CN206496131U - New many channel pipeline connecting pieces - Google Patents

New many channel pipeline connecting pieces Download PDF

Info

Publication number
CN206496131U
CN206496131U CN201720085041.4U CN201720085041U CN206496131U CN 206496131 U CN206496131 U CN 206496131U CN 201720085041 U CN201720085041 U CN 201720085041U CN 206496131 U CN206496131 U CN 206496131U
Authority
CN
China
Prior art keywords
connectivity
connectivity port
connection
length direction
body length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720085041.4U
Other languages
Chinese (zh)
Inventor
程东红
陈苏广
钱斌
曾荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Wanneng Building Material Technology Co Ltd
Original Assignee
Suzhou Wanneng Building Material Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Wanneng Building Material Technology Co Ltd filed Critical Suzhou Wanneng Building Material Technology Co Ltd
Priority to CN201720085041.4U priority Critical patent/CN206496131U/en
Application granted granted Critical
Publication of CN206496131U publication Critical patent/CN206496131U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The utility model is related to a kind of new many channel pipeline connecting pieces, on connector hollow body multiple connectivity port two connectivity ports therein respectively positioned at the body length direction two ends and both on same center line, other connectivity ports in the plurality of connectivity port in addition to foregoing two relative connectivity ports are then located normal to the opposite sides in the body length direction respectively, and should be connected perpendicular to the connectivity port in the body length direction and the connection of the body along the curved transition of fluid flow direction, and when there is more than two arc-shaped transitions to connect, stagger the position of more than two arc-shaped transition connection body vertical direction relatively.The utility model makes liquid flow direction of the outlet originally vertical with import in exit basically identical; both pipeline had been protected from impact; extend pipeline service life, while ensureing the pressure and stability of flow in individual channel direction, it also avoid producing noise due to the impact that liquid flows.

Description

New many channel pipeline connecting pieces
Technical field
The utility model is related to one kind to, draining, the improvement of the conduit coupling structure such as supply, is specifically related to one kind The structure of many logical especially four-way conduit couplings is improved, and is taken this to improve, can be effectively improved pipeline pressure and discharge stability, Extend the pipeline life-span.
Background technology
Water supply and sewerage pipeline is generally divided into metal tube and non-metallic pipe, among the construction of pipeline, according to the need of pipeline function Will or easy construction the need for, it usually needs each associated pipe is connected, and the conduit coupling of each pipeline of UNICOM(Also referred to as For pipe fitting)It is the structure of current four-way pipe fitting based on threeway and four-way, shown in Fig. 1 more.
Existing four-way connector is all a usually import thereon using " ten " font as basic configuration, and three export, The exit passageway for having two in this three outlets is vertical with import and another exit passageway, and two exit passageways exist On same center line, this structure have the shortcomings that it is one very big, exactly when liquid flows in pipeline, under extra-lnigh tension When flowing through four-way connector, because three flow directions are mutually perpendicular to, because pressure effect is also easy to produce impact here, there is water Lose phenomenon, not only easy erosion pipeline and influence the pipeline life-span, and easily produce noise, and due to the impact of liquid, cause three The pipeline pressure and flow of outlet are all unstable, and normal use to other pipelines causes very big influence.
The content of the invention
For above the deficiencies in the prior art, my company carries out Improvement, by original orthogonal four-way connector Structural improvement is carried out, and proposes a kind of new many channel pipeline connecting pieces accordingly, the problem of prior art presence is efficiently solved.
The technical solution adopted in the utility model is:
A kind of new many channel pipeline connecting pieces, the connector includes having on a hollow body, the body and included extremely Connected inside multiple connectivity ports of few an import and outlet, the plurality of connectivity port, it is characterised in that:The plurality of connection Port two connectivity ports therein respectively positioned at the body length direction two ends and both on same center line, it is the plurality of It is long that other connectivity ports in connectivity port in addition to foregoing two relative connectivity ports are then located normal to the body respectively The opposite sides in direction is spent, and should be perpendicular to the connectivity port in the body length direction and the connection of the body along flow of fluid Direction curved transition connection, i.e., this perpendicular to the connectivity port in the body length direction and the connection of the body along fluid stream Dynamic direction is with camber line smoothly curve transition, and when there is more than two arc-shaped transitions to connect, more than two arcs Stagger the position of the relative body vertical direction of shape transition connection.
Preferably, it is somebody's turn to do the central shaft of the central axis perpendicular to the connectivity port in the body length direction and the body Line is at the link position of the connectivity port and the body along fluid flow direction formation tangent line connection.
The utility model will stagger in orthogonal via positions originally on conduit coupling body, and by pipeline stream Dynamic direction be above-below direction path and horizontal direction path arc-shaped recliner of the interface to seamlessly transit, make originally and import Liquid flow direction of the vertical outlet in exit is basically identical.Using many channel pipeline connecting pieces of the utility model structure, The weak point of foregoing existing four-way conduit coupling is completely solved, had both protected pipeline from impact, extension pipeline is used In the life-span, while ensureing the pressure and stability of flow in individual channel direction, it also avoid producing and making an uproar due to the impact that liquid flows Sound.
Brief description of the drawings
Fig. 1 is existing four-way conduit coupling structural representation;
Fig. 2 is the utility model embodiment dimensional structure diagram;
Fig. 3 is the schematic elevation view of Fig. 2 structures.
Wherein:1- bodies, 2- imports, 31- first outlets, 32- second outlets 32, the outlets of 33- the 3rd 33,4- arc-shaped transitions Connection.
Embodiment
Below in conjunction with the accompanying drawings and embodiment is further described in detail in embodiment of the present utility model:
Refer to shown in Fig. 2 and Fig. 3, new many channel pipeline connecting pieces that the present embodiment is provided, including a hollow body 1, there are four connectivity ports for including an import 2 and three outlets, it is first to go out respectively that this three, which export, on the body Mouth 31, the outlet of second outlet the 32, the 3rd 33, the import 2 are connected with this three outlets inside.
First outlet 31 and the import 2 in this three outlets respectively positioned at the two ends of the length direction of body 1 and both On same center line, except the first outlet 31 and the import 2, the outlet of second outlet 32 and the 3rd 33 in this three outlets is then The relative both sides of the length direction of body 1, and the second outlet 32 and the 3rd outlet 33 and the body 1 are located normal to respectively Connection along fluid flow direction curved transition connection 4, i.e., this is perpendicular to the connectivity port in the body length direction and this The connection of body along fluid flow direction be with camber line smoothly curve transition, and this at two arc-shaped transition connection 4 at this Position on body 1 with respect to the vertical direction of body 1 is staggered, as can be seen that the outlet of second outlet 32 and the 3rd 33 from Fig. 2, Fig. 3 Not on the same vertical line of the length direction of body 1.
Preferably, 33 central axis should be exported perpendicular to the second outlet 32 and the 3rd of the length direction of body 1 Exported with the central axis of the body 1 in the second outlet 32 and the 3rd at 33 link positions with the body 1 along flow of fluid Direction forms tangent line connection, and the second outlet 32 and the 3rd outlet 33 is not on the same vertical line of the length direction of body 1.

Claims (2)

1. a kind of new many channel pipeline connecting pieces, the connector includes having on a hollow body, the body and included at least Connected inside one import and multiple connectivity ports of outlet, the plurality of connectivity port, it is characterised in that:The plurality of connection end Two connectivity ports mouthful therein respectively positioned at the two ends in the body length direction and both on same center line, the plurality of company Connect other connectivity ports in port in addition to the relative connectivity port of both of the aforesaid and be then located normal to the body length side respectively To opposite sides, and should perpendicular to the connectivity port in the body length direction and the connection of the body along fluid flow direction Curved transition connection, and when there is more than two arc-shaped transitions to connect, more than two arc-shaped transition connections are relative Stagger the position of the body vertical direction.
2. new many channel pipeline connecting pieces according to claim 1, it is characterised in that:Forenamed vertical is in the body length The central axis of the connectivity port in direction and the central axis of the body are suitable at the link position of the connectivity port and the body Fluid flow direction formation tangent line connection.
CN201720085041.4U 2017-01-23 2017-01-23 New many channel pipeline connecting pieces Expired - Fee Related CN206496131U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720085041.4U CN206496131U (en) 2017-01-23 2017-01-23 New many channel pipeline connecting pieces

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720085041.4U CN206496131U (en) 2017-01-23 2017-01-23 New many channel pipeline connecting pieces

Publications (1)

Publication Number Publication Date
CN206496131U true CN206496131U (en) 2017-09-15

Family

ID=59803536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720085041.4U Expired - Fee Related CN206496131U (en) 2017-01-23 2017-01-23 New many channel pipeline connecting pieces

Country Status (1)

Country Link
CN (1) CN206496131U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107689257A (en) * 2016-08-05 2018-02-13 苏州热工研究院有限公司 A branch pipe connection system used to solve the erosion of steam pipes in nuclear power plants
CN111174625A (en) * 2018-11-09 2020-05-19 深圳龙澄高科技环保股份有限公司 Multi-branch crude gas pipeline component

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107689257A (en) * 2016-08-05 2018-02-13 苏州热工研究院有限公司 A branch pipe connection system used to solve the erosion of steam pipes in nuclear power plants
CN111174625A (en) * 2018-11-09 2020-05-19 深圳龙澄高科技环保股份有限公司 Multi-branch crude gas pipeline component

Similar Documents

Publication Publication Date Title
CN206496131U (en) New many channel pipeline connecting pieces
CN201133542Y (en) Vortex noise reduction joint for architecture water drainage
CN105909566A (en) Combined type vortex control device for pump station water inlet flow field
CN101520120B (en) Swirling-flow noise-reduction joint used in construction drainage
CN207179018U (en) A kind of big radian PP R tee pipe fittings
CN206555606U (en) Reducing seamlessly transits direct conduit coupling
CN204959929U (en) Siphon storm -water system
CN204953108U (en) Magnetism dirt separator
CN206682480U (en) Extruded piping branch tee
CN206347249U (en) A kind of outer pressure axial type expansion joint of the anti-throttling of erosion resistant
CN201382228Y (en) V-shaped low-resistance tee joint
CN208381422U (en) A kind of connection structure between valve and pipeline
CN205048051U (en) Pi shape of aviation fluid pressure line connects
CN206529855U (en) A kind of improved overflow pipe
CN209042822U (en) A kind of streamlined Y-type three way type for ground buried pipe of ground source heat pump
CN205559884U (en) Liquid stream check valve with high pressure passageway
CN204372387U (en) A kind of large tubule
CN209385885U (en) A kind of big bent sub of the water pipe of noise reduction
CN204241044U (en) A kind of high precision pressure-taking head of Pitot Pa flow sensor
CN220225569U (en) Drainage pipe fitting
CN206072623U (en) A kind of water route interface-crossover
CN103398258B (en) Structure for relieving stress concentration of intersecting lines inside plastic tee pipe
CN217030362U (en) Pipeline check valve injection molding
CN206338522U (en) A kind of straight coupling for pipeline
CN218818837U (en) An integrated condensing large arc elbow pipe fitting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Cheng Donghong

Inventor before: Cheng Donghong

Inventor before: Chen Suguang

Inventor before: Qian Bin

Inventor before: Zeng Rong

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170915

Termination date: 20220123

CF01 Termination of patent right due to non-payment of annual fee