CN206421738U - A kind of central air-conditioning actual training device - Google Patents
A kind of central air-conditioning actual training device Download PDFInfo
- Publication number
- CN206421738U CN206421738U CN201621010664.7U CN201621010664U CN206421738U CN 206421738 U CN206421738 U CN 206421738U CN 201621010664 U CN201621010664 U CN 201621010664U CN 206421738 U CN206421738 U CN 206421738U
- Authority
- CN
- China
- Prior art keywords
- air
- conditioning
- pipeline section
- central air
- simulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Air Conditioning Control Device (AREA)
Abstract
The utility model discloses a kind of central air-conditioning actual training device, operation for the cold formula central air-conditioning of simulation water, the device top view is L-shaped, cooling tower is provided with the galianconism of described L shape, air-conditioning electric control box, water supply tank, heating boiler, air conditioner cold water unit and water pump, the long-armed place of described L shape is provided with the first simulation room, second simulation room, air-supply pipeline section and air draft pipeline section, compared with prior art, the utility model compact conformation, it is rationally distributed, real training of the intelligent building specialty in terms of central air-conditioning can effectively be solved, the problem of subject study and enterprise lack the actual training device of comprehensive closing to reality application to central air conditioning managing relevant employee training.
Description
Technical field
The utility model belongs to teaching and training actual training device field, more particularly to be a kind of central air-conditioning real training dress
Put.
Background technology
Air-conditioning system is the important component of modern architecture, and the main monitored object for being building control automated system is also to build
Build one of the management content of intellectualizing system mainly.Air-conditioning system is the important component of modern architecture, is building control automation
The main monitored object of system is also one of the management content of building intelligent system mainly.Air-conditioning system is mainly air themperature
Regulation.By air conditioner facility, summer will simulate room temperature control and 16-20 DEG C is maintained at 25-27 DEG C, winter there is provided stable
Comfortable temperature environment.
With the continuous improvement of people's living standards, the continuous expansion of the area of residence, household central air conditioning system is in technology
Aspect has been achieved with breakthrough, and home-use central air-conditioning has the advantages that energy-conserving and environment-protective, practicality, high cooling efficiency, near several
Year popularization is very fast, receives praises from customers.
Household central air conditioner is commonly referred to as residential central air-, and residential central air- structure is more complicated, to installation requirement
It is higher, and because residential central air- can all have multiple end-equipments, and it is bulky, have seven points of three sub-prime amount and it is installed
Say, this has great inconvenience to installation and debugging, therefore seems particularly significant to installation and maintenance and the training of air-conditioning principle.
Existing central air-conditioning actual training device is typically all in compact framework plus the sensor of some simulations is right
Carry out analog demenstration on the touchscreen afterwards, or even be directly added into Domestic hanging air-conditioning to realize cooling or heating effect, it is this kind of
The defect of central air-conditioning actual training device is core in no central air-conditioning, such as water chiller, air-cooled unit, cooling tower,
Such design can not allow student's ratio compared with the overall structure for getting information about central air conditioner system.
Utility model content
It is of the present utility model in view of the above-mentioned problems of the prior art, provide a kind of central air-conditioning actual training device, can
Effective real training, subject study and the enterprise for solving intelligent building specialty in terms of central air-conditioning is related to central air conditioning managing
The problem of staffs training lacks the actual training device of comprehensive closing to reality application.
In order to solve the above technical problems, the utility model is achieved through the following technical solutions:A kind of central air-conditioning real training
Device, for the operation of the cold formula central air-conditioning of simulation water, the device top view is L-shaped, is set at the galianconism of described L shape
Have cooling tower, air-conditioning electric control box, water supply tank, heating boiler, air conditioner cold water unit and a water pump, described L shape it is long-armed
Room, air-supply pipeline section and air draft pipeline section are simulated provided with the first simulation room, second by place,
Described cooling tower is arranged on the end of the device, and described air-conditioning electric control box is by a staging erection and adjacent
Described water pump, waterpipe, heating boiler and cooling-water machine is set below described cooling tower, described air-conditioning electric control box
Group, the back of described air-conditioning electric control box sets described water supply tank.
Described air-supply pipeline section and air draft pipeline section is set up by support, described first simulation room, the second simulation room,
Air-supply pipeline section and air draft pipeline section set gradually to form the long-armed of L shape, and the first described simulation room and described air-conditioning are electric
The right angle of control cabinet formation L shape.
Described air-conditioning electrical control case includes heavy-current control unit and vulnerabilities scan unit, described heavy-current control unit
Including air switch, power switch, power supply indicator and forceful electric power signal terminal row, described vulnerabilities scan unit includes mutually interconnecting
The DDC controllers and weak electric signal terminal block connect.
TEMP is mounted in described the first simulation room, the second simulation room, air-supply pipeline section and air draft pipeline section
Device, humidity sensor and CO2Air-supply rectifying cover, dirt filtrating screen, filter are additionally provided with sensor, described air-supply pipeline section and air draft pipeline section
Dirt net pressure difference switch, fan valve executor, blower fan, surface cooler.
The device also includes DDC peripheral control systems and the host computer being connected with each other, described DDC peripheral control systems with
Described DDC controllers and the connection of weak electric signal terminal block.
Clear glass sight is equipped with described the first simulation room, the second simulation room, air-supply pipeline section and air draft pipeline section
Examine window.
Compared with prior art, the utility model compact conformation, it is rationally distributed, occupy little space, can effectively solve
Real training, subject study and enterprise of the intelligent building specialty in terms of central air-conditioning lack to central air conditioning managing relevant employee training
The problem of actual training device of weary comprehensive closing to reality application;Using the sensor as building site and corresponding refrigeration,
Heating, allows student to understand central air conditioner system overall structure, the operation principle of each part, improves student's knowwhy with moving
Hand ability.
Brief description of the drawings
Fig. 1 is front view structure figure of the present utility model.
Fig. 2 is left view structure chart of the present utility model.
Fig. 3 is of the present utility model right regarding structure chart.
In figure, 1-cooling tower, 2-the first simulation room, 3-the second simulation room, 4-air draft pipeline section, 5-support,
6-air-supply pipeline section, 7-water pump, 8-clear glass observation window, 9-heating boiler, 10-air-conditioning electric control box, 11-moisturizing
Case, 12-handpiece Water Chilling Units.
Embodiment
Embodiment of the present utility model is elaborated below, the present embodiment using technical solutions of the utility model before
Put and implemented, give detailed embodiment and specific operating process, but protection domain of the present utility model is not limited
In following embodiments.
As shown in Fig. 1-3, a kind of central air-conditioning actual training device, for the operation of the cold formula central air-conditioning of simulation water, the dress
Put that top view is L-shaped, provided with cooling tower 1, air-conditioning electric control box 10, water supply tank 11, heating at the galianconism of described L shape
Room is simulated provided with the first simulation room 2, second in boiler 9, air conditioner cold water unit 12 and water pump 7, the long-armed place of described L shape
3rd, air-supply pipeline section 6 and air draft pipeline section 4,
Described cooling tower 1 is arranged on the end of the device, described air-conditioning electric control box 10 by a staging erection simultaneously
Adjacent described cooling tower 1, the described lower section of air-conditioning electric control box 10 sets described water pump 7, waterpipe, heating boiler 9
And handpiece Water Chilling Units 12, the back of described air-conditioning electric control box 10 sets described water supply tank 11.
Described air-supply pipeline section 6 and air draft pipeline section 4 is set up by support 5, and the first described simulation room 2, second is simulated
Room 3, air-supply pipeline section 6 and air draft pipeline section 4 set gradually to form the long-armed of L shape, described first simulation room 2 with it is described
The right angle of the formation L shape of air-conditioning electric control box 10.
Described air-conditioning electric control box 10 includes heavy-current control unit and vulnerabilities scan unit, described heavy-current control list
Member includes air switch, power switch, power supply indicator and forceful electric power signal terminal row, and described vulnerabilities scan unit includes mutual
The DDC controllers and weak electric signal terminal block of connection.
Temperature is mounted in described the first simulation room 2, second simulation room 3, air-supply pipeline section 6 and air draft pipeline section 4
Sensor, humidity sensor and CO2Air-supply rectifying cover, filter are additionally provided with sensor, described air-supply pipeline section 6 and air draft pipeline section 4
Dirt net, dirt filtrating screen pressure difference switch, fan valve executor, blower fan, surface cooler.
The device also includes DDC peripheral control systems and the host computer being connected with each other, described DDC peripheral control systems with
Described DDC controllers and the connection of weak electric signal terminal block.
Clear glass sight is equipped with described the first simulation room, the second simulation room, air-supply pipeline section and air draft pipeline section
Window 8 is examined, Real Time Observation running situation when being easy to test.
DDC peripheral control systems refer in DDC control systems except the other equipment system of DDC controllers.
Principle of the present utility model as water-cooled central air-conditioning, the connections of all parts also with existing water-cooled
Central air-conditioning is the same,
Whole actual training device profile layer size is 6265mm*3400mm*2000mm, and actual training device global shape is L-type, platform
Frame and support 5 first install a cooling tower 1 by carbon steel spray into, the leftmost side, then toward upper right be air-conditioning electric control box 10, electricity
Gas control cabinet is divided into forceful electric power and weak current part, and strong power part includes air switch, power switch, power supply indicator, forceful electric power terminal
The parts such as row;Weak current part includes DDC controllers and weak electric signal terminal etc..Pacify parallel behind air-conditioning electric control box 10
A replenishing water tank of water is filled, the lower section of air-conditioning electric control box 10 is filled with heating boiler 9 and is filled with air conditioner cold water unit 12, then lower section
Water flow switch, pressure gauge, temperature sensor etc. are installed on water pump 7 and each branch road stainless steel water pipeline, waterpipe.Turn right again according to
Secondary to be filled with the first simulation room 2 and the second simulation room 3, simulation is each fitted with Temperature Humidity Sensor and CO2 sensors in room.
Installed on last carbon steel plastic-spraying support 5 in air-supply pipeline section 6 and air draft pipeline section 4, air-supply pipeline section 6 and air draft pipeline section 4 and humiture is housed
Sensor, CO2 sensors, air-supply rectifying cover, dirt filtrating screen, dirt filtrating screen pressure difference switch, fan valve executor, blower fan, surface cooler etc..Cloth
Office's situation simulates actual water cooling cold type central air conditioner system completely.
When carrying out real training, all parts are connected according to actual water cooling cold type central air conditioner system, then by upper
Position machine sends various types of signal and gives DDC controllers, and the work of whole system is controlled by DDC controllers, meanwhile, host computer receives DDC
The signal of controller output, is easy to experimenter in upper in-flight monitoring.
The utility model compact conformation, it is rationally distributed, intelligent building specialty can be effectively solved in terms of central air-conditioning
Real training, subject study and enterprise lack the real training of comprehensive closing to reality application to central air conditioning managing relevant employee training and fill
The problem of putting;Using the sensor as building site and corresponding Cooling, heating system, student is allowed to understand central air-conditioning
The operation principle of overall system architecture, each part, improves student's knowwhy and manipulative ability.
Obviously, those skilled in the art can be new without departing from this practicality to the various changes of utility model progress and modification
The spirit and scope of type.So, if these modifications and variations of the present utility model belong to the utility model claim and its
Within the scope of equivalent technologies, then the utility model is also intended to comprising including these changes and modification.
Claims (5)
1. a kind of central air-conditioning actual training device, the operation for the cold formula central air-conditioning of simulation water, it is characterised in that the device is bowed
View is L-shaped, and cooling tower, air-conditioning electric control box, water supply tank, heating boiler, air-conditioning are provided with the galianconism of described L shape
Room, air-supply pipeline section and row are simulated provided with the first simulation room, second in handpiece Water Chilling Units and water pump, the long-armed place of described L shape
Airduct section;Described cooling tower is arranged on the end of the device, and described air-conditioning electric control box is by a staging erection and adjacent
Described water pump, waterpipe, heating boiler and cooling-water machine is set below described cooling tower, described air-conditioning electric control box
Group, the back of described air-conditioning electric control box sets described water supply tank;Described air-supply pipeline section and air draft pipeline section passes through branch
Frame is set up, and described the first simulation room, the second simulation room, air-supply pipeline section and air draft pipeline section sets gradually to form L shape
It is long-armed, the first described simulation room and the right angle of the described L-shaped shape of air-conditioning electrical control box-shaped.
2. a kind of central air-conditioning actual training device as claimed in claim 1, it is characterised in that described air-conditioning electrical control case and bag
Heavy-current control unit and vulnerabilities scan unit are included, described heavy-current control unit includes air switch, power switch, power supply instruction
Lamp and forceful electric power signal terminal row, described vulnerabilities scan unit include DDC controllers and the weak electric signal terminal block being connected with each other.
3. a kind of central air-conditioning actual training device as claimed in claim 1, it is characterised in that described the first simulation room, the
Temperature sensor, humidity sensor and CO are mounted in two simulation rooms, air-supply pipeline section and air draft pipeline section2Sensor, it is described
Air-supply pipeline section and air draft pipeline section in be additionally provided with air-supply rectifying cover, dirt filtrating screen, dirt filtrating screen pressure difference switch, fan valve executor, blower fan,
Surface cooler.
4. a kind of central air-conditioning actual training device as claimed in claim 1, it is characterised in that the device also includes what is be connected with each other
DDC peripheral control systems and host computer, described DDC peripheral control systems and described DDC controllers and weak electric signal terminal
Row's connection.
5. a kind of central air-conditioning actual training device as claimed in claim 1, it is characterised in that described the first simulation room, the
Clear glass observation window is equipped with two simulation rooms, air-supply pipeline section and air draft pipeline section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621010664.7U CN206421738U (en) | 2016-08-30 | 2016-08-30 | A kind of central air-conditioning actual training device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621010664.7U CN206421738U (en) | 2016-08-30 | 2016-08-30 | A kind of central air-conditioning actual training device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206421738U true CN206421738U (en) | 2017-08-18 |
Family
ID=59577916
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621010664.7U Active CN206421738U (en) | 2016-08-30 | 2016-08-30 | A kind of central air-conditioning actual training device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206421738U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107204147A (en) * | 2017-06-22 | 2017-09-26 | 星际(重庆)智能装备技术研究院有限公司 | A kind of Fresh air handling units and air-conditioner set demonstration monitoring experiment device based on ARM |
-
2016
- 2016-08-30 CN CN201621010664.7U patent/CN206421738U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107204147A (en) * | 2017-06-22 | 2017-09-26 | 星际(重庆)智能装备技术研究院有限公司 | A kind of Fresh air handling units and air-conditioner set demonstration monitoring experiment device based on ARM |
CN107204147B (en) * | 2017-06-22 | 2019-06-14 | 星际(重庆)智能装备技术研究院有限公司 | A kind of Fresh air handling units and air-conditioner set demonstration monitoring experiment device based on ARM |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Gao et al. | Evaluating the influence of openings configuration on natural ventilation performance of residential units in Hong Kong | |
CN104993399B (en) | A kind of box type switch station | |
Zhang et al. | Flow impact of an air conditioner to portable air cleaning | |
CN108931027A (en) | A kind of visual remote monitoring control maintenance air-conditioning system | |
CN204943795U (en) | A kind of central air conditioner room efficiency optimization system | |
CN206073371U (en) | Subway station air-conditioner temperature kinetic-control system | |
Hamdy et al. | Optimizing hybrid ventilation control strategies toward zero-cooling energy building | |
CN206490955U (en) | Data center machine room system | |
CN105115113A (en) | Energy efficiency optimizing system of central air-conditioner room | |
CN206421738U (en) | A kind of central air-conditioning actual training device | |
CN101350150A (en) | Experimental real-training apparatus for central air-conditioning system | |
CN102194364B (en) | Teaching training table for alternating-current variable-frequency multi-unit air conditioning unit | |
Tadokoro et al. | Smart building technology [TC Spotlight] | |
CN206223233U (en) | A kind of experimental system for simulating for large-scale cabin environment Comfort Evaluation | |
Xu et al. | Effect of an on/off HVAC control on indoor temperature distribution and cycle variability in a single-floor residential building | |
CN103900783A (en) | Scale model test platform for large space airflow distribution | |
CN205920691U (en) | Real examining device that instructs of two accuse formula central air conditioning of panorama | |
Zhang et al. | Multi-indicator adaptive HVAC control system for low-energy indoor air quality management of heritage building preservation | |
CN204557838U (en) | Building automation experience system | |
CN110068444A (en) | A kind of scale model tests platform of Hydropower Station river formula semi-underground power house ventilation model | |
Ding et al. | Design and simulation of an air conditioning project in a hospital based on computational fluid dynamics | |
Qin et al. | Comfort design and optimization of direct expansion multi-connected radiant air conditioning based on 3D flow field simulation | |
CN211084365U (en) | Full-air conditioning system control and simulation test bench | |
CN202929939U (en) | Central air conditioner control system simulation experiment apparatus | |
CN105513454A (en) | Central air-conditioner practical training device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |