- CN206458362U CN206458362U CN201621447862.XU CN201621447862U CN206458362U CN 206458362 U CN206458362 U CN 206458362U CN 201621447862 U CN201621447862 U CN 201621447862U CN 206458362 U CN206458362 U CN 206458362U
- Authority
- CN
- China
- Prior art keywords
- leakage
- pipeline section
- section
- hot washing
- head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Pipe Accessories (AREA)
Abstract
The utility model provides a kind of leakage-proof hot washing structure, including:Body, with head and afterbody, head is stretched into sealing drum, and is connected with sealing drum, and afterbody is located at outside sealing drum;Check configuration, it is arranged on body, wherein, when the liquid in sealing drum enters the head of body, liquid enters the afterbody of body by check configuration, and when carrying out wax removal hot wash operation, hot wash liquid enters body from the afterbody of body, check configuration backstop hot wash liquid enters the head of body, and then prevents flushing fluid from flowing into stratum.The problem of stratum of the prior art is easily polluted by hot wash liquid can be efficiently solved using the technical solution of the utility model.
Description
Technical field
The utility model is related to field of petroleum exploitation, in particular to a kind of leakage-proof hot washing structure.
Background technology
Open-hole horizontal well completion partial pressure tubular column is one of main completion mode that fine and close profit horizontal well is taken.Such tubing string exists
First blowing production after completion classification pressure break, needs the conventional underground work such as progress inspection pump, hot wash after pump production under the later stage.Carry out underground
During operation, the hanger sealing drum of bottom completion partial pressure tubular column is in unprotect state, and when carrying out hot wash operation, hot wash liquid can
It is able to can be flowed into from hanger sealing drum in stratum, so as to cause the generation of hot wash liquid leakage phenomena.In the event of the leakage of hot wash liquid
Phenomenon, then following two problems can be caused:One is that hot wash liquid can not set up circulation, causes well-flushing not thorough;Two be hot wash liquid
The pollution on stratum can be caused into stratum.Further, since hanger sealing drum is in unprotect state, therefore once there is junk to lead to
Cross if hanger sealing drum falls into horizontal segment, it will block completion tubular column crosses liquid passage, influences yield.If junk is larger
If even cause well section to scrap.
Utility model content
Main purpose of the present utility model is to provide a kind of leakage-proof hot washing structure, easy to solve stratum of the prior art
The problem of being polluted by hot wash liquid.
To achieve these goals, the utility model provides a kind of leakage-proof hot washing structure, including:Body, with head
And afterbody, head is stretched into sealing drum, and is connected with sealing drum, and afterbody is located at outside sealing drum;Check configuration, is arranged on body
On;Wherein, when the liquid in sealing drum enters the head of body, liquid enters the afterbody of body by check configuration, when entering
During row wax removal hot wash operation, hot wash liquid enters body from the afterbody of body, and check configuration backstop hot wash liquid enters the head of body,
And then prevent hot wash liquid from flowing into stratum.
Further, check configuration includes plugging structure and the first stopper section coordinated with plugging structure, the first backstop
Portion is arranged on body, and the first stopper section has overcurrent mouth, wherein, plugging structure has open position and closed position, works as envelope
Bridging structure by liquid pressure when, plugging structure be located at open position to avoid overcurrent mouth, when plugging structure is by hot wash liquid
Pressure when, plugging structure is located at closed position to block overcurrent mouth.
Further, plugging structure is ball sealer.
Further, the first stopper section include annular slope structure, direction of the annular slope structure along afterbody to head to
The axis of body is gradually tapered up, and annular slope structure forms overcurrent mouth close to the one end on head.
Further, body includes the first pipeline section and the second pipeline section being independently arranged, and head is located on the first pipeline section.
Further, the first stopper section also includes cylindrical portion, and annular slope structure setting is on the inwall of cylindrical portion with general
Barrel is divided into first section and second section, and the first pipeline section is inserted into first section, and the second pipeline section is inserted into second
In section.
Further, there is fit structure, fit structure coordinates with sealing drum in cylindrical portion.
Further, leakage-proof hot washing structure also includes the second stopper section, and the second stopper section is arranged in body and positioned at single
To side of the structure away from head.
Further, the second stopper section is to be provided with the first flowing hole on baffle plate, baffle plate.
Further, body includes the first pipeline section and the second pipeline section being independently arranged, and head is located on the first pipeline section, body
Also include the 3rd pipeline section, afterbody is located on the 3rd pipeline section, and baffle plate is folded between the second pipeline section and the 3rd pipeline section.
Further, leakage-proof hot washing structure also includes the attachment structure of the second pipeline section of connection and the 3rd pipeline section.
Further, it is provided with second on the tube wall of at least one in the first pipeline section, the second pipeline section and the 3rd pipeline section
Flowing hole.
Further, it is characterised in that leakage-proof hot washing structure also includes joint, joint is arranged on the afterbody of body.
Using the technical solution of the utility model, leakage-proof hot washing structure includes body and the unidirectional knot being arranged on body
Structure.When normally being produced, the liquid in sealing drum can enter the head of the body communicated therewith, and apply to check configuration
From head to the power of caudal directions.When pressure of the check configuration by above-mentioned direction, the liquid can be by described unidirectional
Structure enters the afterbody of the body, and is finally completed production.And when needing to carry out hot wash operation, tail of the hot wash liquid from body
Portion enters in body, and applies the power from afterbody to cephalad direction to check configuration.When check configuration is pressed by above-mentioned direction
During power, it will backstop hot wash liquid enters the head of body, it is to avoid hot wash liquid enters in the sealing drum connected with head, so as to avoid
The generation of hot wash liquid leakage phenomena.Therefore, on the one hand said structure causes hot wash liquid energy enough to set up circulation so that well-flushing is more
Thoroughly.On the other hand avoiding hot wash liquid enters stratum, it is ensured that stratum will not be contaminated.
Brief description of the drawings
The Figure of description for constituting the part of the application is used for providing further understanding to of the present utility model, this practicality
New schematic description and description is used to explain the utility model, does not constitute to improper restriction of the present utility model.
In the accompanying drawings:
Fig. 1 shows the structural representation coordinated with sealing drum of the embodiment according to leakage-proof hot washing structure of the present utility model
Figure;And
Fig. 2 shows the half-sectional structural representation of Fig. 1 leakage-proof hot washing structure.
Wherein, above-mentioned accompanying drawing is marked including the following drawings:
1st, sealing drum;10th, body;11st, the first pipeline section;12nd, the second pipeline section;13rd, the 3rd pipeline section;14th, the second flowing hole;
21st, plugging structure;22nd, the first stopper section;221st, annular slope structure;2211st, overcurrent mouth;222nd, cylindrical portion;2221st, knot is coordinated
Structure;30th, the second stopper section;31st, the first flowing hole;40th, attachment structure;50th, joint.
Embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase
Mutually combination.Describe the utility model in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
The utility model provides a kind of leakage-proof hot washing structure.
In the utility model and embodiment of the present utility model, leakage-proof hot washing structure is used for open-hole horizontal well completion partial pressure
In tubing string.Completion partial pressure tubular column includes hanging packer, and the top of hanging packer has sealing drum 1.
In embodiment of the present utility model, in order to solve the problem of hot wash liquid of the prior art is missed, to leakage-proof hot washing
Structure is improved, specifically described below:
As depicted in figs. 1 and 2, in the present embodiment, leakage-proof hot washing structure includes body 10 and check configuration.Body 10 has
Head and afterbody, head are stretched into sealing drum 1, and are connected with sealing drum 1, and afterbody is located at outside sealing drum 1.Check configuration is arranged on
On body 10.Wherein, when the liquid in sealing drum 1 enters the head of body 10, liquid enters body 10 by check configuration
Afterbody, when hot wash liquid enters body 10 from the afterbody of body 10, check configuration backstop hot wash liquid enters the head of body 10.
By above-mentioned setting, liquid can be extracted out in oil recovery process by check configuration out of well, realize normal production;
Meanwhile, hot wash liquid can will not enter the horizontal segment of sealing drum and horizontal well in hot wash operation by unidirectional structure barrier, so that
Realize leakage-proof hot washing function.
Specifically, because leakage-proof hot washing structure includes body 10 and the check configuration being arranged on body 10, progress is worked as
During normal production, the liquid in sealing drum 1 can be entered in body 10 by the head of the body 10 connected with sealing drum 1, and to
Check configuration applies the pressure from head to caudal directions.When check configuration is by pressure along above-mentioned direction, liquid can
Enter the afterbody of body 10 by check configuration, so as to realize oil pumping operation.And when need carry out hot wash operation when, hot wash liquid from
The afterbody of body 10 enters in body 10, and applies the pressure from afterbody to cephalad direction to check configuration.When check configuration by
During to pressure along above-mentioned direction, it will backstop hot wash liquid enters the head of body 10, it is to avoid hot wash liquid enters to be connected with head
Sealing drum 1 in, so as to avoid the generation of hot wash liquid leakage phenomena.Further, check configuration backstop hot wash liquid enters
Net horizontal section, so as to be conducive to hot wash liquid to be extracted out by pumping pipe string, sets up the circulation of hot wash liquid.Therefore, leakage-proof hot washing structure one
Aspect causes hot wash liquid energy enough to set up circulation so that well-flushing is more thorough;On the other hand avoiding hot wash liquid enters stratum, it is ensured that
Stratum will not be contaminated.
As shown in Fig. 2 in the present embodiment, check configuration includes plugging structure 21 and coordinate with plugging structure 21 first
Stopper section 22.First stopper section 22 is arranged on body 10, and the first stopper section 22 has overcurrent mouth 2211.Wherein, plugging structure
21 have open position and closed position, when pressure of the plugging structure 21 by liquid, and plugging structure 21 is located at open position
To avoid overcurrent mouth 2211;When pressure of the plugging structure 21 by hot wash liquid, plugging structure 21 is located at closed position to block
Overcurrent mouth 2211.
By above-mentioned setting, there is overcurrent mouth 2211 on the first stopper section 22 on body 10, body 10 can be connected
Head and afterbody, form liquid crosses liquid passage.Plugging structure 21 is included due to check configuration and coordinated with plugging structure 21
The first stopper section 22, plugging structure 21 have avoid overcurrent mouth 2211 open position and closure overcurrent mouth 2211 close stance
Put, therefore, in oil recovery process, plugging structure 21 is located at open position under the pressure effect of liquid, to connect in body 10
Cross liquid passage, realize normal production;In hot wash operation, plugging structure 21 is located at close stance under the pressure effect of hot wash liquid
Put, to block the liquid passage excessively in body 10, prevent hot wash liquid from entering in sealing drum 1, so as to realize the liquid passage excessively of body 10
One-way flow.
Specifically, as shown in Fig. 2 in the present embodiment, in order to improve the sealing of plugging structure 21, being tied while being easy to block
Structure 21 switches between open and closed positions, and plugging structure 21 is ball sealer.Said structure is simple, and production cost is low.
Pass through above-mentioned setting, on the one hand, ball sealer has the sectional dimension of gradual change, can reliably be sealed with the first stopper section 22
Stifled overcurrent mouth 2211;On the other hand, the paraffin content height of fine and close oil is, it is necessary to periodically carry out hot-washing wax remover, and the hot-washing wax remover cycle is shorter,
Ball sealer can between open and closed positions switch under the fluid pressure effect of different directions, be adopted in order to realize
Oily operation and the switching of hot wash operation.
Preferably, ball sealer is hollow stainless steel ball.It can prevent hot wash liquid or liquid from causing using hollow stainless steel ball
Ball sealer corrosion, so that avoid closure from failing, and hollow stainless steel ball lighter weight, it can be ensured that pressure of the ball sealer in liquid
Power effect is lower to be located at open position.
As shown in Fig. 2 in embodiment of the present utility model, the first stopper section 22 includes annular slope structure 221, circular slanting
Direction of the face structure 221 along afterbody to head is gradually tapered up to the axis of body 10, annular slope structure 221 close to head one
End forms overcurrent mouth 2211.
Because the first stopper section 22 includes annular slope structure 221, direction of the annular slope structure 221 along afterbody to head
Gradually tapered up to the axis of body 10, therefore, in the case where hot wash liquid is along afterbody to the active force of cephalad direction, outside plugging structure 21
Surface can be pushed against with the inner surface of annular slope structure 221, so as to block one end in annular slope structure 221 close to head
Overcurrent mouth 2211 is formed, reliable sealing is realized in hot wash operation.
Further, when plugging structure 21 is ball sealer, with annular slope structure 221 when ball sealer is in the closed position
Linear contact lay is formed, reliable closure can be realized, the contact area of ball sealer and the first stopper section 22 can be reduced again, it is to avoid closure knot
Structure 21 is stuck in the problem of can not being switched to open position in the first stopper section 22, and this improves the reliable of leakage-proof hot washing structure
Property.
As shown in Fig. 2 in embodiment of the present utility model, body 10 includes the first pipeline section 11 being independently arranged and the second pipe
Section 12, head is located on the first pipeline section 11.
Body 10 includes the first pipeline section 11 and the second pipeline section 12 being independently arranged, and check configuration can be arranged on to the first pipe
Between the pipeline section 12 of section 11 and second, it is easy to leakage-proof hot washing structure to process and assemble.
Specifically, as shown in Fig. 2 the first stopper section 22 also includes cylindrical portion 222, annular slope structure 221 is arranged on cylinder
So that cylindrical portion 222 is divided into first section and second section on the inwall in shape portion 222.First pipeline section 11 is inserted into first section
Interior, the second pipeline section 12 is inserted into second section.
By above-mentioned setting, the first stopper section 22 and the split of body 10 can be set, are easy in the first stopper section 22
The processing of annular slope structure 221 and overcurrent mouth 2211, and the first stopper section 22 can pass through the easily connection of cylindrical portion 222
It is simple and compact for structure between the first pipeline section 11 and the second pipeline section 12, convenient manufacture and assembling.
Preferably, the first pipeline section 11 is inserted into first section by taper thread connection, and the second pipeline section 12 passes through taper thread
Connection is inserted into second section.
Certainly, in other alternate embodiments, the first pipeline section 11 and the second pipeline section 12 can also be sealed by other guarantees
Mode be connected with cylindrical portion 222.
As shown in Fig. 2 having fit structure 2221 in cylindrical portion 222, fit structure 2221 coordinates with sealing drum 1.
By setting fit structure 2221 in cylindrical portion 222, when leakage-proof hot washing structure is seated on sealing drum 1, match somebody with somebody
Close structure 2221 and the upper surface of sealing drum 1 is abutted against, so as to coordinate with the formation sealing of sealing drum 1, prevent hot wash liquid from leakproof
Hot wash structure and the junction of sealing drum 1 are missed into sealing drum 1.
As shown in Fig. 2 in the present embodiment, leakage-proof hot washing structure also includes the second stopper section 30, and the second stopper section 30 is set
In body 10 and positioned at side of the check configuration away from head.
By setting the second stopper section 30 in body 10, and make the second stopper section 30 positioned at the remote head of check configuration
Side, can prevent junk from falling into the horizontal segment of horizontal well.When thering is the junk to drop in well will by the backstop of the second stopper section 30,
The horizontal segment of hanging packer or horizontal well is will not fall into, so as to prevent junk from blocking the liquid passage excessively of completion tubular column, it is to avoid fall
Thing influences yield or the risk for causing well section to scrap.
Further, the second stopper section 30 can also limit the activity space of plugging structure 21, by the work of plugging structure 21
Dynamic scope is limited between the second stopper section 30 and the first stopper section 22, prevents the quilt in the presence of fluid pressure of plugging structure 21
Take out of outside leakage-proof hot washing structure, it is to avoid leakage-proof hot washing structure fails because being lost plugging structure 21.
Specifically, as shown in Fig. 2 the second stopper section 30 is baffle plate, the first flowing hole 31 is provided with baffle plate.
Using baffle plate as the second stopper section 30, leakage-proof hot washing structure can be simplified, by setting first on baffle plate
Flowing hole 31, can make liquid or hot wash liquid pass freely through baffle plate, realize normal oil producing operation and hot wash operation, and junk
Then blocked by baffle plate, will not fall into horizontal segment.Certainly, those skilled in the art are it is to be understood that the diameter of the first flowing hole 31
The diameter of ball sealer should be less than.
As shown in Fig. 2 in the present embodiment, body 10 includes the first pipeline section 11 and the second pipeline section 12 being independently arranged, head
On the first pipeline section 11, body 10 also includes the 3rd pipeline section 13, and afterbody is located on the 3rd pipeline section 13, and baffle plate is folded in second
Between the pipeline section 13 of pipeline section 12 and the 3rd.
By above-mentioned setting, baffle plate can facilitate, be securely fixed between the second pipeline section 12 and the 3rd pipeline section 13, letter
Change leakage-proof hot washing structure.
As shown in Fig. 2 in the present embodiment, in order to realize being reliably connected for the second pipeline section 12 and the 3rd pipeline section 13, simplify peace
Dress process, leakage-proof hot washing structure also includes the attachment structure 40 of the second pipeline section 12 of connection and the 3rd pipeline section 13.
Preferably, as shown in Fig. 2 the side of the pipeline section 13 of direction the 3rd of baffle plate is provided with packing ring, to ensure baffle plate
It is reliable fixed.Attachment structure 40 is connected by taper thread with the second pipeline section 12 and the 3rd pipeline section 13.
Certainly, in the unshowned alternate embodiment of accompanying drawing, the side of the second pipeline section of direction 12 of baffle plate can also be set
There is packing ring.
As shown in Fig. 2 in embodiment of the present utility model, the pipe of the first pipeline section 11, the second pipeline section 12 and the 3rd pipeline section 13
The second flowing hole 14 is provided with wall.
By setting the second flowing hole 14 to increase on the tube wall of the first pipeline section 11, the second pipeline section 12 and the 3rd pipeline section 13
The area of passage of big liquid or hot wash liquid, reduces the flow resistance of liquid or hot wash liquid, increases oil recovery amount, improve hot-washing wax remover
Efficiency.
Certainly, can also be only in the first pipeline section 11, the second pipeline section 12 and the 3rd in the unshowned alternate embodiment of accompanying drawing
The second flowing hole 14 is provided with one or two tube wall in pipeline section 13.
As shown in Fig. 2 in the present embodiment, leakage-proof hot washing structure also includes joint 50, joint 50 is arranged on the tail of body 10
Portion.
Leakage-proof hot washing structure can be connected with delivery instrument by the joint 50 for the afterbody for being arranged on body 10, by throwing
Send instrument that leakage-proof hot washing structure is transferred into precalculated position, and be seated on sealing drum 1.
Specifically, joint 50 is provided with shear pin hole, and joint 50 is connected by shear pin with delivering instrument.When leakage-proof hot washing structure
When transferring to precalculated position, by cutting shear pin, leakage-proof hot washing structure is set to be seated on sealing drum 1.
Further, joint 50 has through hole, and joint 50 is connected on the 3rd pipeline section 13 by taper thread, extends junk
Accommodation space, even if junk it is longer can also be relatively stable fall into inside the pipeline section 13 of joint 50 and the 3rd, and stopped by second
The backstop of stopper 30, so as to be not easy to drop to the outside of leakage-proof hot washing structure, improves the Anti-fall performance of leakage-proof hot washing structure.
Preferably, as shown in Fig. 2 in embodiment of the present utility model, headward one end of the first pipeline section 11 is also set
There is guide head, to guide tripping in direction during leakage-proof hot washing structure G.I.H, it is ensured that the head of body 10 can stretch
Enter in sealing drum 1.Guide head is provided with the second flowing hole 14, to increase the area of passage of liquid.
When being assembled to leakage-proof hot washing structure of the present utility model, the second pipeline section 12 is first arranged on attachment structure 40
On, then packing ring and baffle plate are arranged in attachment structure 40, then the 3rd pipeline section 13 is arranged in attachment structure 40;It will connect
First 50 are connected with the 3rd pipeline section 13;Then, ball sealer is put into the first stopper section 22, then the first stopper section 22 is arranged on the
On two pipeline sections 12;Finally, the first pipeline section 11 is connected with the first stopper section 22.Using leakage-proof hot washing structure pair of the present utility model
When fine and close profit horizontal well carries out hot-washing wax remover, hot wash liquid can be avoided to miss, while can prevent trouble of lost tool in hole from falling into horizontal well
Horizontal segment.Leakage-proof hot washing structure of the present utility model not only possesses leakage-proof hot washing function, and simple in construction, salvages convenient,
It is easy to site operation, the space for accommodating junk is larger.
Leakage-proof hot washing structure of the present utility model when in use, by joint 50 by leakage-proof hot washing structure and deliver instrument phase
Connect, and transferred to oil pipe, the upper surface of sealing drum 1, test weight, it is determined that reaching behind precalculated position, ball is treated in pitching, pumping
Drop down onto on setting ball seat, the liquid feeding pressure into oil pipe, hydraulic pressure is cut shear pin by delivering instrument, be seated leakage-proof hot washing structure
The upper surface of sealing drum 1 of completion tubular column, realizes one-way flow in pipe.If there is junk to fall into well, baffle plate stops that junk is fallen into
Shaft bottom, realizes anti-lost function.If there is junk to fall into leakage-proof hot washing structure, first by conventional Refloatation method, if conventional beat
Drag for method unsuccessful, raising integrally leakage-proof hot washing structure can be selected, it is to avoid the complication of accident.During hot wash operation, in fluid column and
In the presence of circulation pump pressure and stainless steel ball deadweight, stainless steel ball, which falls to coordinating with the first stopper section 22, closes overcurrent mouth 2211,
Prevent hot wash liquid etc. from entering lowermost production zone, and then realize leakage-proof hot washing function, hot wash efficiency is improved to greatest extent, prevents ground
Layer pollution.
As can be seen from the above description, the utility model the above embodiments realize following technique effect:Leakproof
Hot wash structure includes having connection body on plugging structure and the first stopper section coordinated with plugging structure, the first stopper section
Head and afterbody overcurrent mouth, to form the liquid passage excessively of liquid;Meanwhile, leakage-proof hot washing structure also includes the be arranged in body
Two stopper sections.In oil producing operation, plugging structure is located at open position under the pressure effect of liquid, with the mistake in communicating pipe body
Liquid passage, realizes normal production;In hot wash operation, plugging structure is located at closed position under the pressure effect of hot wash liquid, with
Block in body and cross liquid passage, so as to realize the one-way flow for crossing liquid passage in body, prevent hot wash liquid from entering in sealing drum,
So as to avoid the generation of hot wash liquid leakage phenomena, be conducive to setting up the circulation of hot wash liquid so that well-flushing is more thorough, avoids simultaneously
Hot wash liquid enters stratum, it is ensured that stratum will not be contaminated;When there is junk to fall into well, will by the backstop of the second stopper section 30,
The horizontal segment of sealing drum or horizontal well is will not fall into, so as to prevent junk from blocking the liquid passage excessively of completion tubular column, it is to avoid junk shadow
Ring yield or the risk for causing well section to scrap.
Preferred embodiment of the present utility model is the foregoing is only, the utility model is not limited to, for this
For the technical staff in field, the utility model can have various modifications and variations.It is all it is of the present utility model spirit and principle
Within, any modification, equivalent substitution and improvements made etc. should be included within protection domain of the present utility model.
Claims (13)
1. a kind of leakage-proof hot washing structure, it is characterised in that including:
Body (10), with head and afterbody, the head is stretched into sealing drum (1), and is connected with the sealing drum (1), institute
State afterbody and be located at the sealing drum (1) outside;
Check configuration, is arranged on the body (10);
Wherein, when the liquid in the sealing drum (1) enters the head of the body (10), the liquid passes through described unidirectional
Structure enters the afterbody of the body (10), when hot wash liquid enters the body (10) from the afterbody of the body (10), institute
State the head that hot wash liquid described in check configuration backstop enters the body (10).
2. leakage-proof hot washing structure according to claim 1, it is characterised in that the check configuration includes plugging structure (21)
And the first stopper section (22) coordinated with the plugging structure (21), first stopper section (22) is arranged on the body
(10) on, first stopper section (22) has overcurrent mouth (2211),
Wherein, the plugging structure (21) has open position and closed position, when the plugging structure (21) is by the liquid
During the pressure of body, the plugging structure (21) is located at the open position to avoid the overcurrent mouth (2211), when the closure
Structure (21) by the hot wash liquid pressure when, the plugging structure (21) is located at the closed position to block the excessively stream
Mouth (2211).
3. leakage-proof hot washing structure according to claim 2, it is characterised in that the plugging structure (21) is ball sealer.
4. leakage-proof hot washing structure according to claim 2, it is characterised in that first stopper section (22) includes circular slanting
Face structure (221), axle from direction of the annular slope structure (221) along the afterbody to the head to the body (10)
Line is gradually tapered up, and the annular slope structure (221) forms the overcurrent mouth (2211) close to the one end on the head.
5. leakage-proof hot washing structure according to claim 4, it is characterised in that the body (10) include being independently arranged the
One pipeline section (11) and the second pipeline section (12), the head are located on first pipeline section (11).
6. leakage-proof hot washing structure according to claim 5, it is characterised in that first stopper section (22) also includes tubular
Portion (222), the annular slope structure (221) is arranged on the inwall of the cylindrical portion (222) with by the cylindrical portion (222)
It is divided into first section and second section, first pipeline section (11) is inserted into first section, second pipeline section
(12) it is inserted into second section.
7. leakage-proof hot washing structure according to claim 6, it is characterised in that have on the cylindrical portion (222) and coordinate knot
Structure (2221), the fit structure (2221) coordinates with the sealing drum (1).
8. leakage-proof hot washing structure according to claim 1, it is characterised in that the leakage-proof hot washing structure is also stopped including second
Stopper (30), second stopper section (30) is arranged in the body (10) and positioned at the check configuration away from the head
Side.
9. leakage-proof hot washing structure according to claim 8, it is characterised in that second stopper section (30) is baffle plate,
The first flowing hole (31) is provided with the baffle plate.
10. leakage-proof hot washing structure according to claim 9, it is characterised in that the body (10) includes what is be independently arranged
First pipeline section (11) and the second pipeline section (12), the head are located on first pipeline section (11), and the body (10) also includes
3rd pipeline section (13), the afterbody is located on the 3rd pipeline section (13), and the baffle plate is folded in second pipeline section (12)
Between the 3rd pipeline section (13).
11. leakage-proof hot washing structure according to claim 10, it is characterised in that the leakage-proof hot washing structure also includes connection
The attachment structure (40) of second pipeline section (12) and the 3rd pipeline section (13).
12. leakage-proof hot washing structure according to claim 10, it is characterised in that first pipeline section (11), described second
The second flowing hole (14) is provided with the tube wall of at least one in pipeline section (12) and the 3rd pipeline section (13).
13. leakage-proof hot washing structure according to claim 1, it is characterised in that the leakage-proof hot washing structure also includes joint
(50), the joint (50) is arranged on the afterbody of the body (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621447862.XU CN206458362U (en) | 2016-12-27 | 2016-12-27 | Leakage-proof hot washing structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621447862.XU CN206458362U (en) | 2016-12-27 | 2016-12-27 | Leakage-proof hot washing structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206458362U true CN206458362U (en) | 2017-09-01 |
Family
ID=59697661
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621447862.XU Active CN206458362U (en) | 2016-12-27 | 2016-12-27 | Leakage-proof hot washing structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206458362U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108798567A (en) * | 2018-07-27 | 2018-11-13 | 中国石油大学(华东) | A kind of coal bed gas well well-flushing tool and method for crossing fiberglass screen casing |
-
2016
- 2016-12-27 CN CN201621447862.XU patent/CN206458362U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108798567A (en) * | 2018-07-27 | 2018-11-13 | 中国石油大学(华东) | A kind of coal bed gas well well-flushing tool and method for crossing fiberglass screen casing |
CN108798567B (en) * | 2018-07-27 | 2024-03-08 | 中国石油大学(华东) | Coal bed gas well flushing tool and method for passing through glass fiber reinforced plastic screen pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104481580B (en) | A kind of down-hole coal bed mash gas pumping drilling restorative procedure and the device of use thereof | |
CN103422812B (en) | The coal bed gas multi-branch horizontal drilling well of individual well eye and completion method | |
CN105201446B (en) | Bidirectional bearing blanking plug | |
CN206458362U (en) | Leakage-proof hot washing structure | |
CN102536160A (en) | Ball seat type rubber plug system for liner cementing | |
CN106121548A (en) | A kind of sand prevention integrated tubing string of righting and operational approach thereof | |
CN105840154A (en) | Novel slip-type downhole throttler | |
CN201037385Y (en) | Bridge type leak-stopping pipe column | |
CN207315289U (en) | Dual tubing heat extraction wellhead | |
CN208122791U (en) | Casing-broken, which is reinforced, mends adapter tube column | |
CN206458417U (en) | Tubular column unit | |
CN104405331B (en) | A kind of ocean deepwater well tubing packer | |
CN203188949U (en) | Safe sand draining manifold for gas drilling | |
CN206592098U (en) | A kind of pitching deblocking packer | |
CN202047782U (en) | Swabbing steel wire rope spray-prevention device | |
CN206554895U (en) | A kind of underground throttle device | |
CN201723189U (en) | Multi-path releasing device | |
CN204283271U (en) | Deep-sea oil well single-direction and dual-direction well-flushing crossover tool | |
CN210460556U (en) | Large-drift-diameter bridge plug setting releasing adapter capable of automatically releasing plugging balls in underground | |
CN206205836U (en) | Packer both sides' formula releasing gadget | |
CN108240200A (en) | Oil pumping method | |
CN207795207U (en) | Gas filling device | |
CN201486542U (en) | Detachable layered fracturing technology pipe string | |
CN207795206U (en) | Gas filling device | |
CN202417419U (en) | Self-anchoring well-flushing packer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |