CN206421738U - A kind of central air-conditioning actual training device - Google Patents

A kind of central air-conditioning actual training device Download PDF

Info

Publication number
CN206421738U
CN206421738U CN201621010664.7U CN201621010664U CN206421738U CN 206421738 U CN206421738 U CN 206421738U CN 201621010664 U CN201621010664 U CN 201621010664U CN 206421738 U CN206421738 U CN 206421738U
Authority
CN
China
Prior art keywords
air
conditioning
pipeline section
central air
simulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621010664.7U
Other languages
Chinese (zh)
Inventor
王庚
奚弘之
许俊龙
刘正琨
何应坚
杨飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJING SUPCON SCIENTIFIC INSTRUMENT CO Ltd
Original Assignee
ZHEJING SUPCON SCIENTIFIC INSTRUMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJING SUPCON SCIENTIFIC INSTRUMENT CO Ltd filed Critical ZHEJING SUPCON SCIENTIFIC INSTRUMENT CO Ltd
Priority to CN201621010664.7U priority Critical patent/CN206421738U/en
Application granted granted Critical
Publication of CN206421738U publication Critical patent/CN206421738U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The utility model discloses a kind of central air-conditioning actual training device, operation for the cold formula central air-conditioning of simulation water, the device top view is L-shaped, cooling tower is provided with the galianconism of described L shape, air-conditioning electric control box, water supply tank, heating boiler, air conditioner cold water unit and water pump, the long-armed place of described L shape is provided with the first simulation room, second simulation room, air-supply pipeline section and air draft pipeline section, compared with prior art, the utility model compact conformation, it is rationally distributed, real training of the intelligent building specialty in terms of central air-conditioning can effectively be solved, the problem of subject study and enterprise lack the actual training device of comprehensive closing to reality application to central air conditioning managing relevant employee training.

Description

A kind of central air-conditioning actual training device
Technical field
The utility model belongs to teaching and training actual training device field, more particularly to be a kind of central air-conditioning real training dress Put.
Background technology
Air-conditioning system is the important component of modern architecture, and the main monitored object for being building control automated system is also to build Build one of the management content of intellectualizing system mainly.Air-conditioning system is the important component of modern architecture, is building control automation The main monitored object of system is also one of the management content of building intelligent system mainly.Air-conditioning system is mainly air themperature Regulation.By air conditioner facility, summer will simulate room temperature control and 16-20 DEG C is maintained at 25-27 DEG C, winter there is provided stable Comfortable temperature environment.
With the continuous improvement of people's living standards, the continuous expansion of the area of residence, household central air conditioning system is in technology Aspect has been achieved with breakthrough, and home-use central air-conditioning has the advantages that energy-conserving and environment-protective, practicality, high cooling efficiency, near several Year popularization is very fast, receives praises from customers.
Household central air conditioner is commonly referred to as residential central air-, and residential central air- structure is more complicated, to installation requirement It is higher, and because residential central air- can all have multiple end-equipments, and it is bulky, have seven points of three sub-prime amount and it is installed Say, this has great inconvenience to installation and debugging, therefore seems particularly significant to installation and maintenance and the training of air-conditioning principle.
Existing central air-conditioning actual training device is typically all in compact framework plus the sensor of some simulations is right Carry out analog demenstration on the touchscreen afterwards, or even be directly added into Domestic hanging air-conditioning to realize cooling or heating effect, it is this kind of The defect of central air-conditioning actual training device is core in no central air-conditioning, such as water chiller, air-cooled unit, cooling tower, Such design can not allow student's ratio compared with the overall structure for getting information about central air conditioner system.
Utility model content
It is of the present utility model in view of the above-mentioned problems of the prior art, provide a kind of central air-conditioning actual training device, can Effective real training, subject study and the enterprise for solving intelligent building specialty in terms of central air-conditioning is related to central air conditioning managing The problem of staffs training lacks the actual training device of comprehensive closing to reality application.
In order to solve the above technical problems, the utility model is achieved through the following technical solutions:A kind of central air-conditioning real training Device, for the operation of the cold formula central air-conditioning of simulation water, the device top view is L-shaped, is set at the galianconism of described L shape Have cooling tower, air-conditioning electric control box, water supply tank, heating boiler, air conditioner cold water unit and a water pump, described L shape it is long-armed Room, air-supply pipeline section and air draft pipeline section are simulated provided with the first simulation room, second by place,
Described cooling tower is arranged on the end of the device, and described air-conditioning electric control box is by a staging erection and adjacent Described water pump, waterpipe, heating boiler and cooling-water machine is set below described cooling tower, described air-conditioning electric control box Group, the back of described air-conditioning electric control box sets described water supply tank.
Described air-supply pipeline section and air draft pipeline section is set up by support, described first simulation room, the second simulation room, Air-supply pipeline section and air draft pipeline section set gradually to form the long-armed of L shape, and the first described simulation room and described air-conditioning are electric The right angle of control cabinet formation L shape.
Described air-conditioning electrical control case includes heavy-current control unit and vulnerabilities scan unit, described heavy-current control unit Including air switch, power switch, power supply indicator and forceful electric power signal terminal row, described vulnerabilities scan unit includes mutually interconnecting The DDC controllers and weak electric signal terminal block connect.
TEMP is mounted in described the first simulation room, the second simulation room, air-supply pipeline section and air draft pipeline section Device, humidity sensor and CO2Air-supply rectifying cover, dirt filtrating screen, filter are additionally provided with sensor, described air-supply pipeline section and air draft pipeline section Dirt net pressure difference switch, fan valve executor, blower fan, surface cooler.
The device also includes DDC peripheral control systems and the host computer being connected with each other, described DDC peripheral control systems with Described DDC controllers and the connection of weak electric signal terminal block.
Clear glass sight is equipped with described the first simulation room, the second simulation room, air-supply pipeline section and air draft pipeline section Examine window.
Compared with prior art, the utility model compact conformation, it is rationally distributed, occupy little space, can effectively solve Real training, subject study and enterprise of the intelligent building specialty in terms of central air-conditioning lack to central air conditioning managing relevant employee training The problem of actual training device of weary comprehensive closing to reality application;Using the sensor as building site and corresponding refrigeration, Heating, allows student to understand central air conditioner system overall structure, the operation principle of each part, improves student's knowwhy with moving Hand ability.
Brief description of the drawings
Fig. 1 is front view structure figure of the present utility model.
Fig. 2 is left view structure chart of the present utility model.
Fig. 3 is of the present utility model right regarding structure chart.
In figure, 1-cooling tower, 2-the first simulation room, 3-the second simulation room, 4-air draft pipeline section, 5-support, 6-air-supply pipeline section, 7-water pump, 8-clear glass observation window, 9-heating boiler, 10-air-conditioning electric control box, 11-moisturizing Case, 12-handpiece Water Chilling Units.
Embodiment
Embodiment of the present utility model is elaborated below, the present embodiment using technical solutions of the utility model before Put and implemented, give detailed embodiment and specific operating process, but protection domain of the present utility model is not limited In following embodiments.
As shown in Fig. 1-3, a kind of central air-conditioning actual training device, for the operation of the cold formula central air-conditioning of simulation water, the dress Put that top view is L-shaped, provided with cooling tower 1, air-conditioning electric control box 10, water supply tank 11, heating at the galianconism of described L shape Room is simulated provided with the first simulation room 2, second in boiler 9, air conditioner cold water unit 12 and water pump 7, the long-armed place of described L shape 3rd, air-supply pipeline section 6 and air draft pipeline section 4,
Described cooling tower 1 is arranged on the end of the device, described air-conditioning electric control box 10 by a staging erection simultaneously Adjacent described cooling tower 1, the described lower section of air-conditioning electric control box 10 sets described water pump 7, waterpipe, heating boiler 9 And handpiece Water Chilling Units 12, the back of described air-conditioning electric control box 10 sets described water supply tank 11.
Described air-supply pipeline section 6 and air draft pipeline section 4 is set up by support 5, and the first described simulation room 2, second is simulated Room 3, air-supply pipeline section 6 and air draft pipeline section 4 set gradually to form the long-armed of L shape, described first simulation room 2 with it is described The right angle of the formation L shape of air-conditioning electric control box 10.
Described air-conditioning electric control box 10 includes heavy-current control unit and vulnerabilities scan unit, described heavy-current control list Member includes air switch, power switch, power supply indicator and forceful electric power signal terminal row, and described vulnerabilities scan unit includes mutual The DDC controllers and weak electric signal terminal block of connection.
Temperature is mounted in described the first simulation room 2, second simulation room 3, air-supply pipeline section 6 and air draft pipeline section 4 Sensor, humidity sensor and CO2Air-supply rectifying cover, filter are additionally provided with sensor, described air-supply pipeline section 6 and air draft pipeline section 4 Dirt net, dirt filtrating screen pressure difference switch, fan valve executor, blower fan, surface cooler.
The device also includes DDC peripheral control systems and the host computer being connected with each other, described DDC peripheral control systems with Described DDC controllers and the connection of weak electric signal terminal block.
Clear glass sight is equipped with described the first simulation room, the second simulation room, air-supply pipeline section and air draft pipeline section Window 8 is examined, Real Time Observation running situation when being easy to test.
DDC peripheral control systems refer in DDC control systems except the other equipment system of DDC controllers.
Principle of the present utility model as water-cooled central air-conditioning, the connections of all parts also with existing water-cooled Central air-conditioning is the same,
Whole actual training device profile layer size is 6265mm*3400mm*2000mm, and actual training device global shape is L-type, platform Frame and support 5 first install a cooling tower 1 by carbon steel spray into, the leftmost side, then toward upper right be air-conditioning electric control box 10, electricity Gas control cabinet is divided into forceful electric power and weak current part, and strong power part includes air switch, power switch, power supply indicator, forceful electric power terminal The parts such as row;Weak current part includes DDC controllers and weak electric signal terminal etc..Pacify parallel behind air-conditioning electric control box 10 A replenishing water tank of water is filled, the lower section of air-conditioning electric control box 10 is filled with heating boiler 9 and is filled with air conditioner cold water unit 12, then lower section Water flow switch, pressure gauge, temperature sensor etc. are installed on water pump 7 and each branch road stainless steel water pipeline, waterpipe.Turn right again according to Secondary to be filled with the first simulation room 2 and the second simulation room 3, simulation is each fitted with Temperature Humidity Sensor and CO2 sensors in room. Installed on last carbon steel plastic-spraying support 5 in air-supply pipeline section 6 and air draft pipeline section 4, air-supply pipeline section 6 and air draft pipeline section 4 and humiture is housed Sensor, CO2 sensors, air-supply rectifying cover, dirt filtrating screen, dirt filtrating screen pressure difference switch, fan valve executor, blower fan, surface cooler etc..Cloth Office's situation simulates actual water cooling cold type central air conditioner system completely.
When carrying out real training, all parts are connected according to actual water cooling cold type central air conditioner system, then by upper Position machine sends various types of signal and gives DDC controllers, and the work of whole system is controlled by DDC controllers, meanwhile, host computer receives DDC The signal of controller output, is easy to experimenter in upper in-flight monitoring.
The utility model compact conformation, it is rationally distributed, intelligent building specialty can be effectively solved in terms of central air-conditioning Real training, subject study and enterprise lack the real training of comprehensive closing to reality application to central air conditioning managing relevant employee training and fill The problem of putting;Using the sensor as building site and corresponding Cooling, heating system, student is allowed to understand central air-conditioning The operation principle of overall system architecture, each part, improves student's knowwhy and manipulative ability.
Obviously, those skilled in the art can be new without departing from this practicality to the various changes of utility model progress and modification The spirit and scope of type.So, if these modifications and variations of the present utility model belong to the utility model claim and its Within the scope of equivalent technologies, then the utility model is also intended to comprising including these changes and modification.

Claims (5)

1. a kind of central air-conditioning actual training device, the operation for the cold formula central air-conditioning of simulation water, it is characterised in that the device is bowed View is L-shaped, and cooling tower, air-conditioning electric control box, water supply tank, heating boiler, air-conditioning are provided with the galianconism of described L shape Room, air-supply pipeline section and row are simulated provided with the first simulation room, second in handpiece Water Chilling Units and water pump, the long-armed place of described L shape Airduct section;Described cooling tower is arranged on the end of the device, and described air-conditioning electric control box is by a staging erection and adjacent Described water pump, waterpipe, heating boiler and cooling-water machine is set below described cooling tower, described air-conditioning electric control box Group, the back of described air-conditioning electric control box sets described water supply tank;Described air-supply pipeline section and air draft pipeline section passes through branch Frame is set up, and described the first simulation room, the second simulation room, air-supply pipeline section and air draft pipeline section sets gradually to form L shape It is long-armed, the first described simulation room and the right angle of the described L-shaped shape of air-conditioning electrical control box-shaped.
2. a kind of central air-conditioning actual training device as claimed in claim 1, it is characterised in that described air-conditioning electrical control case and bag Heavy-current control unit and vulnerabilities scan unit are included, described heavy-current control unit includes air switch, power switch, power supply instruction Lamp and forceful electric power signal terminal row, described vulnerabilities scan unit include DDC controllers and the weak electric signal terminal block being connected with each other.
3. a kind of central air-conditioning actual training device as claimed in claim 1, it is characterised in that described the first simulation room, the Temperature sensor, humidity sensor and CO are mounted in two simulation rooms, air-supply pipeline section and air draft pipeline section2Sensor, it is described Air-supply pipeline section and air draft pipeline section in be additionally provided with air-supply rectifying cover, dirt filtrating screen, dirt filtrating screen pressure difference switch, fan valve executor, blower fan, Surface cooler.
4. a kind of central air-conditioning actual training device as claimed in claim 1, it is characterised in that the device also includes what is be connected with each other DDC peripheral control systems and host computer, described DDC peripheral control systems and described DDC controllers and weak electric signal terminal Row's connection.
5. a kind of central air-conditioning actual training device as claimed in claim 1, it is characterised in that described the first simulation room, the Clear glass observation window is equipped with two simulation rooms, air-supply pipeline section and air draft pipeline section.
CN201621010664.7U 2016-08-30 2016-08-30 A kind of central air-conditioning actual training device Active CN206421738U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621010664.7U CN206421738U (en) 2016-08-30 2016-08-30 A kind of central air-conditioning actual training device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621010664.7U CN206421738U (en) 2016-08-30 2016-08-30 A kind of central air-conditioning actual training device

Publications (1)

Publication Number Publication Date
CN206421738U true CN206421738U (en) 2017-08-18

Family

ID=59577916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621010664.7U Active CN206421738U (en) 2016-08-30 2016-08-30 A kind of central air-conditioning actual training device

Country Status (1)

Country Link
CN (1) CN206421738U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107204147A (en) * 2017-06-22 2017-09-26 星际(重庆)智能装备技术研究院有限公司 A kind of Fresh air handling units and air-conditioner set demonstration monitoring experiment device based on ARM

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107204147A (en) * 2017-06-22 2017-09-26 星际(重庆)智能装备技术研究院有限公司 A kind of Fresh air handling units and air-conditioner set demonstration monitoring experiment device based on ARM
CN107204147B (en) * 2017-06-22 2019-06-14 星际(重庆)智能装备技术研究院有限公司 A kind of Fresh air handling units and air-conditioner set demonstration monitoring experiment device based on ARM

Similar Documents

Publication Publication Date Title
Gao et al. Evaluating the influence of openings configuration on natural ventilation performance of residential units in Hong Kong
CN104993399B (en) A kind of box type switch station
Zhang et al. Flow impact of an air conditioner to portable air cleaning
CN108931027A (en) A kind of visual remote monitoring control maintenance air-conditioning system
CN204943795U (en) A kind of central air conditioner room efficiency optimization system
CN206073371U (en) Subway station air-conditioner temperature kinetic-control system
Hamdy et al. Optimizing hybrid ventilation control strategies toward zero-cooling energy building
CN206490955U (en) Data center machine room system
CN105115113A (en) Energy efficiency optimizing system of central air-conditioner room
CN206421738U (en) A kind of central air-conditioning actual training device
CN101350150A (en) Experimental real-training apparatus for central air-conditioning system
CN102194364B (en) Teaching training table for alternating-current variable-frequency multi-unit air conditioning unit
Tadokoro et al. Smart building technology [TC Spotlight]
CN206223233U (en) A kind of experimental system for simulating for large-scale cabin environment Comfort Evaluation
Xu et al. Effect of an on/off HVAC control on indoor temperature distribution and cycle variability in a single-floor residential building
CN103900783A (en) Scale model test platform for large space airflow distribution
CN205920691U (en) Real examining device that instructs of two accuse formula central air conditioning of panorama
Zhang et al. Multi-indicator adaptive HVAC control system for low-energy indoor air quality management of heritage building preservation
CN204557838U (en) Building automation experience system
CN110068444A (en) A kind of scale model tests platform of Hydropower Station river formula semi-underground power house ventilation model
Ding et al. Design and simulation of an air conditioning project in a hospital based on computational fluid dynamics
Qin et al. Comfort design and optimization of direct expansion multi-connected radiant air conditioning based on 3D flow field simulation
CN211084365U (en) Full-air conditioning system control and simulation test bench
CN202929939U (en) Central air conditioner control system simulation experiment apparatus
CN105513454A (en) Central air-conditioner practical training device