CN206428743U - River course green ecological desilting processing system - Google Patents

River course green ecological desilting processing system Download PDF

Info

Publication number
CN206428743U
CN206428743U CN201621433522.1U CN201621433522U CN206428743U CN 206428743 U CN206428743 U CN 206428743U CN 201621433522 U CN201621433522 U CN 201621433522U CN 206428743 U CN206428743 U CN 206428743U
Authority
CN
China
Prior art keywords
mud
river course
processing system
green ecological
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621433522.1U
Other languages
Chinese (zh)
Inventor
潘龙
张瑞斌
马振杰
王永君
史明
黄玉莹
赵旭明
黄峥嵘
周乃
祖白玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Longteng Engineering Tsukito Design Inc
Original Assignee
Jiangsu Longteng Engineering Tsukito Design Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Longteng Engineering Tsukito Design Inc filed Critical Jiangsu Longteng Engineering Tsukito Design Inc
Priority to CN201621433522.1U priority Critical patent/CN206428743U/en
Application granted granted Critical
Publication of CN206428743U publication Critical patent/CN206428743U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model discloses a kind of river course green ecological desilting processing system, the system includes environment-friendly type cutter suction dredger, mud conveying pipeline, high-speed stirring apparatus and drying bed, environment-friendly type cutter suction dredger is provided with Accrete clearing device, spoil hopper and slush pump, the bottom of Accrete clearing device is provided with environmental protection cutters head, and environmental protection cutters head is used to cut with scissors silt dredging mud;Spoil hopper, for storing mud;Slush pump is used to by mud conveying pipeline pump to mud in high-speed stirring apparatus;High-speed stirring apparatus, are connected with mud conveying pipeline, for mud to be stirred with the high-performance hydrophobizers SHJ, the high polymer coagulant XNJ that put into it;Drying bed includes mud preliminary sedimentation tank, technical recipe pond, mud-water separation solidification facility, tail water processing pond and entrucking place.The river course green ecological desilting processing system that the utility model is provided, it is possible to increase mud clearance, it is to avoid the secondary pollution to environment, can provide technological borrowing for the desilting in big or middle and small-sized river course.

Description

River course green ecological desilting processing system
Technical field:
The utility model is related to river regulation field, relates generally to a kind of river course green ecological desilting processing system.
Background technology:
With expanding economy, requirement of the people to environment also more and more higher, river regulation turns into hot topic instantly.Bed mud Dredging is the common method of river regulation, at present conventional desilting mode grab type, commonly strand suction, bucket wheel formula, and usual way is general Store-through is low in silt displacement rate, and desilting is not thorough enough, the shortcomings of easily causing secondary pollution.
For river training water quality, universal desilting, the Suzhou River in Shanghai, the Nanjing Qinhuaihe River have been carried out to urban waterway more Desilting engineering is all generally implemented Deng city river.For lake, the environment-protective desilting engineering of city river can be somewhat thick Put, because the characteristics of river course mobility in itself and exchange, the requirement of the precision and prevention of secondary pollution of construction does not all have Lake is sensitive.Current environment-protective desilting engineering generally employs the pattern of stockyard stacking in terms of the processing of mud, what desilting was produced Mud is introduced into stockyard storage, and land decontaminating is carried out after precipitation or processing utilization is carried out.And for middle river channel and How the desilting engineering in rural area river course should be implemented on earth, and using which type of machines for mud clearage and technique, clearing out the mud come should How this is handled, and there is no one to compare specification at present or generally acknowledged method.
Utility model content:
The utility model aims to solve the problem that above mentioned problem, and there is provided a kind of river course green ecological desilting processing system.
To reach above-mentioned purpose, the technical scheme that the utility model is used is as follows:
A kind of river course green ecological desilting processing system, including environment-friendly type cutter suction dredger, mud conveying pipeline, high-speed stirred Device and drying bed, wherein:
The environment-friendly type cutter suction dredger is provided with Accrete clearing device, spoil hopper and slush pump, wherein:
The Accrete clearing device, is arranged on one end of dredger, and its bottom is provided with environmental protection cutters head;The environmental protection cutters Head, for cutting with scissors silt dredging mud, and is configured to the trend for preventing that mud from leaking and spreading;
The spoil hopper, for storing the mud that Accrete clearing device hinge is inhaled;
Mud inlet and mud mouth are provided with the slush pump, mud inlet is connected with the spoil hopper, mud mouth with it is described defeated Mud pipeline is connected, and slush pump is used to the mud stored in spoil hopper being delivered directly in high-speed stirring apparatus by mud conveying pipeline;
The mud conveying pipeline is formed by the flexible connection of several water float bowls;
The high-speed stirring apparatus, are connected with mud conveying pipeline, for by mud with input high-performance hydrophobizers SHJ, High polymer coagulant XNJ stirs;
The drying bed includes mud preliminary sedimentation tank, technical recipe pond, mud-water separation solidification facility, tail water processing pond and entrucking Place, wherein:
The mud preliminary sedimentation tank, with the high-speed stirring apparatus by pipeline communication, for by silt deposit;
The technical recipe pond, is connected with mud preliminary sedimentation tank;
The mud-water separation solidifies facility, is connected with technical recipe pond, for separating, and being set the mud in mud, water Being set to has the trend of mud fast dewatering desiccation;
The tail water processing pond, is connected with mud-water separation solidification facility, for mud-water separation solidification facility to be separated Water handled.
In further embodiment, the environment-friendly type cutter suction dredger is additionally provided with elevation control system, high process control System is electrically connected with the Accrete clearing device, the excavating depth of the environmental protection cutters head for controlling Accrete clearing device.
In further embodiment, the river course green ecological desilting processing system is additionally provided with dredger monitoring system, The monitoring system includes the GPS locator being arranged on the environmental protection cutters head of environment-friendly type cutter suction dredger and is arranged on ground On monitoring device, for for surface personnel observe environmental protection cutters head mining track.
In further embodiment, the high-speed stirring apparatus include serial communication between 2 agitators, 2 agitators.
In further embodiment, corresponding medicine delivery device, medicine are provided with above each agitator Product delivery device respectively puts into high-performance hydrophobizers SHJ, high polymer coagulant XNJ in corresponding agitator.
In further embodiment, muddy water overfall is additionally provided with above the mud preliminary sedimentation tank of the drying bed, for inciting somebody to action The muddy water on upper strata overflows after preliminary sedimentation.
In further embodiment, water-supply-pipe is additionally provided between the mud preliminary sedimentation tank and tail water processing pond of the drying bed Road, described aqueduct one end is connected with the muddy water overfall of mud preliminary sedimentation tank, and the other end is connected with tail water processing pond.
In further embodiment, the diameter of the aqueduct is at least 10cm.
In further embodiment, the material of the aqueduct is spheroidal graphite cast-iron.
In further embodiment, the entrance top of the tail water processing pond of the drying bed is additionally provided with medicine and delivers dress Put, put into the medicine needed for tail water processing in tail water processing pond by the medicine delivery device.
The river course green ecological desilting processing system that the utility model is provided, it is possible to increase mud clearance, it is to avoid river Occupancy of the road mud to urban land and the secondary pollution to urban environment, can provide skill for the desilting in big or middle and small-sized river course Art is used for reference.
Brief description of the drawings
Constitute a part of accompanying drawing of the present utility model to be used for providing further understanding to of the present utility model, this practicality is new The schematic description and description of type is used to explain the utility model, does not constitute and limits of the present utility model.In accompanying drawing In:
Fig. 1 illustrates for the overall structure of the river course green ecological desilting processing system of the one of embodiment of the utility model Figure.
Fig. 2 is the structural representation of the anhydration system of the river course green ecological desilting of the one of embodiment of the utility model Figure.
Embodiment
In order to know more about technology contents of the present utility model, especially exemplified by specific embodiment and coordinate above-mentioned institute's accompanying drawings explanation such as Under.
As shown in Figure 1 with Figure 2, the river course green ecological desilting processing system includes environment-friendly type cutter suction dredger 1, defeated Mud pipeline 2, high-speed stirring apparatus 3 and drying bed 4.
Environment-friendly type cutter suction dredger 1 is provided with Accrete clearing device, spoil hopper and slush pump, and Accrete clearing device is arranged on dredger One end, its bottom is provided with environmental protection cutters head;Environmental protection cutters head, for cutting with scissors silt dredging mud, and is configured to have and prevents mud Leakage and the trend of diffusion;Spoil hopper, for storing the mud that Accrete clearing device hinge is inhaled;Mud inlet and mud extraction are provided with slush pump Mouthful, mud inlet is connected with spoil hopper, and mud mouth is connected with mud conveying pipeline 2, and slush pump is defeated for the mud stored in spoil hopper to be passed through Mud pipeline 2 is delivered directly in high-speed stirring apparatus 3.
Mud conveying pipeline 2 is formed by the flexible connection of several water float bowls.
High-speed stirring apparatus 3, are connected with mud conveying pipeline 2, for the high-performance hydrophobizers SHJ by mud with input, height Molecular flocculant XNJ stirs.
Drying bed 4 includes mud preliminary sedimentation tank 401, technical recipe pond 402, mud-water separation solidification facility 403, tail water processing pond 404 and entrucking place 405, mud preliminary sedimentation tank 401, with high-speed stirring apparatus 3 by pipeline communication, for by silt deposit;Work Skill is formulated pond 402, is connected with mud preliminary sedimentation tank 401;Mud-water separation solidifies facility 403, connects, is used for technical recipe pond 402 Mud in mud, water are separated, and are configured to have the trend of mud fast dewatering desiccation;Tail water processing pond 404, with muddy water Separation solidification facility 403 is connected, and the water for mud-water separation solidification facility 403 to be separated is handled.
In this way, the environmental protection cutters head of environment-friendly type cutter suction dredger 1, which is twisted, inhales bed-silt, mud is stored into environment-friendly type and twists suction In the spoil hopper of formula dredger 1;The mud stored in spoil hopper is delivered directly to high-speed stirring apparatus by slush pump by mud conveying pipeline 2 In 3;High-performance hydrophobizers SHJ, high polymer coagulant XNJ are put into high-speed stirring apparatus 3, high-speed stirring apparatus 3 will become silted up Mud, high-performance hydrophobizers SHJ and high polymer coagulant XNJ are stirred vigorously with up to uniform;The mud stirred passes through Pipeline is into the mud preliminary sedimentation tank 401 of drying bed 4, and mud is carried out after preliminary sedimentation, and the water on upper strata is flowed into tail water processing In pond 404, clear water also river after treatment;And the mud precipitated is pipelined to technical recipe pond 402, input is steady Determine agent into technical recipe pond 402 that mud is stable, mud-water separation solidification facility 403 quickly does the sludge dewatering after stabilization Change, the dry mud after dehydration, which is transported away, realizes recycling, and the water separated is transported in tail water processing pond 404, tail water Processing pond 404 is carried out after tail water processing, clear water also river.
In some preferred embodiments, environment-friendly type cutter suction dredger 1 is additionally provided with elevation control system, high process control System is electrically connected with Accrete clearing device, the excavating depth of the environmental protection cutters head for controlling Accrete clearing device.In this way, accurately controlling reamer Depth, excavates precision high.
In some preferred embodiments, river course green ecological desilting processing system is additionally provided with dredger monitoring system, Monitoring system includes the GPS locator being arranged on the environmental protection cutters head of environment-friendly type cutter suction dredger 1 and set on the ground Monitoring device, for for surface personnel observe environmental protection cutters head mining track.In this way, surface personnel can be real When grasp the track of dredging of environment-friendly type cutter suction dredger 1.
In some preferred embodiments, high-speed stirring apparatus 3 include the company of series connection between 2 agitators, 2 agitators It is logical;Corresponding medicine delivery device is provided with above each agitator, medicine delivery device is hydrophobic by high-performance respectively Agent SHJ, high polymer coagulant XNJ are put into corresponding agitator.In this way, making mud rapid aggregation formation particle Shape, to ensure follow-up sludge dewatering efficiency.
Preferably, the top of mud preliminary sedimentation tank 401 of drying bed 4 is additionally provided with muddy water overfall, for by after preliminary sedimentation The muddy water on upper strata overflows.
Preferably, aqueduct, water delivery are additionally provided between the mud preliminary sedimentation tank 401 and tail water processing pond 404 of drying bed Pipeline one end is connected with the muddy water overfall of mud preliminary sedimentation tank 401, and the other end is connected with tail water processing pond 404.In this way, at the beginning of mud The heavy muddy water of pond 401 is flowed directly into tail water processing pond 404 after muddy water overfall spilling.
Preferably, to ensure that conveying muddy water is unimpeded, the diameter of aqueduct is at least 10cm.In the present embodiment, water delivery A diameter of 15cm of pipeline.
Preferably, it is the service life of guarantee aqueduct, the material of aqueduct is spheroidal graphite cast-iron.
In certain embodiments, the entrance top of the tail water processing pond 404 of drying bed 4 is additionally provided with medicine delivery device, The medicine needed for tail water processing is put into tail water processing pond 404 by the medicine delivery device.
Compared with prior art, the river course green ecological desilting processing system that the utility model is provided, changes system in section Do not limited during construction by natural conditions, without dead angle during desilting, be easy to thoroughly remove Polluted Soil source, eliminate secondary pollution;It is right Local environment influence is smaller;Smaller land area, energy consumption and cost are taken when efficiency high, operation relatively low, using limited soil Ground resource implements construction;In course of conveying, Pipeline transport will not make soil be scattered to cause secondary pollution, and especially polluted bed mud leads to Cross the quick anhydration system of bed mud after treatment, water quality discharge can reach V class water quality standard;Mud after the completion of dredging is through overdrying Landscape soil can be used as after change.
Although the utility model is disclosed above with preferred embodiment, so it is not limited to the utility model.This reality New those of ordinary skill in the art is used, is not being departed from spirit and scope of the present utility model, it is each when that can make The change and retouching planted.Therefore, protection domain of the present utility model is worked as and is defined depending on those as defined in claim.

Claims (10)

1. a kind of river course green ecological desilting processing system, it is characterised in that including environment-friendly type cutter suction dredger, dredging tube Road, high-speed stirring apparatus and drying bed, wherein:
The environment-friendly type cutter suction dredger is provided with Accrete clearing device, spoil hopper and slush pump, wherein:
The Accrete clearing device, is arranged on one end of dredger, and its bottom is provided with environmental protection cutters head;The environmental protection cutters head, is used In hinge silt dredging mud, and it is configured to the trend for preventing that mud from leaking and spreading;
The spoil hopper, for storing the mud that Accrete clearing device hinge is inhaled;
Mud inlet and mud mouth are provided with the slush pump, mud inlet is connected with the spoil hopper, mud mouth and the dredging tube Road is connected, and slush pump is used to the mud stored in spoil hopper being delivered directly in high-speed stirring apparatus by mud conveying pipeline;
The mud conveying pipeline is formed by the flexible connection of several water float bowls;
The high-speed stirring apparatus, are connected with mud conveying pipeline, for the high-performance hydrophobizers SHJ by mud with input, high score Sub- flocculant XNJ stirs;
The drying bed includes mud preliminary sedimentation tank, technical recipe pond, mud-water separation solidification facility, tail water processing pond and brow Ground, wherein:
The mud preliminary sedimentation tank, with the high-speed stirring apparatus by pipeline communication, for by silt deposit;
The technical recipe pond, is connected with mud preliminary sedimentation tank;
The mud-water separation solidifies facility, is connected with technical recipe pond, for separating, and being configured to the mud in mud, water With by the trend of mud fast dewatering desiccation;
The tail water processing pond, is connected with mud-water separation solidification facility, for mud-water separation to be solidified into the water that facility is separated Handled.
2. green ecological desilting processing system in river course according to claim 1, it is characterised in that the environment-friendly type twists suction Dredger is additionally provided with elevation control system, and elevation control system is electrically connected with the Accrete clearing device, for controlling Accrete clearing device Environmental protection cutters head excavating depth.
3. green ecological desilting processing system in river course according to claim 1, it is characterised in that the river course green ecological Desilting processing system is additionally provided with dredger monitoring system, and the monitoring system includes being arranged on environment-friendly type cutter suction dredger The monitoring device of GPS locator and setting on the ground on environmental protection cutters head, for being twisted for surface personnel's observation environmental protection The mining track of cutter head.
4. green ecological desilting processing system in river course according to claim 1, it is characterised in that the high-speed stirring apparatus Including 2 agitators, serial communication between 2 agitators.
5. green ecological desilting processing system in river course according to claim 4, it is characterised in that on each agitator Side is provided with corresponding medicine delivery device, and medicine delivery device respectively wads a quilt with cotton high-performance hydrophobizers SHJ, macromolecule Solidifying agent XNJ is put into corresponding agitator.
6. green ecological desilting processing system in river course according to claim 1, it is characterised in that the mud of the drying bed Muddy water overfall is additionally provided with above preliminary sedimentation tank, for the muddy water on upper strata after preliminary sedimentation to be overflowed.
7. green ecological desilting processing system in river course according to claim 6, it is characterised in that the mud of the drying bed Aqueduct is additionally provided between preliminary sedimentation tank and tail water processing pond, described aqueduct one end and the muddy water of mud preliminary sedimentation tank overflow Mouth connection, the other end is connected with tail water processing pond.
8. green ecological desilting processing system in river course according to claim 7, it is characterised in that the aqueduct it is straight Footpath is at least 10cm.
9. green ecological desilting processing system in river course according to claim 8, it is characterised in that the material of the aqueduct Expect for spheroidal graphite cast-iron.
10. green ecological desilting processing system in river course according to claim 1, it is characterised in that the tail of the drying bed The entrance top of water treating pond is additionally provided with medicine delivery device, the medicine needed for tail water is handled by the medicine delivery device Put into tail water processing pond.
CN201621433522.1U 2016-12-26 2016-12-26 River course green ecological desilting processing system Active CN206428743U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621433522.1U CN206428743U (en) 2016-12-26 2016-12-26 River course green ecological desilting processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621433522.1U CN206428743U (en) 2016-12-26 2016-12-26 River course green ecological desilting processing system

Publications (1)

Publication Number Publication Date
CN206428743U true CN206428743U (en) 2017-08-22

Family

ID=59587549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621433522.1U Active CN206428743U (en) 2016-12-26 2016-12-26 River course green ecological desilting processing system

Country Status (1)

Country Link
CN (1) CN206428743U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759602A (en) * 2016-12-26 2017-05-31 江苏龙腾工程设计股份有限公司 River course green ecological desilting processing system and its processing method
CN108775040A (en) * 2018-07-24 2018-11-09 上海市水利工程设计研究院有限公司 A kind of dystrophication bed mud blows storage transportation system
CN111335383A (en) * 2020-04-03 2020-06-26 广州市璞境生态保护技术有限公司 Black and odorous water body dredging system and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759602A (en) * 2016-12-26 2017-05-31 江苏龙腾工程设计股份有限公司 River course green ecological desilting processing system and its processing method
CN108775040A (en) * 2018-07-24 2018-11-09 上海市水利工程设计研究院有限公司 A kind of dystrophication bed mud blows storage transportation system
CN108775040B (en) * 2018-07-24 2024-03-19 上海市水利工程设计研究院有限公司 River and lake polluted bottom mud blowing and warehousing transportation system
CN111335383A (en) * 2020-04-03 2020-06-26 广州市璞境生态保护技术有限公司 Black and odorous water body dredging system and method

Similar Documents

Publication Publication Date Title
CN106759602A (en) River course green ecological desilting processing system and its processing method
CN109467296A (en) Sludge treatment technique
CN103334469B (en) The treatment system removed for inner city pollution of river bed mud and treatment process
CN206428743U (en) River course green ecological desilting processing system
CN104291543B (en) Well drilling waste mud does not land innocuity disposal system and treatment process thereof
CN208717124U (en) Dredging and sludge treatment system
CN105731758A (en) Sea dredged silt dewatering and solidifying treatment integrated device and method
CN204111563U (en) Vehicular waste mud of drilling well by harmless treatment unit
CN109496481B (en) Closed tailing pond reclamation system and method
CN102312416B (en) Dredger fill sludge dewatering and solidification method
CN105002884B (en) A kind of river silt from the bottom of lake first solidifies the method excavated afterwards
CN106186636A (en) A kind of water silt cleaning and harmless treatment and disposal system
CN107443572A (en) A kind of mud pit configuration application method for meeting two slurry shield machines and constructing simultaneously
CN203462506U (en) Desilting and dewatering equipment for riverway
CN203498891U (en) Treatment system for removing polluted bed mud in river channel of central urban area
CN114351653B (en) Coastal hydraulic filling foundation and salt removing method thereof
JP6006762B2 (en) Classifier pump for dredging and dredging system
CN201746439U (en) Rapid dehydrating system for pumping sludge
CN208884610U (en) A kind of dystrophication bed mud blows storage transportation system
CN204644106U (en) Dredging markets dehydrating and curing integrated device
CN106884451A (en) Ecological dredging and synchronous sludge dewatering integrated construction technique
CN110028222A (en) A kind of construction slurry solidification processing method
CN208152125U (en) Amphibious type desilting platform
CN216550093U (en) Intelligent city desilting curing system
CN110002717A (en) The resource utilization method of mud in discarded pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant