CN206478048U - Multisystem hydraulic pump source automatic switching control equipment on shield machine - Google Patents

Multisystem hydraulic pump source automatic switching control equipment on shield machine Download PDF

Info

Publication number
CN206478048U
CN206478048U CN201621468869.XU CN201621468869U CN206478048U CN 206478048 U CN206478048 U CN 206478048U CN 201621468869 U CN201621468869 U CN 201621468869U CN 206478048 U CN206478048 U CN 206478048U
Authority
CN
China
Prior art keywords
valve
shield machine
branch road
hydraulic control
controlling pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621468869.XU
Other languages
Chinese (zh)
Inventor
卢刘扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cssc Heavy Equipment Co Ltd
Original Assignee
Cssc Heavy Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cssc Heavy Equipment Co Ltd filed Critical Cssc Heavy Equipment Co Ltd
Priority to CN201621468869.XU priority Critical patent/CN206478048U/en
Application granted granted Critical
Publication of CN206478048U publication Critical patent/CN206478048U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fluid-Pressure Circuits (AREA)

Abstract

Multisystem hydraulic pump source automatic switching control equipment on a kind of shield machine, including multiple hydraulic control devices, each hydraulic control device include controlling pump, oil absorption filter, check valve, a reversal valve;Wherein, controlling pump lower port connection oil absorption filter, controlling pump upper port connects the lower port of check valve, check valve upper port connection reversal valve;It is characterized in that, a branch road is separated on main line pipeline between the check valve and reversal valve of each hydraulic control device, one electromagnet cut off valve is installed in the middle of branch road, then the other end of each branch road of multiple hydraulic control devices is linked together, each branch road is all communicated.The utility model is simple in construction, it is ingenious in design, overcome that shield machine hydraulic control device one in the prior art is faulty to result in the problem of whole shield machine can not work, when ensure that one hydraulic control device of shield machine is faulty, by its word hydraulic control device can also normal work, improve the reliability of shield machine.

Description

Multisystem hydraulic pump source automatic switching control equipment on shield machine
Technical field
The utility model is on multisystem hydraulic pump source automatic switching control equipment on shield machine, more particularly to a kind of shield machine Multisystem hydraulic pump source automatic switching control equipment.
Background technology
Existing shield machine hydraulic system is more complicated, is made up of multiple hydraulic control devices, phase between multiple controlling pumps It is mutually independent, once the hydraulic pump of some hydraulic system breaks down on shield machine, it will and directly result in shield machine and stop construction, sternly Shield-tunneling construction efficiency is reduced again, and schedule delays bring certain economic loss to construction enterprises.
Utility model content
The purpose of this utility model provides multisystem hydraulic pump source automatic switching control equipment on a kind of shield machine, in a certain hydraulic pressure When the hydraulic pump of system breaks down, still can normal work, be not required to shut down, it is ensured that the normal tunneling construction of shield machine.
Multisystem hydraulic pump source automatic switching control equipment on a kind of shield machine, including multiple hydraulic control devices, each hydraulic pressure Control device includes controlling pump, oil absorption filter, check valve, a reversal valve;Wherein, controlling pump lower port Oil absorption filter is connected, controlling pump upper port connects the lower port of check valve, check valve upper port connection reversal valve;Its feature exists In a branch road being separated on the main line pipeline between the check valve and reversal valve of each hydraulic control device, in the middle of branch road One electromagnet cut off valve is installed, then the other end of the branch road of multiple hydraulic control devices is linked together, makes each branch road all Communicate.
Deceleration pressure valve is installed between the junction and electromagnet cut off valve of main line and branch road.
The utility model is simple in construction, ingenious in design, overcomes a hydraulic control device on shield machine in the prior art It is faulty to cause the problem of whole shield machine work, it is ensured that when a hydraulic control device of shield machine is faulty, By its word hydraulic control device can also normal work, improve the reliability of shield machine.
Brief description of the drawings
Fig. 1, the structural representation of the embodiment of the present invention one.
Embodiment
Multisystem hydraulic pump source automatic switching control equipment on a kind of shield machine, including multiple hydraulic control devices, each hydraulic pressure Control device includes controlling pump, oil absorption filter, check valve, a reversal valve;Wherein, controlling pump lower port Oil absorption filter is connected, controlling pump upper port connects the lower port of check valve, check valve upper port connection reversal valve;Its feature exists In a branch road being separated on the main line pipeline between the check valve and reversal valve of each hydraulic control device, in the middle of branch road One electromagnet cut off valve is installed, then the other end of the branch road of multiple hydraulic control devices is linked together, makes each branch road all Communicate.
Deceleration pressure valve is installed between the junction and electromagnet cut off valve of main line and branch road.
Embodiment one:
The utility model includes three hydraulic control devices, wherein the first hydraulic control device include the first controlling pump 13, First oil absorption filter 14, the first check valve 12, the first reversal valve 11;Wherein the second hydraulic control device includes the second controlling pump 23rd, the second oil absorption filter 24, the second check valve 22, the second reversal valve 21;3rd hydraulic control device includes the 3rd controlling pump 33rd, the 3rd oil absorption filter 34, the 3rd check valve 32, the 3rd reversal valve 31;The first check valve on the first hydraulic control device 12 and the first main line pipeline between reversal valve 11 on separate branch road, the first electromagnet cut off valve 15 is installed on branch road; Branch road is separated on main line pipeline on two hydraulic control devices between the second check valve 22 and the second reversal valve 21, is pacified on branch road Equipped with the second electromagnet cut off valve 25;Main line on the 3rd hydraulic control device between the 3rd check valve 32 and the 3rd reversal valve 31 Branch road is separated on pipeline, the 3rd electromagnet cut off valve 35 is installed on branch road;First electromagnet cut off valve 15, the second electromagnet cut off valve 25 and the 3rd the branch road of the other end of electromagnet cut off valve 35 link together.
On the 3rd hydraulic control device, one is installed between main line and branch road junction and the 3rd electromagnet cut off valve 35 Pressure-reducing valve 36.
The technical scheme that the utility model is used is:
Multisystem hydraulic pump source automatic switching control equipment on a kind of shield machine, including by controlling pump 1# systems, controlling pump 2# systems System and controlling pump 3# systems, described controlling pump 1# systems are by being provided with electromagnet cut off valve 1#, pressure-reducing valve 1 and electromagnet cut off valve 3# pipeline connection controlling pump 3# systems;Described controlling pump 2# systems are by being provided with electromagnet cut off valve 2#, pressure-reducing valve 1 and electricity Magnetic stop valve 3# pipeline connection controlling pump 3# systems;Described controlling pump 1# systems are by being provided with electromagnet cut off valve 1# and electricity Magnetic stop valve 2# connection controlling pump 2# systems.
Described electromagnet cut off valve 1#, electromagnet cut off valve 2# and electromagnet cut off valve 3# uses LVSH-206G-D2-TB-W.
Described pressure-reducing valve 1 uses DR6DP2-5X/210YM.
Described check valve uses RV-20-07-B.
The utility model passes through in existing separate controlling pump 1# systems, controlling pump 2# systems and controlling pump 3# systems On, install electromagnet cut off valve 1#, electromagnet cut off valve 2#, electromagnet cut off valve 3#, pressure-reducing valve 1, check valve additional, lead to controlling pump 1# systems The pipeline connection controlling pump 3# systems for being provided with electromagnet cut off valve 1#, pressure-reducing valve 1 and electromagnet cut off valve 3# are crossed, make controlling pump 2# systems Unite and connect controlling pump 3# systems by being provided with electromagnet cut off valve 2#, pressure-reducing valve 1 and electromagnet cut off valve 3# pipeline, make controlling pump 1# systems are by being provided with electromagnet cut off valve 1# and electromagnet cut off valve 2# connection controlling pump 2# systems.When in shield machine hydraulic system A certain hydraulic pump system break down when, in the case where not influenceing other systems normal work, the utility model can lead to Control electromagnet cut off valve 1#, electromagnet cut off valve 2#, electromagnet cut off valve 3#, pressure-reducing valve 1 etc. are crossed, switching in time uses other hydraulic pumps The pumping source of system provides oil sources for a certain hydraulic pump system broken down, reduces downtime, is completed while realizing driving Maintenance more changes jobs, and improves the efficiency of shield-tunneling construction.
The utility model is further illustrated below in conjunction with the accompanying drawings.
The utility model includes being made up of controlling pump 1# systems, controlling pump 2# systems and controlling pump 3# systems, described control Pump 1# systems processed connect controlling pump 3# systems by being provided with electromagnet cut off valve 1#, pressure-reducing valve 1 and electromagnet cut off valve 3# pipeline; Described controlling pump 2# systems connect control by being provided with electromagnet cut off valve 2#, pressure-reducing valve 1 and electromagnet cut off valve 3# pipeline Pump 3# systems;Described controlling pump 1# systems are by being provided with electromagnet cut off valve 1# and electromagnet cut off valve 2# connection controlling pump 2# systems System.
Described electromagnet cut off valve 1#, electromagnet cut off valve 2# and electromagnet cut off valve 3# uses LVSH-206G-D2-TB-W.
Described pressure-reducing valve 1 uses DR6DP2-5X/210YM.
Described check valve uses RV-20-07-B.
The utility model is in practical process, when controlling pump 1# systems or controlling pump 2# system jams can not be opened normally When dynamic or pump discharge can not set up pressure, the exportable corresponding signal of control system, while opening electromagnet cut off valve 1# and electromagnetism Stop valve 2#, pressure oil-source is provided using controlling pump 1# sources or controlling pump 2# sources, it is ensured that controlling pump 1# systems or controlling pump 2# System worked well.
When controlling pump 3# system jams can not start or pump discharge can not set up pressure, control system is exportable Corresponding signal, while opening electromagnet cut off valve 1#, electromagnet cut off valve 3# and pressure-reducing valve 1, or opens the second electrical ball valve, electricity simultaneously Magnetic stop valve 3# and pressure-reducing valve 1, pressure oil-source is provided using controlling pump 1# systems or controlling pump 2# systems, it is ensured that controlling pump 3# System worked well.
When can prevent that each pressure oil-source from switching using check valve, pressure oil carries out secondary damage to the hydraulic pump broken down It is bad.

Claims (2)

1. multisystem hydraulic pump source automatic switching control equipment on a kind of shield machine, including multiple hydraulic control devices, each hydraulic pressure control Device processed includes controlling pump, oil absorption filter, check valve, a reversal valve;Wherein, controlling pump lower port connects Oil absorption filter is connect, controlling pump upper port connects the lower port of check valve, check valve upper port connection reversal valve;Its feature exists In a branch road being separated on the main line pipeline between the check valve and reversal valve of each hydraulic control device, in the middle of branch road One electromagnet cut off valve is installed, then the other end of the branch road of multiple hydraulic control devices is linked together, makes each branch road all Communicate.
2. multisystem hydraulic pump source automatic switching control equipment on a kind of shield machine according to claim 1, it is characterised in that Deceleration pressure valve is installed between the junction and electromagnet cut off valve of main line and branch road.
CN201621468869.XU 2016-12-29 2016-12-29 Multisystem hydraulic pump source automatic switching control equipment on shield machine Expired - Fee Related CN206478048U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621468869.XU CN206478048U (en) 2016-12-29 2016-12-29 Multisystem hydraulic pump source automatic switching control equipment on shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621468869.XU CN206478048U (en) 2016-12-29 2016-12-29 Multisystem hydraulic pump source automatic switching control equipment on shield machine

Publications (1)

Publication Number Publication Date
CN206478048U true CN206478048U (en) 2017-09-08

Family

ID=59750407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621468869.XU Expired - Fee Related CN206478048U (en) 2016-12-29 2016-12-29 Multisystem hydraulic pump source automatic switching control equipment on shield machine

Country Status (1)

Country Link
CN (1) CN206478048U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108061068A (en) * 2018-01-08 2018-05-22 中国铁建重工集团有限公司 Double-shielded TBM Rapid reset hydraulic system and digging device
CN113503276A (en) * 2020-09-23 2021-10-15 南京迈瑞生物医疗电子有限公司 Hydraulic control system of medical bed, medical bed and control method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108061068A (en) * 2018-01-08 2018-05-22 中国铁建重工集团有限公司 Double-shielded TBM Rapid reset hydraulic system and digging device
CN108061068B (en) * 2018-01-08 2024-04-23 中国铁建重工集团股份有限公司 Double-shield TBM quick resetting hydraulic system and tunneling equipment
CN113503276A (en) * 2020-09-23 2021-10-15 南京迈瑞生物医疗电子有限公司 Hydraulic control system of medical bed, medical bed and control method

Similar Documents

Publication Publication Date Title
CN108412820B (en) 30000Psi ultra-high pressure wellhead safety control system
CN203095500U (en) Constant-deceleration hydraulic station system
CN103671364B (en) Electrohydraulic control system is turned to for remote control loader
CN206478048U (en) Multisystem hydraulic pump source automatic switching control equipment on shield machine
CN104913179B (en) A kind of automatic lubricating system
CN104728203B (en) A kind of electric-hydraulic control reversing valve with internal pressure relief function
CN205348288U (en) Control system is hauled oneself willingly into fully to water supply pump package
CN101655116B (en) Hydraulic power source system
CN203257641U (en) Air compressor parallel system
CN203756630U (en) Novel sliding nozzle hydraulic control system
CN103883578A (en) Novel hydraulic control system for sliding gate
CN105257617B (en) Pressure-filling and unloading-controlling integrated system of large electric wheel dump truck
CN204851808U (en) Two driving system of jet plane pump sending mechanism
CN112277915A (en) Safety type wire-controlled braking system and method for coal mine trackless auxiliary transportation robot
CN201826840U (en) Double-heightening system of coal-winning machine
CN202250663U (en) Concrete pumping equipment and power system thereof
CN216077049U (en) Control device for operating shear gate plate to close well
CN103727078A (en) Crane and hydraulic system thereof
CN102537469B (en) Remote monitoring device of electric valve of iron ore concentrate pipeline and monitoring method of remote monitoring device
CN105134675A (en) Dual-power system of pumping mechanism of injection machine
CN103129919B (en) Electro-hydraulic control system of disc type braking device of mine belt conveyor
CN104260732B (en) The assisting vehicle control method of electric locomotive brake
CN107269616A (en) A kind of cavity of resorption of high speed hydraulic press is drained the oil the application system of high frequency sound valve
CN103410199B (en) H-shaped fluid delivery pipeline system and fluid delivery method
CN203322439U (en) Quick cutting-off control device of electrically operated valve

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170908

Termination date: 20211229