Prior art keywords
control cabinet
overhang
building roof
erecting
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720127973.0U
Other languages
Chinese (zh)
Inventor
高建文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720127973.0U priority Critical patent/CN206466914U/en
Application granted granted Critical
Publication of CN206466914U publication Critical patent/CN206466914U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of modular erecting by overhang applied to building roof ground, including being mutually juxtaposed module into a load-carrying case by multiple control cabinets, the side headwall of the multiple control cabinet respectively stand upright by the arm of module one, the inverted L-shaped body that biaxially can be stretched and retract all is respectively prepared in the multiple arm, a wire-wound rotary disc is each configured with wherein the multiple control cabinet, and respectively the wire-wound rotary disc ties attached pipeline and can extend to and be lifted outside the side parapet of building roof via the guiding of the fixed arm of the respectively control cabinet, the modular exhibition of improvement tradition hanging apparatus shortcoming is used to receive and handling function, or even between unfavorable vehicle-mounted carrying and ladder the problem of carry.

Description

Modular erecting by overhang applied to building roof ground
Technical field
The utility model is related to the hanging apparatus installed in buildings in general roof, particularly relevant a kind of applied to building The modular erecting by overhang on thing roof ground.
Background technology
The upkeep operations such as cleaning, the repairerment of current skin, the hanging dress installed mostly using building roof Put, maintenance platform is suspended in midair with hawser or washes wall telephone etc. and is vertically moved up or down between the exterior wall of each floor.Wherein, maintenance platform is available for washing wall Workman or maintenance personal stand, in order to the work of cleaning or the repairerment of implementing exterior wall;And wash that wall telephone can then set up by it from Dynamic brush wheel carries out rolling to metope and washes operation.In addition, in another example between each floor of building, also using the above-mentioned roof that is installed on Erecting by overhang hangs down drop hawser to ground, weight is then hung to the fenestra of required floor, with the carrying of sharp weight.
In addition, based on the consideration on antitheft save from damage, buildings in general attic ground is not all fixedly mounted as far as possible above-mentioned to be had The erecting by overhang of hoist cable, but before demand External Wall is cleaned or repaired, just fill the hanging with hoist cable Put and be carried to the roof of building and installed;When installing, the parapet that can be typically extended by roof ground is propped up, And can be moved horizontally on roof ground, wall telephone or other weights (such as maintenance platform, are washed by hanging object in favor of converting Deng) in the horizontal level of exterior wall, therefore erecting by overhang is typically all made can elapse pattern;But, to have seen disclosed hang at present For hang device technology, though it can be elapsed, it is unfavorable for exhibition and receives installation, or even be included in vehicle-mounted carrying, and utilizes It is all by every means hard during limited lift space carrying to the roof of building, and have obstacles and be difficult to walk.
Existing erecting by overhang, has such as TaiWan, China patent announcement M444373 cases and M507929 cases, takes off respectively Expose the hanging structure that L-type support body is presented, and be all that the support that stands is set on a packaged type microscope carrier on outline, and hung down by this The horizontal stand group structure that extending/drawing back type length is set up on staking is formed.The L-type support body of these hanging structures, which belongs to, utilizes screw etc. The pattern of locking, volume is big, and complicated, is unfavorable for module and installs and dismantle;The particularly vertical support frame, horizontal stand The effect of extending/drawing back type, is only limitted to control hawser, the distance outside water pipe and electric wire stent to parapet, for reduction hanging structure in Volume when being carried between above-mentioned vehicle-mounted carrying and ladder, has no and benefits, therefore is less useful for carrying.
The content of the invention
In view of this, the purpose of this utility model, it is intended to improve traditional erecting by overhang or the modular exhibition of structure shortcoming is received And load and unload the problem of being carried between function, or even unfavorable vehicle-mounted carrying and ladder.
To achieve these goals and problem is solved, the utility model especially employs modular load-carrying case and combines exhibition The intention of contracting formula arm, to improve the problem of erecting by overhang is unfavorable for carrying between vehicle-mounted carrying and ladder.
Therefore, a preferred embodiment of the present utility model, provides a kind of modular applied to building roof ground Erecting by overhang, its technical characteristic includes:One arm, in the inverted L-shaped body that biaxially can be stretched and retract;One load-carrying case, by multiple It is each independent and can move and be placed in the control cabinet on roof ground and be mutually juxtaposed module and form, and the side of the multiple control cabinet Headwall respectively stand upright by arm described in module;Wherein, a wire-wound rotary disc, and the respectively coiling are each configured with the multiple control cabinet Rotating disk, which ties attached pipeline, to extend to the one of building roof via the respectively guiding for the arm that the control cabinet institute module is fixed Risen outside the parapet of side
Drop.Wherein, the wire-wound rotary disc can be the hoist engine for attaching power.
On further implement, the branched arm is formed by a vertical frame and a horizontal mutual integrally connected of frame respectively, respectively should Via vertical frame, module is fixed on the headwall of the respectively control cabinet to arm, and the vertical frame and horizontal frame are long by more piece adjustable telescopic respectively The hack lever composition of degree.Wherein:
The stop part that an at least horizontal retractable is configured with the vertical frame contacts the metope of parapet.The vertical frame, horizontal stroke The free pulley that multiple guiding wire-wound rotary discs tie attached pipeline is configured with frame.The multiple control cabinet is controlled comprising a cable Case, a water pipe control cabinet and an electric wire control cabinet.
Further also include:Horizontal frame one end of above-mentioned cable control cabinet extends to form hanging down away from cable control cabinet Support, the nearly bottom for hanging down support is also pivoted a horizontal direction roller, and the wire-wound rotary disc in the cable control cabinet ties attached cable Line outside parapet sequentially via the guiding of the free pulley and roller in being lifted.Wherein, hang down support and the vertical frame phase It is mutually parallel.
In another implementation, the two sided of the multiple control cabinet is respectively equipped with a buckle ear and a clasp, the multiple control Case buckles group and is mutually juxtaposed module into the load-carrying case via the mutual of buckle ear and clasp.In addition, the side of the control cabinet is provided with One hangers for hanging attached balancing weight.
It is of the present utility model to have technical effect that according to above-mentioned implementation content:The load-carrying case of erecting by overhang is by multiple interior The control tank module for carrying wire-wound rotary disc is formed, with the convenience carried beneficial to rapid disassembling and module is installed, and each is controlled The telescopic type arm of institute's module on case, in addition to stent and the function folded, also beneficial to reducing each attached arm that hangs with The volume of control cabinet, therefore especially it is appropriate to carrying and vehicle-mounted carrying between ladder.
The feature and technique effect of disclosed each embodiment, will be presented in the description and diagram of lower section herein.
Brief description of the drawings
Fig. 1 is the attached stereoscopic configurations schematic diagram for hanging arm of the utility model control cabinet;
Fig. 2 is stereoscopic configurations schematic diagram of the utility model by multiple attached control tank modules for hanging arm;
Fig. 3 is Fig. 2 side schematic view;
Fig. 4 is the schematic perspective view of the additional embodiment of arm in Fig. 2;
Fig. 5 is Fig. 4 side view key diagram.
Description of reference numerals:10- control cabinets;10a- cable control cabinets;10b- water pipe control cabinets;10c- electric wire control cabinets; 11- castors;12- wire-wound rotary discs;13- pipelines;13a- cables;13b- water pipes;13c- electric wires;The free pulleys of 14-;14a- pairs are sliding Wheel;15a- buckle ears;15b- clasps;16- hangers;20- arms;21- hangs down frame;21a, 21b- hack lever;The horizontal frames of 22-;22a, 22b- frame Bar;23- hangs down support;24- rollers;30- load-carrying casees;40- roofs ground;41- parapets;42- stop parts;50- balancing weights;W- weights Thing;H1, h2- distance.
Embodiment
First, please refer to Fig. 1 to Fig. 3, disclose a kind of telescopic type erecting by overhang provided by the utility model compared with Good embodiment.Wherein, Fig. 1 exposes the control cabinet 10 that the erecting by overhang includes a presentation hollow, rectangular, and control cabinet 10 side headwall upper module has an arm 20 in shape of standing upright.Fig. 2 exposes the phase of control cabinet 10 for having arm 20 by multiple modules Form of the mutual dependent module into a load-carrying case 30.Fig. 3 discloses the arm 20 and possesses the function for biaxially stretching and retracting, and in exhibition It can stretch and be visited to the outer hanging operation for carrying out weight W of parapet 41 when stretching.
It can see that it is that the inverted L-shaped body in that biaxially can stretch and retract is made to know the arm 20 by Fig. 1 and Fig. 3;In more detail Say, the arm 20 be by one hang down the mutual integrally connected of the horizontal frame 22 of frame 21 and one form, make this hang down frame 21 be integrally attached to respectively should The headwall of control cabinet 10, and the vertical frame 21 and horizontal frame 22 can respectively by the hack lever 21a of more piece adjustable telescopic length, 21b, 22a, 22b group set are formed;Wherein, the keyhole 21c that can be aligned, and the frame of horizontal frame 22 are provided between hack lever 21a, 21b of vertical frame 21 The keyhole 22c that can be aligned also is provided between bar 22a, 22b, the grade keyhole 21c, 22c are to be conducive to hack lever 21a, 21b and hack lever Adjust between 22a, 22b after stent to bit length, and the length needed for adjust is worn after in set keyhole 21c, 22c Set spigot is positioned so that the vertical frame 21 and horizontal frame 22 possess can stent and retraction function.
