CN206495412U - A kind of segment frames beam of decile three - Google Patents
A kind of segment frames beam of decile three Download PDFInfo
- Publication number
- CN206495412U CN206495412U CN201720157935.XU CN201720157935U CN206495412U CN 206495412 U CN206495412 U CN 206495412U CN 201720157935 U CN201720157935 U CN 201720157935U CN 206495412 U CN206495412 U CN 206495412U
- Authority
- CN
- China
- Prior art keywords
- central sill
- deck
- decile
- molding
- end carriage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
A kind of segment frames beam of decile three, it is related to construction engineering technical field, including Vierendeel girder body, Vierendeel girder body includes two sections of end carriages and one section of central sill, end carriage is connected to the both sides of central sill and overall in inverted concave shape, the deck-molding of central sill be on the basis of deck-molding, the deck-molding of end carriage is central sill deck-molding oil (gas) filling device pipeline headroom sum.This programme is by providing a kind of segment frames beam of decile three, and simple in construction, bearing capacity is strong;Internal force distribution is reasonably distributed with deck-molding, can be with flexible arrangement equipment pipe;Lower room story height can be effectively reduced simultaneously, reduced foundation ditch and dug depth and construction timber amount.
Description
Technical field
The utility model is related to construction engineering technical field, more particularly to a kind of segment frames beam of decile three.
Background technology
With continuing to develop for society, the high concentration of the continuous quickening, especially population of urbanization process, to limited
Huge digital population is accommodated in land area and brings very big pressure, and many high-rise or even high-rise building is then
Arise at the historic moment in this case;The problem of building of height solves per capita area, but increasing with floor,
Its stability turns into the most important thing of development.
The floor height of building basement floor determines by structure depth of beam, equipment pipe headroom, in general, equipment pipe
Road colleague is definite value at a high speed, and structural beams need certain altitude due to bearing requirements, and the key for reducing floor height is that structure height has
Effect utilizes equipment pipe headroom.Conventional uiform section Vierendeel girder can not utilize equipment pipe headroom, available at present
The Vierendeel girder form of equipment pipe headroom has two kinds of beam-ends haunched beam, holes in soffit uniform beam.The former utilizes equipment pipe
Road headroom carries out beam-ends haunch, and pipeline region in girder span is passed through, because its regulation internal force distribution capability is limited, it is impossible to effectively
Spaning middle section deck-molding is reduced, limited is reduced to floor height;The latter is using duct height as a structure deck-molding part, and deck-molding is increased, beam
Span centre region holes in soffit is walked for equipment pipe, but holes in soffit has strict position and size requirements, it is impossible to flexible arrangement,
Pipeline is walked and limits more, and it is very unfavorable to following pipeline modification.
Utility model content
The purpose of this utility model is to provide a kind of segment frames beam of decile three, can overcome existing haunched beam regulation internal force
Distribution capability is limited, holes in soffit uniform beam pipeline hole is unable to the deficiency of flexible arrangement.
Above-mentioned purpose of the present utility model technical scheme is that:A kind of segment frames beam of decile three,
Including Vierendeel girder body, Vierendeel girder body includes two sections of end carriages and one section of central sill, and end carriage is connected to the both sides of central sill and entirety is in
Inverted concave shape, the deck-molding of central sill be on the basis of deck-molding, the deck-molding of end carriage for central sill deck-molding oil (gas) filling device pipeline headroom it
With.
By using above-mentioned technical proposal, Vierendeel girder form internal force, which is distributed in deck-molding distribution, tends to be reasonable, its component itself
Possess economic rationality, meanwhile, compare beam-ends haunched beam, its adjust internal force distribution capability it is stronger, can more effectively reduce across
Middle section deck-molding, compared to holes in soffit uniform beam, its span centre region provides sufficient space for flexible arrangement pipeline, to working as
Preceding pipeline is arranged and expected future pipeline modification is highly beneficial.For basement structure, the Vierendeel girder form possesses itself
Economy, reasonability, while lower room story height can be effectively reduced, reduce foundation ditch and dig depth and construction timber amount.
It is preferred that, middle depth of beam is the 1/18 ~ 1/22 of Vierendeel girder body span.
By using above-mentioned technical proposal, because central sill is wide enough, equipment pipe can freely be arranged in the region, two ends
Increase beam using equipment pipe headroom, change Stiffness Distribution in girder span, be distributed while also changing internal force in girder span.Phase
Compared with uniform beam form, the beam end support moment of flexure increase 25% ~ 30% of three sections of beam forms of decile, mid span moment reduces 25% ~ 30%,
Mid span moment is reduced, and is effectively reduced spaning middle section deck-molding, and support moment increase is undertaken by the section of increasing deck-molding.Therefore, etc.
Point three segment frames beam forms meet equipment pipe pass through demand while also possess economy, reasonability.
It is preferred that, provided with the end stirrup being distributed along its length in end carriage, it is provided with and is distributed along its length in central sill
Middle stirrup.
By using above-mentioned technical proposal, equally distributed stirrup is set respectively in end carriage and in central sill so that decile three
Segment frames beam possesses uniform load-bearing capacity and higher structural stability.
It is preferred that, end stirrup is included positioned at the end hoop reinforcement and the middle conventional stirrup area in end at two ends, middle stirrup bag
Include positioned at the middle hoop reinforcement and middle middle conventional stirrup area at two ends.
By using above-mentioned technical proposal, hoop reinforcement is set respectively at the two ends at the two ends of end carriage and central sill, improved
Bearing capacity and structural strength at this, the possibility of reduction Vierendeel girder fracture.
It is preferred that, Vierendeel girder body is provided with the elongated muscle of back and beam bottom muscle, and the elongated muscle of back is located at top and through framework
Beam body, the beam bottom muscle that beam bottom muscle is located at bottom and central sill is anchored into end carriage.
By using above-mentioned technical proposal, the structure in the elongated muscle of back and beam bottom muscle raising Vierendeel girder body length direction connects
Continuous property and uniform structural strength, reduce stress concentration.
It is preferred that, the beam bottom muscle quantity at end carriage is two rows, and upper row extends end carriage end and blocked, and bottom drains into end carriage end and upper curved
Extend back.
By using above-mentioned technical proposal, end carriage plays the important function for sharing moment of flexure, therefore the structural strength of end carriage will
Ask higher than central sill.
It is preferred that, the intersection of end carriage and central sill is provided with end additional hooping and middle additional hooping, and end additional hooping is located at end
In beam, middle additional hooping is located in central sill.
By using above-mentioned technical proposal, end carriage and central sill intersection cross-sectional sizes change, to reduce variable cross-section pair
The influence that Vierendeel girder structural strength in this place and dimensional stability are caused, sets additional hooping, improves the structural strength at this
And stability.
To sum up, the segment frames beam of a kind of decile three described in the utility model, simple in construction, bearing capacity is strong;Internal force is distributed
It is reasonably distributed with deck-molding, can be with flexible arrangement equipment pipe;Lower room story height can be effectively reduced simultaneously, reduced foundation ditch and dug
Depth and construction timber amount.
Brief description of the drawings
Fig. 1 is the fragmentary cross-sectional view of the segment frames beam of decile three;
Fig. 2 is the A portions enlarged drawing in Fig. 1.
Reference:1st, end carriage;2nd, central sill;3rd, stirrup is held;301st, hoop reinforcement is held;302nd, conventional stirrup area is held;4、
Middle stirrup;401st, middle hoop reinforcement;402nd, middle conventional stirrup area;5th, the elongated muscle of back;6th, beam bottom muscle;7th, additional hooping is held;
8th, middle additional hooping.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
As shown in Figure 1 and 2, a kind of segment frames beam of decile three, including Vierendeel girder body, Vierendeel girder body includes two sections of end carriages 1
With one section of central sill 2, end carriage 1 is connected to the both sides of central sill 2 and overall in inverted concave shape.The deck-molding of central sill 2 be on the basis of beam
Height, the height of central sill 2 is the 1/18 ~ 1/22 of Vierendeel girder body span.The deck-molding of end carriage 1 is logical for the deck-molding oil (gas) filling device pipeline of central sill 2
Row height sum.
Vierendeel girder body is provided with the elongated muscle 5 of back and beam bottom muscle 6, and the elongated muscle 5 of back is located at top and through Vierendeel girder sheet
Body, the beam bottom muscle 6 that beam bottom muscle 6 is located at bottom and central sill 2 is anchored into end carriage 1.The quantity of beam bottom muscle 6 at end carriage 1 is two rows, on
Row extends the end of end carriage 1 and blocked, and bottom drains into the end of end carriage 1 and upper curved extends back.
Provided with equally distributed end stirrup 3 along its length in end carriage 1, provided with uniform along its length in central sill 2
The middle stirrup 4 of distribution.Stirrup 3 is held to include positioned at the end hoop reinforcement 301 and the middle conventional stirrup area 302 in end at two ends, in
Stirrup 4 is included positioned at the middle hoop reinforcement 401 and middle middle conventional stirrup area 402 at two ends.The boundary of end carriage 1 and central sill 2
Place is located in end carriage 1 provided with end additional hooping 7 and middle additional hooping 8, end additional hooping 7, and middle additional hooping 8 is located in central sill 2.
During using three segment frames beam of decile, need to determine the benchmark deck-molding of central sill 2 first, Vierendeel girder sheet is can use during preliminary tentative calculation
The 1/20 of body span, the deck-molding of both sides end carriage 1 takes the benchmark deck-molding and equipment pipe headroom sum of central sill 2, if result is full
Foot and the bearing capacity requirement close to specification and deformation requirements, then the deck-molding is required deck-molding, if being unsatisfactory for or beyond a lot of,
Benchmark deck-molding is adjusted, untill design requirement is met.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability
Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but
As long as all being protected in right of the present utility model by Patent Law.
Claims (7)
1. a kind of segment frames beam of decile three, including Vierendeel girder body, it is characterised in that:Vierendeel girder body includes two sections of end carriages(1)
With one section of central sill(2), end carriage(1)It is connected to central sill(2)Both sides and it is overall be in inverted concave shape, central sill(2)Deck-molding be
On the basis of deck-molding, end carriage(1)Deck-molding be central sill(2)Deck-molding oil (gas) filling device pipeline headroom sum.
2. the segment frames beam of a kind of decile three according to claim 1, it is characterised in that:The central sill(2)Height be frame
Set a roof beam in place the 1/18 ~ 1/22 of body span.
3. the segment frames beam of a kind of decile three according to claim 1, it is characterised in that:The end carriage(1)It is interior to be provided with along it
The equally distributed end stirrup of length direction(3), central sill(2)It is interior to be provided with equally distributed middle stirrup along its length(4).
4. the segment frames beam of a kind of decile three according to claim 3, it is characterised in that:The end stirrup(3)Including positioned at
The end hoop reinforcement at two ends(301)With the conventional stirrup area in middle end(302), middle stirrup(4)Including the middle hoop positioned at two ends
Muscle encrypted area(401)With middle middle conventional stirrup area(402).
5. the segment frames beam of a kind of decile three according to claim 3, it is characterised in that:The Vierendeel girder body is provided with back
Elongated muscle(5)With beam bottom muscle(6), the elongated muscle of back(5)Positioned at top and through Vierendeel girder body, beam bottom muscle(6)Positioned at bottom
And central sill(2)The beam bottom muscle at place(6)Anchor into end carriage(1)It is interior.
6. the segment frames beam of a kind of decile three according to claim 5, it is characterised in that:The end carriage(1)The beam bottom muscle at place
(6)Quantity is two rows, and upper row extends end carriage(1)End is blocked, and bottom drains into end carriage(1)Hold and upper curved extend back.
7. the segment frames beam of a kind of decile three according to claim 3, it is characterised in that:The end carriage(1)And central sill(2)'s
Intersection is provided with end additional hooping(7)With middle additional hooping(8), hold additional hooping(7)Positioned at end carriage(1)It is interior, middle additional hooping
(8)Positioned at central sill(2)It is interior.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720157935.XU CN206495412U (en) | 2017-02-21 | 2017-02-21 | A kind of segment frames beam of decile three |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720157935.XU CN206495412U (en) | 2017-02-21 | 2017-02-21 | A kind of segment frames beam of decile three |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206495412U true CN206495412U (en) | 2017-09-15 |
Family
ID=59805492
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720157935.XU Expired - Fee Related CN206495412U (en) | 2017-02-21 | 2017-02-21 | A kind of segment frames beam of decile three |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206495412U (en) |
-
2017
- 2017-02-21 CN CN201720157935.XU patent/CN206495412U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109667598B (en) | Tunnel composite lining design method based on total safety factor method | |
CN202055373U (en) | Combined structure of double-steel-plate sandwich concrete wall and square steel tube concrete | |
CN205529906U (en) | Take semi -closed trough perforated plate's quadrature opposite sex combination bridge panel | |
CN105756235B (en) | A kind of assembled steel concrete frame shear wall building system | |
CN107574929A (en) | Girder with rolled steel section en cased in concrete spinous process of the seventh cervical vertebra frame node and joint construction method | |
CN204152080U (en) | Embedded outsourcing U-shaped steel-concrete composite beam | |
CN203569795U (en) | Long span prestress cube type steel rib concrete superposed beam | |
CN203129359U (en) | Single row reinforced concrete shear wall with cross inclined ribs | |
CN203238845U (en) | Cantilever beam component with high load-bearing capacity | |
CN206495412U (en) | A kind of segment frames beam of decile three | |
CN203755127U (en) | Pre-stress high-performance concrete continuous box girder bridge | |
CN206233433U (en) | New H+T shapes part and its with floor combination beam | |
CN105888133B (en) | A kind of load-carrying members for building | |
CN107419806A (en) | A kind of grid solid beam-string structure system across X-type greatly and its construction method | |
CN208518137U (en) | A kind of closed-section steel deck combined concrete shear wall connecting node | |
CN208137189U (en) | A kind of Honeycomb Beam X-shaped concealed bracings concrete shear force wall and building | |
CN102433960A (en) | Foam filled reinforced concrete hollow beam | |
CN207211436U (en) | A kind of steel and concrete shear wall assembling-type space module structural system | |
CN105672112A (en) | Concrete box girder bridge web reinforcing hole based on double-deck traffic | |
CN106836556B (en) | Composite reinforcement cage truss supporting shear wall | |
CN204609002U (en) | Profile steel concrete column and prestressed girder frame joint | |
CN205857531U (en) | A kind of aspect is than the stirrup attachment structure of combined steel and concrete column | |
CN205776898U (en) | Overall assembled reinforced concrete shear wall structure system | |
CN204126295U (en) | Outsourcing reinforcing bar ruggedized construction at the bottom of a kind of beam | |
CN107268852A (en) | Floor construction and construction method that a kind of prefabricated frid is constituted |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170915 Termination date: 20200221 |