CN206486902U - A kind of replaceable prestressed anchor bolt mechanism - Google Patents

A kind of replaceable prestressed anchor bolt mechanism Download PDF

Info

Publication number
CN206486902U
CN206486902U CN201720144775.5U CN201720144775U CN206486902U CN 206486902 U CN206486902 U CN 206486902U CN 201720144775 U CN201720144775 U CN 201720144775U CN 206486902 U CN206486902 U CN 206486902U
Authority
CN
China
Prior art keywords
bolt
crab
anchor slab
nut
mentioned
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720144775.5U
Other languages
Chinese (zh)
Inventor
张艳江
吴新翔
周俊杰
万莉莎
吕祥云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Electric Power Group Jiangxi Electric Power Co Ltd New Energy Power Generation Branch
Ruifeng Energy (wuhan) Engineering Technology Co Ltd
Original Assignee
State Electric Power Group Jiangxi Electric Power Co Ltd New Energy Power Generation Branch
Ruifeng Energy (wuhan) Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Electric Power Group Jiangxi Electric Power Co Ltd New Energy Power Generation Branch, Ruifeng Energy (wuhan) Engineering Technology Co Ltd filed Critical State Electric Power Group Jiangxi Electric Power Co Ltd New Energy Power Generation Branch
Priority to CN201720144775.5U priority Critical patent/CN206486902U/en
Application granted granted Critical
Publication of CN206486902U publication Critical patent/CN206486902U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model is related to a kind of replaceable prestressed anchor bolt mechanism, including parallel and spaced upper anchor slab and lower anchor slab up and down, and connects the crab-bolt of upper anchor slab and lower anchor slab;The crab-bolt upper and lower end, which is each passed through on the upper anchor slab and lower anchor slab, the crab-bolt periphery between the upper anchor slab and lower anchor slab, is arranged with sleeve pipe, and described sleeve pipe two ends are tightly connected by thermal shrinkable sleeve with corresponding upper anchor slab and lower anchor slab respectively;Leveling nut is provided with the thermal shrinkable sleeve of described sleeve pipe upper end, the leveling nut is threadedly coupled with the crab-bolt;The crab-bolt lower end is connected by fixation kit with the lower anchor slab.Advantage:It is simple in construction, it is easy to use, fixed respectively with fixing nut and anchor bolts by preload piece, preload piece need to be only removed during dismounting, it is that the replacing of crab-bolt can be achieved to pull out crab-bolt.

Description

A kind of replaceable prestressed anchor bolt mechanism
Technical field
The utility model is related to wind power generation stepped replaceable crab-bolt basic technology field, more particularly to it is a kind of it is replaceable it is pre- should Power crab-bolt mechanism.
Background technology
When embedded foundation ring connects wind power generation stepped and basic in reinforced concrete foundation, foundation ring isolates its inside and outside steel Reinforced concrete, both associativities are weak, stress globality poor.Using earth anchor cage connection tower and basis, reinforcement foundation can be in crab-bolt Between very easily intert, the good integrity that crab-bolt is combined with basis, rigidity is uniform, and crab-bolt, which applies prestressing force, can improve bonding pad The anti-fatigue performance of domain concrete.Current ground anchor foundation, if crab-bolt fracture or corrosion are serious, crab-bolt can not be changed, and be left Larger potential safety hazard.Moreover, the Reinforced Concrete Design life-span is 50 years, and blower fan and earth anchor cage fatigue life are 20 years, blower fan Reached with earth anchor cage after fatigue life, if crab-bolt can be changed, just can reuse original reinforced concrete foundation.Can not be more In the basis for changing crab-bolt, the connection of crab-bolt and lower anchor slab is fastened using steel locking nut, but if it is considered that can The actual operation of crab-bolt is changed, if still using steel nut, the replacing of crab-bolt will be unable to realize.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of replaceable prestressed anchor bolt mechanism, effectively overcomes The defect of prior art.
The technical scheme that the utility model solves above-mentioned technical problem is as follows:A kind of replaceable prestressed anchor bolt mechanism, bag Parallel and spaced upper anchor slab and lower anchor slab up and down are included, and connects the crab-bolt of upper anchor slab and lower anchor slab;
Above-mentioned crab-bolt upper and lower end is each passed through above-mentioned upper anchor slab and lower anchor slab, the anchor between above-mentioned upper anchor slab and lower anchor slab Sleeve pipe is arranged with bolt periphery, above-mentioned sleeve pipe two ends are tightly connected by thermal shrinkable sleeve with corresponding upper anchor slab and lower anchor slab respectively;
Leveling nut is provided with the thermal shrinkable sleeve of above-mentioned sleeve upper end, above-mentioned leveling nut is threadedly coupled with above-mentioned crab-bolt;
Above-mentioned crab-bolt lower end is connected by fixation kit with above-mentioned lower anchor slab.
The beneficial effects of the utility model are:It is simple in construction, it is easy to use, fixture need to be only removed during dismounting, anchor is pulled out Bolt is the replacing that crab-bolt can be achieved, meanwhile, effectively reduce the risk of crab-bolt fracture tail tower and crab-bolt cage Joint failure.
On the basis of above-mentioned technical proposal, the utility model can also do following improvement.
Further, above-mentioned fixation kit includes the first fixing nut and preload piece, and above-mentioned first fixing nut is fixed on The position of lower anchor slab lower end correspondence crab-bolt is stated, above-mentioned first fixing nut lower end axial thread is connected with preload piece, above-mentioned pretension Part is axially arranged with runs through its screwed hole up and down, and above-mentioned crab-bolt lower end is stretched into above-mentioned screwed hole, and is threadedly coupled above-mentioned screw thread Hole.
Be using the beneficial effect of above-mentioned further scheme it is simple in anchor structure, it is easy to use, pass through preload piece point Do not fixed with the first fixing nut and anchor bolts, preload piece need to be only removed during dismounting, it is that crab-bolt can be achieved more to pull out crab-bolt Change, meanwhile, effectively reduce the risk of crab-bolt fracture tail tower and crab-bolt cage Joint failure.
Further, above-mentioned first fixing nut is welded on above-mentioned lower anchor slab lower end.
It is that fixed form is simple using the beneficial effect of above-mentioned further scheme, is easy to engineering construction.
Further, above-mentioned preload piece includes pedestal and is integrally formed the columned pretension portion for being arranged on pedestal upper end, on The internal diameter that pretension portion external diameter is stated with above-mentioned first fixing nut is matched, and is had and the first fixing nut on above-mentioned pretension portion periphery The external screw thread matched somebody with somebody, above-mentioned pretension portion is threadedly coupled above-mentioned first fixing nut, above-mentioned pedestal upper end and the first fixing nut lower end Abut, above-mentioned screwed hole sequentially passes through above-mentioned pretension portion and pedestal from top to bottom.
It is that preload piece is simple in construction using the beneficial effect of above-mentioned further scheme, the assembling with fixing nut and crab-bolt It is convenient, dismounting, replacing beneficial to crab-bolt.
Further, above-mentioned fixation kit includes the second fixing nut and tensioning nut, and above-mentioned second fixing nut screw thread connects Crab-bolt lower end is connected on, above-mentioned tensioning nut is arranged in the thermal shrinkable sleeve of above-mentioned its lower end, and is threadedly coupled with above-mentioned crab-bolt.
When using the beneficial effect of above-mentioned further scheme being disassembling, assembling and replacing, the second fixing nut only need to be removed, crab-bolt is It can axially be pulled out in tensioning nut, change convenient.
It is preferred that, above-mentioned leveling nut and tensioning nut are nylon nut.
It is to be beneficial to crab-bolt axially to pull out using the beneficial effect of above-mentioned further scheme, can between nylon nut during pull-out Slide, change more convenient.
Further, above-mentioned fixation kit includes carriage assembly and the 3rd fixing nut, and above-mentioned 3rd fixing nut screw thread connects Above-mentioned crab-bolt lower end is connected on, above-mentioned carriage assembly is fixed on above-mentioned lower anchor slab lower end, and is abutted with above-mentioned crab-bolt lower end.
Using the beneficial effect of above-mentioned further scheme be by the 3rd fixing nut pretension, by carriage assembly to anchor Bolt is supported, and good supporting role can be played to crab-bolt, is effectively reduced crab-bolt fracture tail tower and is connected with crab-bolt cage The risk of failure, meanwhile, during dismounting, carriage assembly and the 3rd fixing nut need to be only removed successively crab-bolt can be achieved more Change, operate more convenient.
It is preferred that, above-mentioned carriage assembly includes at least three bracket studs and carrier frame plate, and above-mentioned bracket stud is vertically set Put, and interval is fixed on above-mentioned lower anchor slab lower end, its upper end is fixedly connected with lower anchor slab lower end, and above-mentioned bracket plate level is set Put, above-mentioned bracket stud lower end is each passed through above-mentioned carrier frame plate, and is separately installed with pre-load nut, and above-mentioned carrier frame plate abuts above-mentioned Pre-load nut, above-mentioned crab-bolt lower end is abutted with above-mentioned carrier frame plate.
It is that carriage assembly is simple in construction using the beneficial effect of above-mentioned further scheme, it is reasonable in design, it is easily installed, can be right Crab-bolt plays good supporting role, effectively reduces the risk of crab-bolt fracture tail tower and crab-bolt cage Joint failure.
Above-mentioned carriage assembly includes at least three bracket studs and carrier frame plate, and above-mentioned bracket spiral shell is vertical and is arranged at intervals, Its upper end is with being fixed through above-mentioned lower anchor slab and by nut, and above-mentioned carrier frame plate is horizontally disposed with, above-mentioned bracket stud lower end point Not Chuan Guo above-mentioned carrier frame plate, and be separately installed with pre-load nut, above-mentioned carrier frame plate abuts above-mentioned pre-load nut, above-mentioned crab-bolt lower end End is abutted with above-mentioned carrier frame plate
It using the beneficial effect of above-mentioned further scheme is carriage assembly to be using the beneficial effect of above-mentioned further scheme It is simple in construction, it is reasonable in design, it is easily installed, good supporting role can be played to crab-bolt, effectively reduces after crab-bolt fracture The risk of pylon and crab-bolt cage Joint failure.
Further, above-mentioned sleeve pipe is managed for PE.
Brief description of the drawings
Fig. 1 is the vertical section structure schematic diagram of replaceable prestressed anchor bolt mechanism of the present utility model in embodiment one;
Fig. 2 is the structural representation of replaceable prestressed anchor bolt mechanism of the present utility model;
Fig. 3 is the structural representation of replaceable prestressed anchor bolt mechanism of the present utility model in embodiment two;
Fig. 4 is the structural representation of replaceable prestressed anchor bolt mechanism of the present utility model in embodiment three;
Fig. 5 is another embodiment of replaceable prestressed anchor bolt mechanism kind carriage assembly of the present utility model in embodiment three Structural representation.
In accompanying drawing, the list of parts representated by each label is as follows:
1st, upper anchor slab, 2, lower anchor slab, 3, crab-bolt, 4, sleeve pipe, the 5, first fixing nut, 6, preload piece, 7, second fixes spiral shell Mother, 8, tensioning nut, 9, carriage assembly, the 10, the 3rd fixing nut, 41, thermal shrinkable sleeve, 42, leveling nut, 61, pedestal, 62, pre- Tight portion, 91, bracket stud, 92, carrier frame plate, 93, pre-load nut.
Embodiment
Principle of the present utility model and feature are described below in conjunction with accompanying drawing, example is served only for explaining this practicality It is new, it is not intended to limit scope of the present utility model.
Embodiment one:As illustrated in fig. 1 and 2, the replaceable prestressed anchor bolt mechanism of the present embodiment include up and down it is parallel and Every the crab-bolt 3 of the upper anchor slab 1 and lower anchor slab 2 of setting, and the upper anchor slab 1 of connection and lower anchor slab 2;
The above-mentioned upper and lower end of crab-bolt 3 is each passed through above-mentioned upper anchor slab 1 and lower anchor slab 2, between above-mentioned upper anchor slab 1 and lower anchor slab 2 The periphery of crab-bolt 3 on be arranged with sleeve pipe 4, the above-mentioned two ends of sleeve pipe 4 pass through thermal shrinkable sleeve 41 and corresponding upper anchor slab 1 and lower anchor slab respectively 2 are tightly connected;
Leveling nut 42, above-mentioned leveling nut 42 and the above-mentioned screw thread of crab-bolt 3 are provided with the thermal shrinkable sleeve 41 of the above-mentioned upper end of sleeve pipe 4 Connection;
The above-mentioned lower end of crab-bolt 3 is connected by fixation kit with above-mentioned lower anchor slab 2.
When crab-bolt 3 is broken or poor-performing needs replacing, fixation kit is removed, crab-bolt 3 is axially pulled out, loaded newly Crab-bolt.
Above-mentioned sleeve pipe 4 is managed for PE.
Above-mentioned fixation kit include the first fixing nut 5 and preload piece 6, above-mentioned first fixing nut 5 be fixed on it is above-mentioned under The position of the lower end of anchor slab 2 correspondence crab-bolt 3, the above-mentioned lower end axial thread of first fixing nut 5 is connected with preload piece 6, above-mentioned pretension Part 6 is axially arranged with runs through its screwed hole up and down, and the above-mentioned lower end of crab-bolt 3 is stretched into above-mentioned screwed hole, and is threadedly coupled above-mentioned spiral shell Pit.
It is threadedly coupled between above-mentioned preload piece 6 and the first fixing nut 5, crab-bolt 3 is threadedly coupled with preload piece 6, above-mentioned One fixing nut 5 is welded on the above-mentioned lower end of lower anchor slab 2, and the above-mentioned lower end of crab-bolt 3 is connected with preload piece 6, the first fixing nut 5 It is connected with lower anchor slab 2, preload piece 6 is connected with the first fixing nut 5 again, when crab-bolt 3 is broken, passes through pretension " self-locking " of the fixing nut 5 of part 6 and first is fixed, after crab-bolt 3 is broken, the secure fit energy of the fixing nut 5 of preload piece 6 and first The certain support force of crab-bolt 3 is provided, the risk of crab-bolt fracture tail tower and crab-bolt cage Joint failure is effectively reduced.
It is preferred that, above-mentioned preload piece 6 includes pedestal 61 and is integrally formed the columned pretension for being arranged on the upper end of pedestal 61 Portion 62, the above-mentioned external diameter of pretension portion 62 is matched with the internal diameter of above-mentioned first fixing nut 5, is had and the on the above-mentioned periphery of pretension portion 62 The external screw thread of one fixing nut 5 matching, above-mentioned pretension portion 62 is threadedly coupled above-mentioned first fixing nut 5, the above-mentioned upper end of pedestal 61 Abutted with the lower end of the first fixing nut 5, above-mentioned screwed hole sequentially passes through above-mentioned pretension portion 62 and pedestal 61, preload piece from top to bottom 6 is simple in construction, is easy to be interconnected and fixed with the first fixing nut 5 and crab-bolt 3, during dismounting, preload piece 6 is back-outed, made Pretension portion 62 is released with fixing nut 5 and is threadedly coupled, synchronous, and the internal thread holes of pretension portion 62 are released with crab-bolt 3 and are threadedly coupled, it Afterwards, crab-bolt 3 is changed.
Embodiment two:As shown in figure 3, above-mentioned fixation kit includes the second fixing nut 7 and tensioning nut 8, above-mentioned second Fixing nut 7 is threaded in the lower end of crab-bolt 3, and above-mentioned tensioning nut 8 is arranged in the thermal shrinkable sleeve 41 of the above-mentioned lower end of sleeve pipe 4, and It is threadedly coupled with above-mentioned crab-bolt 3, when removing the second fixing nut 7, crab-bolt 3 is axially pulled out, in drawing process, tensioning spiral shell Between crab-bolt 3 Relative sliding can occur for mother 8, beneficial to crab-bolt 3 when removing replacing, when pull-out between leveling nut 42 Generation Relative sliding, is easy to the dismounting of crab-bolt 3, meanwhile, leveling can be carried out by 42 pairs of upper anchor slabs 1 of leveling nut.
Other be the same as Examples one.
Embodiment three:As shown in Figures 4 and 5, above-mentioned fixation kit includes the fixing nut 10 of carriage assembly 9 and the 3rd, above-mentioned 3rd fixing nut 10 is threaded in the above-mentioned lower end of crab-bolt 3, and above-mentioned carriage assembly 9 is fixed on the above-mentioned lower end of lower anchor slab 2, and with The above-mentioned lower end of crab-bolt 3 is abutted.
During use, the 3rd fixing nut 10 is fixed with the lower end pretension of crab-bolt 3, meanwhile, carriage assembly 9 is to crab-bolt 3 To the supporting role of axial direction, the risk of crab-bolt fracture failure is effectively avoided.
It is preferred that, above-mentioned carriage assembly 9 includes at least three bracket studs 91 and carrier frame plate 92, and above-mentioned bracket stud 91 is equal It is vertically arranged, and interval is fixed on the above-mentioned lower end of lower anchor slab 2, its upper end is fixedly connected with the lower lower end of anchor slab 2, above-mentioned carrier frame plate 92 are horizontally disposed with, and the above-mentioned lower end of bracket stud 91 is each passed through above-mentioned carrier frame plate 92, and is separately installed with pre-load nut 73, above-mentioned Carrier frame plate 92 abuts above-mentioned pre-load nut 93, and the above-mentioned lower end of crab-bolt 3 is abutted with above-mentioned carrier frame plate 92.
It is preferred that, above-mentioned carriage assembly 9 includes at least three bracket studs 91 and carrier frame plate 92, and above-mentioned bracket stud 91 is equal Vertical and interval setting, its upper end is with being fixed through above-mentioned lower anchor slab 2 and by nut, and above-mentioned carrier frame plate 92 is horizontally disposed with, The above-mentioned lower end of bracket stud 91 is each passed through above-mentioned carrier frame plate 92, and is separately installed with pre-load nut 93, and above-mentioned carrier frame plate 92 is supported Above-mentioned pre-load nut 93 is connect, the above-mentioned lower end of crab-bolt 3 is abutted with above-mentioned carrier frame plate 92.
Above-mentioned carriage assembly 9 dismounts more convenient, and installation is fairly simple.
Other be the same as Examples one.
During construction, tower adpting flange is fixed in the upper upper end of anchor slab 1, the upper end of crab-bolt 3 is through tower adpting flange and passes through Nut pretension is fixed, and installs wind power generation stepped on tower adpting flange.
During construction, tower adpting flange is fixed in the upper upper end of anchor slab 1, the upper end of crab-bolt 3 is through tower adpting flange and passes through Nut pretension is fixed, and installs wind power generation stepped on tower adpting flange.
Preferred embodiment of the present utility model is the foregoing is only, it is all in this practicality not to limit the utility model Within new spirit and principle, any modification, equivalent substitution and improvements made etc. should be included in guarantor of the present utility model Within the scope of shield.

Claims (10)

1. a kind of replaceable prestressed anchor bolt mechanism, it is characterised in that:Including parallel up and down and spaced upper anchor slab (1) and Lower anchor slab (2), and connect the crab-bolt (3) of upper anchor slab (1) and lower anchor slab (2);
Crab-bolt (3) upper and lower end is each passed through the upper anchor slab (1) and lower anchor slab (2), the upper anchor slab (1) and lower anchor slab (2) be arranged with sleeve pipe (4) on crab-bolt (3) periphery between, described sleeve pipe (4) two ends respectively by thermal shrinkable sleeve (41) with it is corresponding Upper anchor slab (1) and lower anchor slab (2) are tightly connected;
Leveling nut (42), the leveling nut (42) and the crab-bolt are provided with the thermal shrinkable sleeve (41) of described sleeve pipe (4) upper end (3) it is threadedly coupled;
Crab-bolt (3) lower end is connected by fixation kit with the lower anchor slab (2).
2. a kind of replaceable prestressed anchor bolt mechanism according to claim 1, it is characterised in that:The fixation kit includes First fixing nut (5) and preload piece (6), first fixing nut (5) are fixed on lower anchor slab (2) the lower end correspondence crab-bolt (3) position, the first fixing nut (5) lower end axial thread is connected with preload piece (6), and the preload piece (6) axially sets Have and run through its screwed hole up and down, crab-bolt (3) lower end is stretched into the screwed hole, and is threadedly coupled the screwed hole.
3. a kind of replaceable prestressed anchor bolt mechanism according to claim 2, it is characterised in that:First fixing nut (5) it is welded on lower anchor slab (2) lower end.
4. a kind of replaceable prestressed anchor bolt mechanism according to claim 3, it is characterised in that:Preload piece (6) bag Include pedestal (61) and be integrally formed the columned pretension portion (62) for being arranged on pedestal (61) upper end, pretension portion (62) external diameter Matched with the internal diameter of first fixing nut (5), have on pretension portion (62) periphery and matched with the first fixing nut (5) External screw thread, the pretension portion (62) is threadedly coupled first fixing nut (5), and pedestal (61) upper end is fixed with first Nut (5) lower end is abutted, and the screwed hole sequentially passes through the pretension portion (62) and pedestal (61) from top to bottom.
5. a kind of replaceable prestressed anchor bolt mechanism according to claim 1, it is characterised in that:The fixation kit includes Second fixing nut (7) and tensioning nut (8), second fixing nut (7) are threaded in crab-bolt (3) lower end, described Draw nut (8) to be arranged in the thermal shrinkable sleeve (41) of described sleeve pipe (4) lower end, and be threadedly coupled with the crab-bolt (3).
6. a kind of replaceable prestressed anchor bolt mechanism according to claim 5, it is characterised in that:The leveling nut (42) It is nylon nut with tensioning nut (8).
7. a kind of replaceable prestressed anchor bolt mechanism according to claim 1, it is characterised in that:The fixation kit includes Carriage assembly (9) and the 3rd fixing nut (10), the 3rd fixing nut (10) are threaded in the crab-bolt (3) lower end, The carriage assembly (9) is fixed on lower anchor slab (2) lower end, and is abutted with the crab-bolt (3) lower end.
8. a kind of replaceable prestressed anchor bolt mechanism according to claim 7, it is characterised in that:The carriage assembly (9) Including at least three bracket studs (91) and carrier frame plate (92), the bracket stud (91) is vertically arranged, and interval is fixed on Lower anchor slab (2) lower end, its upper end is fixedly connected with lower anchor slab (2) lower end, and the carrier frame plate (92) is horizontally disposed with, described Bracket stud (91) lower end is each passed through the carrier frame plate (92), and is separately installed with pre-load nut (73), the carrier frame plate (92) pre-load nut (93) is abutted, crab-bolt (3) lower end is abutted with the carrier frame plate (92).
9. a kind of replaceable prestressed anchor bolt mechanism according to claim 7, it is characterised in that:The carriage assembly (9) Including at least three bracket studs (91) and carrier frame plate (92), the bracket stud (91) is vertical and is arranged at intervals, its upper end With being fixed through the lower anchor slab (2) and by nut, the carrier frame plate (92) is horizontally disposed with, under the bracket stud (91) End is each passed through the carrier frame plate (92), and is separately installed with pre-load nut (93), and the carrier frame plate (92) abuts the pretension Nut (93), crab-bolt (3) lower end is abutted with the carrier frame plate (92).
10. a kind of replaceable prestressed anchor bolt mechanism according to any one of claim 1 to 9, it is characterised in that;The set (4) are managed to manage for PE.
CN201720144775.5U 2017-02-17 2017-02-17 A kind of replaceable prestressed anchor bolt mechanism Active CN206486902U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720144775.5U CN206486902U (en) 2017-02-17 2017-02-17 A kind of replaceable prestressed anchor bolt mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720144775.5U CN206486902U (en) 2017-02-17 2017-02-17 A kind of replaceable prestressed anchor bolt mechanism

Publications (1)

Publication Number Publication Date
CN206486902U true CN206486902U (en) 2017-09-12

Family

ID=59765481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720144775.5U Active CN206486902U (en) 2017-02-17 2017-02-17 A kind of replaceable prestressed anchor bolt mechanism

Country Status (1)

Country Link
CN (1) CN206486902U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501816A (en) * 2020-04-08 2020-08-07 山东中车风电有限公司 Connecting piece for anchor bolt replacement, anchor bolt system and anchor bolt replacement method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501816A (en) * 2020-04-08 2020-08-07 山东中车风电有限公司 Connecting piece for anchor bolt replacement, anchor bolt system and anchor bolt replacement method
CN111501816B (en) * 2020-04-08 2021-08-06 山东中车风电有限公司 Connecting piece for anchor bolt replacement, anchor bolt system and anchor bolt replacement method

Similar Documents

Publication Publication Date Title
KR101780537B1 (en) Foundation for a wind turbine
CN104929148B (en) The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof
CN203924098U (en) Hang adjustable type prestressing force crab-bolt cage
CN206486902U (en) A kind of replaceable prestressed anchor bolt mechanism
CN106088136B (en) A kind of standoff generation power foundation of wind power of band and its construction technology
CN104005569A (en) Construction method for supporting beam and removing columns
CN202596242U (en) Concrete tower
CN109595126B (en) Wind generating set foundation anchor bolt assembly and construction method for connecting tower barrel thereof
CN102102644A (en) Adjustable supporting device for wind power generating unit engine room
CN103967508A (en) Stretchable quick stress compensation type steel frame connection structure
CN201695339U (en) Bent cap construction steel support
CN209159476U (en) Vehicle and its support component, seat-assembly, safety belt assembly and battery component
CN206888040U (en) A kind of plumbing device of ground load-bearing pillar
CN111321674B (en) Support bracket for bridge engineering and construction method thereof
CN210164054U (en) Quick butt joint and temporary fixing device for upper and lower layers of steel concrete composite pipe
CN209145778U (en) A kind of wind generator unit wheel hub installation and transportation device
CN105927025A (en) Electric pole
CN206737264U (en) A kind of spliced pre-stressed carbon fiber plate load-bearing pillar
CN202055146U (en) Connecting structure for screed board accessories
CN214062984U (en) Nut pre-embedded duct piece capable of being mounted on mounting support without damage
CN205857227U (en) A kind of wind power generation stepped hyollow foundation support
CN206294113U (en) photovoltaic bracket with damping device
CN217232976U (en) Steel pipe tower base reinforced structure
CN105421478B (en) A kind of Combined tower crane column foot and its construction method
CN202787311U (en) Prestressed pier foundation anchor system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant