CN206471920U - A kind of intelligent power distribution monitoring system - Google Patents

A kind of intelligent power distribution monitoring system Download PDF

Info

Publication number
CN206471920U
CN206471920U CN201720162783.2U CN201720162783U CN206471920U CN 206471920 U CN206471920 U CN 206471920U CN 201720162783 U CN201720162783 U CN 201720162783U CN 206471920 U CN206471920 U CN 206471920U
Authority
CN
China
Prior art keywords
engineer
positioner
module
power distribution
switching equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720162783.2U
Other languages
Chinese (zh)
Inventor
孟庆
孟庆一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhong Hao Electric Power Engineering Co Ltd
Original Assignee
Jiangsu Zhong Hao Electric Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhong Hao Electric Power Engineering Co Ltd filed Critical Jiangsu Zhong Hao Electric Power Engineering Co Ltd
Priority to CN201720162783.2U priority Critical patent/CN206471920U/en
Application granted granted Critical
Publication of CN206471920U publication Critical patent/CN206471920U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Landscapes

  • Alarm Systems (AREA)

Abstract

The utility model discloses a kind of intelligent power distribution monitoring system, belong to distribution monitoring system field, it is intended to which the controller switching equipment that can notify and break down is relatively near and is not in the engineer of service mode and goes to maintenance controller switching equipment.Its drip irrigation device is:Including data acquisition device, positioner one, router, public data network, monitoring central server:With the router wired connection, and with common data networking wireless connection, for receiving the data that the data acquisition device of each controller switching equipment is gathered, analyzed and processed, and show the position of information, position and each positioner one of each power distribution cabinet on the electronic map by GIS software, and different identity informations are set to each positioner one respectively;Control centre, the refusal device for sending refusal signal, busy alarm set:It is used to inform dispatcher just busy.