Fig. 1, which is also shown, knows the bottom of control cabinet 10 all provided with multiple castors 11, enables the control cabinet 10 is free to exist Between the ladder of building or roof ground 40 is moved, and a wire-wound rotary disc 12, the wire-wound rotary disc are all placed with the control cabinet 10 12 bundles have pipeline 13.It can be cable 13a, water further to disclose the grade wire-wound rotary disc 12 in fig. 2 and tie attached pipeline 13 Pipe 13b or electric wire 13c, the pipeline 13 all can control the quantity under its loading via the winding of wire-wound rotary disc 12;Wherein, Wire-wound rotary disc 12 in the multiple control cabinet 10 can all or selection one implementation into being the elevator that attaches motor power Machine, or be implemented as interior being loaded with spring or damper to control the wire-wound rotary disc of quantity.Can also further it see in Fig. 2 Know the pipeline 13 and can be hung down via the guiding of arm 20 and is down to outside the parapet 41 on building roof ground 40, and via around Line rotating disk 12 controls lifting length of the pipeline 13 under loading.Trickleer says, constitutes the vertical frame 21 and horizontal stroke of the arm 20 The free pulley 14 that multiple guiding wire-wound rotary discs tie attached pipeline 13 is configured between frame 22;The pipeline 13 is via arm 20 The parapet 41 that building roof ground 40 is down in the guiding of upper free pulley 14 and hanging down is outer (as shown in Figure 3 or Figure 4).
In above-mentioned implementation, when the object to be hung of erecting by overhang is washes wall telephone automatically, as shown in Fig. 2 described many Individual control cabinet 10 includes a cable control cabinet 10a, a water pipe control cabinet 10b and an electric wire control cabinet 10c;Wherein, the cable Wire-wound rotary disc 12 in control cabinet 10a ties attached pipeline for cable 13a, and the wire-wound rotary disc 12 in water pipe control cabinet 10b is tied Attached pipeline is that to tie attached pipeline be electric wire 13c for wire-wound rotary disc 12 in water pipe 13b, and electric wire control cabinet 10c.
In addition, the 10a of cable control cabinet shown in Fig. 2, water pipe control cabinet 10b and electric wire control cabinet 10c spell composition load-carrying case 30 modular manner, in can relying on as shown in Figure 1, a buckle ear 15a and one are respectively equipped with the two sided of each control cabinet 10 Clasp 15b, makes between cable control cabinet 10a, water pipe control cabinet 10b and electric wire control cabinet 10c via buckle ear 15a and clasp 15b Mutual button group and be mutually juxtaposed module into the load-carrying case 30.Due to, hanging need to be dependent on when washing wall telephone in cable control cabinet 10a around Line rotating disk 12 ties attached cable 13a to be hung, therefore the wall telephone loading of washing that cable 13a must endure as is much larger than water pipe 13b and electric wire 13c, based on the stability after the load-carrying of load-carrying case 30 and the demand of average load is maintained, makes in spelling group load-carrying case 30 When, cable control cabinet 10a is preferably to be listed between water pipe control cabinet 10b and electric wire control cabinet 10c.
In addition, when when the spelling group of building roof ground 40 completes load-carrying case 30 (such as Fig. 2), the load-carrying case 30 is to be adjacent to Parapet 41 so that each vertical frame 21 parallel can recline or as far as possible parallel be close to parapet 41;Due to standing in the daughter of earth's surface The surface profile of wall 41 is simultaneously nonspecific, therefore, in an additional implementation, can configure an at least horizontal extension on the vertical frame 21 The stop part 42 of formula, the stop part 42 can be combined with rubber blanket by the end of a shank of bolt and be made, and make the stop part 42 via spiral shell Tightening latch rotation locks on vertical frame 21 adjustment proper level length, and make stop part 42 rubber blanket energy conflicting contact parapet 41 it is interior Side wall (such as Fig. 3), so that erecting by overhang can possess good support strength in the operating process that loading is hung.
Furthermore, the side of described any or whole control cabinets 10 is known as seen from Figure 2 can be used to hang attached balancing weight 50 provided with one Hangers 16, shown in Fig. 2 implement in, citing cable control cabinet 10a side is disclosed in set hangers 16 attached to hang Balancing weight 50, the balancing weight 50 can be weights, sand hill or water tank etc..
Continuous to refer to Fig. 4 and Fig. 5, disclosing the outermost end extension of cable control cabinet 10a horizontal frame 22, to be formed with one remote Cable control cabinet 10a vertical support 23 so that the support 23 that hangs down also is relatively distant from the outside metope of parapet 41, the support 23 that hangs down And be parallel to each other with vertical frame 21;In addition, the nearly bottom for hanging down support 23 is pivoted with a horizontal direction roller 24, in order to cable control Wire-wound rotary disc 12 in case 10a processed tie attached cable 13a sequentially via the free pulley 14 on vertical frame 21, horizontal frame 22 and hang down The guiding of roller 24 on support 23, and lifted in outside parapet 41.Further, referring to Fig. 5, illustrating the rolling Cylinder 24 has the cable 13a of correcting vertical lift effect, to avoid cable 13a from being shaken towards parapet 41 (or building exposed wall) direction Put or rock.
To sum up institute is old, should be it can be appreciated that because the multiple interior be loaded with can phase between the control cabinet 10 of wire-wound rotary disc The load-carrying case 30 that mutually module of button group formula is integrally changed side by side, and the upper module of each control cabinet 10 arm 20 also allow for stretching and Fold, therefore when the building attic that move erecting by overhang of the present utility model and cleaned or repaired to demand, especially It is that erecting by overhang of the present utility model provides extremely convenient rapid disassembling machine when being carried between vehicle-mounted carrying and grand stairs Can, therefore in the utility model art, prior art should be made contributions.
It is described above to be merely exemplary for the utility model, and nonrestrictive, those of ordinary skill in the art Understand, in the case where not departing from the spirit and scope that claims appended below is limited, many modifications can be made, change, Or it is equivalent, but fall within protection domain of the present utility model.

Claims (10)

1. a kind of modular erecting by overhang applied to building roof ground, it is characterised in that including:
One arm, in the inverted L-shaped body that biaxially can be stretched and retract;
One load-carrying case, by multiple respective independent and can move and be placed in the control cabinet on roof ground and be mutually juxtaposed module and form, and The side headwall of the multiple control cabinet respectively stand upright by arm described in module;
Wherein, be each configured with a wire-wound rotary disc in the multiple control cabinet, and respectively the wire-wound rotary disc tie attached pipeline can be through Extended to and lifted outside the side parapet of building roof by the respectively guiding for the arm that the control cabinet institute module is fixed.
2. the modular erecting by overhang on building roof ground is applied to as claimed in claim 1, it is characterised in that branched described Arm is formed by a vertical frame and a horizontal mutual integrally connected of frame respectively, and respectively via vertical frame, module is fixed on the respectively control to the arm The headwall of case, and the vertical frame and horizontal frame be made up of the hack lever of more piece adjustable telescopic length respectively.
3. the modular erecting by overhang on building roof ground is applied to as claimed in claim 2, it is characterised in that the vertical frame On be configured with an at least horizontal retractable stop part contact parapet metope.
4. the modular erecting by overhang on building roof ground is applied to as claimed in claim 2, it is characterised in that described to hang down The free pulley that multiple guiding wire-wound rotary discs tie attached pipeline is configured with frame, horizontal frame.
5. the modular erecting by overhang on building roof ground is applied to as claimed in claim 2, it is characterised in that the multiple Control cabinet includes a cable control cabinet, a water pipe control cabinet and an electric wire control cabinet.
6. the modular erecting by overhang on building roof ground is applied to as claimed in claim 4, it is characterised in that the cable control Horizontal frame one end of case processed extends to form a vertical support away from cable control cabinet, this hang down support nearly bottom be also pivoted a level to Roller, the wire-wound rotary disc in the cable control cabinet ties attached cable sequentially via the guiding of the free pulley and roller In being lifted outside parapet.
7. the modular erecting by overhang on building roof ground is applied to as claimed in claim 6, it is characterised in that the support that hangs down It is parallel to each other with vertical frame.
8. the modular erecting by overhang on building roof ground is applied to as claimed in claim 1, it is characterised in that the multiple The two sided of control cabinet is respectively equipped with a buckle ear and a clasp, the multiple control cabinet via buckle ear and clasp it is mutual buckle group and Module is mutually juxtaposed into the load-carrying case.
9. the modular erecting by overhang on building roof ground is applied to as claimed in claim 1, it is characterised in that the control The side of case is provided with a hangers for hanging attached balancing weight.
10. the modular erecting by overhang on building roof ground is applied to as claimed in claim 1, it is characterised in that the coiling Rotating disk is the hoist engine for attaching power.
CN201720127973.0U 2017-02-13 2017-02-13 Modular erecting by overhang applied to building roof ground Active CN206466914U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720127973.0U CN206466914U (en) 2017-02-13 2017-02-13 Modular erecting by overhang applied to building roof ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720127973.0U CN206466914U (en) 2017-02-13 2017-02-13 Modular erecting by overhang applied to building roof ground

Publications (1)

Publication Number Publication Date
CN206466914U true CN206466914U (en) 2017-09-05

Family

ID=59707280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720127973.0U Active CN206466914U (en) 2017-02-13 2017-02-13 Modular erecting by overhang applied to building roof ground

Country Status (1)

Country Link
CN (1) CN206466914U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018145226A1 (en) * 2017-02-13 2018-08-16 高建文 Modular suspension apparatus applied to ground of building roof
CN108423568A (en) * 2017-02-13 2018-08-21 高建文 Modular erecting by overhang applied to building roof ground
CN110143495A (en) * 2019-05-21 2019-08-20 广东精达里亚特种漆包线有限公司 A kind of movable type copper wire erecting by overhang
CN111675114A (en) * 2020-06-26 2020-09-18 徐苏清 High-rise hoisting device for building construction

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018145226A1 (en) * 2017-02-13 2018-08-16 高建文 Modular suspension apparatus applied to ground of building roof
CN108423568A (en) * 2017-02-13 2018-08-21 高建文 Modular erecting by overhang applied to building roof ground
CN110143495A (en) * 2019-05-21 2019-08-20 广东精达里亚特种漆包线有限公司 A kind of movable type copper wire erecting by overhang
CN111675114A (en) * 2020-06-26 2020-09-18 徐苏清 High-rise hoisting device for building construction
CN111675114B (en) * 2020-06-26 2022-01-11 湖南港晨建设工程有限公司 High-rise hoisting device for building construction

Similar Documents

Publication Publication Date Title
CN206466914U (en) Modular erecting by overhang applied to building roof ground
CN204508622U (en) Civil multifunctional high building power hoist
CN213572947U (en) Constructional column outer wall side instrument formula operation platform
CN206273770U (en) The removable telescopic type erecting by overhang for being installed in building roof ground
CN208734190U (en) A kind of construction Moveable Pipeline bracket
CN207581225U (en) The Improvement type support frame structure of telescopic type erecting by overhang
CN207469715U (en) A kind of scaffold for building for being readily transported construction material
CN108423568A (en) Modular erecting by overhang applied to building roof ground
CN206858013U (en) Movable detachable manual-automatic integrated support lift device
CN202072413U (en) Lifting frame
CN211004327U (en) Portable pole wire lifter
CN213452533U (en) Sensor lifting device for mine roadway
WO2018145226A1 (en) Modular suspension apparatus applied to ground of building roof
CN101257238A (en) Method for electric motor with stationary rotor to on site penetrate rotor
CN210759347U (en) Mounting equipment
CN209963467U (en) Convenient earth connection operation platform
TWM542646U (en) Modular crane device applied to building roof floor
CN206818941U (en) Front and rear sleeve type dilatation fiber cable cross connection box
TWM537095U (en) Foldable hanging device allowing movable installation on building roof floor
CN110562871A (en) Portable pole wire lifter
TWI610877B (en) Modular hanging device applied to the roof of a building
CN204661110U (en) The two-layer single-column lifting working platform of two-stage
CN106618365B (en) Telescopic lifting appliance mechanism of window cleaning machine
CN204661111U (en) The two-layer twin columns lifting working platform of two-stage
CN205892680U (en) Anti - formula hanging flower basket of sitting on fence hangs mechanism

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant