CN206467696U - A kind of anchor structure of red mud dump batholith slope seepage control layer - Google Patents

A kind of anchor structure of red mud dump batholith slope seepage control layer Download PDF

Info

Publication number
CN206467696U
CN206467696U CN201720101338.5U CN201720101338U CN206467696U CN 206467696 U CN206467696 U CN 206467696U CN 201720101338 U CN201720101338 U CN 201720101338U CN 206467696 U CN206467696 U CN 206467696U
Authority
CN
China
Prior art keywords
anchored
batholith
slope
red mud
control layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720101338.5U
Other languages
Chinese (zh)
Inventor
杨小全
罗先进
徐明明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN201720101338.5U priority Critical patent/CN206467696U/en
Application granted granted Critical
Publication of CN206467696U publication Critical patent/CN206467696U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses a kind of anchor structure of red mud dump batholith slope seepage control layer, including the anchored platform basal plane (1) that place Slope leveling goes out, anchored platform basal plane (1) corner is circular arc corner (2);Anchored platform basal plane (1) is provided with whitewashing (3), the levelling anchored platform surface (4) formed for laying impervious barrier in surface of whitewashing (3), impervious barrier (6) is laid on anchored platform surface (4), impervious barrier (6) is anchored in drilling (5) using band steel (7) and expansion bolt (8) with holes;Band steel (7) and appearing for expansion bolt (8) are wrapped up provided with concrete (9) above band steel (7) and expansion bolt (8).The utility model can effectively complete anchoring of the impervious barrier in rock slope, can reduce rock slope and be opened flat digging quantities, it is to avoid carry out the big anchoring groove of task difficulty in rock slope and excavate, reduce antiseepage damage layer and cause environment and healthy probability.

Description

A kind of anchor structure of red mud dump batholith slope seepage control layer
Technical field
The utility model belongs to technical field of civil engineering, and in particular to a kind of anchor of red mud dump batholith slope seepage control layer Fixing structure.
Background technology
Red mud belongs to II class Ordinary solid waste, and its pH value is more than 11.0.It is domestic at present mainly to be stored up using land.Due to Wastewater from red mud is in alkalescence, and the antiseepage for stockyard requires higher, and antiseepage film generally uses infiltration coefficient≤10-12cm/s, and heap Field forms overall antiseepage, it is impossible to has attached liquid seepage, causes some serious environmental pollutions and health hazard problem.
At present, domestic southern alumina producer gradually increases, and the red mud dump overwhelming majority is gully type stockyard, its both sides mountain Body side slope is generally rock foundation.Traditional anchorage style is anchoring groove, it is necessary first to flat with the mechanically formed anchoring with operating surface Platform, the cross dimensions minimum of next anchoring groove needs 0.8m*0.8m, and the berm width that traditional anchorage style needs is not less than 4m, Long in time limit and excavation and anchorage ditch difficulty is big on batholith face, investment is high.Impervious barrier at least needs three in rock bolting ditch simultaneously Place's bending, basement rock anchoring groove corner is very difficult to be processed into the turning of smooth smooth-going, wedge angle etc. easily occurs, so easily draw The destruction of impervious barrier is played, seepage is formed, causes environmental pollution, or even health hazard.
Utility model content
The technical problems to be solved in the utility model is that there is provided a kind of anchoring knot of red mud dump batholith slope seepage control layer Structure, can reduce rock slope and be opened flat digging quantities, it is to avoid carry out the big anchoring groove of task difficulty in rock slope and excavate, with Overcome that prior art is present quantities is big, task difficulty big, investment is high and easily causes antiseepage damage layer, cause environment dirt Dye, or even the deficiency such as health hazard.
The technical solution of the utility model is such:
A kind of anchor structure of red mud dump batholith slope seepage control layer, including the anchored platform base that place Slope leveling goes out Face, the anchored platform basal plane corner is circular arc corner;Anchored platform basal plane is provided with whitewashing, and the surface of whitewashing, which is provided with, to be used to lay The anchored platform surface of impervious barrier, lays impervious barrier on anchored platform surface, and impervious barrier uses band steel with holes and expansion Bolt is anchored in the borehole;Band steel and appearing for expansion bolt are wrapped provided with concrete above band steel and expansion bolt Wrap up in.
Wherein, anchored platform base width is not less than 3m.The arc radius of circular arc corner is 0.3m.Drilling is flat along anchoring Platform surface 2~3m of interval sets one.Band steel model specification with holes is 8*100mm, and length is 1.0m;Expansion bolt specification is M16*185mm.Concrete material is C15 or C20, and physical dimension is 1.6m*0.6m*0.2m.
The construction method of this red mud dump batholith slope seepage control layer anchor structure is constructed according to the following steps:
Firstth, anchored platform of being cleared in rock slope basal plane;
Secondth, the corner of anchored platform basal plane sets circular arc corner;
3rd, it is levelling using whitewashing in anchored platform basal plane, form the anchored platform surface for meeting laying impervious barrier;
4th, drilled on anchored platform basal plane;
5th, impervious barrier is laid on anchored platform surface, and impervious barrier, size and bore size are cut in the position of drilling Unanimously;
6th, band steel with holes is placed on impervious barrier;
7th, after band steel is placed, fixed in time using expansion bolt;
8th, band steel and expansion bolt are appeared using concrete and wrapped up, form complete and firm impervious barrier anchor Gu.
Levelling gunite material is M7.5 cement mortar in third step.
The anchor structure of red mud dump batholith slope seepage control layer of the present utility model, is usually to form certain elevation in stockyard Anchored platform basal plane, the levelling basal plane formation of whitewashing meet the platform surface of laying impervious barrier;In the drilling of embedded expansion bolt position; Lay impervious barrier;Impervious barrier is cut in bore position;Place band steel;Construction expansion bolt, is poured on band steel and expansion bolt Concrete is built, effective, firm impervious barrier anchorage style is formed.
The structure is used for the impervious barrier anchor situation of red mud dump rock slope.Storage yard slope interval 10~20m elevations are set Anchored platform is put, the anchorage style for setting band steel and expansion bolt to be combined on platform.
The utility model can effectively complete anchoring of the impervious barrier in rock slope, can reduce rock slope and be opened flat Dig quantities, it is to avoid carry out the big anchoring groove of task difficulty in rock slope and excavate, reduce antiseepage damage layer and cause environment and Healthy probability.Connected mode of the present utility model, it is both easy to operate and economical and practical.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is Fig. 1 top view;
Mark in accompanying drawing for:1- anchored platforms basal plane, 2- circular arcs corner, 3- whitewashings, 4- anchored platforms surface, 5- are bored Hole, 6- impervious barriers, 7- band steels, 8- expansion bolts, 9- concrete, 10- rock slopes.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples.
Embodiment of the present utility model:As illustrated in fig. 1 and 2, red mud dump batholith slope seepage control of the present utility model layer Anchor structure is:Place Slope leveling goes out anchored platform basal plane 1, and the corner of anchored platform basal plane 1 need to be circular arc corner 2, and anchoring is flat The anchored platform surface 4 that stylobate face 1 can be used for laying impervious barrier using the levelling formation of whitewashing 3, the drilling 5 in setting position, Impervious barrier 6 is laid on anchored platform surface 4, impervious barrier 6 is anchored using band steel 7 and expansion bolt 8, then is poured thereon Concrete 9 is appeared and wrapped up to band steel 7 and expansion bolt 8, forms complete and firm impervious barrier anchorage style.
The construction method of red mud dump batholith slope seepage control layer anchor structure of the present utility model, constructs according to the following steps:
Firstth, clear anchored platform basal plane 1 side slope field;
Secondth, the corner of anchored platform basal plane 1 sets circular arc corner 2;
3rd, it is levelling using whitewashing 3 on anchored platform basal plane 1, form the anchored platform table for meeting laying impervious barrier Face 4;
4th, in setting position drilling 5;
5th, impervious barrier 6 is laid on anchored platform surface 4, and impervious barrier, size and bore size are cut in bore position Unanimously;
6th, band steel 7 with holes is placed on impervious barrier 6;
7th, after band steel 7 is placed, fixed in time using expansion bolt 8;
8th, band steel 7 and expansion bolt 8 are appeared and wrapped up using concrete 9, form complete and firm impervious barrier Anchoring.
It is preferred embodiment as follows:
The width of anchored platform basal plane 1 is not less than 3m.
The corner of anchored platform basal plane sets circular arc corner 2, and its arc radius is 0.3m.
The anchor point is spaced 2~3m along anchored platform surface 4 and set.
3 materials of levelling whitewashing are M7.5 cement mortar.
The model band steel 8*100mm of band steel 7, length is 1.0m.
The specification of expansion bolt 8 is M16*185mm.
The material of concrete 9 is C15 or C20, and physical dimension is 1.6m*0.6m*0.2m.
Certainly, it is above concrete application example of the present utility model, the utility model also has other embodiments, all Using equivalent substitution or the technical scheme of equivalent transformation formation, all fall within the protection domain required by the utility model.