Description

A kind of intelligent power distribution monitoring system
Technical field
The utility model is related to distribution monitoring system field, more particularly to a kind of intelligent power distribution monitoring system.
Background technology
Controller switching equipment is mainly used in distribution, needs in time to repair controller switching equipment when controller switching equipment breaks down, A kind of Publication No. CN103475098A intelligent power distribution monitoring system, including:Data acquisition device and Surveillance center's service Device;On data acquisition device, the controller switching equipment for being installed on each monitoring point, for carrying out state-detection to controller switching equipment, collection is matched somebody with somebody The information of electric equipment;Monitoring central server, for receiving the data that the data acquisition device of each monitoring point is gathered, is divided Analysis is handled, and shows by GIS software the information of each monitoring point on the electronic map.
Although above-mentioned this intelligent power distribution monitoring system can be monitored to the state of controller switching equipment, work as distribution , it is necessary to send engineer to go to maintenance controller switching equipment when equipment breaks down, but if engineer is apart from matching somebody with somebody for breaking down When electric equipment is distant, the time for going to controller switching equipment to repair can be longer, causes the power off time of user long, imitates work Rate is low, if the engineer being sent in addition is in service mode, the distribution needed repairing can not be gone to set immediately It is standby, need first to have repaired current controller switching equipment, the controller switching equipment nearby needed repairing is then gone to again, it is less efficient.
Utility model content
The purpose of this utility model is to provide a kind of intelligent power distribution monitoring system, its distribution that can notify and break down Equipment is relatively near and is not in the engineer of service mode and goes to maintenance controller switching equipment.
Above-mentioned technical purpose of the present utility model technical scheme is that:A kind of intelligent power distribution prison Examining system, including controller switching equipment, it is characterized in that:Also include:
Data acquisition device:It is installed on the controller switching equipment, for carrying out state-detection to controller switching equipment, gathers distribution The information of equipment;
Positioner one:On the mobile terminal for being installed on each engineer, the positioner one is called on mobile terminal GPS module, and the mobile terminal of engineer is positioned;
Router:The positioner one and router wireless connection, the positional information for receiving positioner one;
Public data network:It is used to transmit the data that data acquisition device is gathered;
Monitoring central server:With the router wired connection, and with common data networking wireless connection, for receiving The data that the data acquisition device of each controller switching equipment is gathered, are analyzed and processed, and by GIS software on the electronic map The position of information, position and each positioner one of each power distribution cabinet is shown, and each positioner one is set not respectively Same identity information;
Control centre:The distance between power distribution cabinet and positioner one for being broken down for comparing on electronic map, and Control engineer goes to the power distribution cabinet of failure to be repaired nearby;
Refuse device:The refusal device is installed on the mobile terminal of each engineer, when engineer's triggering refusal device When, the refusal device sends refusal signal;
Busy alarm set:It is arranged on control centre, and sends busy signal in response to refusal signal, informs scheduling people Member is just busy, and the control centre can dispatch other engineers nearby excluded outside this engineer again.
By such scheme, data acquisition device is used for the state for gathering controller switching equipment, and positioner one is used for engineering Shi Jinhang is positioned, and router is used to the positional information of positioner one be transferred to monitoring service center, and common data networking Status information and the location transmission of controller switching equipment for data acquisition device to be collected give monitoring service center, then The status information and positional information of each controller switching equipment are shown on the electronic map, if controller switching equipment state is abnormal, Can be shown on electronic map, due to each engineer mobile terminal also on the electronic map, while each engineer Mobile terminal is provided with different identity informations, and then the staff of control centre can be by observing on electronic map Each positioner one around the controller switching equipment of existing failure, i.e., each engineering being distributed around the controller switching equipment of failure Teacher, then can more intuitively observe each engineer from the controller switching equipment of failure with a distance from, and control engineer nearby The power distribution cabinet of failure is gone to be repaired, this makes it possible to allow arrival controller switching equipment of the engineer compared with speed to be repaired, Relative efficiency, but when engineer receives maintenance task, if other controller switching equipments Under Repair, refusal dress can be pressed Put, when engineer presses refusal device, the refusal device sends refusal signal, then refuses signal and is passed by router The busy alarm set of control centre is delivered to, busy alarm set sends busy signal in response to refusal signal, to inform scheduling The current scheduled engineer of personnel is in busy state, then other works again by the scheduling of observation electronic map nearby Cheng Shi, maintenance can not be gone in time by so avoiding engineer closer to the distance but Under Repair, and notify nearer second Individual engineer is gone to, and more timely controller switching equipment can be repaired.
Further, prompting module is included on the positioner one, the control centre includes:
Key-press module, its comprising some with the corresponding trigger button of positioner each described one, when by next triggering During button, the prompting on trigger signal corresponding with the triggering button, positioner one corresponding with this trigger button is sent Module sends alerting signal in response to trigger signal and reminds engineer to have maintenance task;
Voice call module, it is installed on the mobile terminal, and informs that engineer needs dimension in response to trigger signal The destination repaiied.
By such scheme, each different engineer of each trigger button correspondence, that is, when pressing trigger button, send with The corresponding trigger signal of trigger button, while the prompting module on corresponding mobile terminal can send prompting in response to trigger signal Signal, can trigger audio call module in addition, and dispatcher can inform that engineer needs to go to dimension by audio call module The position for the controller switching equipment repaiied.
Further, the prompting module includes:
Audible alarm module:It is arranged on engineer mobile terminal, when positioner two in response to trigger signal for the moment, Send sound prompting engineer.
By such scheme, using sound prompting engineer, engineer is reminded to have maintenance task, in case engineer does not wipe feel To there is maintenance task.
Further, the prompting module also includes:
Shake alarm module:It is arranged on engineer mobile terminal, when positioner two in response to trigger signal for the moment, Send vibration reminding engineer.
By such scheme, engineer is reminded simultaneously using sound and vibrations, largely engineer can be reminded to have Maintenance task, in case engineer does not wipe feel to there is maintenance task.
Further, the data acquisition device includes trip signal detection module, electric power detection module, A/D moduluss of conversion Block and microprocessor module, the positioner one, trip signal detection module, A/D modular converters and microprocessor module connect Connect, the electric power detection module is connected with A/D modular converters.
By such scheme, trip signal detection module is used to detect whether controller switching equipment trips, and electric power detection module is first The electric current and voltage of controller switching equipment are first detected, analog signal is then converted to microprocessor module by A/D modular converters Treatable electric signal, when controller switching equipment breaks down, microprocessor module can trigger positioner one and send trigger signal One.
Further, the mobile terminal is intelligent communication equipment.
By such scheme, on the one hand intelligent communication equipment can be communicated for engineer, be on the other hand easy to carry.
In summary, the utility model has the advantages that:
1st, by the way that the mobile terminal of engineer is simultaneously displayed on electronic map, controller switching equipment and shifting can be observed simultaneously The position of dynamic terminal, then just enters control engineer and goes to maintenance in time;
2nd, by the way that key-press module is mapped with the mobile terminal of different identity information, it is possible to use corresponding triggering is pressed Button reminds corresponding engineer;
3rd, by refusing the setting of device, it is that can select to press to receive prompting in maintenance process in engineer Refuse device, so that matching another nearer engineer goes to maintenance.
Brief description of the drawings
Fig. 1 is the structural representation that the present embodiment is used to embody data acquisition device;
Fig. 2 is the structural representation that the present embodiment is used to embody data acquisition device;
Fig. 3 is the structural representation that the present embodiment is used to embody data acquisition device;
Fig. 4 is the structural representation that the present embodiment is used to embody data acquisition device.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
A kind of intelligent power distribution monitoring system, as shown in Figures 1 to 4, includes controller switching equipment, and it is used for user's distribution, Also include data acquisition device, positioner one, router, public data network, monitoring central server, control centre, Refuse device and busy alarm set.
As shown in figure 1, data acquisition device is arranged on controller switching equipment, for carrying out state-detection to controller switching equipment, and Gather the information of controller switching equipment.
As shown in figure 1, data acquisition device includes trip signal detection module, electric power detection module, A/D modular converters And microprocessor module, trip signal detection module is for detecting whether controller switching equipment trips, and electric power detection module is used to detect The voltage and current of controller switching equipment, the analog signal that A/D modular converters are used to electric power detection module detect is converted into telecommunications Number, trip signal detection module and A/D modular converters are connected with microprocessor module, and then carry out state inspection to controller switching equipment Survey.
As shown in Fig. 2 positioner one is installed on the mobile terminal of each engineer, mobile terminal sets for intelligent communication It is standby, positioned for the mobile terminal to engineer, and positioner one calls the GPS module on mobile terminal, can be compared with It is convenient that more accurately mobile terminal is positioned.
As shown in Fig. 2 router and the wireless connection of positioner one, and with monitoring service center wired connection, for connecing The positional information of positioner one is received, and this positional information is transferred to monitoring central server.
As shown in Fig. 2 public data network is used to transmit the data that data acquisition device is gathered, and taken with Surveillance center The data collected, are transferred to monitoring central server by business device wireless connection.
As shown in Fig. 2 the number that monitoring central server is collected to the positional information of positioner one, data acquisition device According to this and the position of controller switching equipment is analyzed and processed, and by GIS software the letter of each controller switching equipment is shown on the electronic map The position of breath, position and each positioner one, the position of each controller switching equipment can be so shown simultaneously on the electronic map Put, the position of positioner one on the mobile terminal of status information and each engineer, while to each positioner one Position different identity informations are set, the different positioners one shown on electronic map can be distinguished, i.e., can be in electronics The position of different engineers is distinguished on map, consequently facilitating sending maintenance task to the engineer specified.
As shown in figure 3, control centre includes key-press module and audio call module.
Key-press module includes several trigger buttons, and each trigger button corresponds to an engineer respectively, tactile when pressing When sending out button, a trigger signal corresponding with this trigger button is sent, and trigger signal can be passed by data network of diplomatizing It is defeated to prompting module on corresponding positioner one, is included on positioner one, prompting module can be believed in response to this triggering Number and send alerting signal so that engineer has learnt maintenance task.
Audio call module, is scheduled for personnel to send audio call to the mobile terminal for receiving trigger signal, so that Inform that engineer needs to go to the position of the controller switching equipment of maintenance.
Prompting module, in response to trigger signal, sends alerting signal, for reminding engineer to have maintenance task, reminds mould Block includes audible alarm module and vibrations alarm module, and audible alarm module and vibrations alarm module are arranged at engineer's On mobile terminal, audible alarm module is used to send sound, and vibrations alarm module is used to send vibrations, passes through sound and vibrations Remind simultaneously, can largely allow engineer to know has maintenance task.
As shown in Fig. 2 refusal device is application specific integrated circuit, on the mobile terminal of each engineer, if work Cheng Shi is in busy state, can select triggering refusal device, to refuse the requirement for going to controller switching equipment, and sends refusal letter Number.
As shown in figure 3, busy alarm set can send busy signal in response to refusal signal, and busy alarm set is installed In control centre, the dispatcher of control centre can learn whether the engineer currently sent is according to busy signal Busy state.
Specific implementation is described as follows:When the status information of controller switching equipment shown on electronic map is abnormal, scheduling It is nearer from this controller switching equipment which engineer personnel observe from electronic map, then corresponds to this engineer and presses corresponding triggering Button, this trigger button can send a corresponding trigger signal, and this trigger signal is sent to movement by public data network In the prompting module of the positioner one of terminal, then corresponding prompting module begins to send out prompting letter in response to this trigger signal Number engineer is reminded to have maintenance task, while dispatcher can inform this engineer's repair location by audio call module, This engineer can be allowed to go to the place specified to repair controller switching equipment, because this engineer is in electronic map by dispatcher Upper to observe nearer engineer and select, then engineer can be more timely reached at controller switching equipment, and then is timely repaired Controller switching equipment, when this engineer is received in busy state, triggering refusal module sends refusal signal, and refusal signal passes through Router is delivered to the busy alarm set of control centre, and then busy alarm set sends busy letter in response to refusal signal Number, the dispatcher of control centre is received after busy signal, observe again on electronic map in addition to this engineer nearby Engineer, then finds corresponding trigger button, presses trigger button, notifies other nearer engineers, so avoids Engineer closer to the distance but Under Repair can not go to maintenance in time, and notify that second nearer engineer goes to, can More timely controller switching equipment is repaired.
Various illustrative logical blocks, module, circuit, element and/or the component described with reference to embodiments disclosed herein is equal Can be by general processor, digital signal processor (DSP), application specific integrated circuit (ASIC), field programmable gate array (FPGA) or other programmable logic components, discrete gate or transistor logic, discrete hardware components or it is designed to perform this paper Any combinations of described function are practiced or carried out.General processor can be microprocessor, but another selection is, the place It can be any conventional processor, controller, microcontroller or state machine to manage device.Processor can also be embodied as computation module Combination, such as DSP and microprocessor combination, the combination of multi-microprocessor, one or more microprocessors and DSP core The joint of the heart or any other this configuration.
With reference to embodiments disclosed herein describe method or algorithm can be directly contained in hardware, can be by computing device In the combination of software module or both.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but As long as all being protected in right of the present utility model by Patent Law.

Claims (6)

1. a kind of intelligent power distribution monitoring system, including controller switching equipment, it is characterized in that:Also include:
Data acquisition device:It is installed on the controller switching equipment, for carrying out state-detection to controller switching equipment, gathers controller switching equipment Information;
Positioner one:On the mobile terminal for being installed on each engineer, the positioner one calls the GPS moulds on mobile terminal Block, and the mobile terminal of engineer is positioned;
Router:The positioner one and router wireless connection, the positional information for receiving positioner one;
Public data network:It is used to transmit the data that data acquisition device is gathered;
Monitoring central server:With the router wired connection, and with common data networking wireless connection, for receiving each The data that the data acquisition device of controller switching equipment is gathered, are analyzed and processed, and are shown on the electronic map by GIS software The position of the information of each power distribution cabinet, position and each positioner one, and different is set to each positioner one respectively Identity information;
Control centre:The distance between power distribution cabinet and positioner one for being broken down for comparing on electronic map, and nearby Control engineer goes to the power distribution cabinet of failure to be repaired;
Refuse device:The refusal device is installed on the mobile terminal of each engineer, when engineer's triggering refusal device, institute State refusal device and send refusal signal;
Busy alarm set:It is arranged on control centre, and sends busy signal in response to refusal signal, informs dispatcher just Busy, the control centre can dispatch other engineers nearby excluded outside this engineer again.
2. a kind of intelligent power distribution monitoring system according to claim 1, it is characterized in that:Include on the positioner one There is prompting module, the control centre includes:
Key-press module, its comprising some with the corresponding trigger button of positioner each described one, when by next trigger button When, send the prompting module on trigger signal corresponding with the trigger button, positioner one corresponding with this trigger button Sending alerting signal in response to trigger signal reminds engineer to have maintenance task;
Audio call module, it is used to being scheduled for personnel informing the destination that engineer needs repairing.
3. a kind of intelligent power distribution monitoring system according to claim 2, it is characterized in that:The prompting module includes:
Audible alarm module:It is arranged on the mobile terminal of engineer, when positioner one is in response to trigger signal a period of time, sends Sound prompting engineer.
4. a kind of intelligent power distribution monitoring system according to claim 2, it is characterized in that:The prompting module also includes:
Shake alarm module:It is arranged on the mobile terminal of engineer, when positioner two is in response to trigger signal a period of time, sends Vibration reminding engineer.
5. a kind of intelligent power distribution monitoring system according to claim 1, it is characterized in that:The data acquisition device includes Trip signal detection module, electric power detection module, A/D modular converters and microprocessor module, the positioner one, tripping operation letter Number detection module, A/D modular converters and microprocessor module connection, the electric power detection module are connected with A/D modular converters.
6. a kind of intelligent power distribution monitoring system according to claim 1, it is characterized in that:The mobile terminal is logical for intelligence Interrogate equipment.
CN201720162783.2U 2017-02-22 2017-02-22 A kind of intelligent power distribution monitoring system Expired - Fee Related CN206471920U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720162783.2U CN206471920U (en) 2017-02-22 2017-02-22 A kind of intelligent power distribution monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720162783.2U CN206471920U (en) 2017-02-22 2017-02-22 A kind of intelligent power distribution monitoring system

Publications (1)

Publication Number Publication Date
CN206471920U true CN206471920U (en) 2017-09-05

Family

ID=59707500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720162783.2U Expired - Fee Related CN206471920U (en) 2017-02-22 2017-02-22 A kind of intelligent power distribution monitoring system

Country Status (1)

Country Link
CN (1) CN206471920U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108551396A (en) * 2018-03-26 2018-09-18 东莞市博通电气设备工程有限公司 Intelligent monitoring distribution shared system and method
CN109167437A (en) * 2018-09-28 2019-01-08 宁波盈泰电气有限公司 A kind of method and system based on power distribution cabinet intelligent power distribution management
CN112731026A (en) * 2020-12-21 2021-04-30 国网上海市电力公司 Based on transformer noise fault detection recognition device
CN112785746A (en) * 2020-12-24 2021-05-11 京东方科技集团股份有限公司 Intelligent inspection method, device, equipment and storage medium

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108551396A (en) * 2018-03-26 2018-09-18 东莞市博通电气设备工程有限公司 Intelligent monitoring distribution shared system and method
CN109167437A (en) * 2018-09-28 2019-01-08 宁波盈泰电气有限公司 A kind of method and system based on power distribution cabinet intelligent power distribution management
CN112731026A (en) * 2020-12-21 2021-04-30 国网上海市电力公司 Based on transformer noise fault detection recognition device
CN112785746A (en) * 2020-12-24 2021-05-11 京东方科技集团股份有限公司 Intelligent inspection method, device, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN206471920U (en) A kind of intelligent power distribution monitoring system
KR101271743B1 (en) Traffic convenience system for a person who is visually impaired
CN104370169A (en) Elevator Internet of Things bottom layer monitoring system and monitoring method
CN201126627Y (en) Area monitoring positioning system and handhold positioning apparatus
CN105314485A (en) Elevator fault monitoring system and method based on multimedia publishing system
CN108466889B (en) Elevator alarm rescue intelligent terminal system and method
CN103130095A (en) Elevator fault early warning method and relevant server
CN206471921U (en) A kind of intelligent power distribution monitoring system
CN104408897B (en) A kind of accurate mobile alarm positioner based on physical button
CN109693983A (en) Elevator faults processing method, device, server, storage medium and system
CN104244168A (en) Blind-person assisting system based on ANDROID system and wechat platform
CN202025410U (en) Mobile communication alarming terminal
CN202880605U (en) Internet of things elevator comprehensive monitoring system
CN206517158U (en) Intelligent power distribution monitoring system
CN104112377A (en) Train dispatching simulation training system and method
CN109451273A (en) A kind of commanding dispatching system and method
CN102340179A (en) Network-based multi-station monitoring integrated matrix display control system
CN105632116B (en) Automobile charging pile remote short messages alarm system
JP5881547B2 (en) Fire alarm system
CN103679989B (en) The anti-theft monitoring system of transformator
CN203491142U (en) Air switch trip-out monitoring system
CN201842227U (en) Connection method for ship engine room alarm device
CN206471919U (en) Intelligent power distribution monitoring system
CN210271195U (en) Circuit for operation monitoring equipment
CN210518369U (en) Small monitoring station alarm system and alarm device thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170905

Termination date: 20180222

CF01 Termination of patent right due to non-payment of annual fee