CN206479570U - Cabinet fills the fixed structure of electric energy meter meter housing - Google Patents
Cabinet fills the fixed structure of electric energy meter meter housing Download PDFInfo
- Publication number
- CN206479570U CN206479570U CN201720190190.7U CN201720190190U CN206479570U CN 206479570 U CN206479570 U CN 206479570U CN 201720190190 U CN201720190190 U CN 201720190190U CN 206479570 U CN206479570 U CN 206479570U
- Authority
- CN
- China
- Prior art keywords
- meter
- fixture
- fixed
- meter housing
- housing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
Purpose of design of the present utility model is to provide the fixed structure that a kind of cabinet fills electric energy meter meter housing, meter housing body is exposed junction with respect to one end of the gauge outfit display part of instrument, the other end corresponding thereto is built-in end, all edges of projection are provided with the port of exposed junction, the fixture clamped with week along realization conflict is connected with meter housing body, the fixture includes the push rod clamped with week along conflict, limit the locating rod of fixture relative position and the fix bar of fixed fixture position, fix bar is towards being provided with fixed latch in the one side of instrument housing, instrument housing offers the neck closed with fixed latch adapter along built-in end towards exposed junction and positions the chute slided for locating rod, fixture is slided after positioning by means of locating rod on the chute of instrument housing, realized and fixed using fixed latch and neck, all edges and push rod realize the meter housing body that is fixedly clamped immediately.Wherein described fix bar includes slow bullet portion and the pushing part with its integrally connected.
Description
Technical field
The utility model is related to a kind of instrumentation, and more specifically to cabinet fills the fixed structure of electric energy meter meter housing.
Background technology
Instrument, shows the instrument general name of numerical value, including various analytical instrument such as electric energy meter, some electric energy meters are by instrument
Watchcase is directly installed on Electric Appliance Cabinet.
In the typical design, all these electric energy meters have a special instrument housing, and by located at instrument
Itself and cabinet are connected by connection, fixture on housing, such as set screw, and the gauge outfit display part of instrument housing is then straight
Connect exposed to the frame mouthful on cabinet surface or other appropriate positions, but the mode of this connection is all more bothered, it has not been convenient to
The actual installation practice of operating personnel, and due to being to be screwed, once because the reason such as damage or maintenance needs to change electricity
During energy table, corrosion or other reasons produced by screw, the problem of causing to dismantle in time.
Therefore, technical problem to be solved in the utility model is how existing electric energy meter instrument housing to be created
Property improve, can accomplish to be rapidly assembled and disassembled replacing.
Utility model content
Purpose of design of the present utility model is to provide a kind of meter housing for being easy to actual installation and the cabinet of dismounting to fill.
To realize that above-mentioned technical purpose spy provides following technical scheme:Cabinet fills the fixed structure of electric energy meter meter housing, including
Meter housing body, it is characterised in that:The meter housing body is exposed junction with respect to one end of the gauge outfit display part of instrument, with its phase
To the other end be to be connected with all edges that projection is provided with built-in end, the port of exposed junction, meter housing body with week along reality
The fixture of clamping is now contradicted, the fixture includes and week edge contradicts the push rod clamped, limits fixture relative position
Locating rod and the fix bar of fixed fixture position, fix bar is towards being provided with fixed latch, instrument in the one side of instrument housing
Housing offers the neck closed with fixed latch adapter along built-in end towards exposed junction and positions the chute slided for locating rod,
Fixture is slided after positioning by means of locating rod on the chute of instrument housing, is realized and fixed using fixed latch and neck, all immediately
Edge and push rod realize the meter housing body that is fixedly clamped, and top opens fix bar and flicks fixture from meter housing body.Wherein institute
Stating fix bar includes slow bullet portion and the pushing part with its integrally connected.
By above-mentioned technical scheme, in actual installation, the built-in end of meter housing is inserted to the frame mouthful on cabinet surface,
Due to being provided with all edges of projection on described exposed junction, therefore the exposed junction of meter housing can be stuck in the outer surface of cabinet, and
In the technical program, the fixture that effect is fixed to clamp for it is additionally provided with, when actual use, first locating rod to be aligned and slided
Enter chute, and described chute is slotted along built-in end towards exposed junction, the opening of the chute is also to be opened in the end at built-in end
At mouthful, therefore slided in the presence of the obvious tangible locating rod of fixture and chute by built-in end towards exposed junction, until sliding into top
Bar contradicts the inner surface to cabinet, finally realizes last clamping by the engaging between the fixation latch and neck in fix bar
It is fixed, it is achieved in using fixture and week along the wall for clamping cabinet, realizes that it is fixed, and described in the technical program
Fixed latch is that the incline structure engaged in that can be contradicted with neck is set.
Crucial fixation is wherein played in the technical program is fix bar, because it is fixed during use
During power excessively concentrate on fix bar, so if if the unreasonable structure of fix bar due to easily occur fracture etc. feelings
Condition, in the technical program, to avoid the generation of this case, spy sets slow bullet portion in fix bar, by the knot in slow bullet portion
The power that the good action breaks of structure are concentrated in fix bar.And set upper pushing part to be then to be applied to one promotion of operating personnel
Force, facilitates operator in actual use.
Using above-mentioned technical scheme, the not only direct convenience actual installation of staff, and need in the later stage by
When it is disassembled, as long as top sled fix bar so that lose clamping force between fixed latch and neck, you can by described fixation
Part skids off chute in the presence of locating rod, and with meter housing is disassembled, operation readiness substantially increases actual work
Efficiency, and delay the power put aside in bullet portion in the process and also contribute in operating personnel top sled fix bar, help fixed latch
Eject neck.
To optimize above-mentioned technical scheme, this programme is further arranged to:The outer surface of the pushing part is in frosted structure
Set.
To optimize above-mentioned technical scheme, this programme is further arranged to:The slow bullet portion is in semicircular ring structure setting.
To optimize above-mentioned technical scheme, this programme is further arranged to:The chute is set in oat tail groove structure, fixed
Bar is adapted to it, and one layer of fluorescence coating is provided with the cell wall of chute.
To optimize above-mentioned technical scheme, this programme is further arranged to:The fixture is respectively arranged at instrument housing
Four corner positions.
To optimize above-mentioned technical scheme, this programme is further arranged to:The push rod at least includes two, corresponds to respectively
Two EDS maps of housing.
To optimize above-mentioned technical scheme, this programme is further arranged to:The one end on the relatively all edges of the push rod is conflict
Rubber layer is provided with portion, contact part.
To optimize above-mentioned technical scheme, this programme is further arranged to:The neck at least includes 5, and in uniform
Interval setting.
Brief description of the drawings
Fig. 1 is attachment structure schematic diagram of the present utility model;
Fig. 2 is anchor structure schematic diagram 1 of the present utility model;
Fig. 3 is anchor structure schematic diagram 2 of the present utility model.
In figure:1st, meter housing body;2nd, exposed junction;3rd, built-in end;4th, all edges;5th, fixture;6th, push rod;7th, locating rod;
8th, fix bar;81st, bullet portion is delayed;82nd, pushing part;9th, fixed latch;10th, chute;11st, neck;12nd, fluorescence coating;13rd, contact part.
Embodiment
Embodiment of the present utility model is described further referring to figs. 1 to Fig. 3.
To realize that above-mentioned technical purpose spy provides following technical scheme:Cabinet fills the fixed structure of electric energy meter meter housing, including
Meter housing body 1, it is characterised in that:The meter housing body 1 is exposed junction 2 with respect to one end of the gauge outfit display part of instrument, with
Its relative other end is that week of projection is provided with built-in end 3, the port of exposed junction 2 along 4, is connected with meter housing body 1
Realized with week along 4 and contradict the fixture 5 clamped, the fixture 5 includes and contradicted along 4 in week the push rod 6 clamped, limitation fixation
The locating rod 7 of the relative position of part 5 and the fix bar 8 of the fixed position of fixture 5, fix bar 8 is towards setting in the one side of instrument housing
Be equipped with fixed latch 9, instrument housing offered along built-in end 3 towards exposed junction 2 be adapted to fixed latch 9 neck 11 that engages and
The chute 10 slided is positioned for locating rod 7, fixture 5 is slided after positioning by means of locating rod 7 on the chute 10 of instrument housing, is utilized
Fixed latch 9 and neck 11, which are realized, to be fixed, and week realizes the meter housing body 1 that is fixedly clamped along 4 and push rod 6 immediately, and pushes up and open fixation
Bar 8 flicks fixture 5 from meter housing body 1.Wherein described fix bar 8 include slow bullet portion 81 and with its integrally connected
Pushing part 82.
By above-mentioned technical scheme, in actual installation, the frame on cabinet surface is inserted at the built-in end 3 of meter housing
Mouthful, due to being provided with all along 4 of projection on described exposed junction 2, therefore the exposed junction 2 of meter housing can be stuck in the appearance of cabinet
Face, and in the technical program, the fixture 5 that effect is fixed to clamp for it is additionally provided with, be first by positioning when actual use
The alignment of bar 7 slips into chute 10, and described chute 10 is slotted along built-in end 3 towards exposed junction 2, and the opening of the chute 10 is also
It is opened in the presence of the port at built-in end 3, therefore the obvious tangible locating rod 7 of fixture 5 and chute 10 by the built-in court of end 3
Exposed junction 2 is slided, until sliding into push rod 6 contradicts the inner surface for arriving cabinet, finally by the fixation latch 9 in fix bar 8 and card
Between groove 11 engaging realize it is last be fixedly clamped, be achieved in using fixture 5 and week along 4 clamp cabinets walls, in fact
Existing its is fixed, and it is in that can contradict the incline structure engaged with neck 11 to set that the fixation latch 9 described in the technical program, which is,
Put.
Crucial fixation is wherein played in the technical program is fix bar 8, because it is solid during use
Power during fixed excessively concentrates on fix bar 8, so if due to being easily broken if the unreasonable structure of fix bar 8
Situations such as, in the technical program, to avoid the generation of this case, spy sets slow bullet portion 81 in fix bar 8, by slow bullet
The power that the good action breaks of structure in portion 81 are concentrated in fix bar 8, the structure for delaying bullet portion 81 can be in the structure of semicircular ring
Set.And it is then, in order to which one promotes the point of application to operating personnel, to facilitate operator in actual use to set upper pushing part 82, and
In order to avoid skidding occurs during fixture 5 is promoted by pushing part 82 for operating personnel, special envoy obtains described push away
The outer surface in dynamic portion 82 is in frosted structure setting, and increase friction prevents from skidding.
Using above-mentioned technical scheme, the not only direct convenience actual installation of staff, and need in the later stage by
When it is disassembled, as long as top sled fix bar 8 so that lose clamping force between fixed latch 9 and neck 11, you can will be described
Fixture 5 skids off chute 10 in the presence of locating rod 7, and with meter housing is disassembled, operation readiness substantially increases reality
The operating efficiency on border, and delay the power put aside in bullet portion 81 in the process and also contribute in operating personnel top sled fix bar 8, side
Help the fixed ejection of latch 9 neck 11.
It is special to set the chute 10 in oat tail groove structure wherein in order to ensure stability of the locating rod 7 in chute 10,
Fix bar 8 is adapted to it, and thus locating rod 7 would not depart from chute 10 in sliding process.On the other hand in reality
During installing processing, by that can cause insufficient light with reasons in structure inside cabinet, operating personnel are in actual use
Possibly rapid alignment chute 10 locating rod 7 can not be slipped into chute 10 well, be that this spy is provided with the cell wall of chute 10
One layer of fluorescence coating 12, by fluorescence coating 12, operating personnel can be convenient by locating rod with the particular location of rapid examination to chute 10
7 realized with it be aligned after slip into, further increase the real work efficiency of operating personnel, optimize the technical program.
Preferably to cause fixture 5 to reach its actual effect fixed to clamp, the fixture 5 is respectively arranged at by spy
Four corner positions of instrument housing, and the push rod 6 for being used for contradicting clamping action on fixture 5 is arranged at least including two
Individual, two EDS maps of corresponding housing, are improved on the premise of extra cost is not increased as far as possible to greatest extent whereby respectively
The chuck(ing) capacity of fixture 5.
And during specific use, to ensure that the setting of push rod 6 will not cause unnecessary to the inner wall surface in cabinet
Scratching, it is special that rubber layer is provided with along along the 4 namely contact part 13 of inner wall surface in the push rod 6 week relatively, it is further excellent
Technique effect of the present utility model is changed.
Because during actual use, the wall thickness of cabinet directly determines that where fixed latch 9 is should be in card
Groove 11 realizes engaging, because the neck 11 described in meeting the requirement of actual engaging at least includes 5, and is set in uniform interval
Put, thus, in face of the cabinet of different-thickness, fixed latch 9 can just be realized in diverse location in neck 11 contradicts engaging, significantly
Strengthen its tightness and flexibility.
Described above is only preferred embodiment of the present utility model, and protection domain of the present utility model is not limited merely to
Above-described embodiment, all technical schemes belonged under the utility model thinking belong to protection domain of the present utility model.It should refer to
Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and
Retouching, these improvements and modifications also should be regarded as protection domain of the present utility model.
Claims (8)
1. cabinet fills the fixed structure of electric energy meter meter housing, including meter housing body (1), it is characterised in that:The meter housing body
(1) one end of the gauge outfit display part of relative instrument is exposed junction (2), and the other end corresponding thereto is built-in end (3), exposed junction
(2) it is provided with the week edge (4) of projection, meter housing body (1) to be connected with port and contradicts consolidating for clamping with all realized along (4)
Determine part (5), the fixture (5) includes and contradicted along (4) in week the push rod (6) clamped, limits fixture (5) relative position
Locating rod (7) and the fix bar (8) of fixed fixture (5) position, fix bar (8) are solid towards being provided with the one side of instrument housing
Determine latch (9), instrument housing offers the neck (11) that engaging is adapted to fixed latch (9) along built-in end (3) towards exposed junction (2)
And for the chute (10) that locating rod (7) positioning is slided, fixture (5) borrows locating rod (7) on the chute (10) of instrument housing
Slide after positioning, realized and fixed using fixed latch (9) and neck (11), week realize and be fixedly clamped along (4) and push rod (6) immediately
Meter housing body (1), and top opens fix bar (8) and flicks fixture (5) from meter housing body (1), wherein the fix bar
(8) slow bullet portion (81) and the pushing part (82) with its integrally connected are included.
2. cabinet according to claim 1 fills the fixed structure of electric energy meter meter housing, it is characterised in that:The pushing part (82)
Outer surface be in frosted structure setting.
3. cabinet according to claim 1 fills the fixed structure of electric energy meter meter housing, it is characterised in that:The slow bullet portion (81)
In semicircular ring structure setting.
4. cabinet according to claim 1 fills the fixed structure of electric energy meter meter housing, it is characterised in that:The chute (10) is in
Oat tail groove structure is set, and fix bar (8) is adapted to it, and one layer of fluorescence coating (12) is provided with the cell wall of chute (10).
5. cabinet according to claim 1 fills the fixed structure of electric energy meter meter housing, it is characterised in that:The fixture (5)
It is respectively arranged at four corner positions of instrument housing.
6. the cabinet according to claim 1 or 3 fills the fixed structure of electric energy meter meter housing, it is characterised in that:The push rod (6)
At least include two, respectively two EDS maps of corresponding housing.
7. cabinet according to claim 4 fills the fixed structure of electric energy meter meter housing, it is characterised in that:Push rod (6) phase
One end to week along (4) is contact part (13), and contact part is provided with rubber layer on (13).
8. cabinet according to claim 1 fills the fixed structure of electric energy meter meter housing, it is characterised in that:The neck (11) is extremely
Include 5 less, and in uniform interval setting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720190190.7U CN206479570U (en) | 2017-02-28 | 2017-02-28 | Cabinet fills the fixed structure of electric energy meter meter housing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720190190.7U CN206479570U (en) | 2017-02-28 | 2017-02-28 | Cabinet fills the fixed structure of electric energy meter meter housing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206479570U true CN206479570U (en) | 2017-09-08 |
Family
ID=59747253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720190190.7U Expired - Fee Related CN206479570U (en) | 2017-02-28 | 2017-02-28 | Cabinet fills the fixed structure of electric energy meter meter housing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206479570U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115684686A (en) * | 2022-11-10 | 2023-02-03 | 中南仪表有限公司 | Anti-loosening outdoor electric energy meter and installation method thereof |
-
2017
- 2017-02-28 CN CN201720190190.7U patent/CN206479570U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115684686A (en) * | 2022-11-10 | 2023-02-03 | 中南仪表有限公司 | Anti-loosening outdoor electric energy meter and installation method thereof |
CN115684686B (en) * | 2022-11-10 | 2024-03-29 | 中南仪表有限公司 | Anti-loosening outdoor electric energy meter and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206479570U (en) | Cabinet fills the fixed structure of electric energy meter meter housing | |
CN109632365A (en) | It is a kind of that the straight of soil sampling is facilitated to push away drilling machine | |
DE502007004990D1 (en) | Dosing device with a receptacle for an insertable unit | |
CN107627757A (en) | Financial accounting vital document placing box | |
CN110136360A (en) | A kind of intelligent express delivery cabinet efficiently intensively delivered | |
CN206848332U (en) | A kind of meter housing of electric energy meter | |
CN207208830U (en) | The portable unit box that a kind of pipette tips import | |
CN207663742U (en) | A kind of human resource performance exhibition booth | |
CN205209399U (en) | Accurate hole site degree of putting detection device of part double -basis | |
CN200975106Y (en) | Formwork used for pipeline sealing | |
CN202931678U (en) | Chasis | |
CN204378426U (en) | A kind of bookcase | |
CN106066669A (en) | A kind of electronic equipment | |
CN203102752U (en) | Magnetically fixed sign board with magnet | |
CN207796449U (en) | A kind of spliced fixing device of instrument and meter for automation | |
CN213189616U (en) | Blood sampling pipe convenient to connect | |
CN204327670U (en) | A kind of instrument and apparatus case fixing device | |
CN209421343U (en) | Bank bills show table | |
CN204141666U (en) | A kind of range hood | |
CN217325252U (en) | Ecological slope protection structure for water utilization | |
CN207651284U (en) | A kind of positioning device that magnetizes of mount double faced adhesive tape neodymium iron boron | |
CN204009697U (en) | Graphoscope light shield | |
CN209911026U (en) | Cement sample collection device | |
CN209486583U (en) | A kind of plug protective device of USB interface of computer | |
CN205767948U (en) | A kind of chromatography PVC board NC film film sticking apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170908 Termination date: 20180228 |