CN206477298U - A kind of construction site scaffold spray system - Google Patents

A kind of construction site scaffold spray system Download PDF

Info

Publication number
CN206477298U
CN206477298U CN201621490481.XU CN201621490481U CN206477298U CN 206477298 U CN206477298 U CN 206477298U CN 201621490481 U CN201621490481 U CN 201621490481U CN 206477298 U CN206477298 U CN 206477298U
Authority
CN
China
Prior art keywords
water
scaffold
shower
pump
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621490481.XU
Other languages
Chinese (zh)
Inventor
孙波
付祥礼
石金阳
翁栎超
叶身炉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Engineering Construction Management Co., Ltd.
Original Assignee
ZHEJIANG CONSTRUCTION SUPERVISION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG CONSTRUCTION SUPERVISION Co Ltd filed Critical ZHEJIANG CONSTRUCTION SUPERVISION Co Ltd
Priority to CN201621490481.XU priority Critical patent/CN206477298U/en
Application granted granted Critical
Publication of CN206477298U publication Critical patent/CN206477298U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Special Spraying Apparatus (AREA)
  • Nozzles (AREA)

Abstract

The utility model discloses a kind of construction site scaffold spray system, including spray assembly, conduit assembly and water pump component, spray assembly includes many horizontal showers and multiple atomizers for being placed on shower and being communicated with shower being placed on scaffold, conduit assembly includes vibration means for main pipe for supplying water and three-way connection, water pump component includes centrifugal multistage pump multiple centrifugal pump, main valve and filter, the utility model has higher use highly using scaffold, the characteristics of larger building encloses scope, atomizing sprinkling system is arranged on scaffold, reach the effect of the atomizing de-dusting dedusting of large area.

Description

A kind of construction site scaffold spray system
Technical field
The utility model is related to the dedusting depositing dust field in construction site, more particularly to a kind of using high-altitude spray drop The wide construction site scaffold spray system of dirt, dedusting scope.
Background technology
The continuous quickening built with urban modernization, inevitably occurs in that substantial amounts of construction site in city, Various construction sites cause the influence of very severe to surrounding environment, and what is stood in the breach is exactly dust pollution, and construction site is applied Substantial amounts of dust is produced during work, it flies upward everywhere if left, a thick layer dust will be coverd with to whole city;And And, among these dust, there are a large amount of harmful materials again, it will the health to city dweller is impacted, simultaneously Transport dust on the roads and material caused by the slag-soil truck of dregs and shed airborne dust, also can bring severe contamination to urban environment.
In order to avoid these problems, prior art is usually on the fixed buildings periphery or surrounding ground in construction site On be equiped with substantial amounts of water injector, using the water spray of water injector play depositing dust, dustproof function, but this mode Dedusting scope is smaller, and equipment investment is larger, moreover because moisture rapid evaporation needs regular water spray, increase use cost is opened Branch, while not evaporating or the water droplet or current that are atomized also form the secondary pollution of water.
Utility model content
The utility model mainly solves existing water spray cleaner and puts into that larger, dedusting scope is small, use cost big and easily Cause the technical problem of the secondary pollution of water;There is provided the wide construction site of a kind of use high-altitude atomizing de-dusting, dedusting scope Use scaffold spray system.
In order to solve above-mentioned technical problem, the utility model, which is mainly, uses following technical proposals:
A kind of construction site scaffold spray system of the present utility model, the system includes spray assembly, pipeline group Part and water pump component, the spray assembly include some horizontal showers for being placed in scaffold outside and be arrangeding in parallel and many The individual atomizer for being placed on the shower and being communicated with shower, the pipeline assembly includes and affixed vertical of scaffold Vibration means for main pipe for supplying water and multiple three-way connections being connected with vibration means for main pipe for supplying water, shower connect with the three-way connection respectively, the water pump Component includes centrifugal multistage pump multiple centrifugal pump and main valve, the bottom end that the delivery port of centrifugal multistage pump multiple centrifugal pump passes through the main valve and vibration means for main pipe for supplying water Mouthful connection, the water inlet of centrifugal multistage pump multiple centrifugal pump connects with external water source, using scaffold have it is higher using highly, larger build Build thing and enclose scope, atomizing sprinkling system is arranged on scaffold, current are sprayed to by the atomizer on multiple rows of shower, Reach the atomizing de-dusting dust removing effects for enclosing building of large area, and the use of centrifugal multistage pump multiple centrifugal pump, water can be sent to it is tens of very To up to a hundred meters of scaffold, the quantity that main valve can be according to the scaffold of actual use highly with shower, control valve Aperture, so as to adjust the Water usage of high-altitude atomizing de-dusting, reaches water-saving result, moreover, in summer in use, passing through scaffold The atomizing spray cooling of spray system, can form the refrigerant region of subrange around building, be conducive to construction site again The anti-administration cooling of site operation personnel, improves operating efficiency.
Preferably, bypass valve of the junction provided with control shower current of the shower and the vibration means for main pipe for supplying water Door, sets multiple rows of shower and current is controllable, the shower of different height is each responsible for the atomizing spray of different zones, configure It is flexibly and easy to control, meet the use requirement of the nebulization dust depositing dust in construction site.
Preferably, the shower nozzle be micro-atomizing drip-proof shower nozzle, drip-proof shower nozzle can centrifugal multistage pump multiple centrifugal pump stop or Hydraulic pressure closes shower nozzle water route immediately when declining, and prevents that atomizer from continuing to spray water or drop is drenched.
Preferably, the vibration means for main pipe for supplying water matches and is fixedly arranged on scaffold with the scaffold floor height including many Water supply pipeline section, the two ends of the water supply pipeline section are respectively equipped with flange, and many water supply pipeline sections are connected with each other by flange and form whole The vibration means for main pipe for supplying water of body, vibration means for main pipe for supplying water can extend with the rise of scaffold, and two end flanges then facilitate the connection of water supply pipeline section.
Preferably, the water pump component also includes manually-operated gate and filter, the manually-operated gate is located at the multistage The water side of centrifugal pump is simultaneously connected with the delivery port of centrifugal multistage pump multiple centrifugal pump, the filter be located at centrifugal multistage pump multiple centrifugal pump water inlet end and with The water inlet connection of centrifugal multistage pump multiple centrifugal pump, sets filter, it is ensured that enter the water of centrifugal multistage pump multiple centrifugal pump in centrifugal multistage pump multiple centrifugal pump influent side The cleaning in source, will not result in blockage to centrifugal multistage pump multiple centrifugal pump and respective line, shower nozzle, the service life of extension device.
The beneficial effects of the utility model are:Using scaffold have it is higher using height, it is larger enclose scope, will Atomizing sprinkling system is arranged on scaffold, and current are sprayed to by the atomizer on multiple rows of shower, reaches enclosing for large area The atomizing de-dusting dust removing effects of building are closed, the effusion of building airborne dust itself or the dust of building periphery construction site is prevented Influence, and on the use of centrifugal multistage pump multiple centrifugal pump, the scaffold that water can be sent to tens of or even up to a hundred meters, main valve can be according to reality The scaffold height and the quantity of shower used, controlling opening of valve, so as to adjust the Water usage of high-altitude atomizing de-dusting, reaches To water-saving result, moreover, in summer in use, by the atomizing spray cooling of scaffold spray system, building can be formed again The refrigerant region of surrounding subrange, is conducive to the anti-administration cooling of the site operation personnel in construction site, improves operating efficiency.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the present utility model.
1. spray assembly in figure, 11. spray pipelines, 12. atomizers, 13. branch road valves, 2. conduit assemblies, 21. supply water Supervisor, 22. three-way connections, 3. water pump components, 31. centrifugal multistage pump multiple centrifugal pumps, 32. main valves, 33. filters.
Embodiment
Below by embodiment, and with reference to accompanying drawing, the technical solution of the utility model is described in further detail.
Embodiment:A kind of construction site scaffold spray system of the present embodiment, as shown in figure 1, including spray assembly 1st, pipeline assembly 2 and water pump component 3, spray assembly include many and are fixedly arranged in the horizontal spray on the outside of scaffold and be arrangeding in parallel Pipe 11 and multiple micro-atomizing drip-proof shower nozzles 12 for being placed on shower and being communicated with shower, pipeline assembly include and pin hand The affixed vertical vibration means for main pipe for supplying water 21 of frame and multiple three-way connections 22 being connected with vibration means for main pipe for supplying water, vibration means for main pipe for supplying water include many and pin hand Rack-layer height matches and is fixedly arranged on the water supply pipeline section on scaffold, and the two ends of water supply pipeline section are respectively welded flange, many water supply Pipeline section is connected with each other by flange and forms overall vibration means for main pipe for supplying water, and three-way connection is located at the junction of water supply pipeline section, shower Connect respectively with corresponding three-way connection, be also equipped with controlling the branch road valve of shower current in the threeway junction of shower 13, water pump component includes centrifugal multistage pump multiple centrifugal pump 31, main valve 32 and filter 33, the delivery port of centrifugal multistage pump multiple centrifugal pump by main valve with The bottom port connection of vibration means for main pipe for supplying water, filter is located at the water inlet end of centrifugal multistage pump multiple centrifugal pump and connected with the water inlet of centrifugal multistage pump multiple centrifugal pump Connect, the water inlet of filter connects external water source.
During assembling, water supply pipeline section is separately fixed on the column of scaffold, will be supplied water according to the requirement of the number of plies of scaffold Pipeline section and three-way connection connect to form overall vibration means for main pipe for supplying water, the located level shape with multiple on the outside of the scaffold of equivalent layer The shower of atomizer, the direction of atomizer, in 45 °, certainly, difference can be also used as needed towards the oblique side in outside Spray angle, branch road valve is installed close to the end of vibration means for main pipe for supplying water in shower, and the three-way connection of vibration means for main pipe for supplying water is connected to On, finally centrifugal multistage pump multiple centrifugal pump, main valve and filter are sequentially ingressed into, the installation of whole scaffold spray system is completed.
In use, open main valve and branch road valve, start centrifugal multistage pump multiple centrifugal pump, force feed is extremely in the presence of centrifugal pump for current In shower on scaffold, and sprayed from atomizer, substantial amounts of water smoke is diffused around building, is served very well Dust-proof dust suppression effect, eliminate in building it is elegant go out airborne dust, and the atomizer of the oblique angle in high-altitude also to building Thing neighboring area forms water smoke band, reaches preferable depositing dust dust removing effects, main valve and branch road valve can also be used as water rate control Device, according to the scaffold of actual use height and the quantity of shower, controlling opening of valve, so as to adjust high-altitude atomizing de-dusting Water usage, reaches water-saving result, meanwhile, scaffold spray system is used in summer, can also be dropped as the heatstroke prevention in construction site The earth's surface and environment temperature of warm equipment, effectively reduction construction site.
In description of the present utility model, technical term " on ", " under ", "front", "rear", "left", "right", " vertical ", " horizontal stroke ", " interior ", " outer " etc. represent that direction or position relationship are to be based on direction shown in the drawings or position relationship, are for only for ease of description With understand the technical solution of the utility model, described above that not the utility model is limited, the utility model is also not only It is limited to the citing of described above, the change that those skilled in the art are made in essential scope of the present utility model Change, retrofit, increase or replace, be regarded as protection domain of the present utility model.

Claims (5)

1. a kind of construction site scaffold spray system, it is characterised in that:The system includes spray assembly (1), pipeline group Part (2) and water pump component (3), the spray assembly include some and are placed in the horizontal spray on the outside of scaffold and be arrangeding in parallel (11) and multiple atomizers (12) for being placed on the shower and being communicated with shower are managed, the pipeline assembly includes and pin The affixed vertical vibration means for main pipe for supplying water (21) of hand cradle and multiple three-way connections (22) being connected with vibration means for main pipe for supplying water, shower respectively with it is described Three-way connection connects, and the water pump component includes centrifugal multistage pump multiple centrifugal pump (31) and main valve (32), and the delivery port of centrifugal multistage pump multiple centrifugal pump leads to The bottom port for crossing the main valve and vibration means for main pipe for supplying water is connected, and the water inlet of centrifugal multistage pump multiple centrifugal pump connects with external water source.
2. a kind of construction site scaffold spray system according to claim 1, it is characterised in that:The shower (11) with branch road valve (13) of the junction provided with control shower current of the vibration means for main pipe for supplying water (21).
3. a kind of construction site scaffold spray system according to claim 1 or 2, it is characterised in that:The atomization Shower nozzle (12) is micro-atomizing drip-proof shower nozzle.
4. a kind of construction site scaffold spray system according to claim 1, it is characterised in that:The vibration means for main pipe for supplying water (21) including many water supply pipeline sections on scaffold that match and be fixedly arranged on the scaffold floor height, the two of the water supply pipeline section End is respectively equipped with flange, and many water supply pipeline sections are connected with each other by flange and form overall vibration means for main pipe for supplying water.
5. a kind of construction site scaffold spray system according to claim 1, it is characterised in that:The water pump component (3) also include filter (33), the filter be located at the centrifugal multistage pump multiple centrifugal pump water inlet end and with the water inlet of centrifugal multistage pump multiple centrifugal pump Mouth connection, the water inlet of filter connects external water source.
CN201621490481.XU 2016-12-30 2016-12-30 A kind of construction site scaffold spray system Active CN206477298U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621490481.XU CN206477298U (en) 2016-12-30 2016-12-30 A kind of construction site scaffold spray system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621490481.XU CN206477298U (en) 2016-12-30 2016-12-30 A kind of construction site scaffold spray system

Publications (1)

Publication Number Publication Date
CN206477298U true CN206477298U (en) 2017-09-08

Family

ID=59750966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621490481.XU Active CN206477298U (en) 2016-12-30 2016-12-30 A kind of construction site scaffold spray system

Country Status (1)

Country Link
CN (1) CN206477298U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107672565A (en) * 2017-10-24 2018-02-09 太仓麦迪斯自动化设备有限公司 A kind of water injection system for car washer
CN107757564A (en) * 2017-10-24 2018-03-06 太仓麦迪斯自动化设备有限公司 A kind of water-saving car washer
CN109224716A (en) * 2018-10-22 2019-01-18 方鲸联合科技(惠州)有限公司 A kind of construction bare area anti-fugitive dust intelligent spraying platform
CN109772069A (en) * 2019-01-31 2019-05-21 中国十七冶集团有限公司 A kind of fugitive dust monitoring and depositing dust linked system being attached to scaffold
CN111794167A (en) * 2020-07-22 2020-10-20 金琰 Based on construction is with spraying dust fall heat sink
CN111804108A (en) * 2020-07-23 2020-10-23 芜湖耀迪环保科技有限公司 Jellyfish-like air purification device and use method thereof
CN112007456A (en) * 2020-09-14 2020-12-01 合肥建设装饰(集团)有限责任公司 Building construction distributed dust settling device and application method thereof
CN112717596A (en) * 2020-12-02 2021-04-30 安徽物迅科技有限公司 Building spraying dust removal system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107672565A (en) * 2017-10-24 2018-02-09 太仓麦迪斯自动化设备有限公司 A kind of water injection system for car washer
CN107757564A (en) * 2017-10-24 2018-03-06 太仓麦迪斯自动化设备有限公司 A kind of water-saving car washer
CN109224716A (en) * 2018-10-22 2019-01-18 方鲸联合科技(惠州)有限公司 A kind of construction bare area anti-fugitive dust intelligent spraying platform
CN109772069A (en) * 2019-01-31 2019-05-21 中国十七冶集团有限公司 A kind of fugitive dust monitoring and depositing dust linked system being attached to scaffold
CN111794167A (en) * 2020-07-22 2020-10-20 金琰 Based on construction is with spraying dust fall heat sink
CN111804108A (en) * 2020-07-23 2020-10-23 芜湖耀迪环保科技有限公司 Jellyfish-like air purification device and use method thereof
CN112007456A (en) * 2020-09-14 2020-12-01 合肥建设装饰(集团)有限责任公司 Building construction distributed dust settling device and application method thereof
CN112717596A (en) * 2020-12-02 2021-04-30 安徽物迅科技有限公司 Building spraying dust removal system

Similar Documents

Publication Publication Date Title
CN206477298U (en) A kind of construction site scaffold spray system
CN207187387U (en) High-efficiency environment friendly fog gun machine is used in a kind of municipal administration
WO2018049588A1 (en) Arm type watering cart for gardens
CN108854343B (en) Dust device for civil construction
CN108049355A (en) A kind of environmental-protection sprinkler of automatic avoidance pedestrian
CN206005653U (en) A kind of pesticide in vegetable flusher
CN104399213A (en) High-pressure and fine-water-mist multifunctional vehicle
CN204364731U (en) A kind of heavy pressure fine spray MPV
CN210636362U (en) Road watering lorry
CN206380423U (en) A kind of block-resistant type is atomized drip irrigation tube emitter
CN106823623B (en) A kind of Biohazard Waste Disposal atomization dust-collecting equipment
CN205840512U (en) A kind of municipal gardens guard rail with insect killing device
CN109126330A (en) A kind of spray column with self-cleaning function
CN107386169A (en) A kind of more shower nozzle washers of high pressure
CN109045887A (en) A kind of exhaust-gas treatment spray equipment with sedimentation chamber
CN206473951U (en) A kind of construction site tower crane spray system
CN205019619U (en) Thin water smoke multi -function vehicle
CN207244516U (en) A kind of more nozzle washers of high pressure
CN205012268U (en) Washing and sweeping vehicle's rear portion watering device
CN206396596U (en) A kind of emulsified asphalt spraying machine
CN104056739A (en) High rod power-free rotary sprayer
CN209997386U (en) Stainless steel cyclone tower waste gas treatment equipment
CN211408920U (en) Broom with spraying function
CN208527464U (en) A kind of cleaning device of skid tooling
CN209572721U (en) A kind of indoor wall solid green plants water charging system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 310012 Xihu District Wen two road, Hangzhou, Zhejiang Province, No. 28

Patentee after: Zhejiang Engineering Construction Management Co., Ltd.

Address before: 310012 Xihu District Wen two road, Hangzhou, Zhejiang Province, No. 28

Patentee before: Zhejiang Construction Supervision Co., Ltd.

CP01 Change in the name or title of a patent holder