CN206449717U CN201621204212.2U CN201621204212U CN206449717U CN 206449717 U CN206449717 U CN 206449717U CN 201621204212 U CN201621204212 U CN 201621204212U CN 206449717 U CN206449717 U CN 206449717U
Authority
CN
China
Prior art keywords
shower water
heating
water
heat
floor drain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621204212.2U
Other languages
Chinese (zh)
Inventor
汤伟
胡祥满
黄宝柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi University of Science and Technology
Original Assignee
Shaanxi University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi University of Science and Technology filed Critical Shaanxi University of Science and Technology
Priority to CN201621204212.2U priority Critical patent/CN206449717U/en
Application granted granted Critical
Publication of CN206449717U publication Critical patent/CN206449717U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bathtubs, Showers, And Their Attachments (AREA)

Abstract

The utility model discloses a kind of heating installation of utilization bathroom shower water waste heat, including three filter T-joint floor drains and water pipe being arranged among ground heating type laying layer, three filter T-joint floor drain exit connecting water pipes, water pipe is at the groove Zhong You centers of laying layer outwardly around setting, and tube side arrangement on a declining curve from inside to outside, water pipe end connects hand flow regulating valve arrival end, hand flow regulating valve port of export connection sewer connecting pipe;When that need to heat shower, heat gonorrhea bath water is filtered into oral siphon circular tube journey for three times through floor drain, and spurt water smoke heat with indoor shower water to floor heating realizes heating jointly, is discharged by regulating valve with proper flow rates, now rotates spacer cut-off sewer interface;When need not heat, by runing rest rotation cut-off waterpipe jointing, cold shower water is directly entered sewer through three filterings of floor drain;The method is simple, low cost, easily realization and operation, makes full use of residual heat and energy to realize energy-conservation, resources conservation, reduction personal consumption cost.

Description

A kind of heating installation of utilization bathroom shower water waste heat
Technical field
The utility model belongs to energy-conserving and environment-protective technical fiel, is related to a kind of heating installation of utilization bathroom shower water waste heat.
Background technology
It is well known that in current household decoration, the processing method for the shower water of shower room is very simple careless, The warm water of fresh clean is sprayed using shower nozzle during shower, shower water is directly constantly passed through into floor drain during shower It has been discharged into sewer.However, clean heat gonorrhea bath water is sprayed from shower nozzle during entering sewer by human body, the time is short Temporarily, shower water seldom, therefore is directly discharged into sewer, wastes the exhausted big portion of heat gonorrhea bath water by temperature reduction very little, thermal loss Divide energy.
On the other hand, in the winter time with temperature it is relatively low when taken a shower when, shower water when only with normal temperature laboratory or shower Blow out and diffuse the heat that water smoke indoors is provided, often do not reach comfortable condition requirement, it is necessary to separately heat, in north Fang Tongchang has a heating heating, and south is often without heating, it is necessary to reach suitable temperature by opening the means such as warm light lamp, This all adds additional living cost, and for family common bathroom, shower time is completed in a short time, And heating heats not by oneself controlling, heating conveying supply is continual for a long time, then resulted in plenty of time model Heating redundancy in enclosing is wasted, for the public or for money shower house of such as school, open for a long time, and to shower water Consumption it is big, directly exclude even more huge waste.
But at present just for the country, either Household bathroom or large-scale public or for money shower house, still almost All be it is direct exclude shower water and use third party to heat strategy, the repetition for shower water recycles consider less, this with The energy-saving and environmental protection advocated at present, the personal consumption idea economized on resources and policy are repelled each other, therefore consider the reasonable profit to shower water Itself requiring when being taken a shower with satisfaction, or recycling in other respects, and extra resource consumption is reduced, it is to be necessary Discussion.
The content of the invention
The purpose of this utility model is that the above-mentioned reality of consideration and problem utilize bathroom shower water waste heat there is provided one kind Heating installation, make full use of waste heat of showering water be bathroom heating, realize resource fully, recycling, reduce energy dissipation.
In order to overcome above-mentioned realistic problem and realize object above, the utility model uses following technical scheme:
A kind of heating installation of utilization bathroom shower water waste heat, including it is arranged at three filter threeways among ground heating type laying layer Floor drain and water pipe, three filter T-joint floor drain exit connecting water pipes, water pipe at the groove Zhong You centers of laying layer outwardly around setting, And tube side arrangement on a declining curve from inside to outside, water pipe end connection hand flow regulating valve arrival end, hand flow regulating valve The port of export connects sewer connecting pipe.
Three described filter T-joint floor drains include being provided with knitting filter screen pocket in the floor drain housing provided with accommodating chamber, accommodating chamber, Knitting filter screen pocket is also connected with the runing rest set up at accommodating chamber opening, is further respectively had at floor drain shell nozzle parallel Upper filter plate and lower filter plate.
Described floor drain housing, which is provided with, is used for the waterpipe jointing that shower water heats and the in line interface directly excluded, scene 2 Mouth central axis is located normal on the section of casing center axis and angle is θ, 45 °≤θ≤90 °;
Described runing rest upper surface provided with knitting filter screen pocket fixing device and rotation projection, lower surface provided with rotation every From piece, rotation spacer surface and inner walls are tangent, drive to rotate spacer and rotate back and forth by rotating projection and realize interface Or connection.
Described lower filter plate sets and knitting filter screen pocket fixing device and rotates the through hole that projection is engaged, lower filter plate it is big Small to match with accommodating chamber opening, the size of upper filter plate and floor drain shell nozzle are to matching;Floor drain housing lays layer with ground heating type It is additionally provided with the sealing ring of encapsulation.
Described ground heating type laying layer at least includes heat-insulation layer, protection film layer, the special brick layer of floor heating and fixed keelson, from Under be up followed successively by heat-insulation layer, protection film layer, the special brick layer of floor heating, fixed keelson is through therebetween, heat-insulation layer and fixed dragon Iliacus leaves the groove for accommodating water pipe, and water pipe is placed under protection film layer.
Described water pipe is non-metallic material pipeline, and water pipe top is located at center and is connected with three filter T-joint floor drain outlets, Circular spacing and the number of turns should lay layer size according to ground heating type and determine, end connection hand flow regulating valve entrance.
Described hand flow regulating valve is manually adjustable non-switch valve, and it is exported connects with sewer connecting pipe Connect, the shower water velocity of discharge can be adjusted manually according to shower water amount and shower room temperature.
When performing heating, shower water enters oral siphon by three filter T-joint floor drains, and laying is heated in by water pipe tube side Layer, is then discharged by hand flow regulating valve and sewer connecting pipe;Shower water is through sewer connecting tube when being not required to heat Road is directly discharged into sewer.
The beneficial effects of the utility model are:
The heating installation for the utilization bathroom shower water waste heat that the utility model is provided, the mode based on floor heating heat supply is fully sharp With waste heat of showering water, bathroom shower water wipe-out mode is designed as by the ground heating type of water pipe installation side circular from inside to outside Formula, makes full use of waste heat of showering water to be heated for bathroom, in by the long tube side of water pipe, is heated by laying layer, reaches and is drenching The purpose that bathroom space and spray water mist radiate collective effect and heated.The tradition that shower water is directly discharged into sewer is abandoned Way, realizes that resource is abundant, reuse, reduces energy dissipation, save living cost.
The heating installation for the utilization bathroom shower water waste heat that the utility model is provided, device is simple, and input cost is low, it is easy to Realize, practical operation is convenient, when that need to heat shower, heat gonorrhea bath water is filtered for three times into oral siphon circular tube journey through floor drain, over the ground Plate, which is heated, to be spurted water smoke heat with indoor shower water and realizes heating jointly, is discharged, is now rotated with proper flow rates by regulating valve Spacer separates sewer interface;When need not heat, by runing rest rotation cut-off waterpipe jointing, cold shower water is through floor drain three times Filtering is directly entered sewer;Especially to the energy-saving and emission-reduction of shower house large-scale public and for money, cost savings, economic benefit More obvious protrusion.
Brief description of the drawings
Fig. 1 is one of structural representation of the present utility model;
Fig. 2 is the two of structural representation of the present utility model;
In figure:1 it is three filter T-joint floor drains, 2 be water pipe, 3 be heat-insulation layer, 4 be protection film layer, 5 is the special brick layer of floor heating, 6 It is hand flow regulating valve for fixed keelson, 7,8 be sewer connecting pipe, 9 be cement flooring, 10 is valve access cover Plate;
Fig. 3 a, Fig. 3 b, Fig. 3 c1~Fig. 3 c4 are the structural representation of three filter T-joint floor drains;
In figure:Fig. 3 a are three filter T-joint floor drain schematic three dimensional views, and Fig. 3 b are floor drain actual installation schematic diagram, Fig. 3 c1~figure 3c4 is the main three-dimensional parts schematic diagram of three filter T-joint floor drains;Wherein 1-1 is that floor drain housing, 1-11 are waterpipe jointing, 1-12 It is that upper filter plate, 1-3 are that lower filter plate, 1-4 are that runing rest, 1-41 are knitting filter screen pocket fixing device, 1- in line interface, 1-2 42 be that rotation spacer, 1-43 are that rotation projection, 1-6 are sealing ring, 5 are the special brick layer of floor heating;
Fig. 4 is three filter T-joint floor drain two-dimensional cross sections;
In figure:1-1 is that floor drain housing, 1-11 are that waterpipe jointing, 1-12 are that in line interface, 1-2 are under upper filter plate, 1-3 are Filter plate, 1-4 are that runing rest, 1-4 are that 2 rotation spacers, 1-43 are that rotation projection, 1-5 are that knitting filter screen pocket, 1-6 are sealing Circle.
Embodiment
The utility model is described in detail with implementation sample below in conjunction with the accompanying drawings.
As shown in Figure 1 and Figure 2, a kind of heating installation of utilization bathroom shower water waste heat, including it is arranged at ground heating type laying layer Among three filter T-joint floor drains 1 and water pipe 2, the three filter exit connecting water pipes 2 of T-joint floor drain 1, water pipe 2 is in the groove of laying layer By center outwardly around setting, and tube side arrangement on a declining curve, the end of water pipe 2 connection hand flow regulating valve 7 from inside to outside Arrival end, the port of export of hand flow regulating valve 7 connection sewer connecting pipe 8.
Further, three described filter T-joint floor drains 1 include setting in the floor drain housing 1-1 provided with accommodating chamber, accommodating chamber There are knitting filter screen pocket 1-5, knitting filter screen pocket 1-5 to be also connected with the runing rest 1-4 set up at accommodating chamber opening, floor drain shell Parallel upper filter plate 1-2 and lower filter plate 1-3 is further respectively had at body 1-1 openings.
Described floor drain housing 1-1 is provided with line connecing of being used for the shower water waterpipe jointing 1-11 heated and directly exclude Mouth 1-12, two outlet central axis are located normal on the section of casing center axis and angle is θ, 45 °≤θ≤90 °;
Described runing rest 1-4 upper surfaces are provided with knitting filter screen pocket fixing device 1-41 and rotation projection 1-43, following table Face is provided with rotation spacer 1-42, and rotation spacer 1-42 surfaces and housing 1-1 inwalls are tangent, is driven by rotating projection 1-43 Rotation spacer 1-42 rotates back and forth the connection for realizing waterpipe jointing 1-11 or in line interfaces 1-12.
Described lower filter plate 1-3 is set and leading to that knitting filter screen pocket fixing device 1-41 and rotation projection 1-43 are engaged Hole, lower filter plate 1-3 size matches with accommodating chamber opening, and upper filter plate 1-2 size and floor drain housing 1-1 are open to matching; Floor drain housing 1-1 lays the sealing ring 1-6 that layer is additionally provided with encapsulation with ground heating type.
Referring to Fig. 1, Fig. 2, specific embodiment is given below, a kind of heating installation of utilization bathroom shower water waste heat, its It is main to include one or three filter T-joint floor drains 1, water pipe 2, ground heating type laying layer, hand flow regulating valve 7 and sewer connecting pipe 8. Three filter T-joint floor drains 1 are installed among ground heating type laying layer, exit connecting water pipe 2, and water pipe 2 is placed in ground heating type laying layer, The end of water pipe 2 connects the arrival end of hand flow regulating valve 7, the port of export of hand flow regulating valve 7 connection sewer connecting pipe 8. Shower water enters oral siphon 2 by three filter T-joint floor drains 1, in by the long tube side of water pipe, is heated by laying layer, reaches and is drenching The purpose that bathroom space and spray water mist radiate collective effect and heated.Shower water is after tube side residual heat heating, by stream manually Adjustable valve 7 and sewer connecting pipe 8 are excluded, and flow velocity is controllable manually, and cold shower water is expelled directly out during without heating.
Ground heater laying layer as shown in Figure 1 should at least include heat-insulation layer 3, protection film layer 4, the special brick layer 5 of floor heating and fix Keelson 6.The bottom is actual cement flooring 10 during laying, and heat-insulation layer 3, protection film layer 4, floor heating are followed successively by from the bottom up Special brick layer 5, fixed keelson 6 runs through the installation fixation therebetween played between each several part, heat-insulation layer 3 and fixed keel Muscle 6 accordingly leaves the groove for accommodating water pipe 2;Water pipe 2 is placed under protection film layer 4, the special upper surface of brick layer 5 of floor heating and three Filter the upper surface of T-joint floor drain 1 concordant.
The groove for being used to accommodate water pipe 2 as shown in Figure 1 is to surround from inside to outside and whole cloth on a declining curve from inside to outside Put, water pipe 2, which is just placed in this groove, can make water have a natural flow tendency in tube side, the top of water pipe 2 is located at central part Position is simultaneously and the outlet of floor drain one connects the waterpipe jointing 1-11 of such as shower water heating, and end connects hand flow regulating valve 7.It should be noted that Water pipe should be non-metallic material, turns round slow, to be determined around spacing and the number of turns according to actual ground size, it is ensured that good when surrounding Good uniform heat transfer.
As shown in Fig. 3 a~Fig. 3 c-4, Fig. 4, three filter T-joint floor drains include floor drain housing 1-1, upper filter plate 1-2, lower filter plate 1- 3rd, runing rest 1-4, knitting filter screen pocket 1-5, sealing ring 1-6.Upper filter plate 1-2 is used to prevent thick junk from entering, lower filter Plate 1-3 prevents small garbage waste from entering, and knitting filter screen pocket 1-5 prevents small junk such as hair, cotton-wool silk from entering and accumulating Tired obstruction pipeline, the several main parts size structure designs of this example are as shown in Fig. 3 c-1~Fig. 3 c-4.Floor drain housing 1-1 is provided with water pipe Two outlets of interface 1-11 and in line interface 1-12, are respectively used to shower water heating and directly exclusion, the central axis of two outlets It is located normal on the section of casing center axis and angle is 90 °;Runing rest 1-4 fixes projection 1- provided with knitting filter screen pocket 41st, rotation spacer 1-42, rotation projection 1-43, rotation spacer 1-42 surfaces are completely superposed with housing 1-1 inwalls, pass through hand Holding rotation projection 1-43 stress makes runing rest 1-4 rotate back and forth 90 ° of streams for realizing waterpipe jointing 1-11 and in line interface 1-12 Logical and cut-off;Lower filter plate 1-3 can coordinate with fixed projection 1-41 and rotation projection 1-43, will be knitted filter screen pocket 1-5 cableties set It is fixed in fixing on projection 1-41.
First sealing ring 1-6 and floor drain housing 1-1 are installed during installation and connect two outlets respectively, then by runing rest 1- 4 are loaded in housing, make it that rotation spacer 1-42 is just complete by one of pipe outlet 1-11 or in line interfaces 1-12 Cut-off, then knitting filter screen pocket 1-5 is fixed and installs lower filter plate 1-3 cooperations, finally fill on fixed projection 1-41 Filter plate 1-2 on well.When periodic inspection is cleared up, the rubbish first cleared up on upper filter plate 1-2 is pulled down again, has cleared up lower filter plate 1-3 On rubbish also pulled down, then knitting filter screen pocket 1-5 is removed and extracted, cleaned or changed new product, finally fill successively again Filter plate 1-3, upper filter plate 1-2 are played well.Three filter T-joint floor drain 1 installation effects are as shown in Figure 3 b.
The final effect of this implementation sample as shown in Fig. 2 and by the adjusting handle of hand flow regulating valve 7 be placed in brick face it Outer to be easy to operation, valve access panel 10 is used for the maintenance in the future of valve with safeguarding.
It is by the implementation case working method of the present utility model:Need to heat shower when, heat gonorrhea bath water is through three mistakes of floor drain Filter into oral siphon circular tube journey, spurt water smoke heat with indoor shower water to floor heating realizes heating jointly, by regulating valve And sewer connecting pipe 8 is discharged, and the velocity of discharge can be controlled according to indoor temperature and water consumption by hand flow regulating valve 7, Now rotation spacer 1-42 has separated the in line interface 1-12 of sewer;When need not heat, filter plate 1-2 is unloaded by runing rest It is rotated by 90 ° to install again after cut-off waterpipe jointing 1-11 and installs filter plate 1-2, cold shower water is directly entered down through three filterings of floor drain Water channel, vice versa.
Above-mentioned embodiment is only one of case of the present utility model, it is impossible to limit its protection domain, technology with this Any unsubstantiality change that personnel in neighborhood are done on idea basis of the present utility model belongs to the utility model guarantor Protect scope.

Claims (8)

1. a kind of heating installation of utilization bathroom shower water waste heat, it is characterised in that including being arranged among ground heating type laying layer Three filter T-joint floor drains (1) and water pipe (2), three filter T-joint floor drain (1) exit connecting water pipes (2), water pipe (2) laying layer Groove Zhong You centers are outwardly around setting, and tube side arrangement on a declining curve, water pipe (2) end connection manual flow from inside to outside Regulating valve (7) arrival end, hand flow regulating valve (7) port of export connection sewer connecting pipe (8).
2. the heating installation of bathroom shower water waste heat is utilized as claimed in claim 1, it is characterised in that three described filter threeways Floor drain (1) includes being provided with knitting filter screen pocket (1-5) in the floor drain housing (1-1) provided with accommodating chamber, accommodating chamber, is knitted filter screen pocket (1-5) is also connected with the runing rest (1-4) set up at accommodating chamber opening, is further respectively had at floor drain housing (1-1) opening Parallel upper filter plate (1-2) and lower filter plate (1-3).
3. the heating installation of bathroom shower water waste heat is utilized as claimed in claim 2, it is characterised in that described floor drain housing (1-1), which is provided with, is used for the waterpipe jointing (1-11) that shower water heats and the in line interface (1-12) directly excluded, in two outlets Heart axis is located normal on the section of casing center axis and angle is θ, 45 °≤θ≤90 °;
Described runing rest (1-4) upper surface is provided with knitting filter screen pocket fixing device (1-41) and rotates projection (1-43), under Surface is provided with rotation spacer (1-42), and rotation spacer (1-42) surface and housing (1-1) inwall are tangent, by rotating projection (1-43) drives rotation spacer (1-42) to rotate back and forth the connection for realizing waterpipe jointing (1-11) or in line interface (1-12).
4. the heating installation of bathroom shower water waste heat is utilized as claimed in claim 2, it is characterised in that described lower filter plate (1-3) sets the through hole being engaged with knitting filter screen pocket fixing device (1-41) and rotation projection (1-43), lower filter plate (1-3) Size matches with accommodating chamber opening, and size and floor drain housing (1-1) opening of upper filter plate (1-2) match;Floor drain housing (1- 1) sealing ring (1-6) that layer is additionally provided with encapsulation is laid with ground heating type.
5. the heating installation of bathroom shower water waste heat is utilized as claimed in claim 1, it is characterised in that described ground heating type paving If layer at least includes heat-insulation layer (3), protection film layer (4), the special brick layer of floor heating (5) and fixed keelson (6), from the bottom up successively For heat-insulation layer (3), protection film layer (4), the special brick layer of floor heating (5), fixed keelson (6) heat-insulation layer (3) and is consolidated through therebetween Determine keelson (6) and leave the groove for being used for accommodating water pipe (2), water pipe (2) is placed under protection film layer (4).
6. the heating installation of bathroom shower water waste heat is utilized as claimed in claim 1, it is characterised in that described water pipe (2) For non-metallic material pipeline, water pipe (2) top is located at center and be connected with three filter T-joint floor drains (1) outlets, circular spacing with The number of turns should lay layer size according to ground heating type and determine, end connection hand flow regulating valve (7) entrance.
7. the heating installation of bathroom shower water waste heat is utilized as claimed in claim 1, it is characterised in that described manual flow Regulating valve (7) is manually adjustable non-switch valve, and its outlet is connected with sewer connecting pipe (8), can be used according to shower Water and shower room temperature adjust the shower water velocity of discharge manually.
8. the heating installation of the utilization bathroom shower water waste heat as described in claim 1 or 7, it is characterised in that performing heating When, shower water enters oral siphon (2) by three filter T-joint floor drains (1), the heating laying layer in by water pipe tube side, then through receiving and distributing Dynamic flow control valve (7) and sewer connecting pipe (8) discharge;Shower water is directly arranged through sewer connecting pipe when being not required to heating Enter sewer.
CN201621204212.2U 2016-11-08 2016-11-08 A kind of heating installation of utilization bathroom shower water waste heat Expired - Fee Related CN206449717U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621204212.2U CN206449717U (en) 2016-11-08 2016-11-08 A kind of heating installation of utilization bathroom shower water waste heat

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621204212.2U CN206449717U (en) 2016-11-08 2016-11-08 A kind of heating installation of utilization bathroom shower water waste heat

Publications (1)

Publication Number Publication Date
CN206449717U true CN206449717U (en) 2017-08-29

Family

ID=59662603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621204212.2U Expired - Fee Related CN206449717U (en) 2016-11-08 2016-11-08 A kind of heating installation of utilization bathroom shower water waste heat

Country Status (1)

Country Link
CN (1) CN206449717U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110644653A (en) * 2019-09-02 2020-01-03 合肥高丽今生实业有限公司 Connecting piece for integral bathroom wallboard and integral bathroom mechanism
CN113605627A (en) * 2021-07-01 2021-11-05 李小龙 Antistatic PVC plastic floor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110644653A (en) * 2019-09-02 2020-01-03 合肥高丽今生实业有限公司 Connecting piece for integral bathroom wallboard and integral bathroom mechanism
CN110644653B (en) * 2019-09-02 2021-07-06 合肥高丽今生实业有限公司 Connecting piece for integral bathroom wallboard and integral bathroom mechanism
CN113605627A (en) * 2021-07-01 2021-11-05 李小龙 Antistatic PVC plastic floor

Similar Documents

Publication Publication Date Title
CN105708373B (en) A kind of Multifunctional shower bath equipment and shower method
CN206449717U (en) A kind of heating installation of utilization bathroom shower water waste heat
CN104235934B (en) Lower heating multifunctional belt water system super bath
CN108332335A (en) A kind of intelligence is without pipeline New-air purifying system
CN106731345A (en) The dust-removing method and equipment therefor in a kind of construction site
CN203898148U (en) Bathtub with automatic flushing function
CN104279351A (en) Cold and hot tap water purifier and cold and hot water purifying system
CN207741206U (en) A kind of air purifier
CN207538652U (en) Energy-saving water curtain exterior window
CN201809811U (en) Water collecting recovery type temperature-control and water-saving system
CN103174198A (en) Domestic appliance
CN206626208U (en) A kind of bathroom embedded box
CN105221811A (en) Row's cold water glove tap and application thereof
CN204730449U (en) A kind of energy-saving water heater
CN204001077U (en) A kind of hot and cold water separator for Waste Heat Recovery
CN205173637U (en) Arrange cold water and put thing tap
CN103174199A (en) Domestic appliance
CN207081128U (en) A kind of city sand and dust haze protection system
CN105465882A (en) Heating water pipe structure connected with smoke exhauster
CN205978609U (en) Prevent overheated bathtub tap
CN201502194U (en) Water circulating swimming pool
CN201137723Y (en) Combined water tap
CN202969460U (en) Geothermal water semi-open type pipe net delivery system
CN208266976U (en) A kind of device for realizing the cooling of daylighting glass roof Zhongting using rain water on roof
CN206120168U (en) Electric power shower bath

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170829

Termination date: 20181108