CN206479570U
CN206479570U CN201720190190.7U CN201720190190U CN206479570U CN 206479570 U CN206479570 U CN 206479570U CN 201720190190 U CN201720190190 U CN 201720190190U CN 206479570 U CN206479570 U CN 206479570U
Authority
CN
China
Prior art keywords
meter
fixture
fixed
meter housing
housing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720190190.7U
Other languages
Chinese (zh)
Inventor
林晓龙
林晓虎
林晓海
林晓斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MIDDLE-SOUTH METER Co Ltd
Original Assignee
MIDDLE-SOUTH METER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MIDDLE-SOUTH METER Co Ltd filed Critical MIDDLE-SOUTH METER Co Ltd
Priority to CN201720190190.7U priority Critical patent/CN206479570U/en
Application granted granted Critical
Publication of CN206479570U publication Critical patent/CN206479570U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Purpose of design of the present utility model is to provide the fixed structure that a kind of cabinet fills electric energy meter meter housing, meter housing body is exposed junction with respect to one end of the gauge outfit display part of instrument, the other end corresponding thereto is built-in end, all edges of projection are provided with the port of exposed junction, the fixture clamped with week along realization conflict is connected with meter housing body, the fixture includes the push rod clamped with week along conflict, limit the locating rod of fixture relative position and the fix bar of fixed fixture position, fix bar is towards being provided with fixed latch in the one side of instrument housing, instrument housing offers the neck closed with fixed latch adapter along built-in end towards exposed junction and positions the chute slided for locating rod, fixture is slided after positioning by means of locating rod on the chute of instrument housing, realized and fixed using fixed latch and neck, all edges and push rod realize the meter housing body that is fixedly clamped immediately.Wherein described fix bar includes slow bullet portion and the pushing part with its integrally connected.

Description

Cabinet fills the fixed structure of electric energy meter meter housing
Technical field
The utility model is related to a kind of instrumentation, and more specifically to cabinet fills the fixed structure of electric energy meter meter housing.
Background technology
Instrument, shows the instrument general name of numerical value, including various analytical instrument such as electric energy meter, some electric energy meters are by instrument Watchcase is directly installed on Electric Appliance Cabinet.
In the typical design, all these electric energy meters have a special instrument housing, and by located at instrument Itself and cabinet are connected by connection, fixture on housing, such as set screw, and the gauge outfit display part of instrument housing is then straight Connect exposed to the frame mouthful on cabinet surface or other appropriate positions, but the mode of this connection is all more bothered, it has not been convenient to The actual installation practice of operating personnel, and due to being to be screwed, once because the reason such as damage or maintenance needs to change electricity During energy table, corrosion or other reasons produced by screw, the problem of causing to dismantle in time.
Therefore, technical problem to be solved in the utility model is how existing electric energy meter instrument housing to be created Property improve, can accomplish to be rapidly assembled and disassembled replacing.
Utility model content
Purpose of design of the present utility model is to provide a kind of meter housing for being easy to actual installation and the cabinet of dismounting to fill.
To realize that above-mentioned technical purpose spy provides following technical scheme:Cabinet fills the fixed structure of electric energy meter meter housing, including Meter housing body, it is characterised in that:The meter housing body is exposed junction with respect to one end of the gauge outfit display part of instrument, with its phase To the other end be to be connected with all edges that projection is provided with built-in end, the port of exposed junction, meter housing body with week along reality The fixture of clamping is now contradicted, the fixture includes and week edge contradicts the push rod clamped, limits fixture relative position Locating rod and the fix bar of fixed fixture position, fix bar is towards being provided with fixed latch, instrument in the one side of instrument housing Housing offers the neck closed with fixed latch adapter along built-in end towards exposed junction and positions the chute slided for locating rod, Fixture is slided after positioning by means of locating rod on the chute of instrument housing, is realized and fixed using fixed latch and neck, all immediately Edge and push rod realize the meter housing body that is fixedly clamped, and top opens fix bar and flicks fixture from meter housing body.Wherein institute Stating fix bar includes slow bullet portion and the pushing part with its integrally connected.
By above-mentioned technical scheme, in actual installation, the built-in end of meter housing is inserted to the frame mouthful on cabinet surface, Due to being provided with all edges of projection on described exposed junction, therefore the exposed junction of meter housing can be stuck in the outer surface of cabinet, and In the technical program, the fixture that effect is fixed to clamp for it is additionally provided with, when actual use, first locating rod to be aligned and slided Enter chute, and described chute is slotted along built-in end towards exposed junction, the opening of the chute is also to be opened in the end at built-in end At mouthful, therefore slided in the presence of the obvious tangible locating rod of fixture and chute by built-in end towards exposed junction, until sliding into top Bar contradicts the inner surface to cabinet, finally realizes last clamping by the engaging between the fixation latch and neck in fix bar It is fixed, it is achieved in using fixture and week along the wall for clamping cabinet, realizes that it is fixed, and described in the technical program Fixed latch is that the incline structure engaged in that can be contradicted with neck is set.
Crucial fixation is wherein played in the technical program is fix bar, because it is fixed during use During power excessively concentrate on fix bar, so if if the unreasonable structure of fix bar due to easily occur fracture etc. feelings Condition, in the technical program, to avoid the generation of this case, spy sets slow bullet portion in fix bar, by the knot in slow bullet portion The power that the good action breaks of structure are concentrated in fix bar.And set upper pushing part to be then to be applied to one promotion of operating personnel Force, facilitates operator in actual use.
Using above-mentioned technical scheme, the not only direct convenience actual installation of staff, and need in the later stage by When it is disassembled, as long as top sled fix bar so that lose clamping force between fixed latch and neck, you can by described fixation Part skids off chute in the presence of locating rod, and with meter housing is disassembled, operation readiness substantially increases actual work Efficiency, and delay the power put aside in bullet portion in the process and also contribute in operating personnel top sled fix bar, help fixed latch Eject neck.
To optimize above-mentioned technical scheme, this programme is further arranged to:The outer surface of the pushing part is in frosted structure Set.
To optimize above-mentioned technical scheme, this programme is further arranged to:The slow bullet portion is in semicircular ring structure setting.
To optimize above-mentioned technical scheme, this programme is further arranged to:The chute is set in oat tail groove structure, fixed Bar is adapted to it, and one layer of fluorescence coating is provided with the cell wall of chute.
To optimize above-mentioned technical scheme, this programme is further arranged to:The fixture is respectively arranged at instrument housing Four corner positions.
To optimize above-mentioned technical scheme, this programme is further arranged to:The push rod at least includes two, corresponds to respectively Two EDS maps of housing.
To optimize above-mentioned technical scheme, this programme is further arranged to:The one end on the relatively all edges of the push rod is conflict Rubber layer is provided with portion, contact part.
To optimize above-mentioned technical scheme, this programme is further arranged to:The neck at least includes 5, and in uniform Interval setting.
Brief description of the drawings
Fig. 1 is attachment structure schematic diagram of the present utility model;
Fig. 2 is anchor structure schematic diagram 1 of the present utility model;
Fig. 3 is anchor structure schematic diagram 2 of the present utility model.
In figure:1st, meter housing body;2nd, exposed junction;3rd, built-in end;4th, all edges;5th, fixture;6th, push rod;7th, locating rod; 8th, fix bar;81st, bullet portion is delayed;82nd, pushing part;9th, fixed latch;10th, chute;11st, neck;12nd, fluorescence coating;13rd, contact part.
Embodiment
Embodiment of the present utility model is described further referring to figs. 1 to Fig. 3.
To realize that above-mentioned technical purpose spy provides following technical scheme:Cabinet fills the fixed structure of electric energy meter meter housing, including Meter housing body 1, it is characterised in that:The meter housing body 1 is exposed junction 2 with respect to one end of the gauge outfit display part of instrument, with Its relative other end is that week of projection is provided with built-in end 3, the port of exposed junction 2 along 4, is connected with meter housing body 1 Realized with week along 4 and contradict the fixture 5 clamped, the fixture 5 includes and contradicted along 4 in week the push rod 6 clamped, limitation fixation The locating rod 7 of the relative position of part 5 and the fix bar 8 of the fixed position of fixture 5, fix bar 8 is towards setting in the one side of instrument housing Be equipped with fixed latch 9, instrument housing offered along built-in end 3 towards exposed junction 2 be adapted to fixed latch 9 neck 11 that engages and The chute 10 slided is positioned for locating rod 7, fixture 5 is slided after positioning by means of locating rod 7 on the chute 10 of instrument housing, is utilized Fixed latch 9 and neck 11, which are realized, to be fixed, and week realizes the meter housing body 1 that is fixedly clamped along 4 and push rod 6 immediately, and pushes up and open fixation Bar 8 flicks fixture 5 from meter housing body 1.Wherein described fix bar 8 include slow bullet portion 81 and with its integrally connected Pushing part 82.
By above-mentioned technical scheme, in actual installation, the frame on cabinet surface is inserted at the built-in end 3 of meter housing Mouthful, due to being provided with all along 4 of projection on described exposed junction 2, therefore the exposed junction 2 of meter housing can be stuck in the appearance of cabinet Face, and in the technical program, the fixture 5 that effect is fixed to clamp for it is additionally provided with, be first by positioning when actual use The alignment of bar 7 slips into chute 10, and described chute 10 is slotted along built-in end 3 towards exposed junction 2, and the opening of the chute 10 is also It is opened in the presence of the port at built-in end 3, therefore the obvious tangible locating rod 7 of fixture 5 and chute 10 by the built-in court of end 3 Exposed junction 2 is slided, until sliding into push rod 6 contradicts the inner surface for arriving cabinet, finally by the fixation latch 9 in fix bar 8 and card Between groove 11 engaging realize it is last be fixedly clamped, be achieved in using fixture 5 and week along 4 clamp cabinets walls, in fact Existing its is fixed, and it is in that can contradict the incline structure engaged with neck 11 to set that the fixation latch 9 described in the technical program, which is, Put.
Crucial fixation is wherein played in the technical program is fix bar 8, because it is solid during use Power during fixed excessively concentrates on fix bar 8, so if due to being easily broken if the unreasonable structure of fix bar 8 Situations such as, in the technical program, to avoid the generation of this case, spy sets slow bullet portion 81 in fix bar 8, by slow bullet The power that the good action breaks of structure in portion 81 are concentrated in fix bar 8, the structure for delaying bullet portion 81 can be in the structure of semicircular ring Set.And it is then, in order to which one promotes the point of application to operating personnel, to facilitate operator in actual use to set upper pushing part 82, and In order to avoid skidding occurs during fixture 5 is promoted by pushing part 82 for operating personnel, special envoy obtains described push away The outer surface in dynamic portion 82 is in frosted structure setting, and increase friction prevents from skidding.
Using above-mentioned technical scheme, the not only direct convenience actual installation of staff, and need in the later stage by When it is disassembled, as long as top sled fix bar 8 so that lose clamping force between fixed latch 9 and neck 11, you can will be described Fixture 5 skids off chute 10 in the presence of locating rod 7, and with meter housing is disassembled, operation readiness substantially increases reality The operating efficiency on border, and delay the power put aside in bullet portion 81 in the process and also contribute in operating personnel top sled fix bar 8, side Help the fixed ejection of latch 9 neck 11.
It is special to set the chute 10 in oat tail groove structure wherein in order to ensure stability of the locating rod 7 in chute 10, Fix bar 8 is adapted to it, and thus locating rod 7 would not depart from chute 10 in sliding process.On the other hand in reality During installing processing, by that can cause insufficient light with reasons in structure inside cabinet, operating personnel are in actual use Possibly rapid alignment chute 10 locating rod 7 can not be slipped into chute 10 well, be that this spy is provided with the cell wall of chute 10 One layer of fluorescence coating 12, by fluorescence coating 12, operating personnel can be convenient by locating rod with the particular location of rapid examination to chute 10 7 realized with it be aligned after slip into, further increase the real work efficiency of operating personnel, optimize the technical program.
Preferably to cause fixture 5 to reach its actual effect fixed to clamp, the fixture 5 is respectively arranged at by spy Four corner positions of instrument housing, and the push rod 6 for being used for contradicting clamping action on fixture 5 is arranged at least including two Individual, two EDS maps of corresponding housing, are improved on the premise of extra cost is not increased as far as possible to greatest extent whereby respectively The chuck(ing) capacity of fixture 5.
And during specific use, to ensure that the setting of push rod 6 will not cause unnecessary to the inner wall surface in cabinet Scratching, it is special that rubber layer is provided with along along the 4 namely contact part 13 of inner wall surface in the push rod 6 week relatively, it is further excellent Technique effect of the present utility model is changed.
Because during actual use, the wall thickness of cabinet directly determines that where fixed latch 9 is should be in card Groove 11 realizes engaging, because the neck 11 described in meeting the requirement of actual engaging at least includes 5, and is set in uniform interval Put, thus, in face of the cabinet of different-thickness, fixed latch 9 can just be realized in diverse location in neck 11 contradicts engaging, significantly Strengthen its tightness and flexibility.
Described above is only preferred embodiment of the present utility model, and protection domain of the present utility model is not limited merely to Above-described embodiment, all technical schemes belonged under the utility model thinking belong to protection domain of the present utility model.It should refer to Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (8)

1. cabinet fills the fixed structure of electric energy meter meter housing, including meter housing body (1), it is characterised in that:The meter housing body (1) one end of the gauge outfit display part of relative instrument is exposed junction (2), and the other end corresponding thereto is built-in end (3), exposed junction (2) it is provided with the week edge (4) of projection, meter housing body (1) to be connected with port and contradicts consolidating for clamping with all realized along (4) Determine part (5), the fixture (5) includes and contradicted along (4) in week the push rod (6) clamped, limits fixture (5) relative position Locating rod (7) and the fix bar (8) of fixed fixture (5) position, fix bar (8) are solid towards being provided with the one side of instrument housing Determine latch (9), instrument housing offers the neck (11) that engaging is adapted to fixed latch (9) along built-in end (3) towards exposed junction (2) And for the chute (10) that locating rod (7) positioning is slided, fixture (5) borrows locating rod (7) on the chute (10) of instrument housing Slide after positioning, realized and fixed using fixed latch (9) and neck (11), week realize and be fixedly clamped along (4) and push rod (6) immediately Meter housing body (1), and top opens fix bar (8) and flicks fixture (5) from meter housing body (1), wherein the fix bar (8) slow bullet portion (81) and the pushing part (82) with its integrally connected are included.
2. cabinet according to claim 1 fills the fixed structure of electric energy meter meter housing, it is characterised in that:The pushing part (82) Outer surface be in frosted structure setting.
3. cabinet according to claim 1 fills the fixed structure of electric energy meter meter housing, it is characterised in that:The slow bullet portion (81) In semicircular ring structure setting.
4. cabinet according to claim 1 fills the fixed structure of electric energy meter meter housing, it is characterised in that:The chute (10) is in Oat tail groove structure is set, and fix bar (8) is adapted to it, and one layer of fluorescence coating (12) is provided with the cell wall of chute (10).
5. cabinet according to claim 1 fills the fixed structure of electric energy meter meter housing, it is characterised in that:The fixture (5) It is respectively arranged at four corner positions of instrument housing.
6. the cabinet according to claim 1 or 3 fills the fixed structure of electric energy meter meter housing, it is characterised in that:The push rod (6) At least include two, respectively two EDS maps of corresponding housing.
7. cabinet according to claim 4 fills the fixed structure of electric energy meter meter housing, it is characterised in that:Push rod (6) phase One end to week along (4) is contact part (13), and contact part is provided with rubber layer on (13).
8. cabinet according to claim 1 fills the fixed structure of electric energy meter meter housing, it is characterised in that:The neck (11) is extremely Include 5 less, and in uniform interval setting.
CN201720190190.7U 2017-02-28 2017-02-28 Cabinet fills the fixed structure of electric energy meter meter housing Expired - Fee Related CN206479570U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720190190.7U CN206479570U (en) 2017-02-28 2017-02-28 Cabinet fills the fixed structure of electric energy meter meter housing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720190190.7U CN206479570U (en) 2017-02-28 2017-02-28 Cabinet fills the fixed structure of electric energy meter meter housing

Publications (1)

Publication Number Publication Date
CN206479570U true CN206479570U (en) 2017-09-08

Family

ID=59747253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720190190.7U Expired - Fee Related CN206479570U (en) 2017-02-28 2017-02-28 Cabinet fills the fixed structure of electric energy meter meter housing

Country Status (1)

Country Link
CN (1) CN206479570U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115684686A (en) * 2022-11-10 2023-02-03 中南仪表有限公司 Anti-loosening outdoor electric energy meter and installation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115684686A (en) * 2022-11-10 2023-02-03 中南仪表有限公司 Anti-loosening outdoor electric energy meter and installation method thereof
CN115684686B (en) * 2022-11-10 2024-03-29 中南仪表有限公司 Anti-loosening outdoor electric energy meter and installation method thereof

Similar Documents

Publication Publication Date Title
CN206479570U (en) Cabinet fills the fixed structure of electric energy meter meter housing
CN109632365A (en) It is a kind of that the straight of soil sampling is facilitated to push away drilling machine
DE502007004990D1 (en) Dosing device with a receptacle for an insertable unit
CN107627757A (en) Financial accounting vital document placing box
CN110136360A (en) A kind of intelligent express delivery cabinet efficiently intensively delivered
CN206848332U (en) A kind of meter housing of electric energy meter
CN207208830U (en) The portable unit box that a kind of pipette tips import
CN207663742U (en) A kind of human resource performance exhibition booth
CN205209399U (en) Accurate hole site degree of putting detection device of part double -basis
CN200975106Y (en) Formwork used for pipeline sealing
CN202931678U (en) Chasis
CN204378426U (en) A kind of bookcase
CN106066669A (en) A kind of electronic equipment
CN203102752U (en) Magnetically fixed sign board with magnet
CN207796449U (en) A kind of spliced fixing device of instrument and meter for automation
CN213189616U (en) Blood sampling pipe convenient to connect
CN204327670U (en) A kind of instrument and apparatus case fixing device
CN209421343U (en) Bank bills show table
CN204141666U (en) A kind of range hood
CN217325252U (en) Ecological slope protection structure for water utilization
CN207651284U (en) A kind of positioning device that magnetizes of mount double faced adhesive tape neodymium iron boron
CN204009697U (en) Graphoscope light shield
CN209911026U (en) Cement sample collection device
CN209486583U (en) A kind of plug protective device of USB interface of computer
CN205767948U (en) A kind of chromatography PVC board NC film film sticking apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170908

Termination date: 20180228