CN206481109U - A kind of centralized protection supervisory equipment of 3/2 wiring - Google Patents
A kind of centralized protection supervisory equipment of 3/2 wiring Download PDFInfo
- Publication number
- CN206481109U CN206481109U CN201621193819.5U CN201621193819U CN206481109U CN 206481109 U CN206481109 U CN 206481109U CN 201621193819 U CN201621193819 U CN 201621193819U CN 206481109 U CN206481109 U CN 206481109U
- Authority
- CN
- China
- Prior art keywords
- cpu card
- protection
- cpu
- process layer
- station level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 claims abstract description 28
- 230000008569 process Effects 0.000 claims abstract description 28
- 238000004891 communication Methods 0.000 claims abstract description 20
- 241000272814 Anser sp. Species 0.000 claims abstract description 5
- 230000003993 interaction Effects 0.000 claims description 4
- 239000013307 optical fiber Substances 0.000 claims description 4
- 238000005070 sampling Methods 0.000 claims description 2
- 230000005540 biological transmission Effects 0.000 abstract description 4
- 238000012544 monitoring process Methods 0.000 abstract description 3
- 238000013461 design Methods 0.000 description 5
- 230000006870 function Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000012423 maintenance Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000012806 monitoring device Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000008521 reorganization Effects 0.000 description 1
- 238000005204 segregation Methods 0.000 description 1
- 230000008054 signal transmission Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012549 training Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/14—Protecting elements, switches, relays or circuit breakers
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The utility model provides a kind of centralized protection supervisory equipment of 3/2 wiring, including three CPU cards, respectively process layer interface CPU card, protection CPU card and station level communication cpu plug-in unit;Wherein process layer interface CPU card receives SV signals and the SV signals after snap shot is issued into protection CPU card, while completing the reception and transmission of transformer station general purpose event message (GOOSE) signal with protection CPU card;CPU card is protected according to the SV data-signals of reception, corresponding monitoring and protection action is made, each protection corresponding function module can independent operating, the information sharing between disparate modules can also be realized;Protection CPU card passes through station level communication cpu plug-in unit and station level network service.The utility model improves the integrated level of the wiring protection supervisory equipment of intelligent substation 3/2, and the global reliability of system is improved in the case where device reliability is constant.
Description
Technical field
The utility model belongs to field of relay protection in power, and the centralization in particular to a kind of 3/2 wiring is protected
Measure and control device.
Background technology
At present, the transformer station secondary system including 500kV intelligent substations mainly designs reason using layered distribution type
Read, device is used towards monospace design.There is this pattern plant failure to influence face small, be easy to reorganization and expansion and operation maintenance etc.
Advantage, but there is also following deficiency:
1) secondary device quantity is more, integrated level is low
Intelligent substation wall and process layer devices are by interval separate configurations, and a spacing devices include protection, surveyed
The self-contained units such as control, combining unit, intelligent terminal, a 500kV transformer station is up to 200 secondary devices, unattended operation
Pattern is, it is necessary to which more monitoring devices, secondary device quantity is more, integrated level is low.
2) electrical secondary system composition complexity, maintenance work amoun are big
Intelligent substation protects control function to be realized by many table apparatus by the mode such as " directly adopting straight jump ", " net is adopted net and jumped ",
Optical fiber is connected between device, and network node is more, and the workload such as field optical fibers welding, wiring is big, and O&M problem is increasingly protruded.
Utility model content
The utility model provides a kind of centralized protection supervisory equipment of 3/2 wiring, can effectively solve the problem that current intelligence
Secondary device disperses the problem of separate configurations, number of devices are more, operation maintenance is complicated in transformer station.
A kind of centralized protection supervisory equipment of 3/2 wiring, including the protection supervisory equipment frame built by three CPU cards
Frame, three CPU cards are respectively process layer interface CPU card, protection CPU card and station level communication cpu plug-in unit;
Wherein, the process layer of process layer interface CPU card and intelligent substation communication network is communicated to connect, and is received by process
The SV signals that layer is sent;Protect CPU card to be communicated to connect with process layer interface CPU card, receive by process layer interface CPU card
SV signals after the sampling of transmission, while completing transformer station's general purpose event message between process layer interface CPU card
(GOOSE) reception and transmission of signal;Station level communication cpu plug-in unit is simultaneously with protecting CPU card and station level network service.
Further, process layer interface CPU card is communicated using optical fiber with process-level network.
Further, station level communication cpu plug-in unit is using electric Ethernet and station level network service.
Further, redundancy communication between station level communication cpu plug-in unit and station level network.
Further, station level communication cpu plug-in unit is connected with human-computer interaction interface connection, and the human-computer interaction interface includes
Button and display.
The utility model provides a kind of centralized protection supervisory equipment of 3/2 wiring, and the device reduces intelligent power transformation
The quantity of whole station of standing device, the global reliability of system is improved in the case where device reliability is constant.
Brief description of the drawings
Fig. 1 is that the utility model provides device overall schematic;
Fig. 2 is the utility model centralization protection data flow diagram;
Fig. 3 is the utility model centralization protection hardware architecture diagram;
Fig. 4 is line line string integrating device operation principle schematic diagram.
Embodiment
The utility model discloses a kind of centralized protection supervisory equipment of 3/2 wiring, including three CPU cards, difference
For process layer interface CPU card, protection CPU card and station level communication cpu plug-in unit, current intelligent substation device number is solved
Amount is more, the problem of operation maintenance is difficult.
The utility model is described in further detail below in conjunction with the accompanying drawings.
A kind of centralized protection supervisory equipment of 3/2 wiring, its core concept be by it is multiple interval breakers, disconnecting link, CT,
PT accesses integrating device as entirety, by all information unifications, and realizes the basic training such as protection observing and controlling based on this partial information
Energy;The protection domain that centralized protection supervisory equipment is specifically covered is as shown in figure 1, including breaker protection, breaker observing and controlling, line
Drive test control, route protection and main transformer backup protection etc.;For needing the main transformer differential main protection of many side information real by other devices
It is existing.
The device relies on the communication network of intelligent substation, the reception and transmission of data needed for realizing.Wherein Current Voltage
Sampled data is sent to integrating device, intelligent terminal by process-level network by switching value by combining unit by process-level network
Signal is sent to integrating device.After the completion of integrating device is handled by correlation module, trip signal is led to transformer station by network
Intelligent terminal is issued with event (GOOSE) message, so as to realize tripping operation.It is illustrated in figure 2 the utility model and device is provided
Data flow schematic diagram.For example:The sampled values such as two breakers of collection related electric current, voltage are needed during 1 protection act of circuit
Information, circuit breaker position information, above- mentioned information are forwarded to integrating device by combining unit and intelligent terminal by interchanger, integrated
The protection module of circuit 1 of device sends switch trip order and is forwarded to the related intelligence of breaker eventually by interchanger after having handled
End, then realizes the tripping of switch.
As shown in figure 3, the utility model builds the framework of centralization protection observing and controlling using 3 CPU cards.Process layer interface
CPU plug-in units are main to provide redundancy 1000M optical Ethernet process bus interfaces as process bus processing unit, complete SV data
The reception of passage, and GOOSE signals reception and transmission, the SV data-signals received issue protection again after snap shot
CPU card;
CPU card is protected according to the SV data-signals of reception, corresponding monitoring and protection is made, the monitoring and protection includes disconnected
Road device protection, breaker observing and controlling, circuit observing and controlling, route protection and main transformer backup protection etc.;Reflected between disparate modules using internal memory
As technology of sharing so that the process of disparate modules is that can be in communication with each other and separate.In addition, protection CPU card passes through station
Control layer communication cpu plug-in unit and station level network service.
Centralization protection observing and controlling it is integrated it is multiple interval or multiple modules function, to device access data flow access,
Storage performance, real-time, reliability etc. propose higher requirement.For big data flow access demand, centralization protection
CPU processing speeds be based on gigabit Ethernet, protection device is connected with a gigabit network interface with interchanger.
As shown in figure 4, for line line string, by breaker protection, breaker observing and controlling, route protection Integrated design;Line line string
Original line segregation, main transformer interval (line, which becomes, goes here and there), breaker interval function Integrated design will be many into a table apparatus by integrating device
All information unifications are accessed integrating device by individual interval breaker, disconnecting link, CT, PT as entirety, and real based on this partial information
The basic functions such as existing breaker protection, breaker observing and controlling, route protection observing and controlling.
Likewise, becoming string for line, by breaker protection, breaker observing and controlling, route protection and main transformer protection Integrated design.
The utility model is applied by the integrated multiple devices function of a table apparatus, is solved current secondary equipment and is disperseed independently to match somebody with somebody
Put, the problem of many O&Ms of number of devices are complicated.
Claims (5)
1. a kind of centralized protection supervisory equipment of 3/2 wiring, it is characterized in that, including surveyed by the protection that three CPU cards are built
Device frame is controlled, three CPU cards are respectively process layer interface CPU card, protection CPU card and station level communication cpu
Plug-in unit;
The process layer of process layer interface CPU card and intelligent substation communication network is communicated to connect, and receives what is sent by process layer
SV signals;
Protect CPU card to be communicated to connect with process layer interface CPU card, receive the sampling sent by process layer interface CPU card
SV signals afterwards, while completing connecing for transformer station's general purpose event message (GOOSE) signal between process layer interface CPU card
Receive and send;
Station level communication cpu plug-in unit is simultaneously with protecting CPU card and station level network service.
2. a kind of centralized protection supervisory equipment of 3/2 wiring according to claim 1, it is characterized in that, process layer interface
CPU card is communicated using optical fiber with process-level network.
3. a kind of centralized protection supervisory equipment of 3/2 wiring according to claim 1, it is characterized in that, station level communication
CPU card is using electric Ethernet and station level network service.
4. a kind of centralized protection supervisory equipment of 3/2 wiring according to claim 1, it is characterized in that, station level communication
Redundancy communication between CPU card and station level network.
5. a kind of centralized protection supervisory equipment of 3/2 wiring according to claim 1, it is characterized in that, station level communication
CPU card is connected with human-computer interaction interface connection, and the human-computer interaction interface includes button and display.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621193819.5U CN206481109U (en) | 2016-10-28 | 2016-10-28 | A kind of centralized protection supervisory equipment of 3/2 wiring |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621193819.5U CN206481109U (en) | 2016-10-28 | 2016-10-28 | A kind of centralized protection supervisory equipment of 3/2 wiring |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206481109U true CN206481109U (en) | 2017-09-08 |
Family
ID=59756965
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621193819.5U Active CN206481109U (en) | 2016-10-28 | 2016-10-28 | A kind of centralized protection supervisory equipment of 3/2 wiring |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206481109U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110943541A (en) * | 2019-12-11 | 2020-03-31 | 国网上海市电力公司 | Transformer substation protection, measurement and control integrated device and data processing method thereof |
-
2016
- 2016-10-28 CN CN201621193819.5U patent/CN206481109U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110943541A (en) * | 2019-12-11 | 2020-03-31 | 国网上海市电力公司 | Transformer substation protection, measurement and control integrated device and data processing method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106527181B (en) | A kind of electrical power distribution automatization system emulation test method based on communication network | |
CN102937685B (en) | The integrated testing platform of a kind of transformer station based on Real-time Simulation Technology | |
CN101483337B (en) | Failure automatic diagnosis and separation apparatus and method for power distribution network overhead line | |
CN106159759B (en) | A kind of method for automatically generating secondary system of intelligent substation maintenance safety measure | |
CN101854080B (en) | Digitalized fault wave recording device | |
CN107167680B (en) | RTDS-based power distribution network distributed test system | |
CN103023149A (en) | Intelligent power distribution terminal and intelligent power distribution system based on IEC61850 | |
CN105762775A (en) | Power grid self-healing system in 110kV chain type power supply mode and self-healing logic | |
CN105977923B (en) | A kind of substation relay protection apparatus and system for realizing plug and play | |
CN103713214A (en) | Intelligent transformer station relay protection closed loop test system | |
CN101854078A (en) | Monitoring system and method of operation condition of digitalized substation secondary device | |
CN105203870A (en) | Intelligent transformer substation secondary equipment integrated test system based on power line communication | |
CN201478809U (en) | Single-phase grounding line selection device for 20 kV power grid | |
CN103001327A (en) | Centralized protection measurement and control system of digital traction substation | |
CN105186697A (en) | Remote diagnosis system of IED operating conditions of IEC61850 intelligent substation | |
CN105978151A (en) | Relay protection interval integrating device for intelligent substation | |
CN103746304B (en) | The remodeling method of Intelligent transformer station | |
CN201374500Y (en) | Intelligent power distribution cabinet | |
CN201383712Y (en) | Ring-network cabinet monitor terminal | |
CN105932776B (en) | A kind of transformer station secondary system based on boss's unit | |
CN201438636U (en) | Simple bus differential protection device for digital transformer station | |
CN201438645U (en) | Standby-power automatic switching device for digital transformer station | |
CN202334004U (en) | State measurement and control device and system for protection pressing plate | |
CN206481109U (en) | A kind of centralized protection supervisory equipment of 3/2 wiring | |
CN103595128B (en) | Based on the electric substation automation system of double-deck two web frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |