metal insert and modeling are improved
Close adhesion between material, it is to avoid package power subtracts caused by the body portion of plastic material deforms under high-temperature condition
It is small, so as to cause fluid seepage.The utility model by metal Reinforced Hoop limit to a certain degree plastics and metal connector it
Between divide, it is to avoid produce crack, improve the safety coefficient of pipe connections.Setting sealing water channel extension liquid is further advanced by ooze
The circuit of leakage, can effectively mitigate Seepage.
Brief description of the drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is sectional view of the present utility model;
Fig. 3 is the sectional view of the utility model connector.
1st, joint body;2nd, transition duct bodies;3rd, body is strengthened;4th, connector;44th, screw thread;200th, arc tube wall;21st, it is convex
Ring;22nd, ladder platform;5th, Reinforced Hoop;6th, sealing water channel;41st, the first water shutoff platform;42nd, end seal water platform;71st, longitudinal sealing water channel;72nd, hold
Sealing water channel.
Embodiment
With reference to embodiment and accompanying drawing(1 to 3)The utility model will be further described.
Pipe connections involved by the utility model, including joint body 1, transition duct bodies 2, enhancing body 3, the joint
Body 1, transition duct bodies 2 and enhancing body 3 are the transition duct bodies 2 and the joint body 1, described by integrated injection molding
Enhancing body 3 is connected.The transition duct bodies 2 include arc tube wall 200, the arc tube wall 200 and the joint body 1
Tube wall between seamlessly transit.In other embodiments, the transition duct bodies 2 can also be non-arc, i.e. transition duct bodies 2
The diameter parallel of tube wall and transition duct bodies 2.
Enhancing body 3 internal sleeve is provided with connector 4, and the connector 4, which is fixed, to be nested in the enhancing body 3
Portion, the connector 4 is metal connector, preferably copper or plating copper connecting head, and the connector 4 is hollow form, as needed
44 can be threaded on metal connector 4, the screw thread 44 can be external screw thread or internal thread, screw thread 44 is easy to other
Loose joint between the object being engaged, easy installation and removal.If without using loose joint mode, it is welding that can typically use, but this
Thermofussion welding mode is repaired once being molded later stage inconvenience.
The enhancing body 2 includes bulge loop 21, ladder platform 22, and the ladder platform 22 is with the bulge loop 21 by integrally forming
Type, the external diameter of the ladder platform 22 is less than the external diameter of the bulge loop 21.The thickness of the wall of the bulge loop 21 is more than the transition duct bodies 2
Wall thickness, play a part of enhancing pipe junction intensity.Reinforced Hoop 5 is set in the periphery of the ladder platform 22, with the rank
Halfpace 22 is interference fitted.Meanwhile, the periphery of the joint body 1 is also arranged with Reinforced Hoop 5, can so make pipe connections both sides
All improve its cohesive force at connector, it is to avoid fluid seepage.The Reinforced Hoop 5 is stainless steel hollow ring set, and length can
Selection, generally 5-12mm as needed.
Sealing water channel 6 is provided with the connector 4, the sealing water channel 6 there are several, the recessed company of sealing water channel 6
Inside joint 4.The setting of sealing water channel 6 extends the circuit of fluid seepage, helps to slow down or avoid the generation of leakage scenarios.Also
Can be by setting the first water shutoff platform 41, end seal water platform 42 on the connector 4, the first water shutoff platform 41 is along the connection
First 4 axial direction protrusion, the end seal water platform 42 is outwardly along the radial direction of connector 4, and in the first water shutoff platform 41
With set the mode of longitudinal sealing water channel 71 and end seal tank 72 that seepage circuit is further extended respectively on end seal water platform 42, make
Liquid, which oozes out, becomes more difficult.And positioned at its position of some sealing water channels 6 between the first water shutoff platform 41 and end seal water platform 42
In the preferred square-wave-shaped of shape on same section.
Above-mentioned specific embodiment is used only to illustrate the utility model, rather than is that the utility model is limited,
In objective of the present utility model and scope of the claims, what the utility model was made any does not pay creative labor
Dynamic replacement and change, falls within the protection domain of the utility model patent.
Claims (7)
1. a kind of pipe connections, it is characterised in that including:
Joint body;And
Transition duct bodies, the transition duct bodies are fixedly connected with the joint body, the transition duct bodies and the junction block body phase
Connection;
Strengthen body, the enhancing body is fixedly connected with the transition duct bodies, the enhancing body and the transition conduit body phase
Connection;
Connector, the connector is fixed and is set in the enhancing tubular body, and the connector is connected with the transition duct bodies
It is logical;
Sealing water channel is provided with the connector.
2. pipe connections as claimed in claim 1, it is characterised in that the sealing water channel has several, the sealing water channel is recessed
The connector.
3. pipe connections as claimed in claim 1, it is characterised in that the first water shutoff platform, end seal are provided with the connector
Water platform, the first water shutoff platform protrudes along the connector axial direction, and the end seal water platform is along the connector radial direction
It is outwardly;The sealing water channel is located between the first water shutoff platform and end seal water platform.
4. pipe connections as claimed in claim 3, it is characterised in that be provided with end seal tank on the end seal water platform.
5. pipe connections as claimed in claim 3, it is characterised in that connection screw thread is set on the connector.
6. pipe connections as claimed in claim 1, it is characterised in that the enhancing body includes:
Bulge loop;
Ladder platform, the ladder platform is fixedly connected with the bulge loop;And
Reinforced Hoop, the Reinforced Hoop is set in the ladder platform periphery;
The thickness of the wall of the bulge loop is more than the wall thickness of the transition duct bodies.
7. the pipe connections as described in claims 1 to 3 is any, it is characterised in that the transition duct bodies include arc tube wall, institute
Seamlessly transitted between the tube wall for stating arc tube wall and the joint body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620977159.3U CN206496133U (en) | 2016-08-30 | 2016-08-30 | Pipe connections |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620977159.3U CN206496133U (en) | 2016-08-30 | 2016-08-30 | Pipe connections |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206496133U true CN206496133U (en) | 2017-09-15 |
Family
ID=59800679
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620977159.3U Expired - Fee Related CN206496133U (en) | 2016-08-30 | 2016-08-30 | Pipe connections |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206496133U (en) |
-
2016
- 2016-08-30 CN CN201620977159.3U patent/CN206496133U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203404546U (en) | Ribbed reinforced bell-and-spigot joint applied to corrugated pipes | |
CN203286195U (en) | Fully anti-corrosion steel-plastic adaptation connecting structure | |
CN104896218A (en) | Bimetal composite pipe end connecting device | |
CN206496133U (en) | Pipe connections | |
CN204729782U (en) | A kind of heavy caliber steel pipe fittings | |
CN206159725U (en) | Tube connecting piece | |
CN203384540U (en) | Connecting structure for polytetrafluoroethylene hoses | |
CN203023717U (en) | Spigot-and-socket reducing tee electric melting pipe fitting for steel-plastic complex pipe | |
CN206159715U (en) | Tube connecting piece | |
CN204647602U (en) | A kind of composite bimetal pipe pipe end linkage structure | |
CN203686450U (en) | Socket and spigot connector used for steel strip reinforced polyethylene spiral corrugated pipe | |
CN104482321A (en) | Novel titanium alloy composite pipe | |
CN205078934U (en) | Interior ladder way electrothermal welding socket joint formula steel band bellows of heavy -calibre | |
CN204004972U (en) | Multi-way PP-R manages stacked joint | |
CN102518899A (en) | Novel electrofusion-jointing bell and spigot structure of polyethylene-wound structural wall pipe | |
CN203703470U (en) | Steel-plastic transition pipe joint of polyethylene gas or water supply pipe | |
CN203404540U (en) | Spherical four-way pipe fitting | |
CN205173819U (en) | Stainless steel covers moulds internal thread elbow | |
CN203322580U (en) | High-temperature-resistant polyethylene corrugated connecting pipe | |
CN205938227U (en) | Steel pipe and pipeline are strengthened to resinous coat steel strand wires | |
CN215763888U (en) | Pipeline connector | |
CN202302523U (en) | Polyethylene double-wall corrugated pipe | |
CN205136873U (en) | Stainless steel covers moulds nipple | |
CN205136854U (en) | Stainless steel covers moulds conduit bridge joint | |
CN105371016A (en) | Heating pipe coupler and mounting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170915 Termination date: 20210830 |