CN206490383U - A kind of cable testing bridge for being easy to separated time - Google Patents
A kind of cable testing bridge for being easy to separated time Download PDFInfo
- Publication number
- CN206490383U CN206490383U CN201720086122.6U CN201720086122U CN206490383U CN 206490383 U CN206490383 U CN 206490383U CN 201720086122 U CN201720086122 U CN 201720086122U CN 206490383 U CN206490383 U CN 206490383U
- Authority
- CN
- China
- Prior art keywords
- crane span
- span structure
- hole
- screw
- crossbearer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of cable testing bridge for being easy to separated time, including crane span structure body and branch means, the two ends of crane span structure base have been fixedly connected with crane span structure side, first through hole are evenly distributed with crane span structure base;Crane span structure side is provided with the second through hole and heat emission hole, crane span structure top cover and is evenly distributed with third through-hole;The top of top plate is provided with the 3rd screw, and crossbearer and vertical frame are vertically connected, and the bottom of vertical frame, which is fixedly connected with bottom plate, bottom plate, is evenly distributed with the first screw.Originally it is easy to the cable testing bridge of separated time, crane span structure top cover can be slided in groove, so as to position the position of the 3rd screw, because crossbearer and vertical frame are vertically connected so that crane span structure body interior separates multiple passages, different cables can be placed on different passages, it is knotted together so that cable will not be tangled, in order, cable wiring is convenient, improves installation effectiveness for the arrangement of cable.
Description
Technical field
The utility model is related to controller switching equipment technical field, specially a kind of cable testing bridge for being easy to separated time.
Background technology
In recent years, China put into a huge sum of money and carries out upgrading urban and rural power grids, but the distribution line construction time limit in old urban area is more early,
Construction criteria is relatively low compared with modern needs, and ageing equipment is serious, and a large amount of electric wires are hung in the air, no as cobweb
Only hinder city outlook to look forward or upwards, also bury many potential safety hazards, seriously endanger the personal safety of the public.Under such circumstances,
Strengthen the strategic height of urban distribution network reliability and line transmission ability, and thoroughly do away with visual pollution, beautifying urban environment, just into
The trend of INVENTIONModern cable facility development, cable testing bridge turns into the main thoroughfare of urban electricity supply.But existing cable testing bridge knot
Structure design is unreasonable, and not scientific and reasonable enough, in comprehensive wiring, complicated cable is easy to tangle and is knotted together,
So it is unfavorable for the orderly wiring winding displacement of cable run, causes to be inconvenient during installation wiring, installation effectiveness is influenceed, while unfavorable
In the radiating of circuit, cause after installing, cable operationally easily produces high temperature, cause aging circuit to accelerate, use
Reduced lifespan, influences the quality of cable.
Utility model content
The purpose of this utility model is to provide a kind of, possess that installation and removal are convenient, cable arrangement in order, cable
Line wiring is convenient and improves the advantage of installation effectiveness, solves the problems of the prior art.
To achieve the above object, the utility model provides following technical scheme:A kind of cable testing bridge for being easy to separated time, including
Crane span structure body and branch means, the crane span structure body include crane span structure base, crane span structure side and crane span structure top cover;The crane span structure base
Two ends have been fixedly connected with crane span structure side, and first through hole is evenly distributed with the crane span structure base;Set on the crane span structure side
There are the second through hole and heat emission hole, top one end of crane span structure side, which is provided with groove, the top end face of crane span structure side, to be fixedly connected with
Flange;The two ends of the crane span structure top cover are movably connected on groove, and third through-hole is evenly distributed with crane span structure top cover;Described
One through hole and the second through hole are each provided on same vertical plane, and the second through hole is located at the side of heat emission hole;The branch means include
Top plate, dividing wire frame and bottom plate;The top of the top plate is provided with the 3rd screw, and the 3rd screw is corresponding with third through-hole, described
Dividing wire frame is fixedly connected with the bottom end face of top plate;The dividing wire frame includes crossbearer and vertical frame;The crossbearer and vertical frame are vertical
Connection, the bottom of vertical frame is fixedly connected with bottom plate, the second screw, the second screw is equipped with the center of the crossbearer two sides
It is corresponding with the second through hole;The first screw is evenly distributed with the bottom plate, the first screw is corresponding with first through hole.
It is preferred that, the quantity of the crane span structure side is two, and two crane span structure sides are vertical with crane span structure base.
It is preferred that, the cross section of the groove is L-type, and the thickness of groove is more than the thickness of crane span structure top cover.
It is preferred that, the top plate, crossbearer are identical with the length of bottom plate, and the length of top plate, crossbearer and bottom plate is less than crane span structure bottom
The length of seat.
It is preferred that, the vertical frame is identical with the width of crossbearer, vertical frame and crossbearer integrally connected.
Compared with prior art, the beneficial effects of the utility model are as follows:
Originally it is easy to the cable testing bridge of separated time, crane span structure top cover can be slided in groove, so as to position the position of the 3rd screw, dissipates
Hot hole is to entering row line radiating so that the heat that cable is operationally produced easily is distributed so that cable aging speed subtracts
Slowly, service life increases;Because crossbearer and vertical frame are vertically connected so that crane span structure body interior separates multiple passages, different electricity
Cable be can be placed on different passages so that cable will not be tangled and is knotted together, and the arrangement of cable is orderly, cable
Wiring is convenient, improves installation effectiveness, and branch means are arranged in crane span structure body by bolt and nut, are easily installed and dismantle.
Brief description of the drawings
Fig. 1 is crane span structure bulk junction composition of the present utility model;
Fig. 2 is branch means structure chart of the present utility model;
Fig. 3 is overall structure figure of the present utility model;
Fig. 4 is A-A enlarged drawings of the present utility model.
In figure:1 crane span structure body, 11 crane span structure bases, 111 first through hole, 12 crane span structure sides, 121 second through holes, 123
Heat emission hole, 124 flange, 125 grooves, 13 crane span structure top covers, 2 branch means, 21 top plates, 211 the 3rd screws, 22 separated times
Frame, 221 crossbearers, 2,211 second screws, 222 vertical frames, 23 bottom plates, 231 first screws.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belongs to the scope of the utility model protection.
Refer to Fig. 1-4, a kind of cable testing bridge for being easy to separated time, including crane span structure body 1 and branch means 2, crane span structure body 1
Including crane span structure base 11, crane span structure side 12 and crane span structure top cover 13, crane span structure base 11, crane span structure side 12 and crane span structure top cover 13 are used
Cold-rolled steel sheet is made, and has cold galvanizing, galvanizing, electrostatic spraying, fireproof coating, baking vanish in the surface treatment processing of cold-rolled steel sheet
Deng;The two ends of crane span structure base 11 have been fixedly connected with crane span structure side 12, and the quantity of crane span structure side 12 is two, two crane span structure sides
12 is vertical with crane span structure base 11, crane span structure side 12 with the integrally connected of crane span structure base 11, two crane span structure sides 12 and crane span structure bottom
The composition of seat 11 is U-shaped, first through hole 111 is evenly distributed with crane span structure base 11, the quantity of first through hole 111 has three;Crane span structure
The second through hole 121 and heat emission hole 122 that side 12 is provided with the second through hole 121 and heat emission hole 122, each crane span structure side 12 are counted
Amount is one, and top one end of crane span structure side 12 is provided with groove 125, and groove 125 is located at the company of crane span structure side 12 and flange 124
Connect and flange 124 is fixedly connected with place, the top end face of crane span structure side 12, flange 124 plays a part of limiting crane span structure top cover 13;
The two ends of crane span structure top cover 13 are movably connected on groove 125, and the cross section of groove 125 is L-type, and the thickness of groove 123 is more than
The thickness of crane span structure top cover 13, crane span structure top cover 13 can be slided in groove 125, so that the position of the 3rd screw 211 is positioned, crane span structure top
Third through-hole 131 is evenly distributed with lid 13;The through hole 121 of first through hole 111 and second is each provided on same vertical plane, and second leads to
Hole 121 is located at the side of heat emission hole 122, and 122 pairs of heat emission hole enters row line radiating so that the heat that cable is operationally produced
Easily distribute so that cable aging speed slows down, service life increases;Branch means 2 include top plate 21, dividing wire frame 22 and bottom
Plate 23, top plate 21, crossbearer 221 are identical with the length of bottom plate 23, and the length of top plate 21, crossbearer 221 and bottom plate 23 is less than crane span structure bottom
The length of seat 11, branch means 2 are arranged on inside crane span structure body 1;The top of top plate 21 is provided with the 3rd screw 211, the 3rd screw
211 and third through-hole 131 it is corresponding, caused by mobile crane span structure top cover 13 after the 3rd screw 211 and the correspondence of third through-hole 131,
Crane span structure top cover 13 is fixed on top plate 21 by the bolt of matching, dividing wire frame is fixedly connected with the bottom end face of top plate 21
22, dividing wire frame 22 can separate cable;Dividing wire frame 22 includes crossbearer 221 and vertical frame 222;Crossbearer 221 and vertical frame 222 vertically connect
Connect, vertical frame 222 is identical with the width of crossbearer 221, vertical frame 222 and the integrally connected of crossbearer 221, because crossbearer 221 and vertical frame 222 are vertical
Direct-connected to connect so that multiple passages are separated inside crane span structure body 1, different cables can be placed on different passages so that electricity
Cable will not be tangled and is knotted together, and in order, cable wiring is convenient, improves installation effectiveness, vertical frame 222 for the arrangement of cable
Bottom be fixedly connected with bottom plate 23, in crossbearer 221 when two sides center is equipped with the second screw 2211, the second screw 2211
It is corresponding with the second through hole 121, the bolt matched is installed on the second screw 2211 and the second through hole 121 so that crossbearer 221
It is fixed on crane span structure side 12;The first screw 231 is evenly distributed with bottom plate 23, the first screw 231 and first through hole 111 are relative
Should, the bolt matched is installed in the first screw 231 and first through hole 111 so that bottom plate 23 is fixed on crane span structure base 11, pacified
Assembly and disassembly are convenient.
In summary:Originally it is easy to the cable testing bridge of separated time, crane span structure top cover 13 can be slided in groove 125, so as to position the
The position of three screws 211,122 pairs of heat emission hole enters row line radiating so that the heat that cable is operationally produced easily is distributed,
So that cable aging speed slows down, service life increases;Because crossbearer 221 and vertical frame 222 are vertically connected so that crane span structure body
Multiple passages are separated inside 1, different cables can be placed on different passages so that cable will not tangle knotting one
Rise, in order, cable wiring is convenient, improves installation effectiveness, branch means 2 are arranged on by bolt and nut for the arrangement of cable
In crane span structure body 1, it is easily installed and dismantles.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies
Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of cable testing bridge for being easy to separated time, including crane span structure body (1) and branch means (2), it is characterised in that;The crane span structure
Body (1) includes crane span structure base (11), crane span structure side (12) and crane span structure top cover (13);The two ends of the crane span structure base (11) are solid
Surely crane span structure side (12) is connected with, first through hole (111) is evenly distributed with the crane span structure base (11);The crane span structure side
(12) the second through hole (121) and heat emission hole (122) are provided with, the top one end of crane span structure side (12) is provided with groove (125), crane span structure
Flange (124) is fixedly connected with the top end face of side (12);The two ends of the crane span structure top cover (13) are movably connected in recessed
On groove (125), third through-hole (131) is evenly distributed with crane span structure top cover (13);The first through hole (111) and the second through hole
(121) it is each provided on same vertical plane, the second through hole (121) is located at the side of heat emission hole (122);Branch means (2) bag
Include top plate (21), dividing wire frame (22) and bottom plate (23);The top of the top plate (21) is provided with the 3rd screw (211), the 3rd screw
(211) dividing wire frame (22) and third through-hole (131) is corresponding, is fixedly connected with the bottom end face of the top plate (21);Institute
Stating dividing wire frame (22) includes crossbearer (221) and vertical frame (222);The crossbearer (221) and vertical frame (222) are vertically connected, vertical frame
(222) bottom is fixedly connected with bottom plate (23), and the second screw is equipped with the center of the crossbearer (221) two sides
(2211), the second screw (2211) and the second through hole (121) are corresponding;The first screw is evenly distributed with the bottom plate (23)
(231), the first screw (231) and first through hole (111) are corresponding.
2. a kind of cable testing bridge for being easy to separated time according to claim 1, it is characterised in that:The crane span structure side (12)
Quantity is two, and two crane span structure sides (12) are vertical with crane span structure base (11).
3. a kind of cable testing bridge for being easy to separated time according to claim 1, it is characterised in that:The horizontal stroke of the groove (125)
Section is L-type, and the thickness of groove (125) is more than the thickness of crane span structure top cover (13).
4. a kind of cable testing bridge for being easy to separated time according to claim 1, it is characterised in that:The top plate (21), crossbearer
(221) identical with the length of bottom plate (23), the length of top plate (21), crossbearer (221) and bottom plate (23) is respectively less than crane span structure base
(11) length.
5. a kind of cable testing bridge for being easy to separated time according to claim 1, it is characterised in that:The vertical frame (222) and horizontal stroke
The width of frame (221) is identical, vertical frame (222) and crossbearer (221) integrally connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720086122.6U CN206490383U (en) | 2017-01-20 | 2017-01-20 | A kind of cable testing bridge for being easy to separated time |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720086122.6U CN206490383U (en) | 2017-01-20 | 2017-01-20 | A kind of cable testing bridge for being easy to separated time |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206490383U true CN206490383U (en) | 2017-09-12 |
Family
ID=59766866
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720086122.6U Expired - Fee Related CN206490383U (en) | 2017-01-20 | 2017-01-20 | A kind of cable testing bridge for being easy to separated time |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206490383U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109699135A (en) * | 2019-01-22 | 2019-04-30 | 珠海格力电器股份有限公司 | Electrical box assembly and air conditioner |
CN110290664A (en) * | 2019-07-11 | 2019-09-27 | 徐州逸腾机电科技有限公司 | A kind of sealing structure of battery truck brushless motor controller shell |
CN112490970A (en) * | 2020-11-27 | 2021-03-12 | 闵信忠 | Cable bridge with adjustable clamping force |
-
2017
- 2017-01-20 CN CN201720086122.6U patent/CN206490383U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109699135A (en) * | 2019-01-22 | 2019-04-30 | 珠海格力电器股份有限公司 | Electrical box assembly and air conditioner |
CN110290664A (en) * | 2019-07-11 | 2019-09-27 | 徐州逸腾机电科技有限公司 | A kind of sealing structure of battery truck brushless motor controller shell |
CN112490970A (en) * | 2020-11-27 | 2021-03-12 | 闵信忠 | Cable bridge with adjustable clamping force |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206490383U (en) | A kind of cable testing bridge for being easy to separated time | |
CN207183836U (en) | A kind of outdoor cabinet | |
CN206401832U (en) | It is a kind of new to lift the monoblock type cable testing bridge easily extended | |
CN208922774U (en) | One kind being easily installed electric wire | |
CN104314352B (en) | Composite compact transmission line shaft tower | |
CN215681494U (en) | Heavy-duty switching device is with multilayer formula pull type cubical switchboard | |
CN205104865U (en) | Aluminum alloy multilayer chute solidus ware | |
CN213402025U (en) | Electrical cabinet convenient for cable installation | |
CN210608365U (en) | Aluminum alloy bridge with good heat dissipation performance | |
CN207166086U (en) | Add anti-guncotton refractory busbar in a kind of | |
CN206135347U (en) | Horizontal cross elbow of cross | |
CN205195105U (en) | Cubical switchboard with high -efficient heat dissipation function | |
CN201556854U (en) | Cable distribution box of low-pressure cabinet | |
CN205724463U (en) | A kind of electric power is with the intelligent power distribution cabinet of circuit display screen | |
CN210957329U (en) | Suspension fixed high-low voltage power distribution cabinet | |
CN204068109U (en) | The closed wire frame of a kind of rack overhead | |
CN214958461U (en) | Anti-static cable bridge connecting structure | |
CN205231539U (en) | Cubical switchboard convenient to electric elements is categorised | |
CN205489212U (en) | Convenient box -type substation who removes | |
CN204174992U (en) | Composite material compact transmission line shaft tower | |
CN205039483U (en) | Hot -galvanize crane span structure | |
CN203983773U (en) | A kind of electrical switchgear | |
CN203445457U (en) | Cabinet with secondary wire ducts for hoisting | |
CN218386230U (en) | Positioning and fixing device for installing low-voltage complete switch equipment bus | |
CN219576336U (en) | Outdoor floor type three-phase 4 watchband CT metering box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170912 Termination date: 20190120 |