Claims (6)

1. a kind of anchor structure of red mud dump batholith slope seepage control layer, it is characterised in that:The anchor gone out including place Slope leveling Gu platform basal plane (1), anchored platform basal plane (1) corner is circular arc corner (2);Anchored platform basal plane (1) is provided with whitewashing (3), whitewash (3) the levelling anchored platform surface (4) formed for laying impervious barrier in surface, anchored platform surface (4) it Upper berth is set up defences infiltration layer (6), and impervious barrier (6) is anchored in drilling (5) using band steel (7) and expansion bolt (8) with holes;In band steel (7) and above expansion bolt (8) band steel (7) and appearing for expansion bolt (8) are wrapped up provided with concrete (9).
2. the anchor structure of red mud dump batholith slope seepage control layer according to claim 1, it is characterised in that:The anchoring Platform basal plane (1) width is not less than 3m.
3. the anchor structure of red mud dump batholith slope seepage control layer according to claim 1, it is characterised in that:The circular arc The arc radius of corner (2) is 0.3m.
4. the anchor structure of red mud dump batholith slope seepage control layer according to claim 1, it is characterised in that:The drilling (5) it is spaced 2~3m along anchored platform surface (4) and sets one.
5. the anchor structure of red mud dump batholith slope seepage control layer according to claim 1, it is characterised in that:It is described with holes Band steel (7) model specification be 8*100mm, length is 1.0m;Expansion bolt (8) specification is M16*185mm.
6. the anchor structure of red mud dump batholith slope seepage control layer according to claim 1, it is characterised in that:The coagulation Native (9) material is C15 or C20, and physical dimension is 1.6m*0.6m*0.2m.
CN201720101338.5U 2017-01-24 2017-01-24 A kind of anchor structure of red mud dump batholith slope seepage control layer Active CN206467696U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720101338.5U CN206467696U (en) 2017-01-24 2017-01-24 A kind of anchor structure of red mud dump batholith slope seepage control layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720101338.5U CN206467696U (en) 2017-01-24 2017-01-24 A kind of anchor structure of red mud dump batholith slope seepage control layer

Publications (1)

Publication Number Publication Date
CN206467696U true CN206467696U (en) 2017-09-05

Family

ID=59704102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720101338.5U Active CN206467696U (en) 2017-01-24 2017-01-24 A kind of anchor structure of red mud dump batholith slope seepage control layer

Country Status (1)

Country Link
CN (1) CN206467696U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638713A (en) * 2017-01-24 2017-05-10 贵阳铝镁设计研究院有限公司 Anchoring structure and construction method of red mud stockyard rock slope impermeable layer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638713A (en) * 2017-01-24 2017-05-10 贵阳铝镁设计研究院有限公司 Anchoring structure and construction method of red mud stockyard rock slope impermeable layer

Similar Documents

Publication Publication Date Title
CN107503257B (en) One kind being close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN204419195U (en) A kind of supporting and protection structure pattern being applicable to tunnel portal section
CN106498953A (en) Cut slope composite supporting construction and its construction method
CN102002956B (en) Multi-level fully-closed reinforcement technology of exposed fault zone of excavated side slope
US11674393B2 (en) Method for constructing dam inside dump of inner-dump strip mine
CN110004991B (en) Underground structure anti-floating system based on convex wing foot plate and construction method
CN104131575A (en) Plugging and drainage method for dam foundation on karst highly developed stratum
CN111851597B (en) Penetration protection structure of pipe jacking close-distance downward-penetrating pipe gallery and construction method
CN105714772A (en) Re-drilling concrete wall protecting method for hole formation of rock-socketed pile in karst region
CN112323560B (en) Roadbed construction settlement control system in complex soft foundation environment
CN104631440A (en) Stiffening core lengthening foundation pit support structure for existing large-diameter bored concrete pile and construction method
CN207362838U (en) A kind of tool-type soft soil foundation irrigates pile wall
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN206467696U (en) A kind of anchor structure of red mud dump batholith slope seepage control layer
CN203654301U (en) Expanding soil slope protection system
CN208455647U (en) Soft Rock Slope ecological safeguard structure
CN111424685A (en) Deep water falling hole processing structure and method for backfilling foundation in large karst depression
CN206245321U (en) Cut slope composite supporting construction
CN206768832U (en) Support, anchor cable post-tensioning H type component building enclosures before a kind of steel pipe
CN105484270A (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN102031788B (en) Deep well precipitation waterproof construction method of waterproof design-free basement
CN210122735U (en) Underground structure anti-floating system based on outward-protruding wing foot plate
CN212316951U (en) Roadbed structure for side slope
CN106638713A (en) Anchoring structure and construction method of red mud stockyard rock slope impermeable layer
CN111851185A (en) Self-compacting cement soil widening roadbed and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant